Manufacturing Progress 04112023
Manufacturing Progress 04112023
Manufacturing Progress 04112023
ACTUAL
SHIPMENT SHIPMENT SHIPMENT WEIGHTED PROGRESS BY VENDOR WEIGHTED PER PROGRESS BY Estimated Time Actual Time Estimated Time Actual Time
DESCRIPTION VENDOR QTY UOM Description WEIGHTED Progress Photo NOTES Position of Installation
NO. GROUP FROM VALUE % DATA VALUE % SITE SITE Delivery Delivery Arrival Arrival
VALUE %
CIBEET
3 pallet drive unit
3 open shaft
O1 1 Scrapers (Cibeet) JAG Metalbau 18 packages 3 bundle flat steel Germany 2.94% 100.00% 2.94% 7.97% 7.97% 11-May-23 12-May-23 22-Jun-23 27-Jun-23 Photos 27 Jun at Tj. Priuk Port. 13 July on warehouse hydro-PAQ = 3 units
3 bundle angle-profil
3 crate accessories
7 shaft Coagulation Basin = 3 pcs
O1 2 Mixers (Cibeet) E+B Umwelttechnik 7 packages 7 impeller France 3.10% 100.00% 3.10% 8.41% 8.41% 12-May-23 18-May-23 30-Jun-23 23-Jun-23 Photos 23 Jun at Tj. Priuk Port. 14 July on warehouse Flocculation = 3 pcs
7 head Post Coagulation = 1 pc
O2 3 Screens (Cibeet) Top Industry China 0.63% 100.00% 0.63% 1.70% 1.70% 25-Sep-23 25-Sep-23 12-Oct-23 11-Oct-23 Photos 11 Oct at Jakarta Port, 4 Nov at Warehouse Tambun
1 belt conveyor
1 set 1 mechanical coarse screen intake system = 1 set
Conveyors (Cibeet) Top Industry 2 mechanical fine screen China 0.76% 100.00% 0.76% 2.07% 2.07% 25-Sep-23 25-Sep-23 12-Oct-23 11-Oct-23 Photos 11 Oct at Jakarta Port, 4 Nov at Warehouse Tambun
trending of SCU
Compact unit with sensor and LCD Screen
P1 16 Instruments (Cibeet) Chem Kimia 1 unit Output Penang, MY 0.16% 100.00% 0.16% 0.44% 0.44% 29-Oct-23 8-Oct-23 16-Oct-23 17-Oct-23 Photos at Jakarta Port hydro-PAQ Coagulation-Flocculation Transfer Pipe = 1 unit
Sensor Calibration
Accessories: rotameter, flow control, valve and piping
P2 17 Valves (steel) - (Cibeet) Chuah Valve Manufacture 1 lot Penang, MY 5.10% 100.00% 5.10% 13.82% 13.82% 25-Oct-23 TBC 3-Nov-23 TBC on progress fabrication hydropaq, hydrofil, blower discharge, decanter
P2 18 PLC Panel (Cibeet) Bakat 1 set Penang, MY 4.79% 100.00% 4.79% 12.98% 12.98% 25-Oct-23 TBC 3-Nov-23 TBC MCC Room
P2 19 Chemical Dosing Boxes (Cibeet) BW Water 1 lot Penang, MY 0.83% 75.00% 0.62% 2.24% 1.68% 20-Nov-23 TBC 28-Nov-23 TBC chemical room
Raw Water Intake Sump = 2 pcs
Dirty Wash Water Basin = 2 pcs
Clear Wash Water Basin = 1 pc
Service Water Pump = 2 pcs
Clear Water Basin = 1 pc
Reservoir = 2 pcs
Decanter Feed Pump Common Discharge Line = 2 pcs
Polymer Dosing Discharge Line = 4 pcs
Coagulation Tank = 1 pc
Coagulation Tank Common Outlet Pipe = 1 pc
P2 20 Instruments (Cibeet) Sanpo 1 lot Penang, MY 0.78% 100.00% 0.78% 2.11% 2.11% 20-Nov-23 TBC 28-Nov-23 TBC Photos delivered in BW Penang Warehouse NaOCl A Tank = 1 pc
