INFRASTRUCTURE REQUIRED FOR RUNNING 3 PROGRAMMES

Physical Building

1. Classrooms – 3 (12 sq ft per student. So, each CR 400 sq ft. So 3 CR = 1200 sq ft)
2. Specialization classroom – 1 (400 sq ft)
3. Computer lab -1 – (400 sq ft)
4. Director’s Office – 1 (300 sq ft)
5. Faculty Room – 1 ( 50 sq ft x 8 = 400 sq ft)
6. Staff Room – 1 (150 sq ft)
7. Board / Conference Room - 1 (200 sq ft)
8. Exam Office – 1 (100 Sq Ft)
9. Library – 1 (?) (200 sq ft)
10. Toilets ladies – 1 (50 sq ft)
11. Toilet Gents – 1 (50 sq ft)
12. Toilet staff and faculty – 1 (30Sq ft)
13. Total area – 3480 Sq ft

Equipment Requirement

1. Desk cum chair – 12 (incl spl classroom)0


2. Easel and Board or wall fixed – 4
3. OHP – 5
4. Computers for faculty and staff 10
5. Computers for computer lab - 15-
6. Library books – 200
7. Conference table with 12 chairs
8. Faculty tables – 6
9. Staff tables - 6
10. Chairs for staff and faculty – 12
11. Chair and desk for faculty in classroom - 4

Faculty Requirement

1. Director – 1
2. In-house faculty (1 per programme) - 3
3. Internal Quality Assurer (IQA) – 2 (we need to check whether one common IQA will
be enough)
4. Guest faculty - 2 to 3 for all programmes

Staff

1. Accountant – 1
2. Manager – 1
3. System Administrator – 1
4. Technician - 1

Calculation of expenses for Faculty

Faculty Expenses Level 4 and 5

Credits – 240 (two years) per programme


120 per year per programme
TQT 1200 hours per programme
GLH 600 hours per programme
Workload Teacher per year – 1200 hours
Faculty required - ½ per programme

So total GLH for 3 programmes – 1800 hours per year


Assuming all by GF at rate of Rs 1000 per hour – Rs 1800000(Rs 18 lakhs)
This should be the limit of expenses on in-house faculty and GF.

(According to the UGC norms, the workload of teachers in full employment


should not be less than forty hours a week for thirty working weeks in an
academic year,)

Staff Expenses

1. Director – 12 lakhs pa
2. Accountant – 3.6 lakhs pa
3. Admin Executive r – 3.6 lakhs pa
4. System Administrator – 3 lakhs pa
5. Technician – 1.8 lakhs pa
6. Total – 24 lakhs

Total Staff + Faculty – 42 lakhs. Say 50 lakhs.