Mechanical Assembly

Report
HBF Trains J1, J2, K1, K2

For:
Laayoune Wash Plant
Nouvelle Laverie De Laayoune

Jacobs Engineering S.A.


Project Number: Q6521
Purchase Order Number: 354-355L/17

WesTech Contact:
Project Manager: Luiz Infanti
Phone: 801.290.1880
Email: LInfanti@westech-inc.com
WesTech Job Number: 23179 B
Client Document Number: Q6521-WES-Q-06f-011

1 For Information Only VEND IN169 2019-01-14


Rev Description By Checked Date
For:
Laayoune Wash Plant
Nouvelle Laverie De Laayoune

Equipment:
Mechanical Assembly Report
HBF Trains J1, J2, K1, K2

Engineer:
Jacobs Engineering, S.A.
Casablanca, Morocco
Contact: Dali Yacoub
Phone: +212 (0)6 6210 6524
Email: Yacoub.Dali@Jacobs-esa.com

WesTech Agent:
ALTERTECH MAROC
4, bd El Hachemi El Filali, lotiss. Chah 1
Casablanca
Contact: Hassan Hamdi
Phone: +212 (0) 522 21 46 04
Email: hhamdi@altertechmaroc.com

Manufacturer:
WesTech Engineering, Inc.
3665 South West Temple
Salt Lake City, Utah 84115
Phone: 801.265.1000
Fax: 801.265.1080
24 Hour Emergency Assistance 801.265.1000

WesTech Contact:
Project Manager: Luiz Infanti
Phone: 801.290.1880
Email: LInfanti@westech-inc.com

WesTech Job Number: 23179 B


Client Document Number: Q6521-WES-Q-06f-011
Cover Page
Title Page
Table of Contents

Mechanical Assembly Report – HBF Trains J1, J2, K1, K2


Photographic Report
Inspection Reports
Mechanical Assembly Report
HBF Trains J1, J2, K1, K2

Tag Number(s):
06J1-FB-01A, 06J2-FB-01B, 06K1-FB-01A, 06K2-FB-01B

Work with Document(s):


Q6521-WES-M-02a-002
Photographic Report
JESA Delivered Foundation, Ready to Start Assembly on 28 of
September 2018
Assembly of Lower Frame
Assembly of Lower Frame
Assembly of Rollers
Preparing Drainage Belt
Preparing Drainage Belt
Spreading Drainage Belt
Spreading Drainage Belt
Preparing to Stage the Driven Pulley Inside the Drainage Belt
Drive Pulley Staged Inside the Drainage Belt
Positioning Drive Pulley

Positioning Driven Pulley


Drainage Belt Support Installation, To Allow Working Inside
“C” Shape Support for Wear Strips
Installation of Vacuum Box and Wear Strips for Vacuum Box
Installation of Wear Strips (Drainage Belt Support)
Wear Strips Lubrication (Water)
Driven Pulley
Detail of Drainage Belt Support and Vacuum Box Lifting Device
Cloth and Belt Wash System
Feed Box, Cake Formation Roll, and Scraper
Drive
Discharge Hopper
Train J
Mechanical Assembly Finished on 27 of November 2018
Trains J and K

Remarks:
At this point of the project, Jacobs was intensely working on foundations and building.
Some of the activities to finalize the filters assembly are delicate and depend on having the area to
be cleared, and commission should be close, so it was agreed (WesTech and Jacobs) to stop the
assembly at this point, and WesTech would mobilize a second time when the building is available,
and commissioning would be close.
The pending items listed on the next pages, are the issues listed by Jacobs and WesTech, and the
some are solved, some are Jacobs responsibility, and some will be resolved on the next WesTech’s
mobilization.
At this point, WesTech considers the assembly is at 90% and will invoice that amount.
Punch list for Laayoune Wash Plant project:

Description Comment

The pumps, motors and reducers need to be Jacobs shall provide protection
protected by cover in yard.
Platform erection: Who will oversee erecting the Jacobs/OCP
platform and walkway?
All 4 filters should be covered completely Jacobs shall provide cover
Paint issue Paint procedure submitted on 15/Jan/18.
Paint will be finished on the next mobilization,
All four filters need touch up the damage paint after the mechanical assembly is finished.
ASAP. Westech should submit the paint repair
procedure and schedule to Jacobs ASAP. Jacobs must inform WesTech when the second
mobilization will be possible, with 30 days
advance, for arrangements.
Service report, HBF installation report should Present document
be submitted to Jacobs review.
All bearing holes should be plugged, protect Done
form dust.
Motors and reducers installation report Next mobilization, WesTech/Aysar should
submit report including bolt tight torque
value, equipment adjust report (levelness,
alignment, when applicable)
All reducer inside should have preservation gas. Reducers will be filled with lubricant on next
mobilization
Air line and water line should different color WesTech will provide different color for air
tube. and water tubbing on next mobilization
Motors paint cracked WesTech will take motors to authorized
service in Casablanca to fix paint.
Fix 3 damaged parts WesTech will have them for the next
mobilization
Nameplates in Chinese and/or rusting WesTech will replace them on next
mobilization
Deliver and install missing bolts for C-channel of Bolts will be installed on next mobilization
wear belt support of HBF J1,
Deliver and install missing 11 bolts (M16*90) of Items will be installed on next mobilization
vacuum hose of HBF K2.
Deliver and install short of O-ring, circlip, 4 bolts Items will be installed on next mobilization
of one bearing of roller.
All fasteners of motors, reducers, roller bearing Bolts for motors and reducers need higher
should SS, not carbon steel mechanical strength are not to be stainless
steel or they will stripe.
Discharge chute of J1 has some distortion, need Chute will be fixed on the next mobilization
repair.
Install the spray nozzle on cloth clean pipe Nozzles will be assembled before
commissioning
Shim the drive roller and drive unit high about To be done next mobilization
of HBF J1.
Deliver and install 28 bearing housings with slot Items will be installed on next mobilization
wall thinner
Install lubrication systems Items will be installed on next mobilization
Deliver and install damaged parts: pneumatic Items will be installed on next mobilization
cloth tension roller support of K2
Track and train drainage belt ITEMS TO BE FINISHED by WESTECH BEFORE
COMMISSIONING (eventual 3rd mobilization)
Bond curbs ITEMS TO BE FINISHED by WESTECH BEFORE
COMMISSIONING (eventual 3rd mobilization)
Drill hole on drainage belt ITEMS TO BE FINISHED by WESTECH BEFORE
COMMISSIONING (eventual 3rd mobilization)
Install top deck items ITEMS TO BE FINISHED by WESTECH BEFORE
COMMISSIONING (eventual 3rd mobilization)
Install the belt guide rolls ITEMS TO BE FINISHED by WESTECH BEFORE
COMMISSIONING (eventual 3rd mobilization)
Inspection Reports
Topology reports
FICHE TOPOGRAPHIQUE
Projet JEC-Q6521-00-IV_L.01a_00001 Ouvrage : SUPPORT FILTR le / /2018

Plan Q6521-WES-M-01a-008-3 Type de réception : levé élévation des platines filtre J

Ref filtre : 06J1-FB-01A


N° FIL N°AXE Théoriques Réels Ecarts(m)
1
A 101.550 101.561 0.011
B 102.550 102.561 0.011

2
A 101.550 101.561 0.011
B 101.550 101.560 0.010

3
A 101.550 101.561 0.011
B 101.550 101.561 0.011

4
A 101.550 101.561 0.011
B 101.550 101.559 0.009

5
A 101.550 101.560 0.010
B 101.550 101.561 0.011

6
A 101.550 101.560 0.010
B 101.550 101.560 0.010

7
A 101.550 101.561 0.011
B 101.550 101.559 0.009

8
A 101.550 101.560 0.010
B 101.550 101.559 0.009

9
A 101.550 101.560 0.010
B 101.550 101.560 0.010

10
A 101.550 101.559 0.009
B 101.550 101.560 0.010

11
A 101.550 101.560 0.010
B 101.550 101.561 0.011

Topographe Aysar Topographe XY Concept

NAME : KHALID IZZI


DATE : 11/27/2018

SIGNATURE:
FICHE TOPOGRAPHIQUE
Projet JEC-Q6521-00-IV_L.01a_00001 Ouvrage : SUPPORT FILTR le / /2018