Pre-NaOCl Dosing Pump Suction Common Line = 1 pc
NaOH Tank = 1 pc
NaOH Dosing Pump Discharge = 1 pc
H2SO4 Tank = 1 pc
H2SO4 Dosing Pump Discharge = 1 pc
Service Water Tank = 1 pc
Service Water to PPU Common Line = 1 pc
Intake Sump Pump = 1 pc
Back Wash Sump Pump = 1 pc
Distribution Sump Pump = 1 pc
BEKASI
5 pallet drive unit
5 open shaft
O1 1 Scrapers (Bekasi) JAG Metalbau 33 package 5 bundle flat steel Germany 6.08% 100.00% 6.08% 9.63% 9.63% 25-Sep-23 25-Sep-23 7-Nov-23 TBC Photos on delivery process hydro-PAQ = 5 units
5 bundle angle-profil
5 crate accessories
21 shaft Coagulation Basin = 10 pcs
2 Mixers (Bekasi) E+B Umwelttechnik 21 package 21 impeller France 5.17% 100.00% 5.17% 8.20% 8.20% 9-Sep-23 9-Sep-23 10-Oct-23 20-Oct-23 Photos 20 Oct at Jakarta Port. 25 Oct on warehouse Flocculation = 10 pcs
21 head Post Coagulation = 1 pc
3 Screens (Bekasi) Top Industry 2 belt conveyor type D China 1.31% 100.00% 1.31% 2.08% 2.08% 25-Sep-23 25-Sep-23 12-Oct-23 11-Oct-23 Photos 11 Oct at Jakarta Port, 4 Nov at Warehouse Tambun
1 belt conveyor type H
2 set intake system = 2 sets
1 mechanical coarse screen
Conveyors (Bekasi) Top Industry China 1.01% 100.00% 1.01% 1.60% 1.60% 25-Sep-23 25-Sep-23 12-Oct-23 11-Oct-23 Photos 11 Oct at Jakarta Port, 4 Nov at Warehouse Tambun
2 mechanical fine screen
2 pcs decanter centrifuges China
4 Decanter LW 450 X 1800 (Bekasi)Gate Valve LWPZ 450 Jiangsu Huada 2 set 4.79% 100.00% 4.79% 7.59% 7.59% 6-Oct-23 6-Oct-23 16-Oct-23 17-Oct-23 17 Oct at Jakarta Port, 4 Nov at Warehouse Tambun Dewatering = 2 sets
2 pcs water sludge separation gate valve
5 Lamella (Bekasi) E+B Umwelttechnik 35 set 35 wooden pallets (1150 pcs) China 2.29% 100.00% 2.29% 3.63% 3.63% 26-Sep-23 26-Sep-23 15-Oct-23 16-Oct-23 Photos at Jakarta Port hydro-PAQ = 35 sets
6 Gensets 2250 KVA / 1800 KW (Bekasi) Asianet Ventures 5 pcs China 10.25% 100.00% 10.25% 16.24% 16.24% 25-Oct-23 TBC 25-Nov-23 TBC Generator Room = 5 pcs
hydro-PAQ = 25 pcs
P1 40 pcs pump Penang, MY Photos
7 Sludge Pumps (Bekasi) Netzsch 40 unit 1.72% 100.00% 1.72% 2.72% 2.72% 29-Oct-23 8-Oct-23 16-Oct-23 at Jakarta Port Chemical Dosing = 13 pcs
40 pcs temperature controller 17-Oct-23 Dewatering = 2 pcs
P1 Penang, MY Photos PPU for Flocculation = 2 pcs
8 Polymer Preparation Unit (PPU) - (Bekasi) Prominent 4 pcs 1.05% 100.00% 1.05% 1.67% 1.67% 29-Oct-23 8-Oct-23 16-Oct-23 at Jakarta Port
PPU for Dewatering = 2 pcs
P1 9 Air Blowers units TH-300A (Bekasi) Trundean 3 pcs Penang, MY 0.80% 100.00% 0.80% 1.26% 1.26% 29-Oct-23 8-Oct-23 16-Oct-23 Photos at Jakarta Port hydro-FIL = 3 pcs
10 pcs control unit 17-Oct-23
