CLIENT / DEVELOPER:

Investasia Sdn. Bhd.

ARCHITECT:

No Comment.Construction can proceed.


Amend and resubmit this drawing in accordance to comments.Please
return the commented drawing in your next resubmission.
Rejected. Must resubmit for review before commencement of work.

Checking does not relief the contractor of the responsibilities for ensuring full
compliance with all requirement of the contract specification and documents.
The contractor is responsible for all dimensions with shall be confirmed and
correlated at the job site, fabrication processes,techniques of construction and
co-ordination at his work with that of all other trades.
Signature :______________ Date :__________.

C & S ENGINEER:
Jesselton
Consulting
Group

±
Civil, Structural & Project Management

13
Jesselton Consulting Group Sdn. Bhd.

40
12
No Comment.Construction can proceed.

50
25
Amend and resubmit this drawing in accordance to comments.Please
±1340 return the commented drawing in your next resubmission.
Rejected. Must resubmit for review before commencement of work.

±1250 Checking does not relief the contractor of the responsibilities for ensuring full
compliance with all requirement of the contract specification and documents.
The contractor is responsible for all dimensions with shall be confirmed and
correlated at the job site, fabrication processes,techniques of construction and

255
co-ordination at his work with that of all other trades.
Signature :______________ Date :__________.

65
UP 65
M & E ENGINEER:

PEM Consult Sdn. Bhd.


65
No Comment.Construction can proceed.

Amend and resubmit this drawing in accordance to comments.Please


return the commented drawing in your next resubmission.

±1250 JOINT A JOINT B Rejected. Must resubmit for review before commencement of work.

Checking does not relief the contractor of the responsibilities for ensuring full
compliance with all requirement of the contract specification and documents.
The contractor is responsible for all dimensions with shall be confirmed and
correlated at the job site, fabrication processes,techniques of construction and
DN co-ordination at his work with that of all other trades.

Signature :______________ Date :___________

255 LOCAL ARCHITECT:

Arkitek Billings Leong & Tan Sdn. Bhd.

No Comment.Construction can proceed.

Amend and resubmit this drawing in accordance to comments.Please


return the commented drawing in your next resubmission.
Rejected. Must resubmit for review before commencement of work.

Checking does not relief the contractor of the responsibilities for ensuring full
compliance with all requirement of the contract specification and documents.
The contractor is responsible for all dimensions with shall be confirmed and
correlated at the job site, fabrication processes,techniques of construction and
co-ordination at his work with that of all other trades.
Signature :______________ Date :___________

CORE STAIRCASES PLAN OTHER CONSULTANT:

( TYPICAL FLOOR - 3,450mm Floor Height )


No Comment.Construction can proceed.

Amend and resubmit this drawing in accordance to comments.Please


return the commented drawing in your next resubmission.
Rejected. Must resubmit for review before commencement of work.

Checking does not relief the contractor of the responsibilities for ensuring full
compliance with all requirement of the contract specification and documents.
The contractor is responsible for all dimensions with shall be confirmed and
correlated at the job site, fabrication processes,techniques of construction and
co-ordination at his work with that of all other trades.

Signature :______________ Date :___________

JOINT C JOINT D MAIN CONTRACTOR:

CRCG (M) SDN.BHD


Unit P1/J/55, 1st Floor,
Block J, KK Times Square,

HANDRAIL Off Jalan Coastal,


88100 Kota Kinabalu, Sabah.

DETAILS PROJECT:
COMPLETION OF UNCOMPLETED WORKS
FOR PROPOSED 460 UNITS CONDOMINIUM
ON LOT 5, TL. 017544900 AT SUTERA
HARBOUR RESORT, OFF COASTAL
HIGHWAY, SEMBULAN, KOTA KINABALU,
SABAH, MALAYSIA (STRATA
TITLES TO BE APPLIED FOR)

MAIN CORE STAIRCASES DRAWING TITLE:


MAIN CORE STAIRCASES
HANDRAIL DETAIL
HANDRAIL DETAILS - PERSPECTIVE VIEW HANDRAIL DETAIL DRAWN: CHECKED:

SCALE: AS SHOWN DATE: 23-6-2023

SHOP DRAWING Drawing No: Rev: 00


CLIENT / DEVELOPER:

Investasia Sdn. Bhd.

ARCHITECT:

No Comment.Construction can proceed.


Amend and resubmit this drawing in accordance to comments.Please
return the commented drawing in your next resubmission.
Rejected. Must resubmit for review before commencement of work.

Checking does not relief the contractor of the responsibilities for ensuring full
compliance with all requirement of the contract specification and documents.
The contractor is responsible for all dimensions with shall be confirmed and
correlated at the job site, fabrication processes,techniques of construction and
co-ordination at his work with that of all other trades.

Signature :______________ Date :__________.

