METRADO EXCAVACION A AGOSTO 2023

LINEA DE LINEA DE ADUCCION RED DE


SECTOR ACOMETIDAS 1/2"
CONDUCCION 1" 1" DISTRIBUCION 3/4"

ROSASPATA 1 2711.00 340.00 3900.00 4629.00


ROSASPATA 2 0.00 0.00 2900.00 104.00
ESPARTA 1 2600.00 0.00 3700.00 446.10
ESPARTA 2 380.00 0.00 550.00 470.00
ESPARTA 3 0.00 0.00 0.00 0.00
HUAYLLAPATA 0.00 0.00 1903.00 0.00
ALTO ECHARATI 0.00 0.00 1290.00 0.00
VISTA ALEGRE 0.00 0.00 0.00 0.00
TOTAL 5691.00 340.00 14243.00 5649.10
METRADO ENTUBADO A AGOSTO 2023
LINEA DE LINEA DE ADUCCION RED DE
ACOMETIDAS 1/2"
CONDUCCION 1" 1" DISTRIBUCION 3/4"

1950.00 340.00 3750.00 4629.00


0.00 0.00 2060.00 104.00
600.00 0.00 1300.00 446.10
0.00 0.00 0.00 470.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
2550.00 340.00 7110.00 5649.10