P1 10 Delta Mobrey Instruments (Bekasi) Delta Mobrey 10 set Penang, MY 0.35% 100.00% 0.35% 0.55% 0.55% 29-Oct-23 8-Oct-23 16-Oct-23 Photos at Jakarta Port hydro-PAQ Sedimentation Basin = 10 pcs
10 pcs ultrasonic gap sensor
P1 11 Instruments - SM9000 & SM0510 (Bekasi) 7 pcs carton of instrument: 29-Oct-23 8-Oct-23 16-Oct-23 at Jakarta Port Polymer Dilution Panel = 11 pcs
Instruments - EVC004 & EVC002; KQ6005; E12163; EVE004 IFM 1 lot 1 pcs Carton Model SM9000 Penang, MY 0.31% 100.00% 0.31% 0.48% 0.48% 17-Oct-23 Coagulation Tank A = 4 pcs
P1 12 29-Oct-23 8-Oct-23 16-Oct-23 at Jakarta Port
(Bekasi) 2 pcs Carton Model KQ6005 NaOCl Tank A, B, C = 6 pcs
trending of SCU
Compact unit with sensor and LCD Screen
P1 13 Instruments (Bekasi) Chem Kimia 2 unit Output Penang, MY 0.27% 100.00% 0.27% 0.43% 0.43% 29-Oct-23 8-Oct-23 16-Oct-23 17-Oct-23 Photos at Jakarta Port hydro-PAQ Coagulation-Flocculation Transfer Pipe = 2 unit
Sensor Calibration
Accessories: rotameter, flow control, valve and piping
16 pcs penstock
P3 14 Penstocks (Bekasi) Lecotech 16 unit 16 pcs handwheel Penang, MY 0.96% 85.00% 0.82% 1.53% 1.30% 20-Nov-23 TBC 28-Nov-23 TBC intake channel, hydrofil and reservoir
16 pcs stem cover
P5 15 Chemical Dosing Boxes (Bekasi) 2 BW Water 1 lot Penang, MY 1.38% 70.00% 0.97% 2.19% 1.53% TBC TBC TBC TBC chemical room
Raw Water Intake Sump = 2 pcs
Dirty Wash Water Basin = 2 pcs
Clear Wash Water Basin = 1 pc
Service Water Pump Discharge Line = 2 pcs
Clear Water Basin = 1 pc
Reservoir = 2 pcs
Decanter Feed Pump Common Discharge Line = 2 pcs
Polymer Dosing Discharge Line = 11 pcs
Coagulation Tank = 1 pc
Coagulant Tank Common Outlet Pipe = 1 pc
P2 Penang, MY Photos NaOCl Tank = 1 pc
16 Instruments (Bekasi) Sanpo 1 lot 37 pcs instrument 1.30% 100.00% 1.30% 2.05% 2.05% 20-Nov-23 TBC 28-Nov-23 TBC delivered in BW Penang Warehouse
Pre-NaOCl Dosing Pump Discharge = 1 pc
Post-NaOCl Dosing Pump Discharge = 1 pc
NaOH Tank = 1 pc
NaOH Dosing Pump Discharge = 1 pc
H2SO4 Tank = 1 pc
H2SO4 Dosing Pump Discharge = 1 pc
Service Water Tank = 1
Service Water to PPU Common Line = 1 pc
Intake Sump Pump = 1 pc
Back Wash Sump Pump = 1 pc
Distribution Sump Pump = 1 pc
Raw Water Intake Sump = 5 pcs
Intake Feed Pump Common Discharge Line = 1 pc
Hydro-PAQ Effluent Channel = 2 pcs
Hydro-PAQ Inlet Line = 10 pcs
Hydro-PAQ Sludge Recirculation Pump = 10 pcs
Hydro-PAQ Sludge Excess Pump Common Line = 5 pcs
P3 17 Instruments (Bekasi) E+H (Endress Houser) 1 lot 75 pcs instrument Penang, MY 2.56% 100.00% 2.56% 4.06% 4.06% 20-Nov-23 TBC 28-Nov-23 TBC delivered in BW Penang Warehouse Post Coagulation Basin = 1 pc
Hydro-FIL = 33 pcs
Dirty Wash Water Pump Common Discharge Line = 1 pc
