NOTE:
1) FOR NOTES & LEGEND, REFER TO DWG. NO.: A1056-102.

TENDER
16 MAR 2012

DRAWING

ATRIUM MODE OF OPERATION OF ENGINEERED SMOKE CONTROL DESIGN SCENARIO


ENGINNERED SMOKE CONTROL SYSTEM (BASEMENT 1 F&B I SHOPS I CIRCULATION AREA) )
(ESCS CONTRACTOR SHAll UPDATE THE SEQUENCE
OF ACTIVATION BASED ON LATEST ARCHTECTURAI PIP,N)
'--T
1) SMOKE CONTROL SYSTEM SHALL BE ACTIVATED AUTOMATICALLY BY:- MOTORISED DAMPER MOTORISED DAMPER
SMOKE ZONE MOTORISED DAMPER ACTIVATION ACTIVATED SMOKE EXHAUST SERVICES TO TIME
SINO CONTROL PANEL
ACTIVATED (FRESH AIR) (EXHAUST AIR) FAN ACTIVATED SHUTDOWN DELAY
(MDCP)
A) SMOKE DETECTORS LOCATED IN THE PARTICULAR ZONE.
BASEMENT 1
B) REMOTE MANUAL START-STOP SWITCH c/w VISUAL INDICATION
OF THE OPERATIONAL STATUS OF TliE SMOKE SYSTEM AT SEF RF-1 & FRMD-SZ-Bl-0l
SZ-B1-01 MDCP-SZ-Bl-01 FRMD-SZ-Bl-0l (OPEN) SMOKE CURTM~S
FIRE COMMAND CEI~TRE/MAIN FIRE ALARM PANEL, SEF RF - 2 (OPEN) AU. AHUs,
AROUND ATRIUM, VOID
(RUN) MAUs & FCUs ESCALATOR AREAS
2) UPO~I ACTIVATION OF THE ENGINEERED SMOKE CONTROL SYSTEM, THE SEF RF -3 AT THE FIRE
FOLLOWII\IG SHALL TAKE Pi.ACE :- ------f---·-------+--------i(S/B) FLOOR SHALL SHALL BE PROVIDED
WITH TIME DELAY
FRMD-SZ-B1-02 (EACH: 65,000 CMH) BE SHUT OFF SYSTEM FOR ESCAPED
A) THE GENERAL AIR-COI~DITIOj\IING SYSTEM FOR THE WHOLE SMOKE 2 SZ-B1-02 MDCP-SZ-B1-02 FRMD-SZ-Bl-02 (OPEN)
I (OPEN) (TOTAL: 3 NOS) PURPOSE
CONTROL ZONES SHALL BE SHUT OFF.

B) MOTORISED DAMPERS AT THE SMOKE EXHAUST, FRESH AIR & AUTOMATIC SLIDING
DOORS SHALL OPEN. SMOKE CURTAIN DROP TO REQUIRED HEIGHT.

C) FIRE ZONE SMOKE BARRIER CLOSED AND SMOKE EXHAUST FANS


TURN ON.
ENGINEERED SMOKE CONTROL
3) ON RESET OF SMOKE ALARM AT MAP:- DESIGN SCENARIO (ATRIUM)
(ESCS CONTRACTOR SHALL UPDATE THE SEQUENCE NOTES:
OF ACTIVATION BASED or,
LATEST ARCHTECTURAL PLAN)
--~----" .. --~--