Plan Q6521-WES-M-01a-008-3 Type de réception : levé élévation des platines filtre J

Ref filtre : 06J2-FB-01B


N° FIL N°AXE Théoriques Réels Ecarts(m)
1
A 101.550 101.560 0.010
B 102.550 102.562 0.012

2
A 101.550 101.559 0.009
B 101.550 101.561 0.011

3
A 101.550 101.561 0.011
B 101.550 101.562 0.012

4
A 101.550 101.560 0.010
B 101.550 101.562 0.012

5
A 101.550 101.561 0.011
B 101.550 101.559 0.009

6
A 101.550 101.559 0.009
B 101.550 101.560 0.010

7
A 101.550 101.561 0.011
B 101.550 101.560 0.010

8
A 101.550 101.561 0.011
B 101.550 101.560 0.010

9
A 101.550 101.559 0.009
B 101.550 101.561 0.011

10
A 101.550 101.560 0.010
B 101.550 101.561 0.011

11
A 101.550 101.559 0.009
B 101.550 101.561 0.011

Topographe Aysar Topographe XY Concept

NAME : KHALID IZZI


DATE : 11/27/2018

SIGNATURE:
FICHE TOPOGRAPHIQUE
Projet JEC-Q6521-00-IV_L.01a_00001 Ouvrage : SUPPORT FILTR le / /2018

Plan Q6521-WES-M-01a-008-3 Type de réception : levé élévation des platines filtre K

Ref filtre : 06K1-FB-01A


N° FIL N°AXE Théoriques Réels Ecarts(m)
1
A 101.550 101.552 0.002
B 102.550 102.551 0.001
2
A 101.550 101.551 0.001
B 101.550 101.550 0.000
3
A 101.550 101.551 0.001
B 101.550 101.551 0.001
4
A 101.550 101.551 0.001
B 101.550 101.551 0.001
5
A 101.550 101.550 0.000
B 101.550 101.551 0.001
6
A 101.550 101.549 -0.001
B 101.550 101.551 0.001
7
A 101.550 101.550 0.000
B 101.550 101.551 0.001
8
A 101.550 101.549 -0.001
B 101.550 101.550 0.000
9
A 101.550 101.550 0.000
B 101.550 101.549 -0.001
10
A 101.550 101.550 0.000
B 101.550 101.551 0.001
11
A 101.550 101.550 0.000
B 101.550 101.550 0.000

Topographe Aysar Topographe XY Concept

NAME : KHALID IZZI

DATE : 11/27/2018

SIGNATURE:
FICHE TOPOGRAPHIQUE
Projet JEC-Q6521-00-IV_L.01a_00001 Ouvrage : SUPPORT FILTR le / /2018

Plan Q6521-WES-M-01a-008-3 Type de réception : levé élévation des platines filtre K

Ref filtre : 06K2-FB-01B


N° FIL N°AXE Théoriques Réels Ecarts(m)
1
A 101.550 101.550 0.000
B 102.550 102.551 0.001
2
A 101.550 101.551 0.001
B 101.550 101.551 0.001
3
A 101.550 101.550 0.000
B 101.550 101.550 0.000
4
A 101.550 101.551 0.001
B 101.550 101.550 0.000
5
A 101.550 101.550 0.000
B 101.550 101.550 0.000
6
A 101.550 101.551 0.001
B 101.550 101.550 0.000
7
A 101.550 101.550 0.000
B 101.550 101.549 -0.001
8
A 101.550 101.549 -0.001
B 101.550 101.551 0.001
9
A 101.550 101.550 0.000
B 101.550 101.551 0.001
10
A 101.550 101.549 -0.001
B 101.550 101.551 0.001
11
A 101.550 101.551 0.001
B 101.550 101.551 0.001

Topographe Aysar Topographe XY Concept

NAME : KHALID IZZI


DATE : 11/27/2018

SIGNATURE: