4.verticalcurve Data KM 47+713.64-KM 58+931.3

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

List of Vertical Data km 47+713.

64-k
Grade PVC
Curve Grade In PVI PI Elevation Type of
out (g2) Length of
No. (g1) (%) Chainage (m) Curve Chainage
(%) Curve (m)
Start 47+713.64 4.68% 2321.472
1 4.68% 47+808.65 6.37% 2325.92 80 Sag 47+768.65
2 6.37% 47+971.55 4.42% 2336.30 80 Crest 47+931.55
3 4.42% 48+262.29 6.00% 2349.16 100 Sag 48+212.29
4 6.00% 48+499.63 10.00% 2363.40 100 Sag 48+449.63
5 10.00% 48+899.63 6.00% 2403.40 80 Crest 48+859.63
6 6.00% 49+049.63 8.99% 2412.40 80 Sag 49+009.63
7 8.99% 49+379.33 5.87% 2442.04 150 Crest 49+304.33
8 5.87% 49+566.44 4.43% 2453.02 100 Crest 49+516.44
9 4.43% 49+838.78 5.76% 2465.08 169.628 Sag 49+753.96
10 5.76% 50+182.65 -2.34% 2484.90 242.36 Crest 50+061.47
11 -2.34% 50+495.05 3.22% 2477.60 110.067 Sag 50+440.02
12 3.22% 50+661.55 -0.53% 2482.96 95 Crest 50+614.05
13 -0.53% 50+831.25 0.53% 2482.07 100 Sag 50+781.25
14 0.53% 51+014.01 3.37% 2483.03 105 Sag 50+961.51
15 3.37% 51+189.72 -5.78% 2488.94 120 Crest 51+129.72
16 -5.78% 51+350.10 0.00% 2479.67 40.603 Sag 51+329.79
17 0.00% 51+432.10 11.83% 2479.67 82.868 Sag 51+390.67
18 11.83% 51+594.63 7.12% 2498.89 65 Crest 51+562.13
19 7.12% 51+683.87 9.96% 2505.25 36 Sag 51+665.87
20 9.96% 51+830.67 0.60% 2519.86 140 Crest 51+760.67
21 0.60% 51+998.66 -1.79% 2520.88 100 Crest 51+948.66
22 -1.79% 52+156.63 -6.72% 2518.04 120 Crest 52+096.63
23 -6.72% 52+476.08 -1.53% 2496.59 110 Sag 52+421.08
24 -1.53% 52+763.62 -11.92% 2492.20 180 Crest 52+673.62
25 -11.92% 53+165.82 0.00% 2444.26 83.567 Sag 53+124.03
26 0.00% 53+269.90 10.56% 2444.26 75.076 Sag 53+232.37
27 10.56% 53+410.83 3.98% 2459.13 85 Crest 53+368.33
28 3.98% 53+688.00 -4.36% 2470.17 270 Crest 53+553.00
29 -4.36% 53+955.33 -5.14% 2458.50 120 Crest 53+895.33
30 -5.14% 54+172.37 -3.66% 2447.35 80 Sag 54+132.37
31 -3.66% 54+350.18 -9.98% 2440.84 110 Crest 54+295.18
32 -9.98% 54+506.52 0.00% 2425.24 80 Sag 54+466.52
33 0.00% 54+636.57 -6.40% 2425.24 80 Crest 54+596.57
34 -6.40% 54+804.02 7.76% 2414.52 120 Sag 54+744.02
35 7.76% 54+998.33 10.00% 2429.59 80 Sag 54+958.33
36 10.00% 55+224.77 4.72% 2452.24 120 Crest 55+164.77
37 4.72% 55+432.01 5.90% 2462.02 100 Sag 55+382.01
38 5.90% 55+722.59 4.98% 2479.16 100 Crest 55+672.59
39 4.98% 55+873.74 6.00% 2486.68 100 Sag 55+823.74
40 6.00% 56+220.56 -7.99% 2507.50 430 Crest 56+005.56
41 -7.99% 56+660.21 -5.15% 2472.36 120 Sag 56+600.21
42 -5.15% 56+872.72 2.11% 2461.41 120 Sag 56+812.72
43 2.11% 57+139.05 -9.98% 2467.02 210 Crest 57+034.05
44 -9.98% 57+536.73 -6.00% 2427.35 110 Sag 57+481.73
45 -6.00% 57+736.73 -10.00% 2415.35 100 Crest 57+686.73
46 -10.00% 58+057.67 0.00% 2383.27 91.045 Sag 58+012.15
47 0.00% 58+189.70 10.00% 2383.27 90.939 Sag 58+144.23
48 10.00% 58+566.83 1.38% 2420.99 151 Crest 58+491.33
End 1.38% 58+931.30 2426.023
Station Equation-4 Back58+931.3 Ahead
l Data km 47+713.64-km 58+931.3
PVC PVT Algebric Terrain Design
K- Value Landuse
Elevation Chainage Elevation Diff (%) Classification Speed(Km/h)