A) THE SMOKE EXHf,UST FANS CONTINUE TO RUN UNTIL A STOP SIGNAL MOTORISED DAMPER ACTIVATED SERVICES TO TIME 1. ENGINEERED SMOKE CONTROL /SMOKE VENTING SYSTE~1 SHALL BE DESIGNED IN ACCORDAI~CE
SINO SMOKE ZONE SMOKE EXHAUST WITH THE FOLLOWING GUIDELINES AND CODE:
IS ISSUED FROM THE ESCP TO THE SMOKE CONTROL FANS' PANEL. (FRESH AIR) I AUTO. DOORS (BY FIRE FAN ACTIVATED SHUTDOWN DELAY
ACTIVATED
ALARM CONTRACTOR) - SS CODE OF PRACTICE FOR FIRE PRECAUTION IN BUILDINGS: 2007
B) ALL MOTORISED DAMPERS, SMOKE CURTAINS, SMOKE BARRIERS & 1ST STOREY - SS CODE OF PRACTICE 10 2005
SLIDING DOORS SHALL BE RESET TO ITs' ORIGINAL OPEN/CLOSED - SS CODE OF PRACTICE 553 2009
POSITION. ALL AHUs, I SMOKE
SZ-L1-01 - BRITISH RESEARCH ESTABLISHMENT REPORT BR 186: 1990
I MAUs & FCUs CURTAINS
REPLACEMENT AIR - BRITISH RESEARCH ESTABLISHMENT REPORT BR 258: 1994
AT THE FIRE AROUND
NOTES: VIA SUDING DOORS
FLOOR SHALL , .A TRIUM, 2. ALL ENGINEERED SMOKE CONTROL /SMOKE VENTING SYSTEM EQUIPIv1ENT SHALL BE
~OTAL FREE AREA: 10 SQM
2 SZ-L1-02 BY OTHERS) BE SHUT OFF I VOID SUPPLIED AI~D INSTALLED IN ACCORDANCE WITH THE ACCEPTED STANDARDS SUCH
QUANTITY OF ENGINEERED SMOKE CONTROL FANS, SMOKE DETECTORS, ZONE CONTROL PANELS, I ESCALATOR
AREAS AS - SINGf\PORE PRODUCTIVITY AND STANDARD BOARD THIS DRAWING & ANY SPECIFICATION THAT MAY ACCOMPANY IT ARE THE
PROPERTY OF BESCON CONSUll1NG ENGINEERS PTE & MUST NOT BE COPIED
FIRE RATED PARTITION BOARDS, SMOKE CURTAiNS & MOTORISED DAMPERS ARE INDICATIVE ONLY. 2ND STOREY
L
,, SHALL BE - BRITISH STANDARD 8S7346; PART 1 TO 3. OR REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THIS FIRM WHICH
HOLDS THE COPYRIGHT TO THESE DOCUMENTS.

2) FiRE SHUTTERS/DOORS FOR FIRE COIv1PARTMENTATION SHALL BE PROVIDED BY BUILDER. ALL AHUs, PROVIDED
SZ -L2- 01 J. MASTER StvlOKE CONTROL PANEL AND MIMIC PANEL SHALL HAVE REMOTE MANUAL CONTRACTOR/SUB-CONTRACTOR MUST VERIFY ALL DIME.NSIONS BEFORE
MAUs & FCUs WITH TIME COMMENCEMENT OF WORK. SHOP DRAWING MUST BE SUBMITTED AND
APPROVED BEFORE MANUFACTURE OR CONSTRUCTION. APPROVAL DOES
3) FOR CASES WHERE SMOKE RESERVOIR IS ABOVE THE FALSE CEILING, THE REPLACEMENT AIR AT THE FIRE DELAY SWITCHES AND STATUS INDICATIONS OF ALL RELATED SMOKE CONTROL EQUIPMENTS NOT RELIEVE CONTRACTOR'S RESPONSIBILlTlES OF ACCURACY OF WORKS.