Back Wash Water Pump Discharge Line = 1 pc
Clear Water Basin = 2 pcs
Reservoir = 3 pcs
Sludge Holding Tank = 1 pc
Intake Feed Pump Discharge Line = 5 pcs
Hydro-PAQ Sludge Recirculation Pump = 15 pcs
Hydro-PAQ Sludge Excess Pump Discharge = 10 pcs
Dirty Wash Water Pump Discharge Line = 2 pcs
Back Wash Water Pump Discharge Line = 3 pcs
Service Water Pump Discharge Line = 2 pcs
Decanter Feed Pump Discharge Line = 3 pcs
Polymer Dosing Discharge Line = 11 pcs
P2 18 Instrument - PI - Pressure Gauge Wika 77 pcs 0.00% 100.00% 0.00% 0.00% 0.00% TBC TBC TBC TBC Photos delivered in BW Penang Warehouse
Decanter Polymer Dosing Pump Discharge = 2 pcs
Coagulant Dosing Pump Discharge = 11 pcs
Post Coagulant Dosing Pump Discharge = 2 pcs
Pre-NaOCl Dosing Pump Discharge = 2 pcs
Post-NaOCl Dosing Pump Discharge = 2 pcs
NaOH Dosing Pump Discharge = 2 pcs
H2SO4 Dosing Pump Discharge = 2 pcs
Service Water Line = 3 pcs
P5 19 Valves (steel) - (Bekasi) Chuah Valve Manufacture 1 lot Penang, MY 8.50% 80.00% 6.80% 13.47% 10.78% TBC TBC TBC TBC hydropaq, hydrofil, blower discharge, decanter
P5 20 Valves (plastic) - (Bekasi) Hershey 1 lot Penang, MY 0.52% 100.00% 0.52% 0.82% 0.82% TBC TBC TBC TBC in chemical system and service water
P5 21 CPVC Pipe & Fittings (Bekasi) Hershey 1 lot Penang, MY 0.57% 100.00% 0.57% 0.90% 0.90% TBC TBC TBC TBC in chemical system and service water
P5 22 Bellows expansion joints (Bekasi) Flytech 1 lot Penang, MY 0.40% 100.00% 0.40% 0.64% 0.64% TBC TBC TBC TBC almost in centrifugal pump
P4 23 PLC Panel 2 (Bekasi) Bakat 1 lot Penang, MY 7.99% 50.00% 3.99% 12.66% 6.33% TBC TBC TBC TBC MCC Room
24 Local Control Panels (Bekasi) BW Water lot Penang, MY 0.49% 0.00% 0.77% 0.00% TBC TBC TBC TBC MCC Room
25 Valve Control Panels (Bekasi) BW Water 1 lot Penang, MY 0.45% 0.00% 0.71% 0.00% TBC TBC TBC TBC MCC Room
P2 26 Valves (pressure relief) - (Bekasi) Bermad 1 lot Penang, MY 0.56% 100.00% 0.56% 0.88% 0.88% TBC TBC TBC TBC production completed intake channel
27 Gaskets (Bekasi) SJP 1 lot Penang, MY 0.14% 100.00% 0.14% 0.22% 0.22% TBC TBC TBC TBC in all valves
P5 Penang, MY from backwash to hydrofil, from dirty wash to intake and from hydropaq to sludge
28 Nuts/Bolts (Carbon Steel (black)) - Bekasi Advanced Bolt 1 lot 0.39% 100.00% 0.39% 0.62% 0.62% TBC TBC TBC TBC
decanter
TBC from backwash to hydrofil, from dirty wash to intake and from hydropaq to sludge
29 Carbon Steel Pipe & Fittings Hunan 1 lot 1.51% 0.00% 0.00% 2.39% 0.00%
decanter
SHIPMENT
PROGRESS BY
SHIPMENT SHIPMENT WEIGHTED ACTUAL WEIGHTED PROGRESS BY Estimated Time Actual Time Estimated Time Actual Time
DESCRIPTION VENDOR QTY UOM Description VENDOR Progress Photo NOTES Position of Installation
