The work schedule is grouped into two: iron and wood work. Below is a
breakdown of the expenses:
A. IRON WORK
S/N Description Quantity Unit Price N Total N
1 1” Square pipe by 1.5mm 7 2,200 15,400
2 Electrode (packet) 1 3,000 3,000
3 Cutting disc 1 2,000 1,000
4 Grinding stone 1 2,000 2,000
5 Paint ( four liters ) 1 6,000 6,000
6 Thinner - 4000 4000
7 Wheels (Set of trolley - 4) 1 5,000 5,000
8 Transportation - - 5,000
9 Labour - - 10,000
TOTAL: 51,400
B. WOOD WORK
1 MDF ( foreign wood board) 4 9,000 36,000
2 Composite wood 1 5,000 5,000
3 Cutting and taping of the boards 4 1,500 6,000
4 Hinges 4 1,000 4,000
5 Handles 2 500 1000
6 Locks 2 1,500 3,000
7 Screws (packet) 1 2,000 2,000
8 Transportation - - 5,000
9 Labour - - 10,000
TOTAL: 72,000
GRAND TOTAL: N 123,400
I hereby apply for the sum of one hundred and twenty three thousand four
hundred naira (N 123,400) only for above subject matter.
Yours faithfully,