Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

CSI603

Information Systems Engineering

Given Date 19/09/2011

ASSIGNMENT-2

Note: This Assignment carries 5 questions. Attempt all. Each question carries equal marks. 5 marks / day shall be deducted for late submission. NO SUBMISSION NO MARKS. Type the Assignment neatly on a foolscap paper and submit it as a HARD copy. Submit your assignment personally as you have to sign against your name as a part of evidence. No question or part thereof can be answered in less than a page. Do not wait for the last date to submit.

Question 1: Historically, the introduction of technology has caused profound changes in the labor market and, temporarily at least, displaced peoples from jobs. Discuss whether the introduction of CASE technology is likely to have the same consequences for software engineers. If you dont think it will, explain why not? If you think that it will reduce job opportunities, is it ethical for the engineers affected to resist the introduction of this technology passively and actively? Question 2: Explain why programs which are developed using evolutionary development are likely to be difficult to maintain. Write a one page note on Spiral development. Question 3(a): Explain why the intangibility of software systems poses special problems for information systems project management. Question 3(b): As a programmer, you are offered promotion to project manager but you feel that you can make a more effective contribution in a technical rather than a managerial role. Discuss whether you should accept the promotion? Question 4: The following figure sets out a number of activities, durations, and dependencies. Draw an activity chart and a bar chart showing the project schedule. Task Duration (days) Dependencies T1 10 T2 15 T1(M1) T3 10 T1,T2(M2) T4 20 T5 10 T6 15 T3,T4(M3) T7 20 T3(M1) T8 35 T7(M5) T9 15 T6(M7) T10 5 T5,T9(M4) T11 10 T9(M9) T12 20 T10(M6) T13 35 T3,T4(M8) T14 10 T8,T9(M5) T15 20 T12,T14(M10) T16 10 T15(M11)

MT

MM 100

Turn-in Date 13/10/2011

CSI603

Information Systems Engineering

Given Date 19/09/2011

Question 5: You are asked by your manager to deliver software to a schedule which you know can only be met by asking your project team to work unpaid overtime. All team members have young children. Discuss whether you should accept this demand from your manager and whether you should persuade your team to give their time to the organization rather than their families. What factors must be significant in your decision?

-----0-----

MT

MM 100

Turn-in Date 13/10/2011