3G:
• Worst cells optimization.
• Parameter optimization for throughput improvement for upgraded/new sites (Batch-2)
4G:
• Worst cells optimization.
• Paging optimization to reduced paging discard rate
10 PENDING/WIP/DONE
Plann
Town Pre Drive Tentative By Opt. Tentative By Post Drive Tentative By Report Submitted
ed
REMARKS (Q3)
MWANZA YES Done Done Done Done Pending Comment review in progress
4
0.3
0.4
0.5
0.6
0.7
1-Apr-22
6-Apr-22 0.42
0.57
11-Apr-22
16-Apr-22 0.43
21-Apr-22
0.45
© 2023 Nokia
26-Apr-22
1-May-22 0.45
6-May-22 0.42
11-May-22
16-May-22 0.50
21-May-22
26-May-22
Nokia Internal
31-May-22 0.41
5-Jun-22
10-Jun-22
15-Jun-22 0.43
20-Jun-22
25-Jun-22
NED Drop Call Trend (Comb)
30-Jun-22 0.42
5-Jul-22 0.42
10-Jul-22 0.43
15-Jul-22
20-Jul-22 0.44
25-Jul-22 0.39
30-Jul-22
12-Dec-22 0.43
17-Dec-22
22-Dec-22 0.44
27-Dec-22 0.47
1-Jan-23 0.42
6-Jan-23
11-Jan-23 0.42
16-Jan-23 0.46
21-Jan-23
26-Jan-23 0.44
31-Jan-23 0.41 0.60
5-Feb-23 0.42
10-Feb-23 0.57
15-Feb-23 0.43
20-Feb-23 0.49
25-Feb-23 0.58
2-Mar-23 0.50
0.45
From 01st March’23 to 06th March’23
01st Mar’23:-
• V1 DCR trends at 0.56%, Top affected BSCs were BSDO2, BSTK1, BSSG1, BSMU1, BSBK1, BSIR2, BSAR3, BSMS3, BSMB1.
• In BSMU1 BSC, BTS fails observed in Sirari, Sirari_Micro, Sirari2 sites.
• In BSSG1 BSC, BTS fails observed in Kisana_TX_Airtel sites.
• ABIS FAILS observed in BSDO2, BSMB2, BSTB1, BSGT2/GT3 BSCs.
• RNDO2, RNC There was DCR_CS was affected full day in RNDO2, due to RNDO2 degrade after migration from MGDO1 to MGDO2. Parameter rectifications done from BSS and KPIs
resolved.
02nd Mar’23:-
• V1 DCR trends at 0.57%, Top affected BSCs were BSBK1,BSKH1,BSIR2,BSAR2,BSDO1,BSTK1,BSMT1,BSSG1,BSMW3,BSMB3.
• Spike observed in V1 DCR during 06<>09 hrs and 14:00 hrs, ABIS fails & AIF fails increased.
• IN BSKH1 BSC(07<>08 hrs), spike observed in ABIS and AIF fails, distributed on many cells.
• IN BSSU1 BSC(14 hrs), spike observed in ABIS, distributed on many cells.
• IN BSGT3 BSC(07<>08 hrs), spike observed in ABIS and LAPD fails, distributed on many cells.
• IN BSKG1 BSC, LAPD fails observed, distributed on many cells.
• IN BSMB2 BSC, LAPD Fails observed in Iyunga_Mby_Forest_HTT, Mbalizi_Mahenge_HTT, Bondelasongwe sites
On 05th Mar:-
• INC29460684: 30-2G in BSAR2/BSAR3, 42-3G in RNAR2 and 31-4G sites (Lamera, Lemongo, Kwa Iddi and other 100 sites) interfailed since 13h48 and stabilized at 15h22.
• IN BSSU1(21<>23), LAPD fails observed in 18 cells.
• IN BSMB1 LAPD fails observed,
95.00
95.50
96.00
96.50
97.00
97.50
98.00
98.50
99.00
99.50
100.00
1-Apr-22 98.85
6-Apr-22
6
11-Apr-22 98.76
16-Apr-22 98.70
21-Apr-22
26-Apr-22 98.84
1-May-22 98.67
6-May-22 98.59
PLMN.
11-May-22
16-May-22
21-May-22 98.15
26-May-22 98.17
31-May-22
5-Jun-22 97.83
10-Jun-22
Capacity Upgrade.
