CV - Tanmoy Das

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Summary

TANMOY DAS I am a Civil Engineer with more than 13 years of extensive professional experience
in the field of Highway Engineering. After completion of my Graduation in 2009,
I have joined my first organization (2009 – 2011) as Graduate Engineer Trainee
and left the organization as Design Engineer. My first experience was to prepare
BOQ of various components of Roads, assist to prepare various design reports.
During my 2nd work experience (2011 – 2012) I was involved in Road Project
where I had to assist my superiors in designing of Highway using MX Road
Software and designing of Pavement. I was also involved in providing assistance
in preparation of Design Reports.
During my 3rd Work experience (2012 – 2018), I was started to visualize more
about the work that I had done previously when I was involved in filed
investigation of Highways. Investigation includes Road Inventory survey,
Pavement Roughness survey and analysis, root cause analysis of pavement failure
and remedial measures. The scope of work also includes Design of Highways,
Design of Pavement, optional study of alternate route, preparation of BOQ, Life
Cycle cost analysis of Pavement
Between the period of 2018 and 2019, my scope of work was as same as my
previous organization.
During my work in current organization (2019 – Present), I am involved in design
and analysis of highway and pavement with some additional responsibility of
Team Management. In the present tenure I am involved in various responsibilities
related to highway design, review of drawings, analysis of the behavior of
pavement materials, investigation of root cause of failure of pavement, providing
best suited pavement design proposal. With this technical work I am also involved
Contact in project management, provide support in construction related issues, preparation
of Reports related to pavement material and highways.
Address:
Ukil Para, Raiganj, Experience
Uttar Dinajpur,
West Bengal - 733134 • Sr. Engineer (Transit) - 02/2019 to Present
Phone: AECOM, Kolkata, India
+91 6294306176 Projects:
Email:  Project Name: Authority’s Engineer for Design, Engineering,
dastanmoy000@gmail.com Procurement, Supply and Construction of Four Lane Bridge Including
Date of Birth: Approaches Over River Brahmaputra Between Dhubri on North Bank
24/01/1988 and Phulbari on South Bank on The State of Assam / Meghalaya on NH-
127B (Length: 19.282km).
Client: National Highways and Infrastructure Development
Languages Contractor: Larsen & Toubro
Project Cost: INR 35000 Cr.
→ English
Work involved: In this project I am involved as Highway and Pavement
→ Bengali design Engineer. The job entailed review of design of horizontal and
→ Hindi vertical alignment, Junction Plan and Profile review, review of Pavement
Material and Design of Pavement.
Skill Highlights  Project Name: Second Iswar Gupta Bridge (6 lane Extradosed Bridge)
over river Hooghly at Kalyani, West Bengal.
• Project management Client: Larsen & Toubro
• Highway Design Project Cost: INR 1560 Cr.
• MX Road Work Involved: Responsible for preparation of plan Profile that includes
• Innovative detailed design including design of horizontal and vertical alignment with
• Time Management proper value engineering, Junctions design.
 Project Name: Consultancy Services for distress assessment with
• Leadership
rehabilitation proposal of Rigid pavement at ATCC location, Design of
retaining structure for SWB approaches and Review of SWB room
Education drawings.
Bachelor of Technology: Civil Engineering – 2009 Client: Second Vivekananda Bridge Tollway Company Private Limited
Jalpaiguri Government Engineering College, WB Work Involved: The job entailed detailed design of Rigid Pavement at
ATCC location including Preparation of Drawing of Placement of Rigid
Master of Technology: Transportation Engineering – 2018 Pavement Slab for the Placement of sensors and loops.
Indian Institute of Technology, Delhi
• Design Engineer (Highways) - 10/2018 to 01/2019
Feedback Infra, Gurugram
Projects:
 Project Name: DPR for Access Control 6-Lane Bhopal-Indore Green Field Expressway in Madhya Pradesh.
Client: Madhya Pradesh Road Development Corporation (MPRDC)
Project Cost: INR 3500 Cr.
Length of Project: 170 Km.
Work Involved: Work was checking and validating the survey data for its adequacy and main scope of works is checking and
validating the survey data for its adequacy and consistency, Incorporating the validated data into the design software, Preparation
of Digital Terrain Model (DTM), Designing horizontal and vertical alignments.