CEILING SHALI_ BE OF PERFORATED TYPE WITH AT LEAST 25% OPENING. VIA SLIDING DOORS
SEF 6-1 TO FLOOR SHALL ' SYSTEM 4. ALL. SMOKE CONTROL RELATED EQUIPMENTS SHALL BE LINKED TO EMERGEi~CY
OWNER:
~OTAL FREE AREA : 10 SQM
(ALSO APPLICABLE TO ALL INDEPE~JDENT ENGINEERED SMOKE CONTROL SYSTEM) 2 SZ-L2-02 BY OTHERS) I SEF 6-10 I BE SHUT OFF FOR POWER SOURCE.
4) ALL SMOKE CURTAINS AT ATRIUM AREAS SHALL DROP TO FINISHED FLOOR LEVEL.
(RUN) I
ESCAPED OUB CENTRE LIMITED
3RDSTOREY SEE 6-11 & PURPOSE 5. ALL S~WKE EXTRACT FM~S SYSTEM AND SMOKE EXTRACTION DUCT TO BE ENCLOSED 1 RAFFLES PLACE #04-02
5) SMOKE CURTAINS WITH LUMINOUS SiGNAGE & DIRECTIONAL SIGN AT THE BACK OF THE SMOKE SEF 5-12 -----,~,

IN MIN, 1 HOUR FIRE RATED ENCLOSURE C/W ACCESS OPENINGS. ONE RAFFLES PLACE
CURTAINS FOR EVACUATION SHALL BE PROVIDED. SMOKE CURTAINS C/W ZONE CONTROL PANELS, (S/B) ALL AHUs, SINGAPORE 048616
SZ-U-01 MAUs & FCUs 6. SMOKE EXTRACTION FANS USED SHALL BE CAPABLE OF OPERATING AT 250'C FOR 2 HOURS
WIRING, ACCESSORIES AND ETC. SHALL BE PROVIDED AT THE ESCALATOR VOIDS TO PREVENT REPLACEMENT AIR (EACH: 18,OOOCMH)
AT THE FIRE FAN STATIC PRESSURE CALCULATION TO SUBMIT FOR VERIFICATION. ARCHITECT:
SMOKE SEEPAGE FROM LOWER FLOOR TO HIGHEST FLOOR. VIA SLIDING DOORS (TOTAL: 12NOS)
~OTAL FREE AREA : 10 SQM
FI_OOR SHALL
7. ALL ASSOCIATED EQUIPMENT E.G. ROLLER SHUTTERS, VENTILATORS, AUTO DOORS, SMOKE
2 SZ-U-02 BY OTHERS) BE SHUT OFF
VENTILATORS, EXHAUST rANS, MOTORISED DAMPERS ETC. SHALL BE INTERFACED TO TilE
SAA ARCHITECTS PTE LTD
MSCP FOR AUTOMATIC OPERATION I~I THE EVENT OF FIRE/SMOKE ALARM. THE EQUIPMENT 2 BUKIT MERAH CENTRAL #17-00
LEGEND: 4TH STOREY SHALL BE WIRED TO MEET FAIL- TO-SAFE REQUIREMENT.
SPRING SINGAPORE

FIXED SMOKE BARRIER COMPRISE


=DD=aa= NON COMBUSTIBLE BOARD (BY BUILDER) ALL AHUs, 8. ALL AIRCONDITIOINING SYSTEM SUCH AS AIR HMmLiNG UNITS, FAI~ COIL UNITS. ETC,
SZ-L4-01 M&E CONSULTANT:

BES(b@[~
MAUs & FCUs SERVING SMOKE CONTROL ZONE SHALL BE INTERFACED TO THE MSCP FOR AUTOMATIC
01---- sc - - SMOKE CURTAIN REPLACEMENT AIR AT THE FIRE
VIA SLIDING DOORS SHUTDOWN IN THE EVENT OF A FIRE/SMOKE ALARM. CONSULTING
IOTAL FREE AREA: 10 SQM FLOORSHAU.
BUILDING & ENGINEERING SERVlCES CONSULTANTS ENG I NEE R S PTE
{I'•••••••••••••••••••, .•••••.-,.
FIRE RATED DUCT (2HR FIRE RATING) 2 SZ-L4-02 BY OTHERS) BE SHUT OFF 9. ALL SMOKE CURTAINS SYSTElvi INSTALLED SHALL BE PSB LISTED. SMOKE BARRIER OF NON- BLOCK 2 JOD CHIAT ROAD
#05-1121 JOQ CHIAT COMPLEX
.._-,----,-----
COMBUSTIBLE CONSTRUCTION SHALL BE FIXED ABOVE ALL SMOKE CURTAINS & CURTAIN HOUSING SINGAPORE 420002
MD(FR ) o-o.-r- FIRE RATED MOTORISED DAII1PER 5TH STOREY
.--.~