15-Jun-22 97.76
20-Jun-22
© 2023 Nokia
25-Jun-22 97.32
30-Jun-22
5-Jul-22 97.27
10-Jul-22 97.28
15-Jul-22 97.39
20-Jul-22 97.73
25-Jul-22 98.32
30-Jul-22
4-Aug-22 98.34
9-Aug-22 98.06
14-Aug-22 98.15
19-Aug-22 97.98
24-Aug-22 98.19
3-Sep-22 98.05
Nokia Internal
8-Sep-22 98.28
13-Sep-22
18-Sep-22 97.8098.22
23-Sep-22 98.28
28-Sep-22 98.51
3-Oct-22 98.08
8-Oct-22 97.48
13-Oct-22 97.90
18-Oct-22 98.26
NED CSSR (%) - KPI V3
Operational issue cells also cont. 32k block calls overall PLMN.
5-Feb-23 98.75
10-Feb-23
V3 is impacted mainly due to Capacity crunch sites which are under 15-Feb-23 98.39
20-Feb-23 98.28
25-Feb-23
2-Mar-23 98.38
Impact % at PLMN level also consistent from these 73 cells. More than
98.43
On 05th Mar’23, Traffic spike cases increased cont. 26k block calls overall
73 cells consistently contributed >800 block calls for >3 days in Week-09.
Out of 73 cells, 65 Cells are under Capacity upgrade requirement & 8 Cells
150000
170000
190000
210000
230000
250000
270000
290000
310000
330000
50 cells consistently contributed >1000 block calls for >3 days in Week-09.
TCH Traffic, BBH Erlangs
TCH Blocking
100
101
93
94
95
96
97
98
99
0
1
2
3
4
0.5
1.5
2.5
3.5
4.5
01-04-2022 01-04-2022
08-04-2022 08-04-2022
15-04-2022 15-04-2022
22-04-2022 22-04-2022
29-04-2022 29-04-2022
06-05-2022 06-05-2022
14-05-2022 13-05-2022
21-05-2022 20-05-2022
27-05-2022
28-05-2022 03-06-2022
04-06-2022 10-06-2022
11-06-2022 17-06-2022
Coastal
18-06-2022 24-06-2022
25-06-2022 01-07-2022
02-07-2022 08-07-2022
09-07-2022 15-07-2022
16-07-2022 22-07-2022
23-07-2022 29-07-2022
30-07-2022 05-08-2022
06-08-2022 12-08-2022
13-08-2022 19-08-2022
26-08-2022
20-08-2022
Sum of TCH Blocking - VODACOM TZ2
02-09-2022
27-08-2022 09-09-2022
03-09-2022 16-09-2022
Kilimanjaro
10-09-2022 23-09-2022
17-09-2022 30-09-2022
24-09-2022 07-10-2022
01-10-2022 14-10-2022
08-10-2022 21-10-2022
TCH & SD Blocking (BH)
15-10-2022 28-10-2022
22-10-2022 04-11-2022
29-10-2022 11-11-2022
18-11-2022
Lake
05-11-2022 25-11-2022
12-11-2022 02-12-2022
19-11-2022 09-12-2022
26-11-2022 16-12-2022
NED CSSR V3 - REGIONWISE
03-12-2022 23-12-2022
10-12-2022 30-12-2022
17-12-2022 06-01-2023
24-12-2022 13-01-2023
31-12-2022 20-01-2023
07-01-2023 27-01-2023
14-01-2023 03-02-2023
Southern
21-01-2023 10-02-2023
Sum of SDCCH Blocking - VODACOM TZ2
28-01-2023 17-02-2023
24-02-2023
04-02-2023 03-03-2023
11-02-2023
0
1
2
3
18-02-2023
0.5
1.5
2.5
3.5
25-02-2023
04-03-2023 SD Blocking
98.00
98.50
99.00
99.50
100.00
7
1-Apr-22
9-Apr-22
17-Apr-22
25-Apr-22
3-May-22
11-May-22
19-May-22
27-May-22
© 2023 Nokia
4-Jun-22
12-Jun-22
20-Jun-22
28-Jun-22
6-Jul-22
14-Jul-22
R1
22-Jul-22
30-Jul-22
Nokia Internal
7-Aug-22
15-Aug-22
23-Aug-22
31-Aug-22
8-Sep-22
16-Sep-22
Reliability Performance
24-Sep-22
2-Oct-22
10-Oct-22
18-Oct-22
26-Oct-22
