2 Material Submittal Form

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Material Submittal Form

Submittal Ref. Revision 00 Date


Program Title:
Project Title: College of Engineering Pune (COEP)
Architect :- Christopher Charles Benninger Architect (CCBA)
PM: Convurt
Contractor: SHUBHAM EPC PVT LTD

Discipline  Civil  Architecture  Mechanical  Electrical  Others ……………….

Material Details List of Enclosure


Specs. / BOQ / Drawings Copy of related spec’s
Reference
Specified Material Compliance Statement
Proposed Material Samples
Manufacturer / Local Supplier Others (Specify)

Reason for Alternative (if any)


Remarks

Contractor Signatures & Stamp:


Discipline Engineer QA/ QC HSE MEP Construction Manager

Received By Engineer:
Name Signature Date/ Time 2018-11-21
Submittal Status:-
A- Approved B- Approved with Comments C- Revise and Resubmit D- Rejected
Engineer’s Comments:-

PM’s Comments:-

Client’s Comments:-

Received By (Contractor)