Please check that all sheets have been faxed correctly. Total page(s) faxed :
Attached is the design calculation and design of the outrigger parking for the above project for
your perusal.
Regards,
Yuanchang
Page 1 of 1
PEC CIVIL CONSULTANT COMPUTATION SHEET
PROJECT N111
SUBJECT Outrigger Parking Design DATE 17/8/2021
MADE Yuanchang
CLIENT Ssangyong
Job No.
Stress on soil, P =
2 2 2
2.5 m
= 95.52 kPa
1
2
Nc = 30.1 c = 0 B = 1.5 m
3
Nγ = 20.1 P'o = 0 γ = 18 kN/m
Nq = 18.4 P0 = 0
Qu = 271 kPa
FoS = 2
Qallowable = 136 kPa > 95.52 kPa OK!
K = M / (bd2fck) b = 1000 mm
= 0.03 < 0.167 d = 75 mm
2
No compression reinforcement required. fck = 20 N/mm
2
fyk = 500 N/mm
lever arm, z = (d/2)*(1+√1-3.53K) < 0.95 d
Page 1 of 3
PEC CIVIL CONSULTANT COMPUTATION SHEET
PROJECT N111
SUBJECT Outrigger Parking Design DATE 17/8/2021
MADE Yuanchang
CLIENT Ssangyong
Job No.
= 0.98 d
As,req = M / (fydz)
= 96.4 mm2/m
2
WB10 mesh (780 mm /m) provided.
Page 2 of 3
PEC CIVIL CONSULTANT COMPUTATION SHEET
PROJECT N111
SUBJECT Outrigger Parking Design DATE 17/8/2021
MADE Yuanchang
CLIENT Ssangyong
Job No.
Check settlement
Immediate settlement, ρi = qB(1-v 2) * I p / E q = 95.52 kPa
= 0.02432 m B = 2.5 m
= 24.32 mm v = 0.3
Ip = 1.119
E = 10000 kPa
= 6.7m
= 2.5m
Page 3 of 3
2.00
1.50
3.0mX2.0mX0.15m THK.
RC SLAB 2pcs
2.00
STEEL MAT
3.00
OUTRIGGER LEG
6.00
7.00
0.227
0.50 0.25 0.25 0.50
0.35 0.15
3.00
4.50
3.00