Professional Documents
Culture Documents
4 - Avantages de Power Vs x86 Pour Oracle
4 - Avantages de Power Vs x86 Pour Oracle
Oracle can be deployed, migrated, restored on any server and Power Virtual Server
Complete Scalability, Flexibility and Ease of Migration
Keep running as-is your current Oracle DB version on Power10 with AIX7.2 support till 2030
AIX 7.1 AIX Power
DLPAR LPM AME WPAR
AIX 7.2 LKU VM
https://www.oracle.com/fr/database/technologies/virtualization-matrix.html
How Power drives Oracle TCO Savings ?
Oracle SW is 80% of the TCO,
licensing and SWMA cost reduction is the key to success
Oracle costs lay beneath the surface
➢ Reduce #Cores to reduce Oracle SWMAcost
➢ Reduce #Cores to prepare Oracle Unlimited License Agreement (ULA) exit
➢ Reduce #Cores to grow the workload with no additional licenses purchase
70% 30%
>2.2x +146%
+60%
incompatible
2012 2013 2015 2016 2017 2019 2021 2012 2014 2017 2021
Exa X3 Exa X4 Exa X5 Exa X6 Exa X7 Exa X8M Exa X9M Power7 Power8 Power9 Power10
16 Cores 24 Cores 36 Cores 44 Cores 48 Cores 48 Cores 64 Cores P780+ E980 E1080
E880
Xeon E5-2690 Xeon E5-2697 Xeon E5-2699 Xeon E5-2699 Xeon 8160 Xeon 8260 Xeon 8358 15 core/chip
8-Core/chip 12-Core/chip
8-Core/chip 12-Core/chip 12-Core/chip
18-Core/chip 22-Core/chip 24-Core/chip 24-Core/chip 32-Core/chip 7 nanometers
10 nanometers
Continuous improvement
Source: IDC QPI, http://www.idc.com/qpi
© Copyright IBM Corporation 2021 9
RAS & Resilience, IBM Power servers Ranked Number #1
by ITIC , 12 years in a row
➔Power8 and Power9 servers were the first in the IT industry with
risk mitiga tion against Spec tre and Meltdown sec urity conc erns
Disable HMT on x86 to mitigate the issue *data pulled July 20th, 290221
https://access.redhat.com/security/vulnerabilities/L1TF
Objective : Choose the right platform to prepare Oracle ULA exit E950 – 40c E950 – 40c
Upgrade x86 Servers to Intel Cascade Lake or Migrate to POWER9
PowerHA
Pro Pro
d d
Pr Pr
od od
Shared
Dev Te Processor Pool Dev Te
X86/VMWare X86/VMWare X86/VMWare for Oracle
X86/VMWare X86/VMWare X86/VMWare X86/VMWare st LPARs
st
VM Ware HA – Auto-Restart VM Ware HA – Auto-Restart
VIOS1 - 1 VIOS2 - 1 VIOS1 - 1 VIOS2 - 1
core core core core
SAN Storage GAD SAN Storage SAN Storage GAD SAN Storage
Sizing based on IDC QPI Data Target Usage 75% OracleSW 4years ListPrice Discounted
TCO
Equivalent Current $ 43,855,700.00 $ 24,120,635.00
Target x86 Server POWER9 POWER9
Current Infrastructure Cascade
(48 cores) (Equivalent) (Usage Target 120 x86 Lic
Lake (5 servers)
Rate) $ 33,952,800.00 $ 18,674,040.00
#Servers #Cores #Cores #Servers #Cores
#Cores #Cores
20 290 230 5 240
102 60 Savings $ 9,902,900.00 $ 5,446,595.00
OracleLicenses 155 115 120
102
Savings 26% 23% Target 60 P9 cores $ 16,976,400.00 $ 9,337,020.00
34% 61%
Savings $ 26,879,300.00 $ 14,783,615.00
Reduce Oracle Licensing Costs Target 80 P9 cores $ 22,635,200.00 $ 12,449,360.00
Reduce Footprint
Savings $ 21,220,500.00 $ 11,671,275.00
Flexibility in Architecture / Consolidate Multiple Workloads (SAP/Oracle/HANA) 45% Oracle SW Discount – Oracle EE + Partitioning + Advanced Security +
Diagnostic Pack + Tuning Pack + Database Vault + Multitenant
Thank You