TABLE OF CONTENT
CONTENT PAGES
1) INTRODUCTION 3
2) ROOF BEAM
- TAKING OFF 4 - 19
- BILL OF QUANTITIES 20 - 22
3) ROAD EMBANKMENT
- TAKING OFF 23 – 25
- BILL OF QUANTITIES 26
4) DISCUSSION/CONCLUSION 27
5) APPENDIX 28 - 30
6) REFERENCES 31
2
INTRODUCTION
For this project, I have been asked to do a taking off calculation of roof beams which
are Beam 2/C-H, Beam B/3-5, and also Beam 6/F-H. As you know, roof beams is the
component that involves to the house construction. The function of roof beams is provide a
support for truss covered with roof cover to protect the house from climate change such as
raining, sunny, or any things that protected the house from any damages. I also been asked
to do a taking off for road embankment. As you know, there are several layers that involves in
constructing the road construction which are the first layers was subgrade, the second layers
was fine aggregates (sand), the third layers was coarse aggregates (stones), and last but not
least the bitumen or asphalts layers. The width that proposed in constructing the road
construction was 15 m, meanwhile for the thickness for both layers which are sand and stones
are proposed to the thickness of 0.5 m and 0.85 m. The slope for road construction that been
designed was 2.5 : 1 and the length of road was at about 240 m.
I also been asked to do bill of quantities for both of them in order to get the actual
price by taking the rate of prices from any supplier. For truss beam, we need to find two
supplier in order to make the comparison in terms of its price that produce and select the most
cheapest one. Meanwhile, we just need to have one supplier in producing the actual price for
road construction work. This method was very important really useful for all construction work
especially for house construction work and also road construction work in order to make the
estimation for that construction. For example, it’s not only taking off for beam, there might be
taking off for slab, pad footing, stump, column and so on.
3
BEAM 2/C-H
2T12
R8 - 150
200 200 200 200
2T12
4
1 2 3 4
1) CONCRETE VOLUME
(BEAM 2/C-D1 & 2/F1-H)
3.66
0.45
0.2
2/
0.2 m Length = 3.46
0.45 m add (+)
3.66 m 2 (1/2) column
0.66 m! 2 (1/2)(0.2 ) = 0.20
3.66
Length = 5.28
add (+)
2 (1/2) column
2 (1/2)(0.2) = 0.20
5.28
2/
3.66 m 2) FORMWORK
0.45 m (BEAM 2/C-D1 & 2/F1-H)
3.29 m"
OUTER SIDE (OUTER LENGTH)
3.66
0.45
5
INNER SIDE (INNER LENGTH)
2/
3.26 m
3.26
0.45 m
2.93 m"
0.45
Length = 3.46
less (-)
2 (1/2) column
2 (1/2)(0.2) = 0.20
3.26
2/ SOFFIT
3.26 m
3.26
0.20 m
1.30 m"
0.20
0.45
Length = 5.08
less (-)
2 (1/2) column
2 (1/2)(0.2) = 0.20
4.88
6
1/ SOFFIT
4.88
4.88
0.20
0.98 m"
0.20
REINFORCEMENT
BOTTOM
2T12
cover cover
B B
cover
A
2T12
R8 – 150 mm C/C
7
SIDE A
Length = 0.2
less (-) cover
2(0.025) = 0.05
0.15
SIDE B
Length = 0.45
less (-) cover
2(0.025). = 0.05
0.40
2/ NO OF LINK R8-150
23/ (BEAM 2/C-D1 & 2/F1-H)
1.292 m
59.43 m !."$
%.&'
+ 1 = 22.93 ≈ 23
1/ (.))
34/ 1.292 m %.&'
+ 1 = 33.53 ≈ 34
43.93 m
8
BEAM B/3-5
2T16
4000 4000
2T16
200 200
200
9
1 2 3 4
2/ 1) CONCRETE VOLUME
0.2 m (BEAM B/3-4 & B/4-5)
0.45 m
4.20 m 4.2
!
