Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

A B C D

25 mm SS TUBE RO WATER 25 mm SS TUBE RO WATER


LOOP IN FROM SECOND FLOOR LOOP IN TO SECOND FLOOR
WATER TREATMENT AREA WATER TREATMENT AREA

1
EMERGENCY REJECTED
EXIT PM STORE DE DUSTING MATERIAL
8'-3" x 6'-0" 8'-0" x 6'-0" RECEIVING
RM 8'-0"x6'-0"
STAGING
SOLUTION 6'-0" X 10'-6"
RO
PREPARATION
16'-0" X 15'-4"

25 mm SS TUBE RO WATER
LOOP IN FALSE CEILING 7'-0" x 7'-8" PM QUARANTINE
OFFICE 25'-0" x 8'-0"

25 mm SS TUBE RO WATER
LOOP IN FALSE CEILING

BUFFER
6'-0" X 8'-6"

2 AEROSOL FILLING
AND SEALING OVER PRINTING
RO 16'-0" X 12'-0"
7'-0" x 19'-0"
JAR BLOWING
6'-0" X 7'-9"

PM STORE
17'-7" x 25'-5"

25 mm SS TUBE RO WATER
LOOP IN FALSE CEILING
25 mm SS TUBE RO WATER
LOOP IN FALSE CEILING
PACKING HALL
22'-6" x 12'-0"

BUFFER
7'-0" x 6'-0"

UP
MAT ENTRY
7'-0" X 5'-0"
1 2 3 4 5 6
7
8
RO SOLUTION 9
PREPARATION OFFICE / IPQC 10
15'-0" X 17'-0" 11 PRIMARY
7'-0" X 7'-0"
LIFT WELL PACKING
12 STORE
6'-8" x 9'-10"
13
11'-4" x 20'-2"
25 mm SS TUBE RO WATER 14
LOOP IN FALSE CEILING

AIR LOCK JANITORIAL STORE


7'-0" X 8'-6" 12'-0" X 4'-6"

4
REJECTED MATERIAL
LIQUID FILLING DE DUSTING
RO RM STORE RECEIVING
8'-0"x6'-0"
15'-0" X 14'-0" 8'-3" x 6'-0" 8'-0"x6'-0"

CAN BLOWING
7'-0" X 9'-6"

QUARANTINE SAMPLING
18'-7" x 9'-6" 6'-0" X 9'-6"
CORRIDOR 8'-0" WIDE

25 mm SS TUBE RO WATER
25 mm SS TUBE RO WATER LOOP IN FALSE CEILING
LOOP IN FALSE CEILING

PACKING HALL
22'-6" x 19'-2"

RM STORE
25'-0" x 24'-2"

25 mm SS TUBE RO WATER
6 LOOP IN FALSE CEILING

POWDER FILLING
RO 13'-0" X 12'-0" CAN BLOWING
9'-0" X 6'-0"

25 mm SS TUBE RO WATER
LOOP IN FALSE CEILING

RO
BUFFER AIR LOCK COLD
6'-0" X 8''-6" 4'-10" x 4'-0" STORE
BUFFER 16'-0" x 6'-0"
POST DISP PRE DISP
7'-0" x 10'-4" 7'-0"x 10'-4"
RO 25 mm SS TUBE RO WATER
LOOP IN FALSE CEILING DISPENSING
10'-3" x 6'-0"

POWDER
MIXING
7 16'-0" X 15'-4"
RM
STAGING
6'-0" X 10'-6"

RETURN AND BUFFER


FG QUARANTINE
RECALL 5'-7" x 8'-0"
16'-6" x 8'-0"
8'-0" x 8'-0"
RO

25 mm SS TUBE RO WATER
LOOP IN FALSE CEILING
STEP OVER

CORRIDOR 8'-0" WIDE

25 mm SS TUBE RO WATER
LOOP IN FALSE CEILING

FEMALE
CHANGE
FG STORE
12'-9"x13'-9"
25'-0" x 18'-6"
BUFFER
9'-4"x5'-0"

8
STEP OVER

25 mm SS TUBE RO WATER
LOOP IN FALSE CEILING
EXEC.
MALE CHANGE
STEP OVER

ENTRY
12'-9"x13'-9" 8'-0" X 8'-0" DISPATCH
25 mm SS TUBE RO WATER 8'-5" x 8'-0"
BUFFER
9'-4" x 5'-0" LOOP IN FALSE CEILING

9
SAMPLES
RO WASHING AND RECEIVING
FUME HOOD DOCUMENTS
9'-0" x 6'-3" AND RECORD
WASH
QUALITY CONTROL LAB 9'-6" x 7'-6" PM OFFICE 5'-0" X 10'-9"

17'-0" x 12'-7" 17'-4" x 10'-9"

CHEMICALS
STORE
9'-0" x 6'-0"
ENTRANCE
17
9'-6" x 6'-6"
16
15
14
LIFT WELL 13
6'-6" x 8'-0" 12
11
RECEPTION
21'-0" x 13'-10" 10
INSTRUMENTS ROOM ANALYTICAL LAB 9
12'-0" x 12'-4½" 12'-0" x 12'-0" QCM OFFICE
8
9'-6" x 10'-0"
1 2 3 4 5 6 7
STAIR
STEP = 11" UP
TREAD = 6"

10

GROUND FLOOR PLAN RO WATER LOOP SYSTEM


RO RO WATER LOOP POINT IN ROOM RO WATER TUBE LINE

You might also like