3-Nov-22
11-Nov-22
NED Reliability (%) - KPI R1
Target_R1
19-Nov-22
27-Nov-22
5-Dec-22
13-Dec-22
21-Dec-22
29-Dec-22
6-Jan-23
14-Jan-23
22-Jan-23
30-Jan-23
7-Feb-23
15-Feb-23
23-Feb-23
3-Mar-23
0.00
1.00
2.00
1-Apr-22
9-Apr-22
17-Apr-22
25-Apr-22
3-May-22
11-May-22
19-May-22
27-May-22
4-Jun-22
12-Jun-22
20-Jun-22
28-Jun-22
6-Jul-22
14-Jul-22
22-Jul-22
30-Jul-22
7-Aug-22
15-Aug-22
R2
23-Aug-22
31-Aug-22
8-Sep-22
R2
16-Sep-22
24-Sep-22
2-Oct-22
10-Oct-22
18-Oct-22
26-Oct-22
Target_R2
3-Nov-22
11-Nov-22
19-Nov-22
27-Nov-22
5-Dec-22
13-Dec-22
21-Dec-22
29-Dec-22
6-Jan-23
14-Jan-23
NED Reliability (% of Cells >4hrs outage) - KPI
22-Jan-23
30-Jan-23
7-Feb-23
15-Feb-23
23-Feb-23
3-Mar-23
2G OPTIMIZATION ACTIVITIES
Observations:-
• Attempted 29 cells top V3 Contributor, where TRX addition planned and implemented.
• At Cell Level 25 Cells improvement observed. 4 cells Traffic dip observed- 2 cells having TCH availability issue & 2 under observation, Will
monitor and if not improve plan to Rollback as previous.
• 25 cells almost same trend in BBH Traffic observed as compared to previous week.
• Block calls improved by 1k (1.5K to <400) comparatively previous week.
Cell List
• V3_NED CSSR improved (98% to >99.5%) by 1.5% comparatively previous week.
• Average TCH Blocking rate improved 2.5% to <0.5% comparatively previous week.
• Average SD Blocking rate also improved from 0.6% to <0.2% by comparison to previous week as shown.
• SDCCH Busy attempt also reduced (1K to <100) approximately comparison to previous week.
• No degradation observed in V1_DCR as shown.
Observations:-
• CDED% Modification implemented on 3rd Mar 2023.
• Attempted 121 cells where criteria of " Call Block >20 and getting TCH Blocking >2%" of ageing >=3 days out of 7 Days
having CDED TS >2 with d 0% TBF DL/UL Blocking.
• Increasing trend in BBH Traffic observed ( Approx 300 Er. ) as compared to previous week. Cell List
• Block calls improved by 12k (35K to <23K) comparatively previous week.
• V3_NED CSSR improved by 3% (92% to >95%) as comp. to previous week.
• Average TCH Blocking rate improved from 9% to <6% comparison to previous week as shown in chart.
• Average SD Blocking rate improved from 2% to <1.5% comparison to previous week as shown in chart.
• SDCCH Busy attempt also reduced approx. 25K comparison to previous week.
• Day level Traffic also increasing trend.
• No major degradation observed at Day Level UL/DL Multislot blocking rate as shown in charts.
Observation:-
• Paging Deletion reduced 75% with 5 % increase in traffic with respect to last week MBCCHC to
15 © 2023 Nokia Nokia Internal
MBCCH TSL change
3G KPI AND OPTIMIZATION ACTIVITIES
99.82
99.81
99.81
99.80
99.80
99.80
99.80
99.79
99.79
99.79
99.79
99.79
99.79
99.79
99.3
99.78
99.78
99.77
99.76
99.76
99.74
99.74
99.73