0.76 m
0.45
0.2
Length = 4.0
add (+)
2 (1/2) column
2 (1/2)(0.2 ) = 0.20
4.20
1/ 2) FORMWORK
3.80 m (BEAM B/3-4 & B/4-5)
0.45 m
1.71 m" OUTER SIDE (OUTER LENGTH)
3.8
0.45
Length = 4.0
add (+)
2 (1/2) column
2 (1/2)(0.2) = 0.20
Less (-)
Width from
secondary beam
2 (0.2) = 0.40
3.80
10
2/ INNER SIDE (INNER LENGTH)
3.8 m
0.45 m
3.8
3.42 m"
0.45
Length = 4.0
less (-)
2 (1/2) column
2 (1/2)(0.2) = 0.20
3.80
2/ SOFFIT
3.8 m
3.8
0.2 m
1.52 m"
0.20
REINFORCEMENT
2/
2/ TOP
4.282 m 2T12
17.13 m
11
BOTTOM
2/
2/
4.326 m
17.3 m
2T16
cover cover
B B
cover
A
2T16
R6 – 150 mm C/C
SIDE A
Length = 0.2
less (-) cover
2(0.025) = 0.05
0.15
12
SIDE B
Length = 0.45
less (-) cover
2(0.025) = 0.05
0.40
2/ NO OF LINK R6-150
27/ (BEAM B/3-4 & B/4-5)
1.244
67.18 m !.)
%.&'
+ 1 = 26.33 ≈ 27
13
BEAM 6/F-H
R10 -125
2T16
2250 2000
2T18
200 200 200
125
14
1 2 3 4
1) CONCRETE VOLUME
(BEAM 6/F-G)
2.45
0.45
0.2
1/
0.2 m Length = 2.25
0.45 m add (+)
2.45 m 2 (1/2) column
0.22 m! 2 (1/2)(0.2 ) = 0.20
2.45
(BEAM 6/G-H)
1/
0.2 m 2.2
0.45 m
2.2 m 0.45
!
0.2 m
0.2
Length = 2.0
add (+)
2 (1/2) column
2 (1/2)(0.2) = 0.20
2.2
1/
2.45 m 2) FORMWORK
0.45 m (BEAM 6/F-G)
1.10 m"
OUTER SIDE (OUTER LENGTH)
2.45
0.45
15
INNER SIDE (INNER LENGTH)
1/
2.05 m
2.05
0.45 m
0.45
0.92 m"
Length = 2.25
less (-)
2 (1/2) column
2 (1/2)(0.2) = 0.20
2.05
1/ SOFFIT
2.05 m
2.05
0.20 m
(BEAM 6/G-H)
0.99 m"
0.45
0.81 m"
0.45
Length = 2.0
less (-)
2 (1/2) column
2 (1/2)(0.2) = 0.20
1.8
16
1/ SOFFIT
2.05
2.05
0.20
REINFORCEMENT
TOP
2T16
1/
2/
4.576 m
Outer length = 4.45
9.15 m less (-) cover
2 x 0.025. = 0.05
Add (+) bend
No.beam x 5.5 x d
2 x 5.5 x 0.016 = 0.176
4.576
1/
2/ BOTTOM
4.598 m
9.2 m 2T18
17
LINK (R10 – 125 mm C/C)
A
cover 2T16
cover cover
B B
cover
A
2T18
SIDE A
Length = 0.2
less (-) cover
2(0.025) = 0.05
0.15
SIDE B
Length = 0.45
less (-) cover
2(0.025). = 0.05
0.40
".%'
+ 1 = 17.4 ≈ 18
%.&"'
18
1/ (BEAM 6/G - H)
16/
4.34 m &.)
+ 1 = 15.4 ≈ 16
%.&"'
21.44 m
19
BILL OF QUANTITITES
SUPPLIER A
FORMULA
• T12
+(%.%&")!
x 66.26 x 7850 x 0.0009 = 0.05295 ton
(
• T16
+(%.%&$)!
x 26.45 x 7850 x 0.0009 = 0.03758 ton
(
• T18
+(%.%&))!
(
x 9.2 x 7850 x 0.0009 = 0.01654 ton
• R6
+(%.%%$)!
x 67.18 x 7850 x 0.0009 = 0.01342 ton
(
• R8
+(%.%%))!
x 103.36 x 7850 x 0.0009 = 0.0367 ton
(
• R10
+(%.%&)!
x 45.56 x 7850 x 0.0009 = 0.02528 ton
(
20
Item Description Quantity Unit Rate RM
No.
