Executive summary
This document is meant as a report for our overall internship at SNNPR Science and
Information
Technology Bureauthat we worked from April 2021 to July 2021.Over the course of
these three
months, we have participated on two projects. This document will detail our role in
each project,
what we contributed our overall performance in these projectsThe first project goal is
to solve
the exciting LAN network limitation and to improve existing LAN network for
SNNPRS ICT
Agency and the second project is to designing the local area network (LAN) which is
the
important network designs for the organization. Typically, a LAN encompasses
computers and
peripherals connected to a server within a small geographic area such as an office
building,home, school that is restricted to smaller physical areas
ACKNOWLEDGMENT
First of all we would like thank Bule Hora University’s University Industry
Linkageand
Department of Electrical and Computer Engineering for giving us a chance to
participate in three
months internship period by accepting our request to be placed at. SNNPR Science
and
Information Technology Bureau. We are so grateful to the internship placement
SNNPR Science
and Information Technology Bureau for successfully arranging the internship
program and
providing what we needed.Weconvey our sincere gratitude to our hosting company
supervisorMr.Ashenafi Yohannes for his exemplary guidance, constant
encouragement, and
careful monitoring throughout the internship was so great that, even our most
profound gratitude
is not enough.We also would like to thank our university supervisor Mr.Motuma
Bekele whose
guidance, encouragement and suggestion
3|Page
Figure 1.1work flow of the company
BULE HORA UNIVERSIRY INTERNSHIP REPORT
CHAPTER TWO
OVER ALL EXPERIENCE GAINeD FROM THE INTERNSHIP
2. REASON WHY WE SELECT THE COMPANY
We have chosen the organization because it is one of the leading ICT and information
technology
companies in the region and in the country, as well as a leading institution that
provides practical
training to students from various universities in the country by providing necessary
equipment
And because the institution has rooms that are directly related to the subject we are
taking and
also it is located a short distance from our home city.
2.1 OUR INTERNSHIP WORKING SECTION
During our stay in the organization, we have chosen networking from the various
sectors offered
to us as an alternative, and the reason is Because of our eagerness to put into practice
the
network technology we have seen at the theory level because it is one of the sections
of the
organization that provides adequate functional training in the organization.
2.2 THE WORK FLOW OF NETWORKING DEPARTMENT
The networking unit of the organization divides the work into several stages. These
operations
are arranged in stages as follows they receive internet service from a service provider
and
manage using different switches. Deploy the managed network to the various offices
of the office
as needed. These include monitoring the network and repairing it in the event of a
malfunction,
as well as setting up a data center and providing and receiving information to the
recipient in a
timely manner.
2.4 OUR TASK DURING THE INTERNSHIP
Once we were in the company and selected the networking unit, the task we were
given was to
take the floor plan of one of the buildings of the company and set up an internet
connection for
each office and create local area network with different VLANs
4|Page
ARSI UNIVERSIRY INTERNSHIP REPORT
2.4 MATERIALS AND METHODOLOGY USED
2.4.1 Methodology
For the achievement of our internship we used different approach as the hardness of
the project.
Accordingly, the following procedure was used to overcome our difficulty and lastly,
we
achieved our project in a good and best manner. Some methods are as listed as follow:
Observation of the site
Free hand sketch of the design
Measurement
Counting no of nodes and users
Drawing the design on Visio software
a) Observation
This is the first thing to start our project by surveying the overall design of the agency
which we
aimed to do project or to upgrade current existing LAN design in to new design which
solves the
problems listed in the statement of problem of the project. And we physically vested
around the
agencies site or bureaus and collect some information to do our next task.
Freehand sketch
The next step before going to design on Visio software in this step we draw the design
of agency
on the paper.
b) Measurement
In this step we measured each and every room lengths in addition to cable length from
server
room to each access switch. Then from access switch to nodes or end users.
c) Counting
Counting is method which we used to count number of nodes in each room which are
functional
and non-functional and number of users how many user is there to solve problem of
network
availability of the personals. Then finally we put theProposed Network materials and
in the
following table
Bill of quantity/network installation tools