LAYOUT OF 1400 MM DIA.

PIPELINE IN VECL CONVEYING SYSTEM

OUT OF 56 KM,
PIPELINE IS INSERTED
IN 28.35 KM.

RIL, PS-I &II DISCH.


VEDACH TO SAROD 800 VEDACH TO SAROD 1400 MM dia.
MM dia. PIPELINE PIPELINE
15.00 KM 15.00 KM (2014, 2021 & 2023) GSFC & IOCL DISCH.
INSTALL IN THE EXISTING CHANNEL

LUNA TO EKALBARA
4.02 KM (ZONE –II
YEAR- 2019)

ALEMBIC TO VEDACH
9.33 KM (ZONE – III YEAR –
2016, 2017, 2020 and 2021