Professional Documents
Culture Documents
Plans Proposed Completion Three Storey Building For Isolation Rooms
Plans Proposed Completion Three Storey Building For Isolation Rooms
PERSPECTIVE VIEW
A-8 COLUMN SCHEDULE (POWER HOUSE)
1 A-8a
ENSUITE TOILET & BATH DETAIL
TOILET & BATH DETAIL
FOOTING DETAILS (POWER HOUSE) MECHANICAL DETAIL OF PEAR HANGER
M-1
DETAIL OF FLOOR CONTROL VALVE ELECTRICAL
A 1 SCALE NTS
A-8b
A-8c
TOILET & BATH DETAIL
TOILET & BATH DETAIL
ELECTRICAL M-2
SITE DEVELOPMENT PLAN
GENERAL NOTES
IDENTIFICATION SIGNS
LEGENDS INSPECTOR TEST VALVE DETAILS
E-1 SITE DEVELOPMENT PLAN
A-8d STAFF CHANGING ROOM DETAIL M-3 GROUND FLOOR VENTILATION AND ACU PLAN
GENERAL NOTES
A-8e STAFF CHANGING ROOM DETAIL E-2 ELECTRICAL LEGEND M-3a SECOND FLOOR VENTILATION AND ACU PLAN
D
A-9
R O A
SUNSHINE
PARK
DOOR SCHEDULE E-3 GROUND FLOOR LIGHTING LAYOUT M-3b THIRD FLOOR VENTILATION AND ACU PLAN
PROJECT A-9a DOOR SCHEDULE E-4 SECOND FLOOR LIGHTING LAYOUT PIPING PROTECTION & HANGER DETAIL
MECHANICAL
D
UNIVERSITY A-10 WINDOW SCHEDULE E-5 THIRD FLOOR LIGHTING LAYOUT M-4 COLOR CODING FOR PIPING
SITE OF THE
PHILIPPINES A-10a WINDOW SCHEDULE E-6 ROOF DECK LIGHTING LAYOUT RISER GUIDE AT DETAIL
VERTICAL PIPE INSULATION DETAIL
BAGUIO A-10b WINDOW SCHEDULE E-7 GROUND FLOOR POWER LAYOUT NEGATIVE PRESSURE ROOM
CONVENTION
CENTER A-11 WORKI COUNTER DETAIL E-8 SECOND FLOOR POWER LAYOUT CEILING CONCEALED AIR HANDLING UNIT
CONCEALED HORIZONTAL FAN COIL UNIT DETAIL
WORK TABLE DETAIL E-9 THIRD FLOOR POWER LAYOUT CENTRIFUGAL FAN (SISW) MOUNTING DETAIL
A-11a SINK COUNTER DETAIL HORIZONTAL FAN MOUNTING DETAIL
E-10 ROOF DECK POWER LAYOUT EXHAUST FAN MOUNTING DETAIL SANITARY
M-5
LE
TO LOAD SCHEDULE
CU
LITARY DUCTWORK BEND & TAPER DETAILS
MI
A-12 GROUND FLOOR WALL HARDWARE PLAN
E-13 PANEL BOARD DIAGRAM
A-12a SECOND FLOOR WALL HARDWARE PLAN DUCT INSULATION DETAIL
E-14 RISER DIAGRAM VANED ELBOW DETAIL
BGHMC
GARDEN A-12b THIRD FLOOR WALL HARDWARE PLAN TYPICAL DUCT TAKE OFF DETAIL
H IGH
W AY
CORNER GUARD
DUCT THRU WALL DETAIL
VIBRATION ISOLATORS HANGER DETAIL PLUMBING
K
M A R COS
E
VINYL TILE PVC WITH BASEBOARD DUCT JOINT & SEAMS DETAIL
M-6
N
W P
OR AND MEDICAL CENTER
FF CRASH HANDRAIL SECTION
N
CE
ST
OLD RESIDENTIAL BUILDING
ER
FIRE DAMPER ACCESS DOOR DETAIL
SHED
BA
ROAD
LS
RO
FLEXIBLE ROUND DUCT
AD
ACCESS DOOR ON DUCT
FIRE DAMPER INSTALLATION DETAIL
FIRE RATED PIPE SLEEVE
ELECTRONICS
PIPE BRACKET ALONG WALLS
VICINITY MAP
REFRIGERANT PIPE INSULATION DETAIL
PIPE RISER GUIDES & SUPPORTS
2 M-7 TYPICAL PIPE SLEEVE DETAIL
REFRIGERANT PIPING MOUNTING & INSULATION DETAIL
A 1 SCALE NTS REFRIGERANT PIPING MOUNTING & INSULATION DETAIL
CONDENSATE DRAIN TRAP
PIPE HANGER DETAIL
REFRIGERANT PIPING SUPPORT DETAIL GEODETIC ENGINEER
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL and documents of the architect,
MAIN EXIT
GATE
I WATER TANK
STORE
G
10 26 STAIR
S
A B 6 J 13
K
OLD PS C E F
BGHMC DRIVE
WAY 27
14 L
1
2 Q
3
R
S
T P
22 19 18
U 23 24 V
W SHED
WATER TANK
M
TO BRGY. PHIL-A
17
OLD BUILDING
