Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 6

NOTE: PLEASE DO NOT ADD OR REMOVE ANY WORKSHEETS, CELLS, ROWS OR COLUMNS FROM THE EXCEL

RFQ Response Questionnaire for: rfq_26243


COLOUR LEGEND
Response Optional
Response Mandatory
Ignored During Import
Questionnaire Information

Currency:USD

1 Technical Envelope

1.1 Questions related to Item Specifications:


Note Note Details
1.1.1 NOTE Below is the list of required items. Respond if you are quoting for same specs or a variant.
Question Description Response Type
1.1.2 0010195597- Development of construction drawings Option List
1.1.3 00010-00010
0010195597- Development of construction
Removal of existing structure drawings
from insid Option List
1.1.4 00010-00040
0010195597- Removal of existing structure from duri
Repairing of any defects identified inside Option List
1.1.5 00010-00060
0010195597- Repairing of any defects
Fabrication/installation identified
and weldingduring
of Option List
1.1.6 00010-00070
0010195597- Installation and
Replacement ofwelding
deflectorofplate
new ofremovable
nozzle Option List
1.1.7 00010-00080
0010195597- Replacement of deflector
Pre and post heat plate
treatment as of
pernozzle
proce Option List
1.1.8 00010-00090
0010195597- Pre and post heat treatment as per
Inspection/testing of the weld joints an Option List
1.1.9 00010-00120
0010195597- Inspection/testing of the weld joints
Hydrostatic test of complete unit after and Option List
1.1.10 00010-00150
0010195597- Hydrostatic test
Mobilization of complete unit
/ Demobilization after
charges Option List
1.1.11 00010-00160
0010195597- Mobilization / Demobilization charges
ASME authorized inspector charges for in Option List
00010-00170 ASME authorized inspector charges for
1.2 TECHNICAL EVALUATION CRITERIA
Question Description Response Type
1.2.1 Company Establishment of the company should be at Attachment
1.2.2 Establishment
Past Experience least
Bidder 10should
years have
(Bidder
moreto attach
than 05 theyears of Attachment
1.2.3 Previous Projects experience
Bidder should of fabrication of vessel/repair of Attachment
provide documentary
1.2.4 Staff Experties evidence
Bidder / completion
should have at certificates of
least two engineers Attachment
1.2.5 Certifications with 10 years of experience of similar jobs.
Bidder should be registered with PEC in C- Attachment
1.2.6 Certifications 1 category
Bidder shouldor above. Bidder to provide
have authorization from Attachment
1.2.7 Certifications ASME for ‘U’ and ‘R’ stamps.
Bidder should have an Integrated Bidder to Attachment
1.2.8 Tools Management
Bidder System.
shall provide theBidder
list of to provide
tools, Attachment
1.2.9 Deviation to PPL equipment and machinery which will be
A separate sheet highlighting deviation to Attachment
1.2.10 Tender document
Requisites PPL
Bidderrequirement to be submitted
must be registered in FBR withand the
copy Attachment
1.2.11 Income Tax of NTN certificate must be submitted
Acknowledgement of Income tax returns as Attachment
1.2.12 returnsTax returns for last three years /
Sales Attachment
(Mandatory) Acknowledgement of Monthly sales tax
Note Note Details
1.2.13 Note 1. Bidders to submit completion/ satisfactory performance certificate from organizations.
2. PPL reserves the rights to verify the validity of submitted documents from the respective a
1.3 MANDATORY REQUIREMENTS/TERMS:
Question Description Response Type
1.3.1 Bid Bond (*) Please attach copy of Bid Bond . Attachment
1.3.2 Bid/ Price Validity: Please
The bid/note thatprice
quoted bid submitted without
should remain bid
validYes/No Value
1.3.3 DELIVERY / till
Work 31-01-2024.
completion time. Text
1.3.4 COMPLETION
Payment Terms: Net 30, after satisfactory completion of Yes/No Value
1.3.5 Increase/ jobs
PPL mentioned
reserves thein right
the scope of work
to increase / on Yes/No Value
1.3.6 decrease
Liquidatedthe decrease
Company’s the quantities
standard of items Damages
Liquidated requested Yes/No Value
1.3.7 Damages (LD)
Instructions, (LD) & Performance
The Bidder is expected Guarantee
to examine(PG)all Yes/No Value
1.3.8 Standard Terms
Affidavit for forms and given his acceptance
The Contractor/Company shall confirm to PPL's Attachment
1.3.9 Litigation:
Affidavit for whether any of its shareholders,
The Contractor/Company directors,
shall not be Attachment
1.3.10 Blacklisting:
Affidavit for eligible if its directors, employees,
Bidder to submit a sworn affidavit, if the Attachment
1.3.11 Embargo
Declaration/ of supplier / contractor / bidder including
The successful bidder(s) is required to any Yes/No Value
Beneficial submit/provide Beneficial Owners’
Note Note Details
1.3.12 Special Note: Kindly note that any deviation to the above mandatory requirements, may lead to disqualifica

