Project Name: ________________________

DCP QA Signoff DCP TEST CERTIFICATE

NB: All measurements are in meters

Date Work Order No.

Route Name Contractor

Distance(in meters) :

Route Comment:

Route Comment:

1. Description

• DCP-Dynamic Cone Penetrometer used to test the compaction of the soil that has been worked on.
• DCP must be done at 4 points around newly installed manhole after reinstatement.
• Trench Soil-Soil that has been worked in for the installation of optic fibre duct system.
• Virgin Soil-Undisturbed soil that is used as a reference point next to the trench that been dug for optic fibre duct
system.
• Virgin Soil DCP test needs be done 0.5meters from Trench after reinstatement.
• 30m or less between Manholes only do 1-2 DCP test.
• Best practice, do 5 tests between 2 manholes on the route.
• Example: 780m between manholes
• 780/5=156meters between test
• Example: 800m between manholes
• 800/5=160meters between test
• During test especially on virgin soil measurement between test must not exceed 0,08m between two consecutive
readings.
• Please note during the test, the DCP with 5 consecutive strikes should not exceed 0.12m from the 1st blow to the 5th
blow.
• In the event consecutive readings fail then soil compaction in specific route needs to be re done.

2. DCP test after reinstatement


Doc No: LET-F-127 Effective Date: 2020-12-07
Title: DCP Test Certificate Revision: 07 Page 1 of 12
Soil Type Manhole(M/H) ID Manhole(M/H) ID Route Name

Soft Intermediate Hard rock

Total distance between M/H(in


meters)

Co-ordinates

Distance between tests(in meters)

Number of Tests 1st Test 1st Test 2nd Test 2nd Test 3rd Test 3rd Test 4th Test 4th Test 5th test 5th test
No. of Test
Top Soil Top soil Number Number
Reading Reading of Blows of Blows Trench Virgin Trench Virgin Trench Virgin Trench Virgin Trench Virgin
TRENCH VIRGIN TRENCH VIRGIN

1st Test Ref.

2nd Test Ref.

3rd Test Ref.

4th Test Ref.

5th Test Ref.

3. Block Diagram of DCP Test Process

Re work Compacted
trench soil in identified
area & redo DCP test

COMPLETED NO

DCP Tester Route distance


Trench Test to be performed
YES assembly in place YES between Manholes YES YES DCP Test Successful
reinstatement between manholes on
for soil compaction mapped out & soil Yes/No
completed virgin & trenched soil
testing typed to be identified
YES

QA documents information:
*Date
*Manhole information
*Route distance between Manholes
All parties present at
recorded test to sign off DCP
*Co-odinates recorded for each QA sheet when test is
manhole on route successful
*Soil type(soft/intermediate/hard rock)
*Graph provided with comparison
between trench & virgin soil

Doc No: LET-F-127 Effective Date: 2020-12-07


Title: DCP Test Certificate Revision: 07 Page 2 of 12
Soil Type Manhole(M/H) ID Manhole(M/H) ID Route Name

Soft Intermediate Hard rock

Total distance between M/H(in


meters)

Co-ordinates

Distance between tests(in meters)

Number of Tests 1st Test 1st Test 2nd Test 2nd Test 3rd Test 3rd Test 4th Test 4th Test 5th test 5th test
No. of Test
Top Soil Top soil Number Number
Reading Reading of Blows of Blows Trench Virgin Trench Virgin Trench Virgin Trench Virgin Trench Virgin
TRENCH VIRGIN TRENCH VIRGIN

1st Test Ref.

2nd Test Ref.

3rd Test Ref.

4th Test Ref.

5th Test Ref.

4. Block Diagram of DCP Test Process

Re work Compacted
trench soil in identified
area & redo DCP test

COMPLETED NO

DCP Tester Route distance


Trench Test to be performed
YES assembly in place YES between Manholes YES YES DCP Test Successful
reinstatement between manholes on
for soil compaction mapped out & soil Yes/No
completed virgin & trenched soil
testing typed to be identified
YES

QA documents information:
*Date
*Manhole information
*Route distance between Manholes
All parties present at
recorded test to sign off DCP
*Co-odinates recorded for each QA sheet when test is
manhole on route successful
*Soil type(soft/intermediate/hard rock)
*Graph provided with comparison
between trench & virgin soil