WATER TANK
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
A-1a
and documents of the architect,
whether the object for which they are THREE-STOREY BUILDING FOR
MARK ANDREW B. PINOS-AN made is executed or not. It shall be
AND MEDICAL CENTER unlawful for any person to duplicate ISOLATION ROOMS
or make copies of said documents for AS SHOWN
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH
41 800
6 075 3 325 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
2 100 2 475 1 500 1 500 1 825 1 700 350 1 275 4 800
1 804 1 500
Dn
Ramp Up
Ramp Dn
2 200
2 200
PERSONNEL ACCESS
Up
H
675
675
ANTE ROOM
LAB GOWN
COMMON
ENSUITE
ENSUITE
LOUNGE
T&B
T&B
ELEVATOR
1 750
G'
1 350
BED
BEDROOM
BEDROOM
D
4 300
3 625
L RO
1 875
AIRLOCK
AIRLOCK
STATION
NURSE
PPE
PITA
1 350
G
700
HOS
4 200
4 000 1 925 1 700 1 900 3 000 3 050 1 925 600 1 900 1 300 350
Ramp Up
1 000
1 000
1 000
CHANGING
CHANGING
AIRLOCK
AIRLOCK
AIRLOCK
CHANGING
STAFF
STAFF
ROOM
ROOM
F
STAFF
ROOM
22 750
22 750
1 300
1 300
4 000
4 000
4 000
Y
AIRLOCK
AIRLOCK
AIRLOCK
UTILITIY
UTILITIY
UTILITIY
DIRTY
DIRTY
DIRTY
2 525
2 700
A
W
L
E
L
1 725
1 725
A
GOING FROM
DELTA E.R.
250mm STRUCTURAL GAP
BEDROOM
BEDROOM
BEDROOM
ACCESS
3 000
H
ENSUITE
ENSUITE
ENSUITE
B C D
2 575
2 575
T&B
T&B
T&B
250 1 300
250
SCALE
GARBAGE
CHUTE
ELECTRICAL
Dn
DECONTAMINATION
3 500
3 500
EXIT
Up
STORAGE
2
1
A
A
EMERGENCY
EXIT
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
A-2
and documents of the architect,
whether the object for which they are THREE-STOREY BUILDING FOR
MARK ANDREW B. PINOS-AN made is executed or not. It shall be
AND MEDICAL CENTER unlawful for any person to duplicate ISOLATION ROOMS
or make copies of said documents for AS SHOWN
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH 6 075 3 325 3 275 3 050 6 075
41 800
200 2 950 1 850 3 750 3 750 3 750 3 750
2 100 2 475 1 500 1 500 1 825 1 775 1 500 2 700 350 1 275 4 800
Dn
2 200
2 200
ROOF
Up
H
675
675
ANTE ROOM
LAB GOWN
DOCTORS'
ENSUITE
ENSUITE
LOUNGE
T&B
T&B
ELEVATOR
1 750
G'
BED
BEDROOM
BEDROOM
4 300
3 625
1 875
AIRLOCK
AIRLOCK
STATION
NURSE
PPE
G
700
1:100 MTS
SECOND FLOOR PLAN
2 500
Y A W L L A H
4 200
4 200
1 000
CHANGING
CHANGING
CHANGING
AIRLOCK
AIRLOCK
AIRLOCK
STAFF
STAFF
STAFF
ROOM
ROOM
ROOM
F
22 750
22 750
1 300
4 000
4 000
Y
AIRLOCK
AIRLOCK
AIRLOCK
UTILITIY
UTILITIY
UTILITIY
DIRTY
DIRTY
DIRTY
2 700
A
W
L
ROOF
E
L
1 725
A
250mm STRUCTURAL GAP
BEDROOM
BEDROOM
BEDROOM
3 000
H
ENSUITE
ENSUITE
ENSUITE
B C D
2 575
T&B
T&B
T&B
250 1 300
250
SCALE
& WASTE HOLDING AREA
GARBAGE
DECONTAMINATION
CHUTE
ELECTRICAL
Dn
ROOM
3 500
3 500
A 2a
Up
1
A
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
A-2a
and documents of the architect,
whether the object for which they are THREE-STOREY BUILDING FOR
MARK ANDREW B. PINOS-AN made is executed or not. It shall be
AND MEDICAL CENTER unlawful for any person to duplicate ISOLATION ROOMS
or make copies of said documents for AS SHOWN
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
41 800
