JOB SAFETY ANALYSIS (JSA)

TANK MODIFICATION AND REPAIR


WORK

JSA Number: JSA Title: Coating and Raping activity


Area: Activity: Coating and raping activity in side and out side tank Date

Task Description Coating and raping activity in side and out side tank
Uncontrolle Residual
d Risk Risk
Ste Activity Haza H M L Control H M L
p rd Measures
1. Site preparation ● Poor communication M ● DESCON employees shall have mandatory training. L
between work parties.
● Work permit from the client, with all concurring parties
signatures approval must be obtained prior to start of work and
display at site
● Safety requirements stated on the work permit must be available on
● Inexperience persons /
site and strictly followed
lack of safety awareness
● Toolbox talk shall be conducted to all personnel on site &
documented before start of work.
● Appropriate PPE shall be worn by all personnel at site.

● Assigned trained dedicated Banks man for job with reflective jacket.
● Heat stress
● No water no work policy shall be followed.

● Noise ● Work Schedule according to heat Index

● Ear protection shall be worn where required.


● Vehicles Movement
● Noise meter will be made available at site.

● Maintenance of equipment on regular basis.

● Use of Approved/Trained license drivers.


● Vehicle movements on site shall be controlled by banks man

● Appropriate signage to be provided.


2. Confined space H L
● Lake of Communication ● All personnel working in confined space must
entry.
have confined space training.
● PRL confined space procedure shall be followed.
JOB SAFETY ANALYSIS (JSA)
TANK MODIFICATION AND REPAIR
WORK

JSA Number: JSA Title: Coating and Raping activity


Area: Activity: Coating and raping activity in side and out side tank Date

Task Description Coating and raping activity in side and out side tank
Uncontrolle Residual
d Risk Risk
Ste Activity Haza H M L Control H M L
p rd Measures
 Hole watcher is attentive all the time during
● Ventilation. confined space activity. Lighting provided in CSE to
be 24V.
● Damage material  Easy communication between hole watcher and
supervisor is established all the time.
● Oxygen deficiency  Ensure that passage and transport rout is clear during
accumulation of confined space activities. Proper access/agrees should
toxic gases be maintained.
 Gas test to be done by AGT prior to entering into
the confined space.
 A trained and qualified individual should outside the tank
with the responsibility of ensuring the safety of
● Physical hazards authorized entrants (Fabricator, Fitter, Welder e.tc)
through the performance pre‐entry briefing, checking and
inspecting PPE, equipment and tools and performing
regular monitoring in ensuring person working inside pipe
remains safe for entry and occupation.
 A written rescue plan that has provision for conducting a
timely rescue of individuals working inside the pipe
(Confined Space) should be kept on site. Raising the
alarm
in the event of an emergency using the radio/mobile
JOB SAFETY ANALYSIS (JSA)
TANK MODIFICATION AND REPAIR
WORK

JSA Number: JSA Title: Coating and Raping activity


Area: Activity: Coating and raping activity in side and out side tank Date

Task Description Coating and raping activity in side and out side tank
Ji Uncontrolle Residual
d Risk Risk
Ste Activity Haza H M L Control H M L
p rd Measures
phones provided to them.
● Ensure effective communication systems for the entry
are tested.
● Improper stacking ● Proper light should be provided less than 25v.
of material
● All material stack proper and category wise.

● Rescue arrangement shall be made while working


● Unauthorized entrant more than five meter inside large bore size.
● PRL SHE&S Procedure shall be followed.
● Lack of oxygen ● Close supervision required while working inside.
/oxygen/ air
deficiency ● Execute the work under close supervision and presence
of hole watcher.
● Proper air supply to be provided or air mover will
be provided.
● Proper ventilation shall be there.

● Working crew shell be trained for confined space working.


11. Coating Works M L
● Health hazards. ● Correct PPE should be worn

● Respiration Hazards. ● MSDS should be kept at site for PPE compliances

● Appropriate mask should be worn


JSA Number: JSA Title: Coating and Raping activity
Area: Activity: Coating and raping activity in side and out side tank Date

Task Description Coating and raping activity in side and out side tank
Uncontrolle Residual
d Risk Risk
Ste Activity Haza H M L Control H M L
p rd Measures

● Manual Handling & ● Hands should be cleaned with soap solution before eating
storage paint.
● Storage of paint as per MSDS

● Waste Paint tins to be removed from the work site


• Environmental pollution and dispose to designated area (as per JGC
Procedure)
● Provide secondary containment 110% of largest cane.
● Chemical Spillage
● Keep proper type of fire extinguisher at site.

● Keep minimum stock level at site.


• Inhalation of toxic
● Spills to be reported immediately
fumes Or irritating
eyes. ● Portable Eye wash bottle shall be provided

• Splatter from brush. ● Explain the expected hazards and remedies to the
working crew’s chemicals that they are dealing with.
• Slips, Trips, and Hazardous material training to be done.
Falls. Fire
● Care to be taken by all persons handling chemicals not
to spill, splash nor have contact with the substances.
● Safety harness/fall arrestor to be worn for work at height
● 100% tie off of safety harness all times
during erection/dismantling
JSA Number: JSA Title: Coating and Raping activity
Area: Activity: Coating and raping activity in side and out side tank Date

Task Description Coating and raping activity in side and out side tank
Uncontrolle Residual
d Risk Risk
Ste Activity Haza H M L Control H M L
p rd Measures

● Supervisor to be on site at all times during work activity.

13 Extended M L
● Inadequate lighting in ● Adequate lighting at work area and Access/Egress area.
hour/night
Works (Actual and around work areas, Emergency route to muster point to be clearly
works will be the causing shadows or illuminated.
same as day poorly lit work areas
that could result in ● Proper cable management
work)
unsafe acts and injuries
● Use clear safety glass for night work for good visibility.
taking place
● Warning Lights and sign boards.

● Trained Flag man for equipment movement provided


with signal torch.
● Close supervision required while working in night shift.

14 Emergency ● Poor Communication M L


● Educate the workforce about Emergency Procedure.
Procedure /
Response ● All safety sign board shall be displayed properly at site.

● In case of any Emergency all work will be stopped, Shut


down all running equipment & Machineries and reported
to Muster Point
● Improper Access/ Egress
● Proper Access & Egress shall be available.

● All Workforces shall know the Muster Point location.

● PRL Emergency Procedure to be followed.


JSA Number: JSA Title: Coating and Raping activity
Area: Activity: Coating and raping activity in side and out side tank Date

Task Description Coating and raping activity in side and out side tank
Uncontrolle Residual
d Risk Risk
Ste Activity Haza H M L Control H M L
p rd Measures

● Emergency # 00000000

● PRL Medical # 00000000

15. House keeping ● Trips and fall M ● All waste generated shall be contained and disposed off L
in designated waste skips.
● Sharp Objects ● Do not store materials/equipments inside the plant area.

● Use Proper Personal protective equipment for handling


● Equipment damage of waste.
● All materials shall be removed from the site to a
safe storage location immediately after the work.

Approved
Signature Print Date

Performing Party
Signatu Pri Date
re nt