Fiber Panel Plan (Method Statement) 19 July 23
• Need the Automation / Digital group for support and to isolate the all cable outside the Fiber
Boxes as Below PIC.
• Will shaping up the ceiling around the pipe and right side.
• shift the full set-in front 3 Fiber Boxes 90 CM to right side.
• Soft Chiping with Hammer to avoid any possible damage to the pipes or Cable