6 075 3 325 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
NORTH 2 100 2 475 1 500 1 500 1 825 1 775 1 500 2 700 350 1 275 4 800
Dn
2 200
2 200
Up
H
675
675
LAB GOWN
ELEVATOR
1 750
1:100 MTS
G'
BED
4 300
STATION
NURSE
3 625
7 BED WARDS
WC
STATION
NURSE
TOILET
PPE
G
700
TOILET 3
TOILET 4
SINK
SINK
ELEVATOR LOBBY
WC
WC
2 500
Y A W L L A H
ROOM
4 200
4 200
ANTE
SHOWER
SHOWER
WC
WC
TOILET 1
TOILET 2
1 000
SINK
SINK
ROOM
ANTE
SHOWER
TOILET
F
22 750
22 750
1 300
4 000
4 000
Y
2 700
A
W
15 BED WARDS
L
E
SCALE
1 725
8 BED-WARDS
250mm STRUCTURAL GAP
3 000
H
2 575
A 2b
1
250 1 300
250
ELECTRICAL
Dn
ROOM
3 500
3 500
& WASTE HOLDING
DECONTAMINATION
GARBAGE
CHUTE
A
6 075
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
A-2b
and documents of the architect,
whether the object for which they are THREE-STOREY BUILDING FOR
MARK ANDREW B. PINOS-AN made is executed or not. It shall be
AND MEDICAL CENTER unlawful for any person to duplicate ISOLATION ROOMS
or make copies of said documents for AS SHOWN
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH 41 800
6 075 3 325 3 275 3 050 200 2 950 1 850 3 750 3 750 3 750 3 750
2 100 2 475 1 500 1 500 1 825 1 275 4 800
Dn
2 200
2 200
H
675
675
ROOF
DECK
G'
3 625
3 625
4 200
F
22 750
4 000
4 000
E
3 000
(PROPOSED DELTA E.R.)
EXISTING INFECTIOUS
DESEASE BUILDING
B C D
250 1 300
250 1 300
SCALE
Dn
A 2c
ROOF
DECK
3 500
3 500
1
A
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
A-2c
and documents of the architect,
whether the object for which they are THREE-STOREY BUILDING FOR
MARK ANDREW B. PINOS-AN made is executed or not. It shall be
AND MEDICAL CENTER unlawful for any person to duplicate ISOLATION ROOMS
or make copies of said documents for AS SHOWN
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH
41 800
6 075 3 325 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
2 100 2 475 1 500 1 500 1 825 2 700 350 1 275 4 800
1:100 MTS
ARCHITECTURAL ROOF PLAN
J
2 200
2 200
H
675
675
1 750
G'
ROOF
DECK
4 300
3 625
1 875
G
700
2 500
4 200
4 200
1 000
F
G
22 750
22 750
1 300
N
I
4 000
4 000
F
O
2 700
O
R
SCALE
E
1 725
3 000
(PROPOSED DELTA E.R.)
EXISTING INFECTIOUS
DESEASE BUILDING
4 300
A 2d
1
B C D
2 575
250 1 300
250
ROOF
DECK
3 500
3 500
7"
200mm STRUCTURAL GAP
1"
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
1"
26 800 15 000
41 800 2" 3" 8"
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
A-2d
and documents of the architect,
whether the object for which they are THREE-STOREY BUILDING FOR
MARK ANDREW B. PINOS-AN made is executed or not. It shall be
AND MEDICAL CENTER unlawful for any person to duplicate ISOLATION ROOMS
or make copies of said documents for AS SHOWN
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
EXTERIOR FINISHES
A CEMENT PLASTERED CHB WALL,
(CONCRETE GROOVES AS SHOWN)
ELASTOMERIC COATING SYSTEM
(PLANT MIXED)
22 750 22 750
A1 CEMENT PLASTERED CHB WALL,
3 500 250 4 300 4 000 4 200 4 300 2 200 2 200 4 300 4 200 4 000 4 300 250 3 500
ELASTOMERIC COATING SYSTEM
W/ 25mm PVC GROOVES INSERTS
@ 600mm O.C.