Doc No: LET-F-127 Effective Date: 2020-12-07


Title: DCP Test Certificate Revision: 07 Page 3 of 12
Soil Type Manhole(M/H) ID Manhole(M/H) ID Route Name

Soft Intermediate Hard rock

Total distance between M/H(in


meters)

Co-ordinates

Distance between tests(in meters)

Number of Tests 1st Test 1st Test 2nd Test 2nd Test 3rd Test 3rd Test 4th Test 4th Test 5th test 5th test
No. of Test
Top Soil Top soil Number Number
Reading Reading of Blows of Blows Trench Virgin Trench Virgin Trench Virgin Trench Virgin Trench Virgin
TRENCH VIRGIN TRENCH VIRGIN

1st Test Ref.

2nd Test Ref.

3rd Test Ref.

4th Test Ref.

5th Test Ref.

5. Block Diagram of DCP Test Process

Re work Compacted
trench soil in identified
area & redo DCP test

COMPLETED NO

DCP Tester Route distance


Trench Test to be performed
YES assembly in place YES between Manholes YES YES DCP Test Successful
reinstatement between manholes on
for soil compaction mapped out & soil Yes/No
completed virgin & trenched soil
testing typed to be identified
YES

QA documents information:
*Date
*Manhole information
*Route distance between Manholes
All parties present at
recorded test to sign off DCP
*Co-odinates recorded for each QA sheet when test is
manhole on route successful
*Soil type(soft/intermediate/hard rock)
*Graph provided with comparison
between trench & virgin soil

Doc No: LET-F-127 Effective Date: 2020-12-07


Title: DCP Test Certificate Revision: 07 Page 4 of 12
Soil Type Manhole(M/H) ID Manhole(M/H) ID Route Name

Soft Intermediate Hard rock

Total distance between M/H(in


meters)

Co-ordinates

Distance between tests(in meters)

Number of Tests 1st Test 1st Test 2nd Test 2nd Test 3rd Test 3rd Test 4th Test 4th Test 5th test 5th test
No. of Test
Top Soil Top soil Number Number
Reading Reading of Blows of Blows Trench Virgin Trench Virgin Trench Virgin Trench Virgin Trench Virgin
TRENCH VIRGIN TRENCH VIRGIN

1st Test Ref.

2nd Test Ref.

3rd Test Ref.

4th Test Ref.

5th Test Ref.

6. Block Diagram of DCP Test Process

Re work Compacted
trench soil in identified
area & redo DCP test

COMPLETED NO

DCP Tester Route distance


Trench Test to be performed
YES assembly in place YES between Manholes YES YES DCP Test Successful
reinstatement between manholes on
for soil compaction mapped out & soil Yes/No
completed virgin & trenched soil
testing typed to be identified
YES

QA documents information:
*Date
*Manhole information
*Route distance between Manholes
All parties present at
recorded test to sign off DCP
*Co-odinates recorded for each QA sheet when test is
manhole on route successful
*Soil type(soft/intermediate/hard rock)
*Graph provided with comparison
between trench & virgin soil

Doc No: LET-F-127 Effective Date: 2020-12-07


Title: DCP Test Certificate Revision: 07 Page 5 of 12
Soil Type Manhole(M/H) ID Manhole(M/H) ID Route Name

Soft Intermediate Hard rock

Total distance between M/H(in


meters)

Co-ordinates

Distance between tests(in meters)

Number of Tests 1st Test 1st Test 2nd Test 2nd Test 3rd Test 3rd Test 4th Test 4th Test 5th test 5th test
No. of Test
Top Soil Top soil Number Number
Reading Reading of Blows of Blows Trench Virgin Trench Virgin Trench Virgin Trench Virgin Trench Virgin
TRENCH VIRGIN TRENCH VIRGIN

1st Test Ref.

2nd Test Ref.

3rd Test Ref.

4th Test Ref.

5th Test Ref.