99.73
99.73
99.72
99.71
99.71
99.70
99.4
99.69
99.67
99.67
99.66
99.66
99.63
99.59
99.1
99.57
99.2
99.43
98.9
99
99.25
98.7
99.14
98.8
98.5 98.6
27-01-2023
29-01-2023
31-01-2023
02-02-2023
04-02-2023
06-02-2023
08-02-2023
10-02-2023
12-02-2023
14-02-2023
16-02-2023
18-02-2023
20-02-2023
22-02-2023
24-02-2023
26-02-2023
28-02-2023
02-03-2023
04-03-2023
06-03-2023
98.4
98.2
98
27-01-2023
29-01-2023
31-01-2023
02-02-2023
04-02-2023
06-02-2023
08-02-2023
10-02-2023
12-02-2023
14-02-2023
16-02-2023
18-02-2023
20-02-2023
22-02-2023
24-02-2023
26-02-2023
28-02-2023
02-03-2023
04-03-2023
06-03-2023
RNAR2 RNDA3 RNDA4 RNDA5 RNDA6
RNDO2 RNDO3 RNGT1 RNMB1 RNMB2
RNMW2 RNDA1 RNMW3 RNMS2 RNMK1
• In week 10, CSSR CS degraded due to below reasons Total CS Traffic [Erl]
93,665
91,950
91,217
91,177
91,168
95000
90,413
90,164
90,084
90,089
On 28th Feb ,RNGT1, INC29399462: Signaling disturbances on BSKG1/BSKG2 since 08h30 and
89,985
•
89,896
89,764
89,663
89,535
89,520
89,335
88,637
88,312
88,250
88,176
88,166
stabilized at 14h03 due to congestion on MW link Geita2 <> Buseresere, following fiber failure
87,571
87,158
87,052
86,722
between Mishamo<>Mpanda since 08h29 and restored at 15h56 and there was ongoing fiber failure
85,685
90000
84,990
Biharamulo<>Kibondo which restored at 13h39 after couplers were changed. Kigoma_TTCL <>
84,173
Sumbawanga (10G), Kibondo <> Geita_TTCL (5G) and Kigoma_TTCL <> Geita_TTCL (5G) restored at
81,449
81,245
81,025
16h11, 14h35 and 16h11 respectively. Cut at 61km from Mpanda towards Mishamo. 85000
80,359
79,600
79,365
78,801
• On 4th March ,RNMB1/RNMK1, INC29446918: Multiple fiber failure from Mbeya Via NICTBB since
78,584
78,480
78,153
19h54 and restored at 20h11, affected MBY <> DODOMA 20G, MBEYA <> MBEZI 15G, MBEYA <>
MAKAMBAKO 7.5G and MBEYA <> KWALE 7.5G, restored after being rerouted to alternative path by 80000
74,581
NICTBB Team.
• On 5th March ,RNAR2, INC29460684: 30-2G in BSAR2/BSAR3, 42-3G in RNAR2 and 31-4G sites 75000
(Lamera, Lemongo, Kwa Iddi and other 100 sites) interfailed since 13h48 and stabilized at 15h22,
Observed CPU overload and later on crush of Sinoni router which led to temporary freezing and
restart of other routers ( including NHC, Bandambili etc). Sinoni router restored after hard reset and 70000
others after remote reset of BGP peers.
27-01-2023
29-01-2023
31-01-2023
02-02-2023
04-02-2023
06-02-2023
08-02-2023
10-02-2023
12-02-2023
14-02-2023
16-02-2023
18-02-2023
20-02-2023
22-02-2023
24-02-2023
26-02-2023
28-02-2023
02-03-2023
04-03-2023
06-03-2023
• On 6th March ,RNMB1/RNMB2, INC29471359: Fiber failure between Mbeya and Kasumulo via
NICTBB
17 since 14h30,
© 2023 Nokiaaffecting Tukuyu<>Mbeya
Nokia Internal 2.4G and Kasumulo<>Mbeya STM 4, fiber cut
observed at 36.9km from Mbeya station towards Kasumulo.