AND BOTTOM BAR FINISHES TO MATCH ARCHITECTURE'S REQUIREMENT) TEL; {55) 62932611 FAX: (65) 62931126 E-mQil: bce@tlesGon.com.sg

(NORMALL Y CLOSE) (ELECTRIC) PROJECT:


ALL AHUs, 10. IN THE EVENT OF ACTIVATION OF ENGINEERED SMOKE CONTROL SYSTEM, A FIRE SIGNAL USING
t~RD + NON RETURN DAMPER SZ -L5-01 ~~AUs & FCUs FIRE RATED CABLES IN METAL CONDUIT SHALL BE SENT TO THE FOLLOWING:
PROPOSED CHANGE OF USE & ADDITIONS
REPLACEMENT AIR AT THE FIRE & AL TERA TIONS WORK TO EXISTING
VIA SLIDING DOORS - ALL AIRCONDITIONING SYSTEM SUCH AS AIR HANDLING UNITS & PRE-COOLED AIR HANDLING UNITS,
FLOOR SHALL BASEMENT 1 TO 5TH STOREY AT PODIUM
($\ SMOKE DETECTOR (CONCEALED & EXPOSED) (OTAl FREE AREA: 10 SQM
2 SZ-L5-02 BY OTHERS) I BE SHUT OFF FAN COIL UNITS ETC. TO SHUT-DOWN AUTOMATICALLY
BLOCK OF TOWER 1 AT OUB CENTRE ON
FA FRESH P.lR - ALL SLIDING DOOR OPERATORS AT 1ST STOREY TO OPEN fI,UTOMATICALLY FOR REPLACEMENT AIR
(APPLICABLE FOR ATRIUM SMOKE CONTROL SYSTEM) LOT 534A & 535K TS 1 AT NO. 1
SED SMOKF EXHAUST DUCT - ALL MOTORISED SMOKE DAMPERS ACCORDING TO THE FIRE SCENARIOS RAFFLES PLACE (DOWNTOWN CORE
(FOR EXHAUST SYSTEM AND FRESH AIR INTAKE (BASEMENT SMOKE CONTROL SYSTEM) PLANNING AREA)
SEF SMOKE EXHAUST FAN
r NOTE: . - ALL SMOKE CURTAIN SYSTEM ACCORDING TO THE FIRE SCENARIOS
- MAIN FIR~ ALARM PANEL (DEDICATED FIRE SIGNALS)
DRAWING TlTLE:
I IN THE EVENT OF SMOKE CONTROL ACTIVATION, ALL DOORS FOR REPLACEMENT AIR
SHALL OPEN AUTOMATICALLY. ENGINEERED SMOKE CONTROL
THE QUANTITY OF SMOKE ZONE IS INDICATIVE ON PLAN ONLY, THE ESCS CONTRACTOR
SHALL REFER TO LATEST ARCHITECTURAL PLAN,
SYSTEM NOTES, LEGEND AND
SYSTEM OF ACTIVATION
PROJECT DIRECTOR: DESIGNED BY: I DRAWN BY;

SIMON LEE T Y PUA ARIS


_ .... ~\\1"·I\t\ ... -.~~---.-~ .. ~ C;:------j
CHECKED BY: APPR()VEO~BY: DATE:

SEQUENCE OF ACTIVATION ENGINEERED SMOKE CONTROL SYSTEM SIM EE MAR '12


'"''"''' ,
SER~CE AIR CONDITIONING
AND I
MECHANICAL VENTILATION
INSTALLATION
SCALE: DRAWING NO;

NTS
A1056-909

You might also like