Test Forms - Water Based Fire Suppression System
Test Forms - Water Based Fire Suppression System
Client/CMS CONSTRACTOR'S
LOGO LOGO
FIRE PROTECTION SYSTEM
Site : Location :
Description :
Equipment Mark :
Item Compliance
Description
No. Y N
Check if the pressure sensing line is installed correctly from the system and
8
the controller.
Perform visual inspection inside the component of the controller if there is
9
some loose connections or contacts.
Inspection witnessed by :
CMS Representative Signature Date
REMARKS :
TEST CERTIFICATE
CONTRACTOR'S
Client/CMS Logo
LOGO
FIRE PROTECTION SYSTEM
Site : Location :
Description :
Equipment Mark :
Test witnessed by :
CMS Representative Signature Date
REMARKS :
TEST CERTIFICATE
CONTRACTOR'S
LOGO
FIRE PROTECTION SYSTEM
Client/CMS Logo
Site : Location :
Description :
Equipment Mark :
MOTOR SPECIFICATION
Brand / Manufacturer : Type :
Model No. : FLC :
Electrical Supply : Speed :
Output Power : Phase / Frequency :
Frame number :
STARTER
Manufacturer : Type :
O/L Setting : O/L Range :
Timer Setting : CB Rating :
DRIVE COUPLING
Coupling Manufacturer : Type :
Model No. : Size :
Test witnessed by :
CMS Representative Signature Date
Description :
Equipment Mark :
Check if the pressure sensing line is installed correctly from the system and
8
the controller.
Perform visual inspection inside the component of the controller if there is
9
some loose connections or contacts.
Test witnessed by :
CMS Representative Signature Date
REMARKS :
TEST CERTIFICATE
CONTRACTOR'S
LOGO
FIRE PROTECTION SYSTEM
Client/CMS Logo
Site : Location :
Description :
Equipment Mark :
STARTER DRIVE
Manufacturer : Coupling Manufacturer :
O/L Setting : Model No. :
O/L Range : Type :
Type : Size :
Fuse Rating :
Timer Setting :
Test witnessed by :
Signature Date
CMS Representative
Site : Location :
Description :
Equipment Mark : :
Conforme
Pre-Commissioning Checklist Comments
Yes No
Check if fire storage tank installation is in accordance with the approved
1
drawings and water leak testing has been completed.
Check if the cleaning, flushing and sterilization of fire storage tank is
2
completed.
Check if the float level control valve for the inlet pipe is functioning properly
3
and float valve setting is correct.
Check if the following fire storage tank appurtenances are provided and
4
installed properly.
4.1 Tank Manhole Door Opening
4.8 Return pipe for fire pump is installed properly and completed
Test witnessed by :
CMS Representative Signature Date
REMARKS:
TEST CERTIFICATE
CONTRACTOR'S LOGO
FIRE PROTECTION SYSTEM
Client/CMS Logo
Site : Location :
Description :
Equipment Mark :
Manufacturer : Manufacturer :
Required Accessories :
Size :
PRE-COMMISSIONING CHECKLIST
DESCRIPTION Y N REMARKS
1. The alarm check valve is installed in accordance with the approve drawing.
2. The pressure gauges are installed at the inlet and outlet side of the alarm valve.
3. The alarm valve trim such as valves, fittings and nipples are properly connected.
4. Check if main drain discharge line is connected to open site drain or nearest drain.
5. Check if flow switch is correctly installed in the supply line and wired for FDAS.
6. Check if the entire piping system had been hydrostatically & flushed.
7. Check if water-motor alarm going piping connection is complete and strainer cleaned.
8. Check if supervisory tamper switch for riser shut-off valve is installed and wired to FDAS.
FUNCTIONAL TEST
To simulate the test operation of alarm check valve and The water motor alarm bell should activate. The alarm sound
1. alarm equipment open the alarm test module of one floor 1 should be clear and steady. If not make the necessary
control valve equivalent to one sprinkler flow. adjustment and repeat the test.
To simulate the test operation of alarm bell only, close the This should activate the water motor alarm bell. The alarm
2. ball valve in the alarm line and open the valve in the alarm 2 sound should be clear and steady. If not make the necessary
test line. adjustment and repeat the test.
A full flow of water indicates a clear supply line & also verifies
To test main water supply piping for unobstructed flow,
3 3 that alarm valve clappers has lifted form its normal seated
close ball valve in the alarm line & open main drain valve.
position.