KPI120
0
1000
200
400
600
800
60
65
70
75
80
85
01-08-2022
08-08-2022 01-08-2022
15-08-2022 08-08-2022
22-08-2022 15-08-2022
22-08-2022
Coastal
29-08-2022
29-08-2022
05-09-2022 05-09-2022
12-09-2022 12-09-2022
19-09-2022 19-09-2022
26-09-2022 26-09-2022
03-10-2022 03-10-2022
10-10-2022
10-10-2022
Dar_City
17-10-2022
17-10-2022 24-10-2022
24-10-2022 31-10-2022
31-10-2022 07-11-2022
14-11-2022
07-11-2022 21-11-2022
14-11-2022 28-11-2022
21-11-2022 05-12-2022
28-11-2022 12-12-2022
OVERLOAD_CELL_COUNT
Kilimanjaro
05-12-2022 19-12-2022
26-12-2022
12-12-2022 02-01-2023
19-12-2022 09-01-2023
26-12-2022 16-01-2023
02-01-2023 23-01-2023
Lake
09-01-2023 30-01-2023
06-02-2023
KPI120
16-01-2023 13-02-2023
23-01-2023 20-02-2023
30-01-2023 27-02-2023
06-02-2023 06-03-2023
13-02-2023
1000
1200
1400
1600
1800
2000
2200
2400
2600
2800
3000
Southern
20-02-2023
27-02-2023
OVERLOAD_CELL_CPONT
06-03-2023
50
55
60
65
70
75
80
85
90
PLMN 01-08-2022
08-08-2022
180000 15-08-2022
190000
200000
210000
220000
230000
240000
250000
260000
22-08-2022
01-08-2022 29-08-2022
Coastal
08-08-2022
PLMN
05-09-2022
15-08-2022
22-08-2022 12-09-2022
29-08-2022 19-09-2022
05-09-2022 26-09-2022
12-09-2022
19-09-2022 03-10-2022
26-09-2022 10-10-2022
03-10-2022
Coastal
Dar_City
10-10-2022 17-10-2022
17-10-2022 24-10-2022
24-10-2022
31-10-2022 31-10-2022
07-11-2022 07-11-2022
14-11-2022 14-11-2022
21-11-2022
28-11-2022 21-11-2022
05-12-2022 28-11-2022
12-12-2022
Kilimanjaro
Kilimanjaro
19-12-2022 05-12-2022
KPI120 - Region level
26-12-2022 12-12-2022
02-01-2023 19-12-2022
09-01-2023
16-01-2023 26-12-2022
23-01-2023
PS Traffic_ GB_ PLMN & Region wise
02-01-2023
Lake
30-01-2023
Lake
06-02-2023 09-01-2023
13-02-2023 16-01-2023
20-02-2023 23-01-2023
27-02-2023
06-03-2023 30-01-2023
0
06-02-2023
13-02-2023
20000
40000
60000
80000
Southern
100000
20-02-2023
Southern
27-02-2023
Region
06-03-2023
3G HSDPA throughput optimization (Mostly upgraded/new sites)
40% HSDPA User
20% Traffic increased Throughput improved
95.00
97.00
99.00
01-11-2022 01-11-2022
04-11-2022 04-11-2022
07-11-2022 07-11-2022
10-11-2022 10-11-2022
13-11-2022 13-11-2022
© 2023 Nokia
16-11-2022 16-11-2022
19-11-2022 19-11-2022
22-11-2022 22-11-2022
25-11-2022 25-11-2022
28-11-2022 28-11-2022
Intra eNB HO SR
E-UTRAN E-RAB stp SR
01-12-2022 01-12-2022
04-12-2022 04-12-2022
07-12-2022 07-12-2022
Nokia Internal
16-12-2022 16-12-2022
LTE KPIs summary
19-12-2022 19-12-2022
22-12-2022 22-12-2022
25-12-2022 25-12-2022
28-12-2022 28-12-2022
31-12-2022 31-12-2022
03-01-2023 03-01-2023
Mobility KPIs
09-01-2023 09-01-2023
12-01-2023
Accessibility KPIs
12-01-2023
01-03-2023 26-02-2023
04-03-2023 01-03-2023
04-03-2023
Target Value of Total E-UTRAN RRC conn stp SR
0.15
0.20
0.25
0.30
01-11-2022
3,40,000
3,60,000
3,80,000
4,00,000
4,20,000
4,40,000
4,60,000
4,80,000
5,00,000
04-11-2022
01-11-2022 07-11-2022
04-11-2022 10-11-2022
07-11-2022 13-11-2022
10-11-2022 16-11-2022
13-11-2022 19-11-2022
16-11-2022 22-11-2022
19-11-2022 25-11-2022
22-11-2022 28-11-2022
25-11-2022 01-12-2022
28-11-2022 04-12-2022
01-12-2022 07-12-2022
04-12-2022
07-12-2022 10-12-2022
10-12-2022 13-12-2022
13-12-2022 16-12-2022
E-RAB DR RAN
16-12-2022 19-12-2022
19-12-2022 22-12-2022
22-12-2022 25-12-2022
25-12-2022 28-12-2022
28-12-2022 31-12-2022
31-12-2022 03-01-2023
03-01-2023 06-01-2023
06-01-2023 09-01-2023
Total Volume( GB)
09-01-2023 12-01-2023
12-01-2023 15-01-2023
15-01-2023 18-01-2023
Total Volume LTE ( GB)
18-01-2023 21-01-2023
21-01-2023 24-01-2023
24-01-2023 27-01-2023
Retainability ( E-RAB Drop)
27-01-2023 30-01-2023
30-01-2023 02-02-2023
Target value E-RAB DR RAN
02-02-2023 05-02-2023
05-02-2023 08-02-2023
08-02-2023 11-02-2023
11-02-2023 14-02-2023
14-02-2023 17-02-2023
17-02-2023 20-02-2023
20-02-2023
23-02-2023 23-02-2023
26-02-2023 26-02-2023
01-03-2023 01-03-2023
04-03-2023 04-03-2023
•
22
DL PRB Util DL PRB util
26.00
28.00
30.00
32.00
34.00
36.00
28.00
30.00
32.00
34.00
36.00
01-11-2022 01-11-2022
04-11-2022 04-11-2022
07-11-2022 07-11-2022
10-11-2022 10-11-2022
13-11-2022 13-11-2022
© 2023 Nokia
16-11-2022 16-11-2022
19-11-2022 19-11-2022
22-11-2022 22-11-2022
25-11-2022 25-11-2022
28-11-2022 28-11-2022
01-12-2022 01-12-2022
04-12-2022 04-12-2022
07-12-2022 07-12-2022
10-12-2022 10-12-2022
13-12-2022 13-12-2022
16-12-2022 16-12-2022
19-12-2022 19-12-2022
22-12-2022
Nokia Internal
22-12-2022 25-12-2022
25-12-2022
LTE KPIs summary
28-12-2022 28-12-2022
31-12-2022
31-12-2022
23-02-2023 01-03-2023
26-02-2023 04-03-2023
01-03-2023
04-03-2023
2,50,000
3,00,000
3,50,000
4,00,000
4,50,000
5,00,000
1,20,000.00
1,30,000.00
1,40,000.00
1,50,000.00
1,60,000.00
01-11-2022
04-11-2022
07-11-2022
3,20,000
3,70,000
4,20,000
4,70,000
5,20,000
10-11-2022
13-11-2022 01-11-2022
16-11-2022 04-11-2022
07-11-2022
19-11-2022 10-11-2022
22-11-2022 13-11-2022
16-11-2022
25-11-2022 19-11-2022
28-11-2022 22-11-2022
01-12-2022 25-11-2022
28-11-2022
04-12-2022 01-12-2022
07-12-2022 04-12-2022
07-12-2022
10-12-2022 10-12-2022
13-12-2022 13-12-2022
16-12-2022
16-12-2022 19-12-2022
19-12-2022 22-12-2022
25-12-2022
22-12-2022 28-12-2022
25-12-2022 31-12-2022
Perc UL PRB Util
03-01-2023
Total Volume( GB)
28-12-2022 06-01-2023
31-12-2022 09-01-2023
12-01-2023
03-01-2023 15-01-2023
06-01-2023 18-01-2023
21-01-2023
09-01-2023 24-01-2023
12-01-2023 27-01-2023
30-01-2023
15-01-2023 02-02-2023
18-01-2023 05-02-2023
08-02-2023
21-01-2023 11-02-2023
24-01-2023 14-02-2023
17-02-2023
Perc DL PRB Util
27-01-2023
Data Vol (GB) vs RRC Conn UE
20-02-2023
30-01-2023 23-02-2023
26-02-2023
02-02-2023 01-03-2023
05-02-2023 04-03-2023
DL PRB Utilization vs UL PRB Utilization
08-02-2023
11-02-2023
14-02-2023
17-02-2023
20-02-2023
23-02-2023
26-02-2023
1,20,000.00
1,30,000.00
1,40,000.00
1,50,000.00
1,60,000.00
01-03-2023
04-03-2023 Avg RRC Conn UE
•
•
Avg DL thpt
23
13.00
13.50
14.00
14.50
15.00
15.50
16.00
16.50
01-11-2022
04-11-2022
07-11-2022
10-11-2022
13-11-2022
16-11-2022
19-11-2022
© 2023 Nokia
22-11-2022
25-11-2022
28-11-2022
01-12-2022
04-12-2022
07-12-2022
10-12-2022
13-12-2022
16-12-2022
19-12-2022
Nokia Internal
22-12-2022
25-12-2022
LTE KPIs summary
02-02-2023
05-02-2023
08-02-2023
11-02-2023
14-02-2023
17-02-2023
Avg PDCP cell thp UL(Mbits/sec)
20-02-2023
23-02-2023
26-02-2023
01-03-2023
04-03-2023
1.20
1.25
1.30
1.35
1.40
1.45
1.50
Avg UL Thpt
40.00
42.00
44.00
46.00
48.00
50.00
52.00
54.00
56.00
58.00
60.00
01-11-22
04-11-22
07-11-22
10-11-22
13-11-22
16-11-22
19-11-22
22-11-22
25-11-22
28-11-22
01-12-22
04-12-22
07-12-22
10-12-22
13-12-22
16-12-22
19-12-22
22-12-22
25-12-22
28-12-22
31-12-22
03-01-23
06-01-23
09-01-23
12-01-23
Avg Latency DL(ms)
15-01-23
18-01-23
21-01-23
24-01-23
27-01-23
30-01-23
02-02-23
05-02-23
08-02-23
11-02-23
14-02-23
17-02-23
The average DL and UL cell throughputs are in improving trend due to L700 BW upgrade & L2300 layer addition on-going project.
20-02-23
23-02-23
26-02-23
01-03-23
04-03-23
KPI160
50
55
60
65
70
75
80
85
55
60
65
70
75
80
05-Jun
12-Jun 05-Jun
19-Jun 12-Jun
• KPI160
26-Jun 19-Jun
03-Jul 26-Jun
10-Jul 03-Jul
10-Jul
KPI 160
Coastal
17-Jul
24-Jul 17-Jul
24 © 2023 Nokia
31-Jul 24-Jul
31-Jul
07-Aug 07-Aug
14-Aug 14-Aug
21-Aug 21-Aug
DSM
28-Aug 28-Aug
04-Sep 04-Sep
04-Sep 11-Sep
11-Sep 18-Sep
Nokia Internal
18-Sep 02-Oct
KPI160
02-Oct 09-Oct
09-Oct 16-Oct
16-Oct 23-Oct
23-Oct 30-Oct
06-Nov
Kilimanjaro
30-Oct 13-Nov
Region: KPI160
06-Nov 20-Nov
13-Nov 27-Nov
KPI160B
20-Nov 18-Dec
PLMN : KPI160 & KPI160B
27-Nov 25-Dec
18-Dec 01-Jan
Lake
25-Dec 08-Jan
01-Jan 15-Jan
08-Jan 22-Jan
29-Jan
to 20Mhz
15-Jan 05-Feb
22-Jan 12-Feb
29-Jan
L700 Band BW
19-Feb
05-Feb 26-Feb
12-Feb Southern 05-Mar
19-Feb
26-Feb
05-Mar
1000
1200
1400
1600
1800
upgraded from 10 2000
2200
KPI160B
0
100
200
300
400
500
600
700
KPI160
60
65
70
75
80
85
05-Jun
12-Jun
19-Jun 05-Jun
26-Jun 12-Jun
03-Jul 19-Jun
10-Jul 26-Jun
Coastal
03-Jul
17-Jul 10-Jul
24-Jul 17-Jul
31-Jul 24-Jul
07-Aug 31-Jul
14-Aug 07-Aug
21-Aug 14-Aug
DSM
28-Aug 21-Aug
28-Aug
04-Sep 04-Sep
11-Sep 11-Sep
18-Sep 18-Sep
KPI160
02-Oct 02-Oct
09-Oct 09-Oct
16-Oct 16-Oct
23-Oct
23-Oct 30-Oct
30-Oct 06-Nov
Kilimanjaro
06-Nov 13-Nov
Region: KPI160b#
13-Nov 20-Nov
20-Nov 27-Nov
KPI160B
DAR: KPI160 & KPI160B
27-Nov 18-Dec
18-Dec 25-Dec
01-Jan
25-Dec 08-Jan
Lake
01-Jan 15-Jan
08-Jan 22-Jan
15-Jan 29-Jan
22-Jan 05-Feb
29-Jan 12-Feb
05-Feb 19-Feb
26-Feb
& KPI160b # are Increased compared with last week but it is week on week reducing trend with on-going capacity addition project.
12-Feb 05-Mar
19-Feb
Southern
26-Feb
200
300
400
500
600
700
05-Mar
KPI160B
•
25
Data Traffic
100
98
99
01-10-2022
1000
2000
3000
4000
5000
6000
7000
8000
0
07-10-2022
13-10-2022 10.01.2022
19-10-2022 10.09.2022
© 2023 Nokia
25-10-2022 10.17.2022
31-10-2022 10.25.2022
06-11-2022 11.02.2022
12-11-2022 11.10.2022
18-11-2022 11.18.2022
24-11-2022
Nokia Internal
11.26.2022
12.12.2022
Accessibility KPI's
11-01-2023 01.21.2023
17-01-2023 01.29.2023
Total PDCP SDU Volume (GB)
23-01-2023 02.06.2023
29-01-2023 02.14.2023
04-02-2023
02.22.2023
10-02-2023
03.02.2023
0
1
0.2
0.4
0.6
0.8
01-10-2022 01-10-2022
08-10-2022 07-10-2022
13-10-2022
15-10-2022
19-10-2022
22-10-2022
25-10-2022
29-10-2022 31-10-2022
05-11-2022 06-11-2022
12-11-2022 12-11-2022
19-11-2022 18-11-2022
26-11-2022 24-11-2022
E-RAB DR, RAN view
30-11-2022
03-12-2022
06-12-2022
Average of Perc DL PRB Util
10-12-2022
12-12-2022
17-12-2022 18-12-2022
24-12-2022 24-12-2022
Data volume increased due to addition of L2300 Band and DL & UL PRB Utilization same Trend.
