The document contains 3 labour reports for the construction contractor AFCONS for their work on different sections of a project - Structure work, Entry & Exit work, and Viaduct work. It shows the minimum labour requirements for each section or sub-section against the available labour as of 12th December 2023. There are significant shortfalls ranging from 20-92% across various sections, with the total shortfall being 590 workers out of the minimum requirement of 1255.
The document contains 3 labour reports for the construction contractor AFCONS for their work on different sections of a project - Structure work, Entry & Exit work, and Viaduct work. It shows the minimum labour requirements for each section or sub-section against the available labour as of 12th December 2023. There are significant shortfalls ranging from 20-92% across various sections, with the total shortfall being 590 workers out of the minimum requirement of 1255.
The document contains 3 labour reports for the construction contractor AFCONS for their work on different sections of a project - Structure work, Entry & Exit work, and Viaduct work. It shows the minimum labour requirements for each section or sub-section against the available labour as of 12th December 2023. There are significant shortfalls ranging from 20-92% across various sections, with the total shortfall being 590 workers out of the minimum requirement of 1255.
C1- AFCONS- Labour Report - Station Work(Structure)
Minimum Available As SR. No Contractor Name Balance Short fall (%) Required on 12.12.23 1 Tapovan Circle 125 73 52 42 2 GNLU 60 36 24 40 AFCONS 3 PDPU 40 5 35 88 4 Gift City 100 34 66 66 Total 325 148 177
C1- AFCONS-Labour Report - Entry & Exit Work
Minimum Available As SR. No Contractor Name EE Balance Short fall (%) Required on 12.12.23 1 Tapovan Circle-A 14 50 28 56 2 Tapovan Circle-B 8 3 GNLU-A 20 50 10 20 4 GNLU-B 20 AFCONS 5 PDPU-A 17 50 15 30 6 PDPU-B 18 7 Gift City-A 16 50 16 32 8 Gift City-B 18 Total 200 131 69