524
SURFACE IMPERFECTIONS. PROVIDE PAINT
ROOF APEX LINE ROOF APEX LINE
SAMPLE FOR APPROVAL PRIOR TO PLANT
1 039
1 037
MIX PURCHASE.
ROOF APEX LINE ROOF APEX LINE
3 477
3 476
B SAND STONE EXTERIOR
WALL CLADDING
2 439
2 439
ROOF DECK FFL ROOF DECK FFL
C 120x60cm PORCELAIN EXTERIOR
ELEV ± 12.0 M ELEV ± 12.0 M WALL TILES
1 400
1 400
1 600 25x50mm (1"x2") 1"
D EMBOSS
THIRD FCL THIRD FCL CEMENT PLASTERED,
3 900
3 900
ELASTOMERIC
2"
2 500
2 500
W COATING SYSTEM
2"
4
2"
W W W W W W
THIRD FFL 2 2 2 THIRD FFL 1 2 2
2"
ELEV + 8.10 M ELEV + 8.10 M
16 000
16 000
2"
1 400
1 400
SECOND FCL SECOND FCL
3 900
3 900
50x100mm (2"x4") TUBULAR ALUMINUM
POWDER COATED
2 500
2 500
W E
4 ARCHITECTURAL LOUVERS SPACED
W W W W
SECOND FFL 2 SECOND FFL 1 2 2 @ 250mm O.C.
ELEV + 4.20 M ELEV + 4.20 M
1 400
F ARCHITECTURAL LOUVERS SPACED
ISOLATION ROOMS
ACCESS @ 200mm O.C
GROUND FCL GROUND FCL
FROM
3 900
3 900
DELTA E.R. 200x100 CONCRETE LEDGE
2 500
2 500
W G
4 ELASTOMERIC COATING SYSTEM
W W W W W/ 20x20mm DRIP MOLD
GROUND FFL 2 GROUND FFL 1 2 2
ELEV + 0.30 M ELEV + 0.30 M
300
300
ROAD LEVEL ROAD LEVEL
ELEV ± 0.00 M ELEV ± 0.00 M STAINLESS STEEL SIGNAGE
H (300mm HEIGHT x 50mm THK)
NOTES :
1 FRONT SIDE ELEVATION 2 REAR SIDE ELEVATION USE OF FIRST CLASS QUALITY MATERIALS AND/OR
PRODUCTS FOR ALL ARCHITECTURAL WORKS
A 3 SCALE 1:100 MTS A 3 SCALE 1:100 MTS APPROVED AND ACCEPTABLE TO THE BGHMC
PROJECT MANAGEMENT TEAM (PMT) AND PRIOR TO
EXECUTION / INSTALLATION SUBMIT SAMPLE FOR
APPROVAL.
ALL CEILING HEIGHTS SHOULD BE APPROVED BY
BGHMC PMT PRIOR TO EXECUTION / INSTALLATION.
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL and documents of the architect,
523
ROOF APEX LINE (PLANT MIXED)
1 039
* PLANT MIXED PRODUCT INSTRUCTIONS
ROOF APEX LINE INCLUDING PLASTERING/PATCHING OF ALL
SURFACE IMPERFECTIONS. PROVIDE PAINT
4 000
MIX PURCHASE.
W W
THIRD FFL 2 2
A2 CEMENT PLASTERED CHB WALL,
ELEV + 8.10 M
16 000
@ 300mm O.C.
SECOND FCL * PLANT MIXED PRODUCT INSTRUCTIONS
3 900
WALL CLADDING
GROUND FCL
3 900
W W W
6 6 6
W 25x50mm (1"x2") 1"
GROUND FFL 2
D EMBOSS
ELEV + 0.30 M
CEMENT PLASTERED,
300
ROAD LEVEL
ELASTOMERIC
2"
ELEV ± 0.00 M
COATING SYSTEM
2"
RIGHT SIDE ELEVATION
2"
1 2 3 4 5 6 7 8 9 2
2"
2"
A 3a SCALE 1:100 MTS
24 950
6 075 1 500 1 825 3 275 3 050 6 075 200 2 950
APEX LINE 50x100mm (2"x4") TUBULAR ALUMINUM
522
POWDER COATED
ROOF APEX LINE E
ARCHITECTURAL LOUVERS SPACED
1 039
@ 200mm O.C.