NO. GROUP VALUE % PROGRESS % PER SITE SITE Delivery Delivery Arrival Arrival
FROM TO DATA%
CIBEET
1 unit overhead crane 2 ton
1 1.1 Overhead Crane C PT Maeda Wijaya Prakarsa (MAEWISA) 2 sets Jakarta Tambun 0.80% 90.00% 0.72% 2.13% 1.92% pump room and intake channal
1 unit overhead crane 1 ton
1 1.2 Filter Nozzles PT Tridita Yasa Mandiri 11,340 pcs Bekasi Tambun 2.40% 100.00% 2.40% 6.39% 6.39% 11-Jun-23 19-Jun-23 19-Jun-23 19-Jun-23 Photos DO signed; storage on Warehouse Tambun hydro-FIL
Collection Trough, Flocculation Basin and Lamella
1 1.3 Turbine and other Fabricated Items - C PT Medina Engineering 1 lot Bekasi Tambun 5.11% 87.14% 5.11% 13.62% 13.62%
Support
- Collection Through Cibeet PT Medina Engineering 30 pcs Cikarang Tambun 1.63% 100.00% 1.63% 4.33% 4.33% 1-Jun-23 26-May-23 26-May-23 26-May-23 Photos DO signed; storage on Warehouse Tambun
3 pcs top shell
3 pcs baffle
- Turbine (Draft Through)/(Flocculation Basin) PT Medina Engineering 3 sets Cikarang Tambun 2.32% 100.00% 2.32% 6.19% 6.19% 15-Jun-23 16-Jun-23 16-Jun-23 16-Jun-23 Photos DO signed; storage on Warehouse Tambun
3 pcs inlet pipe hydro-PAQ
3 pcs bottom shell
2 2.1 Cables (partial 1) PT Prysmian 1 lot 8300 m Cikarang Tambun 6.51% 100.00% 6.51% 17.35% 17.35% 28-Sep-23 29-Sep-23 28-Sep-23 29-Sep-23 DO signed; storage on Warehouse Tambun electrical accessories
2 2.2 FRP Chemical Tanks PT Graha Adhi Jaya 5 pcs N. JKTA Tambun 0.40% 100.00% 0.40% 1.07% 1.07% 20-Jul-23 20-Jul-23 20-Jul-23 20-Jul-23 Photos DO signed; storage on Warehouse Tambun chemical room = 5 pcs
2 2.3 Transformer PT Asata Utama 2 pcs JKTA Tambun 2.60% 100.00% 2.60% 6.93% 6.93% 22-Jun-23 22-Jun-23 22-Jun-23 22-Jun-23 Photos DO signed; storage on Warehouse Tambun transformer room = 2 pcs
2 2.4 FRP Pipe & Fittings - Partial 1 PT Graha Adhi Jaya 35 sets (pipe, flange, elbow, shop joint) 2.00% 100.00% 2.00% 5.33% 5.33% 15-Jun-23 19-Jun-23 15-Jun-23 19-Jun-23 Photos DO signed; storage on Site intake to hydropaq
1 lot N. JKTA Site
FRP Pipe & Fittings - Partial 2 PT Graha Adhi Jaya 30 sets (pipe, flange, elbow, shop joint) 28-Aug-23 28-Aug-23 28-Aug-23 28-Aug-23 DO signed; storage on Site intake to hydropaq
2 2.5 Low Voltage MCC Panels PT Industri Elektrik Metal 2 pcs JKTA Tambun 6.91% 100.00% 6.91% 18.42% 18.42% 16-Oct-23 14-Oct-23 16-Oct-23 14-Oct-23 Photos DO Signed; Storage on Site MCC Room = 2 pcs
2 2.6 Sand & Gravel PT. Heksagon Karyatama Indonesia 1 lot Bandung Tambun 2.45% 0.00% 0.00% 6.54% 0.00% TBC TBC TBC TBC hydrofil
already on warehouse as below: (25 oct) intake system = 2 pcs
12 pumpset Cibeet Hydro-FIL = 6 pcs
