Waste Management
Waste Management
i. Goningore Site
a. Items needed startup recycling machine
S/N Item/Serivce Amount (N)
1 Electric Motor 25hrs Power V.S.
2 3 Pieces 25DA Breaker @N25,000X3
3 Box Bar 400A
4 Rightling Cable 50Meters @ N2,800 Per Meter
5 Water Pmp 2hrs Power
6 Cooling Tower 10Ton
7 Cables Ammo 100Meters N14,000x20
8 50-meter 6mm cable @N800 per meter
9 Connection Pipes for Water Supply
Total
c. Generator
S/N Item/Serivce Amount (N)
1 Keystarter
2 Exhaust
3 Brainbox
Total
e. Transformer
S/N Item/Serivce Amount (N)
Total
f. Transformer
S/N Item/Serivce Amount (N)
1 Logistics and Labour
Total
Grand Total………………..
b. Transformer
S/N Item/Serivce Amount (N)
Transformer Commissioning and Termination to
1 Consumer unit
Total
Grand Total……………………….