ROOF APEX LINE
10 11 12 13 14
1.2mm THK. 50x75mm (2"x3") G.I. TUBE
3 477
15 000
@ 200mm O.C
3 750 3 750 3 750 3 750
ROOF DECK FFL
ELEV ± 12.0 M
200x100 CONCRETE LEDGE
G ELASTOMERIC COATING SYSTEM
1 400
W
THIRD FFL
ELEV + 8.10 M
2
NOTES :
16 000
1 400
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL and documents of the architect,
523
ROOF APEX LINE ROOF APEX LINE
3 477
2 439
2 439
STAIR STAIR
ROOF DECK FFL ROOF DECK ROOF DECK FFL ROOF DECK
LANDING LANDING
ELEV ± 12.0 M ELEV ± 12.0 M
1 400
1 400
STAIR
THIRD FCL LANDING THIRD FCL
3 900
3 900
2 500
2 500
STAFF STAFF
DECONTAMINATION STAIR STAIR DIRT UTILITY
THIRD FFL CORRIDOR THIRD FFL ISOLATION ROOM CHANGING CORRIDOR CHANGING DOFFING AREA
& WASTE HOLDING AREA LANDING LANDING ROOM
ELEV + 8.10 M ELEV + 8.10 M ROOM ROOM
16 000
16 000
1 400
1 400
STAIR ELECTRICAL
SECOND FCL LANDING ROOM SECOND FCL
3 900
3 900
2 500
2 500
STAFF STAFF
DECONTAMINATION STAIR STAIR DIRT UTILITY
SECOND FFL CORRIDOR SECOND FFL ISOLATION ROOM CHANGING CORRIDOR CHANGING DOFFING AREA
& WASTE HOLDING AREA LANDING LANDING ROOM
ELEV + 4.20 M ELEV + 4.20 M ROOM ROOM
1 400
1 400
STAIR
GROUND FCL GROUND FCL
LANDING
3 900
3 900
STAFF STAFF
DECONTAMINATION STAIR STAIR DIRT UTILITY
GROUND FFL CORRIDOR GROUND FFL ISOLATION ROOM CHANGING CORRIDOR CHANGING DOFFING AREA
& WASTE HOLDING AREA LANDING LANDING ROOM
ELEV + 0.30 M ELEV + 0.30 M ROOM ROOM
300
300
STAIR
ROAD LEVEL LANDING ROAD LEVEL
ELEV ± 0.00 M ELEV ± 0.00 M
NOTES :
USE OF FIRST CLASS QUALITY MATERIALS AND/OR PRODUCTS FOR ALL
ALL INTERIOR WALL FINISH SHALLBE SEMI GLOSS ARCHITECTURAL WORKS APPROVED AND ACCEPTABLE TO THE BGHMC PROJECT
ODOURLESS AND ANTIBACTERIAL PAINT SYSTEM MANAGEMENT TEAM (PMT) AND PRIOR TO EXECUTION / INSTALLATION SUBMIT
100% ACRYLIC PAINT ULTRA LOW LEVEL OF VOC SAMPLE FOR APPROVAL.
APPLY AS PER MANUFACTURERS PRODUCT ALL CEILING HEIGHTS SHOULD BE APPROVED BY BGHMC PMT PRIOR TO EXECUTION /
INSTRUCTION (PLANT MIXED) INSTALLATION.