3 3.2 Centrifugal Pumps 1 (Partial) Wilo 16 unit Tangerang Tambun 6.31% 100.00% 6.31% 16.82% 16.82% 11-Oct-23 11-Oct-23 11-Oct-23 11-Oct-23
12 pumpset Bekasi Water Distribution = 4 pcs
3 sump pump Pump Sump Area = 4 pcs
4 4.4 CCTV TBC TBC JKTA Tambun 0.34% 0.00% 0.00% 0.91% 0.00% TBC
6 6.1 Medium Voltage Switchgear PT Uni Makmur Elektrika 1 pcs JKTA Tambun 1.68% 100.00% 1.68% 4.49% 4.49% TBC TBC TBC TBC Photos FAT 14 Sep MCC Room
Street Lighting TBC street
Electrical Accessories (Cables for LV, MV) PT. Prima Indah Lestari TBC MCC Room
37.50% 34.62% 100.00% 92.33%
BEKASI
1 1.1 Overhead Crane B PT Maeda Wijaya Prakarsa (MAEWISA) 2 sets 2 crane 10 ton JKTA Tambun 1.33% 50.00% 0.67% 2.13% 1.07% pump room and intake channal
1 1.2 Filter Nozzles PT Tridita Yasa Mandiri 116,270 pcs Bekasi Tambun 4.00% 100.00% 4.00% 6.39% 6.39% 11-Jun-23 20-Jun-23 20-Jun-23 20-Jun-23 Photos DO signed; storage on Warehouse Tambun hydro-FIL
Collection Trough, Flocculation Basin and Lamella
1 1.3 Turbine and other Fabricated Items - B PT Medina Engineering 1 lot Bekasi Tambun 8.51% 100.00% 8.51% 13.62% 13.62%
Support
- Collection Through Bekasi PT Medina Engineering 100 pcs Bekasi Tambun 2.71% 100.00% 2.71% 4.33% 4.33% 22-Jun-23 22-Jun-23 22-Jun-23 27-Jun-23 Photos DO signed; storage on Warehouse Tambun
10 pcs Frame WF
10 pcs Frame UNP
- Lamella Support Bekasi PT Medina Engineering 10 sets Bekasi Tambun 2.13% 100.00% 2.13% 3.41% 3.41% 23-Jun-23 23-Jun-23 23-Jun-23 23-Jun-23 Photos DO signed; storage on Warehouse Tambun
10 pcs Flat Steel 3637
10 pcs Flat Steel 3652
2 2.1 Cables (partial 2) PT Prysmian 1 lot Cikarang Tambun 10.84% 100.00% 10.84% 17.35% 17.35% 15-Dec-23 29-Sep-23 15-Dec-23 29-Sep-23 FAT 8 Dec electrical accessories
2 2.2 FRP Chemical Tanks PT Graha Adhi Jaya 8 pcs N. JKTA Tambun 0.67% 60.00% 0.40% 1.07% 0.64% TBC TBC TBC TBC Photos Chemical Room = 8 pcs
2 2.3 Transformer PT Asata Utama 5 pcs JKTA Tambun 4.33% 100.00% 4.33% 6.93% 6.93% 22-Jun-23 22-Jun-23 22-Jun-23 22-Jun-23 Photos DO signed; storage on Warehouse Tambun Transformer Room = 5 pcs
2 2.4 FRP Pipe & Fittings - Partial 1 PT Graha Adhi Jaya N. JKTA Tambun 3.33% 40.00% 1.33% 5.33% 2.13% TBC TBC TBC TBC Embedded Pipe Delivered to Bekasi Site (10 Oct) intake to hydropaq
1 lot
FRP Pipe & Fittings - Partial 2 PT Graha Adhi Jaya TBC TBC TBC TBC FAT 4-Jan 2024, to bekasi site if Ready intake to hydropaq
2 2.5 Low Voltage MCC Panels PT Industri Elektrik Metal 5 pcs JKTA Tambun 11.51% 60.00% 6.91% 18.42% 11.05% 1-Nov-23 TBC 1-Nov-23 TBC Photos On progress fabrication MCC Room = 5 pcs
2 2.6 Sand & Gravel PT. Heksagon Karyatama Indonesia 1 lot Bandung Tambun 4.09% 0.00% 0.00% 6.54% 0.00% TBC TBC TBC TBC hydrofil
