THE GOVERNMENT OF THE REPUBLIC OF INDONESIA

PATIMBAN PORT DEVELOPMENT PROJECT (II)


PACKAGE 5 CONTRACT: CAR TERMINAL CONSTRUCTION
Bid Documents Volume III - Bill of Quantities Insert Rates Here
Exchange Rate : 1 IDR =
BILL NO. 10: ARCHTECTURAL WORKS AND BUILDING UTILITIES
UNIT RATE AMOUNT
COMBINED
ITEM Foreign Foreign EQUIVALENT
DESCRIPTION UNIT QUANTITY Local Currency Local Currency REMARKS
No. Currency Currency TOTAL
ADM Component Component
Component Component (JPY)
(IDR) (IDR)
(JPY) (JPY)

Supply and construct all buildings and other necessary materials, and
complete all necessary works of building structural installation including
temporary works and factroy tests of equipment and engineered
materials to be conducted as set out in the Specification and as shown on
the Drawings
10 01 01 ADMINISTRATION OFFICE BUILDING: Architectural and Structural Works

(7) Structure Steel Work


01 Steel Material ton 1.175,00 27.192.941,19 31.951.705.900,64 - 31.951.705.900,64
02 Steel Fabrication and painting, supply and deliver at site ton 1.175,00 5.283.366,43 6.207.955.551,60 - 6.207.955.551,60
03 Steel Erection (Total weight of steel) and fasten HTB ton 1.175,00 6.503.702,78 7.641.850.766,00 - 7.641.850.766,00
04 Anchor Bolt for 1F pcs 1.296,00 209.384,81 271.362.719,98 - 271.362.719,98
05 Anchor Bolt for 2F pcs 227,00 209.384,81 47.530.352,96 - 47.530.352,96
06 Anchor Bolt for 3F pcs 227,00 209.384,81 47.530.352,96 - 47.530.352,96
07 Anchor Bolt for 4F pcs 227,00 209.384,81 47.530.352,96 - 47.530.352,96
08 Anchor Bolt for 5F pcs 161,00 209.384,81 33.710.955,18 - 33.710.955,18
09 Fire protection Paint for steel structure m2 22.379,00 802.649,27 17.962.488.015,20 - 17.962.488.015,20

10 01 02 MOTORCYLE GARAGE: Architectural and Structural Works


(4) Structure Steel Work
01 Steel Material ton 50,00 27.192.941,19 1.359.647.059,60 - 1.359.647.059,60
02 Steel Fabrication and anti-rust painting, supply and deliver at site ton 50,00 5.283.366,43 264.168.321,34 - 264.168.321,34
03 Steel Erection (Total weight of steel) and fasten HTB ton 50,00 6.503.702,78 325.185.138,98 - 325.185.138,98
04 Anchorbolt Setting (total 256pcs) set 1,00 53.602.512,59 53.602.512,59 - 53.602.512,59

10 01 03 DRIVER RESTHOUSE: Architectural and Structural Works Exclude Exclude Exclude Exclude Exclude

10 01 04 FIRE PUMP HOUSE: Architectural and Structural Works Exclude Exclude Exclude Exclude Exclude

10 01 05 MAIN GATE with GUARD HOUSE: Architectural and Structural Works Exclude Exclude Exclude Exclude Exclude

10 01 06 GUARD HOUSE: Architectural and Structural Works (2 Units) Exclude Exclude Exclude Exclude Exclude

10 02 01 LANDSCAPING: Fencing and Paving Works Exclude Exclude Exclude Exclude Exclude

66.214.268.000,00