TASK RISK ASSESSMENT

Project Name: Bauer Assembling, Repair and Maintenance Yard


Client : Bauer International FZE 22-444
Consultant : KN International Architects and Engineers LLC

Plot No. KHIA5/ P12


Task Description Manual Handling
Task Site Location Taweela, Kizad, Abu Dhabi

What is the LIKELIHOOD of an occurrence? Hierarchy of Controls


What would the
SEVERITY Almost
Improbable Low Medium High
Of an occurrence be? Certain Can the hazard be Eliminated or removed from the workplace?
1 2 3 4
5
Minor
Causing minor injuries (e.g. cuts and scratches) Low Low Low Low Med Can the product or process be substituted for a less hazardous
No lost time likely other than First Aid 1 2 3 4 5 alternative?
treatment
Low
Causing significant injuries (e.g. sprains, Low Low Med Med Med
Can the hazard be engineered away with guards or barriers?
bruises, lacerations, dermatitis) 2 4 6 8 10

Medium
Causing temporary disability (minor fracture, Low Med Med High High Can Administrative Controls be adopted
asthma, deafness, concussion) 3 6 9 12 15 i.e. procedures, job rotation etc.

High
Causing permanent disability (major fractures, Low Med High High High Can Personal Protective Equipment & Clothing be worn to safeguard against
amputation, head injuries, eye injuries, 4 8 12 16 20 hazards?
poisoning)
Major RISK RATING (Likelihood x Severity)
Causing death to one or more people (fatal Med Med High High High 1-4 LOW RISK (No further action required)
injuries, occupational cancer, fatal disease, 5 10 15 20 25 5-10 MEDIUM RISK (Procedure to be available)
fire) 11-25 HIGH RISK (Full time supervision present)

Document No. MNGC-OHS-TRA-014 Rev No. 00 Issue Date – 01/08/2021 Page 1 of 4


TASK RISK ASSESSMENT
Legal Residual
S. Consequence Risk
Task Step Hazard Details L S Current Control Measures Req. L S Risk Additional Control Measures
No Details Rating
(Y/N) Rating

 Assess the load prior to the lift


Manual Handling of Fall of material/ Personnel 9  Ensure that the operatives are
materials Musculoskeletal injury /Sprain/ 3 3 Med Yes 1 3 3
trained in manual handling are
LOW
disorder Back injury deployed
 Ensure that the route survey is done
& is free from obstruction
 Ensure adequate illumination &
ventilation at the workplace. Ref#
Ministerial order 32 of 1982 article 5
 Ensure adequate workmen shall be
deployed to perform the activity
 Ensure that the load shall not be
lifted beyond the capacity of an
individual.
 Ensure mechanical lifting equipment
shall be used wherever possible
 Proper lifting techniques have to be
followed:
a. Position in front of the load with
legs balanced and spread equal to
the shoulder width
b. Bend the knees to reach the
bottom of the load to get a grip; do
not bend the spine
c. Lift the load slowly by gradually
straightening the legs

Document No. MNGC-OHS-TRA-014 Rev No. 00 Issue Date – 01/08/2021 Page 2 of 4


TASK RISK ASSESSMENT
Legal Residual
S. Consequence Risk
Task Step Hazard Details L S Current Control Measures Req. L S Risk Additional Control Measures
No Details Rating
(Y/N) Rating

 Assess the load prior to the lift


Manual Handling of Fall of material/ Personnel 9  Ensure that the operatives are
materials Musculoskeletal injury /Sprain/ 3 3 Med Yes 1 3 3
trained in manual handling are
d. Do not twist spine if you need to
change direction; turn your whole
body instead.
e. Carry the load as close as to your
body and as high as your waist
 Ensure adequate supervision is
available at the work area.
 Ensure that the task specific PPE
must be worn. Ref# Federal Law 8 of
1980 article 91.
Legal requirement: AD EHSMS COP 23.0, 11.0, 49.0, 1.0, 7.0, 28.0, V2.0 Feb 2012 / Federal Law 8 of 1980 / Ministerial Order No. 32 of 1982, Ministry of Labour, UAE / Federal Law No. 24
of 1999.

Prepared by Albert C.G. Reviewed by Eng. Mohammed Fazeel Approved by Eng. Sanal Kumar
Position HSE Advisor Position Project Engineer Position Project Manager
Signature Signature Signature

Date of next
Assessment Date 01/06/2022 Review Period 6 months 30/11/2022
review
Reviewed By K N International Architects and Engineers LLC
Name Position Resident Engineer Signature

Document No. MNGC-OHS-TRA-014 Rev No. 00 Issue Date – 01/08/2021 Page 3 of 4


TASK RISK ASSESSMENT
Legal Residual
S. Consequence Risk
Task Step Hazard Details L S Current Control Measures Req. L S Risk Additional Control Measures
No Details Rating
(Y/N) Rating

Date Stamp

Document No. MNGC-OHS-TRA-014 Rev No. 00 Issue Date – 01/08/2021 Page 4 of 4