2324.05 47+848.65 2328.47 47.26 1.69% Rolling Urban 50.000


2333.75 48+011.55 2338.07 41.03 1.95% Rolling Urban 50.000
2346.95 48+312.29 2352.16 63.42 1.58% Rolling Urban 50.000
2360.40 48+549.63 2368.40 25.00 4.00% Rolling Urban 50.000
2399.40 48+939.63 2405.80 20.00 4.00% Rolling Urban 50.000
2410.00 49+089.63 2416.00 26.76 2.99% Rolling Urban 50.000
2435.30 49+454.33 2446.44 48.03 3.12% Rolling RURAL 70.000
2450.09 49+616.44 2455.23 69.64 1.44% Rolling RURAL 70.000
2461.33 49+923.59 2469.97 127.39 1.33% Rolling RURAL 70.000
2477.92 50+303.83 2482.07 29.93 8.10% Rolling RURAL 70.000
2478.88 50+550.08 2479.37 19.80 5.56% Rolling RURAL 70.000
2481.43 50+709.05 2482.71 25.33 3.75% Mountainous RURAL 60.000
2482.33 50+881.25 2482.33 94.71 1.06% Mountainous RURAL 60.000
2482.75 51+066.51 2484.80 36.99 2.84% Mountainous RURAL 60.000
2486.92 51+249.72 2485.47 13.12 9.15% Escarpment RURAL 50.000
2480.84 51+370.40 2479.67 7.02 5.78% Escarpment RURAL 50.000
2479.67 51+473.54 2484.57 7.01 11.83% Escarpment RURAL 50.000
2495.05 51+627.13 2501.21 13.81 4.71% Escarpment RURAL 50.000
2503.96 51+701.87 2507.04 12.70 2.84% Escarpment RURAL 50.000
2512.89 51+900.67 2520.28 14.97 9.35% Rolling Urban 50.000
2520.57 52+048.66 2519.98 41.74 2.40% Rolling Urban 50.000
2519.12 52+216.63 2514.01 24.37 4.92% Rolling Urban 50.000
2500.28 52+531.08 2495.75 21.20 5.19% Mountainous RURAL 60.000
2493.57 52+853.62 2481.47 17.32 10.39% Mountainous RURAL 60.000
2449.24 53+207.60 2444.26 7.01 11.92% Escarpment RURAL 50.000
2444.26 53+307.44 2448.22 7.11 10.56% Escarpment RURAL 50.000
2454.65 53+453.33 2460.82 12.93 6.57% Escarpment RURAL 50.000
2464.79 53+823.00 2464.28 32.35 8.35% Mountainous RURAL 60.000
2461.12 54+015.33 2455.42 154.72 0.78% Mountainous RURAL 60.000
2449.40 54+212.37 2445.88 54.00 1.48% Mountainous RURAL 60.000
2442.85 54+405.18 2435.35 17.41 6.32% Mountainous RURAL 60.000
2429.23 54+546.52 2425.24 8.02 9.98% Escarpment RURAL 50.000
2425.24 54+676.57 2422.68 12.49 6.40% Escarpment RURAL 50.000
2418.36 54+864.02 2419.17 8.47 14.16% Escarpment RURAL 50.000
2426.49 55+038.33 2433.59 35.60 2.25% Mountainous RURAL 70.000
2446.24 55+284.77 2455.07 22.69 5.29% Mountainous RURAL 70.000
2459.66 55+482.01 2464.97 84.48 1.18% Mountainous RURAL 70.000
2476.21 55+772.59 2481.65 108.29 0.92% Rolling RURAL 70.000
2484.19 55+923.74 2489.68 97.37 1.03% Rolling RURAL 70.000
2494.59 56+435.56 2490.32 30.73 14.00% Rolling RURAL 70.000
2477.16 56+720.21 2469.27 42.29 2.84% Rolling RURAL 70.000
2464.50 56+932.72 2462.67 16.52 7.26% Rolling RURAL 70.000
2464.81 57+244.05 2456.55 17.38 12.08% Mountainous RURAL 60.000
2432.84 57+591.73 2424.05 27.67 3.98% Mountainous RURAL 60.000
2418.35 57+786.73 2410.35 25.03 4.00% Mountainous RURAL 60.000
2387.82 58+103.19 2383.27 9.11 10.00% Mountainous RURAL 60.000
2383.27 58+235.16 2387.82 9.09 10.00% Mountainous RURAL 60.000
2413.44 58+642.33 2422.03 17.52 8.62% Mountainous RURAL 60.000

on-4 Back58+931.3 Ahead 56+500.00

You might also like