7. Block Diagram of DCP Test Process

Re work Compacted
trench soil in identified
area & redo DCP test

COMPLETED NO

DCP Tester Route distance


Trench Test to be performed
YES assembly in place YES between Manholes YES YES DCP Test Successful
reinstatement between manholes on
for soil compaction mapped out & soil Yes/No
completed virgin & trenched soil
testing typed to be identified
YES

QA documents information:
*Date
*Manhole information
*Route distance between Manholes
All parties present at
recorded test to sign off DCP
*Co-odinates recorded for each QA sheet when test is
manhole on route successful
*Soil type(soft/intermediate/hard rock)
*Graph provided with comparison
between trench & virgin soil

Doc No: LET-F-127 Effective Date: 2020-12-07


Title: DCP Test Certificate Revision: 07 Page 6 of 12
Soil Type Manhole(M/H) ID Manhole(M/H) ID Route Name

Soft Intermediate Hard rock

Total distance between M/H(in


meters)

Co-ordinates

Distance between tests(in meters)

Number of Tests 1st Test 1st Test 2nd Test 2nd Test 3rd Test 3rd Test 4th Test 4th Test 5th test 5th test
No. of Test
Top Soil Top soil Number Number
Reading Reading of Blows of Blows Trench Virgin Trench Virgin Trench Virgin Trench Virgin Trench Virgin
TRENCH VIRGIN TRENCH VIRGIN

1st Test Ref.

2nd Test Ref.

3rd Test Ref.

4th Test Ref.

5th Test Ref.

8. Block Diagram of DCP Test Process

Re work Compacted
trench soil in identified
area & redo DCP test

COMPLETED NO

DCP Tester Route distance


Trench Test to be performed
YES assembly in place YES between Manholes YES YES DCP Test Successful
reinstatement between manholes on
for soil compaction mapped out & soil Yes/No
completed virgin & trenched soil
testing typed to be identified
YES

QA documents information:
*Date
*Manhole information
*Route distance between Manholes
All parties present at
recorded test to sign off DCP
*Co-odinates recorded for each QA sheet when test is
manhole on route successful
*Soil type(soft/intermediate/hard rock)
*Graph provided with comparison
between trench & virgin soil

Doc No: LET-F-127 Effective Date: 2020-12-07


Title: DCP Test Certificate Revision: 07 Page 7 of 12
Soil Type Manhole(M/H) ID Manhole(M/H) ID Route Name

Soft Intermediate Hard rock

Total distance between M/H(in


meters)

Co-ordinates

Distance between tests(in meters)

Number of Tests 1st Test 1st Test 2nd Test 2nd Test 3rd Test 3rd Test 4th Test 4th Test 5th test 5th test
No. of Test
Top Soil Top soil Number Number
Reading Reading of Blows of Blows Trench Virgin Trench Virgin Trench Virgin Trench Virgin Trench Virgin
TRENCH VIRGIN TRENCH VIRGIN

1st Test Ref.

2nd Test Ref.

3rd Test Ref.

4th Test Ref.

5th Test Ref.

9. Block Diagram of DCP Test Process

Re work Compacted
trench soil in identified
area & redo DCP test

COMPLETED NO

DCP Tester Route distance


Trench Test to be performed
YES assembly in place YES between Manholes YES YES DCP Test Successful
reinstatement between manholes on
for soil compaction mapped out & soil Yes/No
completed virgin & trenched soil
testing typed to be identified
YES

QA documents information:
*Date
*Manhole information
*Route distance between Manholes
All parties present at
recorded test to sign off DCP
*Co-odinates recorded for each QA sheet when test is
manhole on route successful
*Soil type(soft/intermediate/hard rock)
*Graph provided with comparison
between trench & virgin soil

Doc No: LET-F-127 Effective Date: 2020-12-07


Title: DCP Test Certificate Revision: 07 Page 8 of 12
Soil Type Manhole(M/H) ID Manhole(M/H) ID Route Name

Soft Intermediate Hard rock

Total distance between M/H(in


meters)

Co-ordinates

Distance between tests(in meters)

Number of Tests 1st Test 1st Test 2nd Test 2nd Test 3rd Test 3rd Test 4th Test 4th Test 5th test 5th test
No. of Test
Top Soil Top soil Number Number
Reading Reading of Blows of Blows Trench Virgin Trench Virgin Trench Virgin Trench Virgin Trench Virgin
TRENCH VIRGIN TRENCH VIRGIN

1st Test Ref.

2nd Test Ref.

3rd Test Ref.

4th Test Ref.

5th Test Ref.

