Lifting of equipment Incident due to use of defective ii. Lift Plan to be completed prior to any lift taking place by crane supervisor Machine
Machine isolated and
Operator competency; lifting gear / equipment; and engineer; breakdown
and material quarantined until repaired.
20 iii. Ensure all lifting tackle and equipment have valid test certificate before
4 Lift planning; Crane collapse due to lifting loads 4 5 Low
HIGH use (6 monthly 3 rd party inspections);
(Mobile crane beyond SWL; Spoil removed and treated as
Hydraulic fluid spill
Operator) iv. Method statements and risk assessments to be submitted and adhered to hazardous waste
No crane documentation in place;
for technical and/or non-routine lifts;
v. Crane load indicator to be functioning correctly, and not to be overridden
under any circumstances;
Over-sailing of material over live vi. Tag lines shall be used to guide materials while lifting, 2 lines minimum
10m in length;
traffic routes;
vii. Slings protected from sharp edges with rubber etc.;
High winds – adverse weather;
viii. Riggers to undertake visual inspection of all lifting equipment daily;
Untrained staff attempting repairs; ii. If any breakdowns occur, regardless of management pressure, the crane
shall be isolated, locked and plant department informed of the breakdown;
Inadequate and unsafe repairs,
resulting in failure of equipment; iii.Machine barriered off if in risk areas such as access routes, traffic routes
Crane Maintenance etc. If on live traffic routes advanced warning vehicle to be mobilized;
6 Injury to operatives; 3 4 12 Low
(revised 06-06-2018) Injury to mechanics undertaking
repairs; iv. Mechanics shall be advised of time, activity and nature of breakdown;
v. Under no circumstances shall temporary repairs be undertaken on any
mobile crane;
vi. During repairs under no circumstances shall workers be placed at risk by
pinch points, crush area, high pressure release or moving parts;