1. Conrete (Grade 30) 1.64 m! 230.00 377.20
2. Reinforcement
• T12 0.05295 ton 3250.00 172.09
• T16 0.03758 ton 3780.00 142.05
• T18 0.01654 ton 4250.00 70.30
• R6 0.01342 ton 2650.00 35.56
• R8 0.0367 ton 2850.00 104.60
• R10 0.02528 ton 3200.00 80.90
3. Formwork
• Sawn Timber 25 mm thick 24.36 m" 40.00 974.40
TOTAL 1957.10
SUPPLIER B
• T12
+(%.%&")!
x 66.26 x 7850 = 58.83 kg
(
• T16
+(%.%&$)!
(
x 26.45 x 7850 = 41.75 kg
• T18
+(%.%&))!
x 9.2 x 7850 = 18.38 kg
(
• R6
+(%.%%$)!
x 67.18 x 7850 = 14.91 kg
(
• R8
+(%.%%))!
x 103.36 x 7850 = 40.78 kg
(
• R10
+(%.%&)!
x 45.56 x 7850 = 28.09 kg
(
21
Item Description Quantity Unit Rate RM
No.
1. Concrete (Grade 30) 1.64 m! 255.00 418.20
2. Reinforcement
• T12 58.83 kg 3.28 192.96
• T16 41.75 kg 3.13 130.68
• T18 18.38 kg 3.13 57.53
• R6 14.91 kg 3.23 48.16
• R8 40.78 kg 3.23 131.72
• R10 28.09 kg 3.28 92.14
3. Formwork
• Sawn Timber 25 mm thick 24.36 m" 40.00 974.40
TOTAL 2045.79
22
DATA FOR EMBANKMENT
TAR
15 m
STONE 0.85 m
SAND 0.50 m
2.5 : 1 2.5 : 1
23
CHAINAGE 240
CHAINAGE 100
0m
24
2.60 m
CHAINAGE 00
0m
10
2.00 m
1.2 m
Sand = 1800 m!
Stone = 3060 m!
Tar = 15 x 240
24
AREA OF CHAINAGE, A = bd + s!!
&."1".%
d678& = = 1.6
"
".% 1".$
d678" = = 2.3
"
25
Ratio Stones
150 mm : 14.60
85 mm : ?
)'
x 14.60 = RM = 8.27 New unit rate for stones
&'%
&' 67,704.52
&%%
X 451,363.45
GRAND TOTAL 519,067.97
26
DISSCUSION
From this calculation, I’m able to do taking off and bill of quantities for beam and road
embankment. As you can see for taking off beam, I had making the comparison in terms of its
bill of quantities where I took or find the rate of price from any supplier such as Supplier A is
from Kelantan meanwhile for supplier B, I took the rate of price from the internet. For supplier
A, the supplier that involves were the reinforcement is took from Komtar Hardware, concrete
from Othomats Trading, and Formwork from Mars Kayu. After we have made the calculation
for bill of quantities, we got that the prices for supplier A is the cheapest one which is
RM1957.10 rather we compared to Supplier B which gives the of RM2045.79. From that, I
had mad decision to choose Supplier A as our supplier to provide the materials of building due
to the most economical prices.
Meanwhile, bill of quantities for road embankment, I took the rates prices from JKR
“Jadual Kadar Kerja Kejuruteraan Dan Bangunan Tahun 2021” and gives the total that have
been computed for making the road embankment construction was RM 519,067.97 which
represent the actual value for this construction.
CONCLUSION
Inconclusion, I able to produce the actual prices for both construction which is three
roof beams such as 2/C-H, B/3-5, and 6/F-H and also the road embankment construction. It’s
helps us in producing or creating the actual prices and really useful when we involves to any
construction building and also road construction in future. From this project, I have completely
for doing for this task.
27
APPENDIX
RATES OF PRICES
ROOF BEAMS
SUPPLIER A
• REINFORCEMENT (KOMTAR HARDWARE) = 012-2232739
- T12 = RM 3250/ton
- T16 = RM 3780/ton
- T18 = RM 4250/ton
- R6 = RM 2650/ton
- R8 = RM 2850/ton
- R10 = RM 3200/ton
28
SUPPLIER B
29
ROAD EMBANKMENT
30
REFERENCES
- Materials Prices. (2022). QUANTITY SURVEYOR ONLINE.
http://quantitysurveyoronline.com.my/materials-prices.html
- JuruUkur Bahan Penguasa Kanan, Bahagian Khidmat Kos & Inovasi, Cawangan
Kontrak & Ukur Bahan (2021). “Jadual Kadar Kerja Kejuruteraan Awam Dan
Bangunan Tahun 2021”
31