10. Block Diagram of DCP Test Process

Re work Compacted
trench soil in identified
area & redo DCP test

COMPLETED NO

DCP Tester Route distance


Trench Test to be performed
YES assembly in place YES between Manholes YES YES DCP Test Successful
reinstatement between manholes on
for soil compaction mapped out & soil Yes/No
completed virgin & trenched soil
testing typed to be identified
YES

QA documents information:
*Date
*Manhole information
*Route distance between Manholes
All parties present at
recorded test to sign off DCP
*Co-odinates recorded for each QA sheet when test is
manhole on route successful
*Soil type(soft/intermediate/hard rock)
*Graph provided with comparison
between trench & virgin soil

Doc No: LET-F-127 Effective Date: 2020-12-07


Title: DCP Test Certificate Revision: 07 Page 9 of 12
Soil Type Manhole(M/H) ID Manhole(M/H) ID Route Name

Soft Intermediate Hard rock

Total distance between M/H(in


meters)

Co-ordinates

Distance between tests(in meters)

Number of Tests 1st Test 1st Test 2nd Test 2nd Test 3rd Test 3rd Test 4th Test 4th Test 5th test 5th test
No. of Test
Top Soil Top soil Number Number
Reading Reading of Blows of Blows Trench Virgin Trench Virgin Trench Virgin Trench Virgin Trench Virgin
TRENCH VIRGIN TRENCH VIRGIN

1st Test Ref.

2nd Test Ref.

3rd Test Ref.

4th Test Ref.

5th Test Ref.

11. Block Diagram of DCP Test Process

Re work Compacted
trench soil in identified
area & redo DCP test

COMPLETED NO

DCP Tester Route distance


Trench Test to be performed
YES assembly in place YES between Manholes YES YES DCP Test Successful
reinstatement between manholes on
for soil compaction mapped out & soil Yes/No
completed virgin & trenched soil
testing typed to be identified
YES

QA documents information:
*Date
*Manhole information
*Route distance between Manholes
All parties present at
recorded test to sign off DCP
*Co-odinates recorded for each QA sheet when test is
manhole on route successful
*Soil type(soft/intermediate/hard rock)
*Graph provided with comparison
between trench & virgin soil

Doc No: LET-F-127 Effective Date: 2020-12-07


Title: DCP Test Certificate Revision: 07 Page 10 of 12
Soil Type Manhole(M/H) ID Manhole(M/H) ID Route Name

Soft Intermediate Hard rock

Total distance between M/H(in


meters)

Co-ordinates

Distance between tests(in meters)

Number of Tests 1st Test 1st Test 2nd Test 2nd Test 3rd Test 3rd Test 4th Test 4th Test 5th test 5th test
No. of Test
Top Soil Top soil Number Number
Reading Reading of Blows of Blows Trench Virgin Trench Virgin Trench Virgin Trench Virgin Trench Virgin
TRENCH VIRGIN TRENCH VIRGIN

1st Test Ref.

2nd Test Ref.

3rd Test Ref.

4th Test Ref.

5th Test Ref.

12. Block Diagram of DCP Test Process

Re work Compacted
trench soil in identified
area & redo DCP test

COMPLETED NO

DCP Tester Route distance


Trench Test to be performed
YES assembly in place YES between Manholes YES YES DCP Test Successful
reinstatement between manholes on
for soil compaction mapped out & soil Yes/No
completed virgin & trenched soil
testing typed to be identified
YES

QA documents information:
*Date
*Manhole information
*Route distance between Manholes
All parties present at
recorded test to sign off DCP
*Co-odinates recorded for each QA sheet when test is
manhole on route successful
*Soil type(soft/intermediate/hard rock)
*Graph provided with comparison
between trench & virgin soil

Doc No: LET-F-127 Effective Date: 2020-12-07


Title: DCP Test Certificate Revision: 07 Page 11 of 12
13. Signature

Name and Title


Signature Date
CONTRACTOR’S REPRESENTATIVE - (required)

Name and Title Signature Date


ENGINEER’S REPRESENTATIVE - (required)

Name and Title Signature Date


CLIENT REPRESENTATIVE - (required)

Name and Title Signature Date


LETECH REPRESENTATIVE - (required)

Doc No: LET-F-127 Effective Date: 2020-12-07


Title: DCP Test Certificate Revision: 07 Page 12 of 12