2 Commercial Envelope

2.1 Rehabilitation of MEA Scrubber Bank No.8


Code Description
2.1.1 0010195597- Development of construction drawings
2.1.2 00010-00010
0010195597- Development of construction
Removal of existing structure drawings
from insidrequired for
2.1.3 00010-00040
0010195597- Removal
Repairingof ofexisting structure
any defects from duri
identified inside of vessel
2.1.4 00010-00060
0010195597- Repairing of any defects
Fabrication/installation andidentified
weldingduring
of vessel inspection
2.1.5 00010-00070
0010195597- Installation and
Replacement ofwelding
deflectorofplate
new ofremovable
nozzle structure as per
2.1.6 00010-00080
0010195597- Replacement of deflector plate
Pre and post heat treatment as per of nozzle
proceas per developed
2.1.7 00010-00090
0010195597- Pre and post heat of
Inspection/testing treatment
the weldas per procedure/standard,
joints an where
2.1.8 00010-00120
0010195597- Inspection/testing
Hydrostatic test of of the weldunit
complete joints and complete work by
after
2.1.9 00010-00150
0010195597- Hydrostatic test
Mobilization of complete unit
/ Demobilization after completion of work
charges
2.1.10 00010-00160
0010195597- Mobilization / Demobilization charges
ASME authorized inspector charges for in
00010-00170
Section Sub Total ASME authorized inspector charges for inspection and R-
S OR COLUMNS FROM THE EXCEL RESPONSE SPREADSHEET, OR EDIT ANY FORMULAE WITHIN THE SPREADSHEET AS THIS M

quoting for same specs or a variant.


Response Guide Response
Select one of the
Options listed
Select one in the
of the
Options listed
Select one in the
of the
Options listed
Select one in the
of the
Optionsone
Select listed in the
of the
Options listed in the
Select one of the
Options listed
Select one in the
of the
Options listed
Select one in the
of the
Optionsone
Select listed in the
of the
Options listed in the
Select one of the
Options listed in the

Response Guide Response


The applicable
attachment must be
The applicable
attachment must be
The applicable
attachment
The must be
applicable
attachment must be
The applicable
attachment must be
The applicable
attachment must be
The applicable
attachment
The must be
applicable
attachment must be
The applicable
attachment must be
The applicable
attachment must be
The applicable
attachment
The must be
applicable
attachment must be
nce certificate from organizations.
itted documents from the respective agencies.
Response Guide Response
The applicable
attachment must be
Select the applicable
response
Enter plainfrom
textthe drop
Select the applicable
response
Select thefrom the drop
applicable
response
Select thefrom the drop
applicable
response
Select thefrom the drop
applicable
response from the drop
The applicable
attachment must be
The applicable
attachment must be
The applicable
attachment must be
Select the applicable
response from the drop
requirements, may lead to disqualification of the Bidder.

Single Option
(Exclusive Sales / Services
List
Unit of Measurement Quantity Taxes) Price Tax %
AU 1 0
AU 1 0
AU 1 0
AU 1 0
AU 1 0
AU 1 0
AU 1 0
AU 1 0
AU 1 0
AU 1 0
0
E SPREADSHEET AS THIS MAY CAUSE THE IMPORT OF THE SPREADSHEET TO FAIL.
Formula Comments
Total (Inclusive
Sales Tax) Comments

You might also like