I. MATERIAL
Bolt
Grade 8.8
Ultimate strength of bolt Fu = 80 kN/cm²
Nominal tensile strength Fnt = 0.75 Fu = 60 kN/cm² (Table J3.2)
Plate
Material A572 Gr 50
Ultimate tensile strength Fu = 44.8 kN/cm²
Yeild strength Fy = 34.5 kN/cm²
Column, Beam
Material A572 Gr 50
Ultimate tensile strength Fu = 44.8 kN/cm²
Yeild strength Fy = 34.5 kN/cm²
Elastic module E= 20000 kN/cm²
Weld
Weld material E7XT
Weld metal strength FEXX = 48.3 kN/cm²
III. MEMBERS
Beam section
Height h= 314 mm
Width bf = 164 mm
Web thickness tw = 6 mm
Flange thickness tf = 8 mm
Is apex
Vertical angle i= 0 %
Include flange stiffener
Thickness for flange stiffener ts = 10 mm
Weld
Flange weld size Wf = 10 mm
Web weld size Ww = 6 mm
Job No. IDN 42.23 Item Main Structure
Revison 00
Date 09-08-23
Project SMELTER PROJECT - DRYER OFFGAS CLEANING SYSTEM
Designed by HKA
Description MOMENT ENDPLATE CONNECTION Checked by CTH
Bolts
Type M36
Gage - tranverse center-to-center spacing g= 120 mm
Vertical edge distance Lev = 60 mm
Horizontal edge distance Leh = 32 mm
V. DESIGN CHECK
1. Moment end plate (external flange)
a. Flexural yielding
∅𝑀 ∅
= 𝐹𝑡 𝑌= 234.15 kNm DG16 Sec 2.5
𝛾 𝛾
With: Φ= 0.9
gr = 1.25
Y= 1509.38 mm Tables (4-2…6)
Demand flexural moment Man = 217.53 kNm
Ratio demand/capacity D/C = 0.93 OK
2𝑇 (𝑑 +𝑑 +𝑑 +𝑑
d. Bolts shear
𝜋𝑑
∅𝑅 = ∅𝐹 𝑛= 1099.31 kN AISC Eq. J3-1
4
With: Φ= 0.75
n= 4
Demand shear strength Va = 34.094 kN
Ratio demand/capacity D/C = 0.03 OK
Job No. IDN 42.23 Item Main Structure
Revison 00
Date 09-08-23
Project SMELTER PROJECT - DRYER OFFGAS CLEANING SYSTEM
Designed by HKA
Description MOMENT ENDPLATE CONNECTION Checked by CTH
f. Shear yielding
∅𝑅 = ∅0.6𝐹 𝑏 𝑡 = 856.33 kN DG4 Eq. 3.12
With: Φ= 0.9
Demand shear strength Va = 355.81 kN
Ratio demand/capacity D/C = 0.42 OK
g. Shear rupture
∅𝑅 = ∅0.6𝐹 [𝑏 − 2(𝑑 + 1.6)] t = 518.30 kN DG4 Eq. 3.13
With: Φ= 0.75
Demand shear strength Va = 355.81 kN
Ratio demand/capacity D/C = 0.69 OK
With: Φ= 0.75
𝜋𝑑
𝑃 =𝐹 = 610.73 kN
4
𝑑 = 630.00 mm
d. Bolts shear 𝜋𝑑
∅𝑅 = ∅𝐹 𝑛= 1099.31 kN AISC J3-1
4
With: Φ= 0.75
n= 4
Demand shear strength Va = 121.37713 kN
Ratio demand/capacity D/C = 0.11 OK
Job No. IDN 42.23 Item Main Structure
Revison 00
Date 09-08-23
Project SMELTER PROJECT - DRYER OFFGAS CLEANING SYSTEM
Designed by HKA
Description MOMENT ENDPLATE CONNECTION Checked by CTH
f. Shear yielding
∅𝑅 = ∅0.6𝐹 𝑏 𝑡 = 856.33 kN DG4 Eq. 3.12
With: Φ= 0.9
Demand shear strength Va = 367.05 kN
Ratio demand/capacity D/C = 0.43 OK
g. Shear rupture
∅𝑅 = ∅0.6𝐹 [𝑏 − 2(𝑑 + 1.6)] t = 518.30 kN DG4 Eq. 3.13
With: Φ= 0.75
Demand shear strength Va = 367.05 kN
Ratio demand/capacity D/C = 0.71 OK
3. Weld check
a. Web weld shear strength
- Fillet Welding
∅𝑅 = ∅0.6𝐹 𝐴 = 289.55 kN AISC Eq. J2-4
With: Φ= 0.75
2
𝐴 = (2𝑊 −𝑊 )𝐿 = 1332.19 mm² Sec. J2.4
2
- Groove Welding
∅𝑅 = ∅0.6𝐹 𝐴 = 0.00 kN
Weld size W g= 0 mm
𝐴 = 2W 𝐿 = 0.00 mm²
Φ= 0.75
Demand shear strength Va = 121.38 kN
Ratio demand/capacity D/C = 0.42 OK
c. Shear yielding
∅𝑅 = ∅0.6𝐹 𝐿 𝑡 = 389.69 kN AISC Eq. J4-3
With: Φ= 1
Demand shear strength Va = 121.38 kN
Ratio demand/capacity D/C = 0.31 OK
With: Φ= 0.75
2
𝐴 = (2𝑊 −𝑊 )𝑏 = 2319.31 mm² Sec. J2.4
2
c= 1.5
- Groove Welding
∅𝑅 = ∅0.6𝐹 𝐴 = 0.00 kN
Weld size W g= 0 mm
𝐴 = 2W 𝑏 = 0.00 mm²
Φ= 0.80
Demand shear strength Va = 711.62 kN
Ratio demand/capacity D/C = 0.94 OK
With: Φ= 0.75
2
𝐴 = (2𝑊 −𝑊 )𝑏 = 2319.31 mm² Sec. J2.4
2
c= 1.5
- Groove Welding
∅𝑅 = ∅0.6𝐹 𝐴 = 0.00 kN
Weld size W g= 0 mm
𝐴 = 2W 𝑏 = 0.00 mm²
Φ= 0.80
Demand shear strength Va = 734.10 kN
Ratio demand/capacity D/C = 0.97 OK