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL and documents of the architect,
1 CF1 CF1
BAGUIO CITY
CF1 2500 2500
2500
2 100
CF1 CF1
DEPARTMENT OF HEALTH
2500 2500
4 575
2500 D
O
CC
TV
V T
2500
CC
2 475
CF3 CF2
CF1 2500 2550
1' 2500
1 500
1 500
1 500
1 500
2500 2500
E
3 325
D M
3 E
M
O CF3 C
C
D
O
CF1
TV
TV
C
C
2500 2500
1 825
1 825
CF1 CF1
CF5 CF5 2500
2500
- - CF3 SD
ARCHITECT OF RECORD
4 2500
CF1
2500
BULLET
3000
1 500
26 800
5 CF1
CF1
2500 CF1
2500
2500
SD
2550
RA 9266 SECTION 33
6 SD
CF1 CF1 CF1
CF4
1 275
2 938
2500
SD SD
D
O
M
E CF3
TV
C
C 2500
CF1 CF1 CF5 CF5
2500
6 075
6 075
2500 SD DATA
- -
CF1 CABINET
(6U)
1 412
4 800
2500
LOCATION
PROJECT TITLE
CF1
CF1 2500 CF4
ISOLATION ROOMS
2500 3000
1 725
41 800
41 800
7 CF1 2500
2950
2 950
2 950
8 ELEVATOR
1 850
1 850
10
AS SHOWN
SHEET CONTENTS
3 750
3 750
11
3 750
3 750
EXISTING INFECTIOUS
DESEASE BUILDING
CHECKED
15 000
13
3 750
3 750
14
VILMA O. MOLTIO, MPA
Chief Administrative Officer
RECOMMENDING APPROVAL
ROAD
ITAL
HOSP
3 500 250 1 300 3 000 4 000 4 200 3 625 675 2 200
22 750
CONCURRED
A 5 SCALE 1: 100MTS
PVC LAMINATED BOARD ON 1- 34" x1- 34" ALUMINUM T-RUNNER - ANODIZED FINISHED 60X120 cm AND ACTUAL CONDITION.
STANDARD INSTALLATION PROCEDURE. APPLY SILICON SEALANT ON ALL SIDES/CORNERS HEPA FILTER 4. ALL DRAWINGS ARE IN MILLIMETERS.
OF EACH PANEL
Baguio General Hospital & Medical Center
CF4 200MM PVC CEILING PANELS W/ COMPLETE 60 x 60 cm x 40-WATT LED PANEL LIGHT, APPROVAL OF THE 'BGHMC'.
ACCESSORIES ON LIGHT STEEL FRAMING SYSTEM. RECESSED MOUNTED, CLEAN ROOM RATED, 6. THIS DRAWINGS SHOULD BE READ IN
FOLLOW CEILING PATTERN AND DESIGN AS INDICATED. TOTALLY SEALED HOUSING, 4000K = 55pcs CONJUNCTION WITH RELEVANT
ARCHITECTURAL/ENGINEERING DRAWINGS,
ANY DISCREPANCY NOTED SHOULD
SURFACE TYPE with ALUMINUM REFLECTOR IMMEDIATELY BE BROUGHT TO THE NOTICE OF
CF5 PAINT FINISH CONCRETE 2-20W 220 VOLT LIGHTING FIXTURE 'BGHMC' PRIOR TO EXECUTION.
CEILING FINISH INDICATOR
CF1 7. OTHER CEILING FIXTURES ARE INDICATED IN
VERTICAL DOWNLIGHT SURFACE TYPE THE ELECTRICAL & ELECTRONICS PLAN
SHEET NO.
A-5
1 CF1 CF1
BAGUIO CITY
CF1 2500 2500
2500
2 100
CF1 CF1
DEPARTMENT OF HEALTH
2500 2500
4 575
DO
2500
V T
2500
CC
2 475
CF3 CF2
CF1 2500 2550
1' 2500
1 500
1 500
2 CF1 2500
CF1 CF3
3000 2500 CF1 CF1
1 500
1 500
2500 2500
E
3 325
M
3 E
M
DO
CF3 C
C
O
D
CF1
TV 2500
TV 2500
CC
1 825
1 825
CF1 CF1
CF5 CF5 2500
2500
- - CF3 SD
ARCHITECT OF RECORD
4 2500
CF1
1 775
2500
BULLET
3000
1 500
26 800
5 CF1
CF1
2500 CF1
CF2 2500
2500
SD SD
2550
RA 9266 SECTION 33
6 075
6 075
2500 SD DATA
- -
CF1 CABINET
(6U)
4 800
2500
LOCATION
PROJECT TITLE
CF1
CF1 2500 CF1 CF1 CF4
ISOLATION ROOMS
2500 CF1 2500 2500 3000
41 800
41 800
7 CF1 2500
CF4 BED
2 950
2 950
8 3000 ELEVATOR
ROOF
1 850
1 850
10
AS SHOWN
SHEET CONTENTS
3 750
3 750
11 ROOF
3 750
3 750
EXISTING INFECTIOUS
DESEASE BUILDING
CHECKED
15 000
13
3 750
3 750
14
VILMA O. MOLTIO, MPA
Chief Administrative Officer
RECOMMENDING APPROVAL
A 5a SCALE 1: 100MTS
PVC LAMINATED BOARD ON 1- 34" x1- 34" ALUMINUM T-RUNNER - ANODIZED FINISHED 60X120 cm AND ACTUAL CONDITION.