• Sr. Manager (Highway) - 02/2012 to 10/2018


Intercontinental Consultants & Technocrats Pvt Ltd, New Delhi
Projects:
 Project Name: Consultancy Services for Preparation of DPR for Development of Economic Corridors, Inter Corridors, Feeder
Routes to Improve the Efficiency of Freight Movement in India (Lot-1/Madhya Pradesh/Package-6), REWA-BEOHARI-
TETKA-SHAHDOL (SH-9).
Client: National Highway Authority of India (NHAI)
Project Cost: INR 1016 Cr.
Length of Project: 320 Km.
Work Involved: Checking and validating the survey data for its adequacy and consistency, Incorporating the validated data
into the design software, Preparation of Digital Terrain Model (DTM), Designing horizontal and vertical alignments, reviewing
the material properties of Pavement, Option Study of various type of pavement, Life Cycle Cost Analysis, Checking cross
sections, generate the drawings scripts (plan, profile and cross sections), hand it over to the draftsmen for editing in
AutoCAD, To assist in finalizing drawings, To prepare data for area and volume calculations.
 Project Name: Consultancy Services for Detailed Project Report cum Transaction Advisory Services for Karnataka State
Highway Improvement Project-lll (KSHIP-lll)
Client: Government of Karnataka
Length of Project: 666 Km.
Work Involved: Checking and validating the survey data for its adequacy and consistency, Incorporating the validated data
into the design software, Preparation of Digital Terrain Model (DTM), Designing horizontal and vertical alignments, design of
interchange, Checking cross sections, generate the drawings scripts (plan, profile and cross sections), hand it over to the
draftsmen for editing in AutoCAD, Designing horizontal and vertical alignments, reviewing the material properties of Pavement,
Option Study of various type of pavement, Life Cycle Cost Analysis, Road condition survey using Falling Weight Deflectometer.
To assist in finalizing drawings, To prepare data for area and volume calculations.
 Project Name: Greater Imphal Ring Road, Manipur
Client: Imphal Public Work Department
Project Cost: INR 1400 Cr.
Length of Project: 127 Km.
Work Involved: Checking and validating the survey data for its adequacy and consistency, Incorporating the validated data
into the design software, Preparation of Digital Terrain Model (DTM), Designing horizontal and vertical alignments, Design
of Pavements, Pavement Condition Survey, Analysis of Pavement Material.
 Project Name: Consultancy Services for Project Management Phase-I including Preparation of Detailed Project Report
for Up-gradation of Junction with NH-41-Bhimasar-Anjar, Bhuj, Khavda- Dharmshala section of NH-341 in the State of Gujarat
to two/four lane with Paved Shoulder Configuration.
Client: Ministry of Road Transport & Highways
Project Cost: INR 1046 Cr.
Length of Project: 130 Km.
Work Involved: Checking and validating the survey data for its adequacy and consistency, Incorporating the validated data
into the design software, Preparation of Digital Terrain Model (DTM), Designing horizontal and vertical alignments, design of
interchange, Checking cross sections, generate the drawings scripts (plan, profile and cross sections), hand it over to the
draftsmen for editing in AutoCAD, To assist in finalizing drawings, To prepare data for area and volume calculations.

• Dy. Manager (Highway) - 09/2011 to 02/2012


Consulting Engineers Group, New Delhi
Projects:
 Project Name: Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Up-gradation to 2-
Lane/2-Lane with Paved Shoulders and Strengthening of Fathua-Harnaut-Barh Section (km 0 to km 69) of NH 30 A in the State
of Bihar. (Government of India).
Client: MORT&H
Length of Project: 69 Km.
Work Involved: Assisting for designing horizontal and vertical alignments, assisting for preparation of Design and Material
Reports.

• Design Engineer - 07/2009 to 09/2011


Aquagreen Engineering Management Pvt. Ltd, New Delhi
Projects:
 Project Involved: Various road development project for the construction of water retaining structure.

You might also like