Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

QUOTATION FOR THE PRODUCTION OF A SHELVE (IRON FURNITURE)

FOR THE COOPERATIVE SECRETARIAT

The work schedule is grouped into two: iron and wood work. Below is a
breakdown of the expenses:

A. IRON WORK
S/N Description Quantity Unit Price N Total N
1 1” Square pipe by 1.5mm 7 2,200 15,400
2 Electrode (packet) 1 3,000 3,000
3 Cutting disc 1 2,000 1,000
4 Grinding stone 1 2,000 2,000
5 Paint ( four liters ) 1 6,000 6,000
6 Thinner - 4000 4000
7 Wheels (Set of trolley - 4) 1 5,000 5,000
8 Transportation - - 5,000
9 Labour - - 10,000
TOTAL: 51,400
B. WOOD WORK
1 MDF ( foreign wood board) 4 9,000 36,000
2 Composite wood 1 5,000 5,000
3 Cutting and taping of the boards 4 1,500 6,000
4 Hinges 4 1,000 4,000
5 Handles 2 500 1000
6 Locks 2 1,500 3,000
7 Screws (packet) 1 2,000 2,000
8 Transportation - - 5,000
9 Labour - - 10,000
TOTAL: 72,000
GRAND TOTAL: N 123,400

I hereby apply for the sum of one hundred and twenty three thousand four
hundred naira (N 123,400) only for above subject matter.

Yours faithfully,

Gaven Dipnap V. (Assistant General Secretary)

You might also like