4 4.4 CCTV TBC TBC JKTA Tambun 0.57% 0.00% 0.00% 0.91% 0.00% TBC
6 6.1 Medium Voltage Switchgear PT Uni Makmur Elektrika 1 pc JKTA Tambun 2.81% 100.00% 2.81% 4.49% 4.49% TBC TBC TBC TBC On progress fabrication MCC Room
Street Lighting TBC street
Electrical Accessories (Cables for LV, MV) PT. Prima Indah Lestari TBC MCC Room
28-Jun-23
Actual Weighted
Weighted Value % Progress by Site
Value %
OFFSHORE CIBEET 36.94% 25.67% 68.87%
OFFSHORE BEKASI 63.06% 43.15% 68.42%
Total 100.00% 68.82%
8-Jul-23
Actual Weighted
Weighted Value % Progress by Site
Value %
OFFSHORE CIBEET 36.94% 26.50% 71.72%
OFFSHORE BEKASI 63.06% 42.46% 67.33%
Total 100.00% 68.96%
14-Jul-23
Actual Weighted
Weighted Value % Progress by Site
Value %
OFFSHORE CIBEET 36.94% 26.81% 72.57%
OFFSHORE BEKASI 63.06% 42.62% 67.59%
Total 100.00% 69.43%
5-Aug-23
Actual Weighted
Weighted Value % Progress by Site
Value %
OFFSHORE CIBEET 36.95% 27.15% 73.49%
OFFSHORE BEKASI 63.05% 43.02% 68.22%
Total 100.00% 70.17%
10-Aug-23
Actual Weighted
Weighted Value % Progress by Site
Value %
OFFSHORE CIBEET 36.95% 27.73% 73.49%
OFFSHORE BEKASI 63.05% 43.77% 68.22%
Total 100.00% 71.50%
26-Aug-23
Actual Weighted
Weighted Value % Progress by Site
Value %
OFFSHORE CIBEET 36.95% 28.36% 76.76%
OFFSHORE BEKASI 63.05% 44.61% 70.76%
Total 100.00% 72.97%
8-Sep-23
Actual Weighted
Weighted Value % Progress by Site
Value %
OFFSHORE CIBEET 36.95% 29.38% 79.52%
OFFSHORE BEKASI 63.05% 47.38% 75.15%
Total 100.00% 76.76%
16-Sep-23
Actual Weighted
Weighted Value % Progress by Site
Value %
OFFSHORE CIBEET 36.95% 32.91% 89.16%
OFFSHORE BEKASI 63.05% 51.01% 80.87%
Total 100.00% 83.92%
23-Sep-23
Actual Weighted
Weighted Value % Progress by Site
Value %
OFFSHORE CIBEET 36.95% 34.11% 92.39%
OFFSHORE BEKASI 63.05% 51.01% 80.87%
Total 100.00% 85.12%
7-Oct-23
Actual Weighted
Weighted Value % Progress by Site
Value %
OFFSHORE CIBEET 36.95% 34.15% 92.39%
OFFSHORE BEKASI 63.05% 51.03% 80.87%
Total 100.00% 85.18%
13-Oct-23
Actual Weighted
Weighted Value % Progress by Site
Value %
OFFSHORE CIBEET 36.95% 34.61% 92.50%
OFFSHORE BEKASI 63.05% 51.03% 80.90%
Total 100.00% 85.64%
20-Oct-23
Actual Weighted
Weighted Value % Progress by Site
Value %
OFFSHORE CIBEET 36.95% 34.61% 92.50%
OFFSHORE BEKASI 63.05% 51.03% 80.90%
Total 100.00% 85.64%
4-Nov-23
Actual Weighted
Weighted Value % Progress by Site
Value %
OFFSHORE CIBEET 36.95% 35.11% 93.86%
OFFSHORE BEKASI 63.05% 54.40% 84.81%
Total 100.00% 89.51%
Work Progress %
100% Delivered
Work Progress %
100% Delivered
Work Progress % Valves ready, waiting for the delivery of elec. Actuators
Work Progress %
100% Delivered
Work Progress % Valves ready, waiting for the delivery of elec. Actuators (Batch 2).