31-12-2022 30-12-2022
E-RAB Drop Rate
07-01-2023 05-01-2023
14-01-2023 11-01-2023
17-01-2023
DL & UL PRB UTILIZATION
21-01-2023
23-01-2023
28-01-2023
29-01-2023
04-02-2023 04-02-2023
11-02-2023 10-02-2023
18-02-2023 16-02-2023
Target value E-RAB DR RAN
Average of Perc UL PRB Util
25-02-2023 22-02-2023
04-03-2023 28-02-2023
06-03-2023
Avg DL PDCP thpt
10.00
15.00
20.00
25.00
30.00
15
17
19
21
23
25
27
26
01.01.2023
01.02.2023
01.05.2023
01.08.2023 01.08.2023
01.11.2023
© 2023 Nokia
01.14.2023
01.15.2023 01.17.2023
01.20.2023
01.22.2023 01.23.2023
01.26.2023
Nokia Internal
01.29.2023
Avg PDCP cell thp DL
01.29.2023 02.01.2023
NOKIA_LTE TDD KPIs
02.04.2023
02.07.2023
02.05.2023
02.10.2023
dl_user_thrptfl18
02.13.2023
02.12.2023 02.16.2023
DL & UL Avg Cell Throughput
02.19.2023
02.22.2023
02.19.2023 02.25.2023
Avg PDCP cell thp UL
02.28.2023
02.26.2023 03.03.2023
03.06.2023
1
2
3
4
5
6
7
300
01.02.2023
01.06.2023
01.10.2023
01.14.2023
01.18.2023
01.22.2023
01.26.2023
01.30.2023
under optimization by NI team.
Total PDCP SDU Volume
02.03.2023
02.07.2023
02.11.2023
02.15.2023
02.19.2023
02.23.2023
02.27.2023
Avg PDCP DL & UL throughput following same trend.
Avg RRC conn UE
03.03.2023
Total PDCP SDU Volume (GB) & Avg RRC conn UE's
0
500
• RRC paging discard decreased post TAC alignment activity performed on 3rd March.
• RRC
28Setup SR Nokia
© 2023 and E-RAB Setup
Nokia SR slightly degraded due to increase in E-rab fails in cell: Kwembe_HTT_2L on 5th and 6th March.
Internal
Under monitoring.
Retainability, CSFB & RACH – TAC 52
• RRC paging discard decreased post TAC alignment activity performed on 3rd March.
• RRC
31Setup SR Nokia
© 2023 and E-RAB Setup
Nokia SR maintain trend.
Internal
Retainability, CSFB & RACH – TAC 60
• E-RAB Drop rate slightly increased on 5th March due to increase in E-rab drops in cells: Segerea_Shule_HTT_L700_5L & Segerea_3L.
Currently recovered.
32 © 2023 Nokia Under monitoring.
Nokia Internal
• CSFB attempts and Avg RRC Conn UE slightly increased since 3rd March.
Data Volume & Mobility – TAC 60
• RRC paging discard decreased post TAC alignment activity performed on 3rd March.
• RRC
34Setup SR Nokia
© 2023 and E-RAB Setup
Nokia SR maintain trend.
Internal
Retainability, CSFB & RACH – TAC 185
• Data volume & PRB Utilization slightly decreased for TAC 185 as TAC
changed to TAC 45 for 26 cells on 3rd March.
• Mobility – maintains previous trend. Inter Enb S1 HO SR slightly
degraded.
• RRC paging discard decreased post TAC alignment activity performed on 3rd March.
• RRC
37Setup SR Nokia
© 2023 and E-RAB Setup
Nokia SR maintain trend.
Internal
Retainability, CSFB & RACH – TAC 45