Notice to All Bidders – December 4, 2023

Ministry of Natural Resources and Forestry

Request for Bid

For

Substation Concrete Repairs at the Dorion Fish Culture Station

tender_18792

Addendum #1

Amendments to the RFB

As set out in the RFB Attachment #1 – RFB Definitions, Terms and Conditions, Section 2.4.1 of
the above noted RFB, Bidders are reminded that the Addendum shall form an integral part of
the RFB. Bidders are responsible for obtaining all addenda issued by Ministry of Natural
Resources and Forestry on ontariotenders.jaggaer.com.

The following additional information will now form part of the contract documents for
tender_18792 and amends the applicable information contained in the original contract
tendering documents (including as set out in Amendments No. 1 – 6, which are incorporated in
and form part of this Addendum).

Note the following Amendments to tender_18792 - Substation


Concrete Repairs at the Dorion Fish Culture Station

tender_18792 - Substation Concrete Repairs at the Dorion Fish Culture Station Addendum #1 Page 1
Amendment #1

Opportunity Listing – Opportunity Details


The following section is deleted:

Information Session
Yes, Optional

And replaced with:

N/A

Amendment #2

The following section is deleted:

Site Meeting
Yes, optional
Site Meeting Date and Time
Location: MNRF Dorion Fish Culture Stn, 800 Fish Hatchery Rd. Dorion, Ontario P0T 1K0
Date: February 27, 2024
Time: 11:00 a.m. (Toronto time)

And replaced with:

Site Meeting
Yes, optional
Site Meeting Date and Time
Location: MNRF Dorion Fish Culture Stn, 800 Fish Hatchery Rd. Dorion, Ontario P0T 1K0
Date: February 6, 2024
Time: 11:00 a.m. (Toronto time)

rfx_16703 - Substation Concrete Repairs at the Dorion Fish Culture Station

Qualification Envelope

Amendment #3
The following section is deleted:

1.1.13 Bidder’s Deadline for Questions: March 5, 2024 at 11:00 a.m. (Toronto time).

(See Attachment #1 – RFB Definitions, Terms and Conditions, Bid Process Requirements.)

And replaced with:

1.1.13 Bidder’s Deadline for Questions: February 20, 2024 at 11:00 a.m. (Toronto time).

tender_18792 - Substation Concrete Repairs at the Dorion Fish Culture Station Addendum #1 Page 2
(See Attachment #1 – RFB Definitions, Terms and Conditions, Bid Process
Requirements.)

Amendment #4
The following section is deleted:

1.1.14 Deadline for Issuing Addenda: March 7, 2024 at 11:00 a.m. (Toronto time).

(See Attachment #1 – RFB Definitions, Terms and Conditions, Communication After Issuance
of RFB.)

And replaced with:

1.1.14 Deadline for Issuing Addenda: February 23, 2024 at 11:00 a.m. (Toronto time).

(See Attachment #1 – RFB Definitions, Terms and Conditions, Communication After


Issuance of RFB.)

Amendment #5
The following section is deleted:

1.1.15 RFB Closing Date and Time: March 21, 2024 at 11:00:00 a.m. (Toronto time).

Note:

If the Ministry makes any changes to the RFB after a Bidder has submitted its Bid, the Bid will
be invalidated on the Ontario Tenders Portal eTendering System and the Bidder will need to re-
submit its Bid. The Bidder will be required to update any new or modified sections of the RFB by
way of the Ontario Tenders Portal eTendering System and re-submit its Bid.

Bidders will be notified of Ministry changes to the RFB through the Ontario Tenders Portal
eTendering System. In order to be notified of these changes, Bidders must continue to monitor
the Ontario Tenders Portal eTendering system after they have submitted their Bid.

Please note:

Any Bids (or sections of a Bid) submitted through the OTP online messaging function will not be
accepted.

(See Attachment #1 – RFB Definitions, Terms and Conditions, Bid Process Requirements.)

And replaced with:

1.1.15 RFB Closing Date and Time: March 5, 2024 at 11:00:00 a.m. (Toronto time).

Note:

tender_18792 - Substation Concrete Repairs at the Dorion Fish Culture Station Addendum #1 Page 3
If the Ministry makes any changes to the RFB after a Bidder has submitted its Bid, the
Bid will be invalidated on the Ontario Tenders Portal eTendering System and the Bidder
will need to re-submit its Bid. The Bidder will be required to update any new or modified
sections of the RFB by way of the Ontario Tenders Portal eTendering System and re-
submit its Bid.

Bidders will be notified of Ministry changes to the RFB through the Ontario Tenders
Portal eTendering System. In order to be notified of these changes, Bidders must
continue to monitor the Ontario Tenders Portal eTendering system after they have
submitted their Bid.

Please note:

Any Bids (or sections of a Bid) submitted through the OTP online messaging function
will not be accepted.

(See Attachment #1 – RFB Definitions, Terms and Conditions, Bid Process


Requirements.)

Amendment #6

The following section is deleted:

1.1.16 Site Meeting

Yes, optional.

Location: MNRF Dorion Fish Culture Stn, 800 Fish Hatchery Rd. Dorion, Ontario P0T 1K0
Date: February 27, 2024
Time: 11:00 a.m. (Toronto time)

And replaced with:

1.1.16 Site Meeting

Yes, optional.

Location: MNRF Dorion Fish Culture Stn, 800 Fish Hatchery Rd. Dorion, Ontario P0T 1K0
Date: February 6, 2024
Time: 11:00 a.m. (Toronto time)

[End of Addendum #1]