EQUIPMENT MASTER LIST

Pasig-Marikina Project

EQUIPMENT VESSEL & SMALL BOATS (BREAKDOWN HISTORY)


ITEM NO. DESCRIPTION CODE

1 TUGBOAT RAYMAN-2

2 TUGBOAT RAYMAN-3

3 TUGBOAT RAYMAN-4

4 BOAT SB-06

5 BOAT FB-01

Prepared by: Engr. Edward E. Balagtas


WN HISTORY)
ISSUE DATE
Transmission bolts June 7, 2023
Transmission bolts July 20, 2023
Voltage Regulator July 23, 2023
Carbon Brush in genset alternator July 23, 2023
Engine Water pump July 27, 2023
Domestic Shipping Business Operation September 14, 2023
Genset Alternator September 16, 2023

Clogged Fuel and Oil filters September 12, 2023


Genset Alternator September 15, 2023

Clogged Fuel filters September 17, 2023


Genset Fuel line leak September 18, 2023
Defective Ballast tank and Fuel tank September 18, 2023

Genset Alternator September 26, 2023


Clogged Fuel line August 22, 2023
Damage Fuel line in return September 3, 2023

Release Bearing September 14, 2023


Contaminated Fuel September 25, 2023
Defective Battery August 15, 2023
Release Bearing August 19, 2023
Transmission gears need to clean August 19, 2023
Exhaust hose August 19, 2023

Noted By: Engr. Ferdinand Andrada, PM


REMARKS
Changed bolts
Changed bolts

Changed of carbon brush


Changed of water pump
Registered in RMC
C/O powercity

Changed of fuel and oil filters


C/O powercity

Changed of fuel filters


Replaced the fuel line

Weld the hole inside the ballast tank

Cleaning of Fuel line


Weld the damage part by gas
welding
Replaced the Release Bearing
Replaced the Diesel
Recharged the battery
Replaced the Release Bearing
Cleaned the gears
Reposition of suction and replaced
the hose