Work Progress %
90%
No Description Photo
No Description Photo
1
PROGRESS REPORT
DATE : 27.10.2023
CLIENT : BW WATER SDN BHD
PRODUCT : 1. WM RS PENSTOCK 1900WX2500H C/W ISO FL F16 SS304
(CLOSED FRAME & EXTENDED FRAME) – QTY 1 SET
2. WM RS PENSTOCK 1900WX2500H C/W ISO FL F16 SS304
(CLOSED FRAME & EXTENDED FRAME) – QTY 4 SETS
3. WM RS PENSTOCK 800WX800H C/W ISO FL F10 SS304
(CLOSED FRAME & EXTENDED FRAME) – QTY 11 SETS
2
PROGRESS REPORT
DATE : 27.10.2023
CLIENT : BW WATER SDN BHD
PRODUCT : 1. WM RS PENSTOCK 1900WX2500H C/W ISO FL F16 SS304
(CLOSED FRAME & EXTENDED FRAME) – QTY 1 SET
2. WM RS PENSTOCK 1900WX2500H C/W ISO FL F16 SS304
(CLOSED FRAME & EXTENDED FRAME) – QTY 4 SETS
3. WM RS PENSTOCK 800WX800H C/W ISO FL F10 SS304
(CLOSED FRAME & EXTENDED FRAME) – QTY 11 SETS
3
PROGRESS REPORT
DATE : 27.10.2023
CLIENT : BW WATER SDN BHD
PRODUCT : 1. WM RS PENSTOCK 1900WX2500H C/W ISO FL F16 SS304
(CLOSED FRAME & EXTENDED FRAME) – QTY 1 SET
2. WM RS PENSTOCK 1900WX2500H C/W ISO FL F16 SS304
(CLOSED FRAME & EXTENDED FRAME) – QTY 4 SETS
3. WM RS PENSTOCK 800WX800H C/W ISO FL F10 SS304
(CLOSED FRAME & EXTENDED FRAME) – QTY 11 SETS
4
PROGRESS REPORT
DATE : 27.10.2023
CLIENT : BW WATER SDN BHD
PRODUCT : 1. WM RS PENSTOCK 1900WX2500H C/W ISO FL F16 SS304
(CLOSED FRAME & EXTENDED FRAME) – QTY 1 SET
2. WM RS PENSTOCK 1900WX2500H C/W ISO FL F16 SS304
(CLOSED FRAME & EXTENDED FRAME) – QTY 4 SETS
3. WM RS PENSTOCK 800WX800H C/W ISO FL F10 SS304
(CLOSED FRAME & EXTENDED FRAME) – QTY 11 SETS
5
PROGRESS REPORT
DATE : 27.10.2023
CLIENT : BW WATER SDN BHD
PRODUCT : 1. WM RS PENSTOCK 1900WX2500H C/W ISO FL F16 SS304
(CLOSED FRAME & EXTENDED FRAME) – QTY 1 SET
2. WM RS PENSTOCK 1900WX2500H C/W ISO FL F16 SS304
(CLOSED FRAME & EXTENDED FRAME) – QTY 4 SETS
3. WM RS PENSTOCK 800WX800H C/W ISO FL F10 SS304
(CLOSED FRAME & EXTENDED FRAME) – QTY 11 SETS