Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Infrastructure Policy 5.

Appurtenances replacement and


installation (i.e. valves, production meters)
 Road and Transport Systems
6. Installation f Generator Sets (spring
Increase the capacity of adjacent
source)
national roads and develop a Barangay Road
Network.  Solid Waste
Re-use, recycling and composting
Strengthen the development alternative
Information, Education and
for more bypass roads
Communication
Provision of traffic control and Establishment of Material Recovery
management schemes Facility
Enactment of appropriate local laws
 Communication and regulation
To increase the portion of populace Awards and Incentives
serviced by various communication modes by Monitoring System
establishing a healthy market that will invite
communication investments that will meet the Socio-Economic Plan
varied preferences and demands of the  Over-All Goals and Objectives
potential consumers. Economic activity in Tagaytay City is
predominantly focused on tourism. As
 Power such,
The issue on power supply is primarily the infrastructure support system and
handled by Meralco, which is not within the tourism facilities are improved to
uthority of the City Government. In this regard, attract
the City does not deal with direct planning and more tourists and investors.
project implementation. Constant evaluation Collaborative efforts between the City
and monitoring of the existing and current Government and
power demand in relation to Meralco's the private sectors in promoting
provision of services in the City however will tourism related programs are highly
prompt the City Government when to formulate encouraged
needed actions in ensuring adequate power to ensure success and sustainability.
provisions. Innovative marketing strategies, such as
local
 Water trade fairs and mass media, are
explored to showcase the city’s tourism
1. Aquisition of additional Water
potentials.
Delivery Trucks
 Tourism Development
2. Construction of New Supply Source Development of the Primary Urban
(Ground source), Water Reservoir and Zone and People's Park Areas
installation of Booster Pumps; Rehabilitation of Cliffside Area
Agri-Resort Complex
3. Pipeline extension and upgrades
Shopping Areas
4. Meter Replacement Development and Preservation of
Cultural Heritage and Landmarks
 Institutions transportation system based on their respective
Centralization of Government Services thresholds;
Training/Capability Building Programs
b) to identify the general physical infrastructure
 Agriculture
and transportation demands
Training Program for Farmers
Support Services for Farmers of the City given the overall vision; and
Organizational Development
c) to conceptualize the physical infrastructure
Post-Harvest Equipment
and transportation policies that
 Education
Expansion and Improvement of Public shall outline plans needed for the direction/s of
High Schools development for the next ten
Expansion and Improvement of Public
Elementary Schools (10) years.
Competency-Building of Teachers
Non-Formal Education and Functional
Literacy Program
 Social Welfare and Development
Information Dissemination
 Protective Services
Police Services
Fire Protection Services
Disaster Preparedness
 Health and Nutrition
Expansion /improvement of Existing
City Hospital (Ospital ng
Tagaytay)
Health Monitoring
Information Educational Campaign (IEC)
on Health Care
 Sports and Recreation
City Public Park
Children's Playfield

In order for the City to be able to deliver the


necessary facilities given the desired

development, integrated physical infrastructure


and transportation plans have to

be conceptualized. For this end, the overall


goals of the plans are:

a) to assess the present conditions of the


physical infrastructure facilities and

You might also like