Check operation of the tamper switch by setting back the Alarm signal in the FACP should disappear indicating valve
5 5
main OS & Y valve to normally open position. has been put back to its normally open position.
REMARKS :
TEST CERTIFICATE
CONTRACTOR'S
LOGO
FIRE PROTECTION SYSTEM
Client/CMS Logo
Site : Location :
Description :
Equipment Mark :
1. Check if the Sprinkler Heads installed are correct as per approved drawings and/or specifications.
2. Check if the item installed is mounted or fixed properly.
3. Check if the sprinkler heads installed are in correct temperature rating with regards on the area it serves.
4. Check or test if the item indicated is functioning properly.
Test witnessed by :
CMS Representative Signature Date
REMARKS:
TEST CERTIFICATE
CONTRACTOR'S LOGO
FIRE PROTECTION SYSTEM
Client/CMS Logo
Site : Location :
Project : Area Served :
Description :
Equipment Mark :
Project code: System ID :
VISUAL INSPECTION CHECKLIST
WET STAND PIPE
Conforme
Item Description Comments
Yes No
Are materials and Installation in accordance with the approved
1.
shopdrawings/submittals (RFA), plans and specifications.
Test witnessed by :
CMS Representative Signature Date
Description :
Equipment Mark :
Item Conforme
Inspection Description Remarks
No. Yes No
4 Is labelling provided?
5
Is labelling provided?
Inspection witnessed by :
CMSRepresentative Signature Date
REMARKS :
TEST CERTIFICATE
CONTRACTOR'S
LOGO
FIRE PROTECTION SYSTEM
Client/CMS Logo
Site : Location :
Project : Area Served :
Description :
Equipment Mark :
Test witnessed by :
Signature Date
CMS Representative
Description :
Equipment Mark :
Test witnessed by :
CMS Representative Signature Date
Remarks:
TEST CERTIFICATE
CONTRACTOR'S LOGO
Client/CMS Logo
FIRE PROTECTION SYSTEM
Site : Location :
Project : Area Served :
Description :
Equipment Mark :
Project No.: System ID :
VISUAL & FUNCTIONAL TEST OF FLOOR CONTROL VALVE ASSEMBLY
EQUIPMENT TAG NO. :
FLOOR CONTROL VALVE
Manufacturer : Type :
Model No. : Size :
Operating Pressure :
FUNCTIONAL TEST
Procedure Desired Result Pass Fail Remarks
Check operation of tamper switch by closing the Alarm signal should be send to FACP
1. 1.
OS&Y valve. indicating valve has been closed.
Check operation of tamper switch by setting back Alarm signal indicated in the FACP should
2. the OS&Y valve to normally open position. 2. disappear indicating valve is put back to its
normally open position.
Check operation of water flow switch by opening Water flow switch should be activated and fire
3. the test valve to simulate water flow equivalent to 3. alarm signal is send to FACP indicating the
one sprinkler. affected zone area.
Test witnessed by :
CMS Representative Signature Date
REMARKS :
TEST CERTIFICATE
CONTRACTOR'S LOGO
Client/CMS Logo
FIRE PROTECTION SYSTEM
Site : Location :
Project : Area Served :
Description :
Equipment Mark :
Project No.: System ID :
VISUAL & FUNCTIONAL TEST OF FIRE HYDRANT
EQUIPMENT TAG NO. :
FIRE HYDRANT
Manufacturer : Type :
Model No. : Size :
Operating Pressure :
ISOLATION VALVE
Manufacturer : Type :
Model No. : Size :
Operating Pressure :
FUNCTIONAL TEST
Procedure Desired Result Pass Fail Remarks
Closing of OS&Y valve result no passing of
Check operation of OS&Y valve (isolation valve) by
1. 1. water thru system and by opening of OS&Y
closing and opening of the valve.
valve result continous flowing of water
Check operation of Angle valve by closing and Closing of Angle valve result no passing of
2. opening of the valve. 2. water thru system and by opening of Angle
valve result continous flowing of water
Check operation of water flow switch by opening Water flow switch should be activated and fire
3. the test valve to simulate water flow equivalent to 3. alarm signal is send to FACP indicating the
one sprinkler. affected zone area.
LEGEND: (P) Yes (X) No (N/A) Not Applicable