C & S ENGINEER:
Jesselton
Consulting
±1417 Group

Civil, Structural & Project Management

Jesselton Consulting Group Sdn. Bhd.


No Comment.Construction can proceed.
Amend and resubmit this drawing in accordance to comments.Please
return the commented drawing in your next resubmission.
900

±98 ±1250 ±1250


Rejected. Must resubmit for review before commencement of work.

±1512 UPPER FLOOR Checking does not relief the contractor of the responsibilities for ensuring full
compliance with all requirement of the contract specification and documents.
LANDING LEVEL The contractor is responsible for all dimensions with shall be confirmed and
900

50x25mm RHS handrail.


20(6) correlated at the job site, fabrication processes,techniques of construction and
co-ordination at his work with that of all other trades.

19(5) 20x20mm RHS balustrade Signature :______________ Date :__________.


with ±96mm gap in between.
50

18(4)
25x25mm RHS baluster
M & E ENGINEER:
@ max.1300mm c/c

1035
17(3)
25x25mm RHS bottom-rail.
PEM Consult Sdn. Bhd.
Selected nosing 65 ±96
tile. 16(2)
cement sand 2ND LANDING No Comment.Construction can proceed.
Concrete staircase. 15(1) cement sand floor screeding ±930 ±1161
floor screeding LEVEL

900
50x25mm RHS handrail. Amend and resubmit this drawing in accordance to comments.Please
14(6) return the commented drawing in your next resubmission.
Rejected. Must resubmit for review before commencement of work.
20x20mm RHS balustrade
13(5) with ±96mm gap in between. Checking does not relief the contractor of the responsibilities for ensuring full

50
compliance with all requirement of the contract specification and documents.
12(4) 25x25mm RHS baluster The contractor is responsible for all dimensions with shall be confirmed and
@ max.1300mm c/c correlated at the job site, fabrication processes,techniques of construction and
Selected nosing

1035
11(3) co-ordination at his work with that of all other trades.
tile.

900

3450
10(2) 25x25mm RHS bottom-rail. Signature :______________ Date :___________
Concrete staircase.
±96
9(1)
1ST LANDING
LEVEL LOCAL ARCHITECT:
8

7
Arkitek Billings Leong & Tan Sdn. Bhd.

50
6
50x25mm RHS handrail. No Comment.Construction can proceed.

900
5 Amend and resubmit this drawing in accordance to comments.Please
20x20mm RHS balustrade return the commented drawing in your next resubmission.

1380
4 with ±96mm gap in between.
Rejected. Must resubmit for review before commencement of work.
Selected nosing 25x25mm RHS baluster
tile. 3 @ max.1300mm c/c Checking does not relief the contractor of the responsibilities for ensuring full
compliance with all requirement of the contract specification and documents.
The contractor is responsible for all dimensions with shall be confirmed and
Concrete staircase. 2
correlated at the job site, fabrication processes,techniques of construction and
25x25mm RHS bottom-rail.
1
LOWER FLOOR co-ordination at his work with that of all other trades.
Signature :______________ Date :___________
LANDING LEVEL
OTHER CONSULTANT:

SECTION THROUGH SECTION THROUGH SECTION THROUGH


3RD FLIGHT 2ND FLIGHT 1ST FLIGHT No Comment.Construction can proceed.

Amend and resubmit this drawing in accordance to comments.Please


return the commented drawing in your next resubmission.
Rejected. Must resubmit for review before commencement of work.

TYPICAL STAIRCASE RAILING SHOP DRAWING Checking does not relief the contractor of the responsibilities for ensuring full
compliance with all requirement of the contract specification and documents.

( TYPICAL FLOOR - 3,450mm Floor Height ) The contractor is responsible for all dimensions with shall be confirmed and
correlated at the job site, fabrication processes,techniques of construction and
co-ordination at his work with that of all other trades.

Signature :______________ Date :___________

MAIN CONTRACTOR:

CRCG (M) SDN.BHD


Unit P1/J/55, 1st Floor,
Block J, KK Times Square,
Off Jalan Coastal,
88100 Kota Kinabalu, Sabah.

PROJECT:
COMPLETION OF UNCOMPLETED WORKS
FOR PROPOSED 460 UNITS CONDOMINIUM
ON LOT 5, TL. 017544900 AT SUTERA
HARBOUR RESORT, OFF COASTAL
HIGHWAY, SEMBULAN, KOTA KINABALU,
SABAH, MALAYSIA (STRATA
TITLES TO BE APPLIED FOR)

MAIN CORE STAIRCASES DRAWING TITLE:


MAIN CORE STAIRCASES
HANDRAIL DETAIL
HANDRAIL DETAIL DRAWN: CHECKED:

SCALE: AS SHOWN DATE: 23-6-2023

SHOP DRAWING Drawing No: Rev: 00

You might also like