STANDARD INSTALLATION PROCEDURE. APPLY SILICON SEALANT ON ALL SIDES/CORNERS HEPA FILTER 4. ALL DRAWINGS ARE IN MILLIMETERS.
OF EACH PANEL
Baguio General Hospital & Medical Center
CF4 200MM PVC CEILING PANELS W/ COMPLETE 60 x 60 cm x 40-WATT LED PANEL LIGHT, APPROVAL OF THE 'BGHMC'.
ACCESSORIES ON LIGHT STEEL FRAMING SYSTEM. RECESSED MOUNTED, CLEAN ROOM RATED, 6. THIS DRAWINGS SHOULD BE READ IN
FOLLOW CEILING PATTERN AND DESIGN AS INDICATED. TOTALLY SEALED HOUSING, 4000K = 55pcs CONJUNCTION WITH RELEVANT
ARCHITECTURAL/ENGINEERING DRAWINGS,
ANY DISCREPANCY NOTED SHOULD
SURFACE TYPE with ALUMINUM REFLECTOR IMMEDIATELY BE BROUGHT TO THE NOTICE OF
CF5 PAINT FINISH CONCRETE 2-20W 220 VOLT LIGHTING FIXTURE 'BGHMC' PRIOR TO EXECUTION.
CEILING FINISH INDICATOR
CF1 7. OTHER CEILING FIXTURES ARE INDICATED IN
VERTICAL DOWNLIGHT SURFACE TYPE THE ELECTRICAL & ELECTRONICS PLAN
SHEET NO.
BAGUIO CITY
2 100
DEPARTMENT OF HEALTH
REPUBLIC OF THE PHILIPPINES
4 575
1 500
1 500
3000
1 500
1 500
3 325
3 CF3
2500
1 825
1 825
ARCHITECT OF RECORD
O
4 M
E
1 775
CF1
3 275
3 275
SD
26 800
5
CF1 CF1 CF1
2500 2500 2500
SD SD
RA 9266 SECTION 33
6 CF1 SD
CF3
3000 CF4
1 275
2400
CF3 3000
SD
CF1 2500
BULLET
2500 CCTV
CCTV
BULLET
CF1 CF4
2500
3000
CF5 CF5
6 075
6 075
6 075
CF1 - -
SD 2500
4 800
LOCATION
CF1
PROJECT TITLE
2400
CF4
ISOLATION ROOMS
CF1 3000
41 800
41 800
7 CF1
CF4 BED
2 950
2 950
8 3000 ELEVATOR
1 850
1 850
10
AS SHOWN
SHEET CONTENTS
3 750
3 750
11
3 750
3 750
EXISTING INFECTIOUS
DESEASE BUILDING
CHECKED
15 000
13
3 750
3 750
14
VILMA O. MOLTIO, MPA
Chief Administrative Officer
RECOMMENDING APPROVAL
PVC LAMINATED BOARD ON 1- 34" x1- 34" ALUMINUM T-RUNNER - ANODIZED FINISHED 60X120 cm AND ACTUAL CONDITION.
STANDARD INSTALLATION PROCEDURE. APPLY SILICON SEALANT ON ALL SIDES/CORNERS HEPA FILTER 4. ALL DRAWINGS ARE IN MILLIMETERS.
OF EACH PANEL
Baguio General Hospital & Medical Center
CF4 200MM PVC CEILING PANELS W/ COMPLETE 60 x 60 cm x 40-WATT LED PANEL LIGHT, APPROVAL OF THE 'BGHMC'.
ACCESSORIES ON LIGHT STEEL FRAMING SYSTEM. RECESSED MOUNTED, CLEAN ROOM RATED, 6. THIS DRAWINGS SHOULD BE READ IN
FOLLOW CEILING PATTERN AND DESIGN AS INDICATED. TOTALLY SEALED HOUSING, 4000K = 55pcs CONJUNCTION WITH RELEVANT
ARCHITECTURAL/ENGINEERING DRAWINGS,
ANY DISCREPANCY NOTED SHOULD
SURFACE TYPE with ALUMINUM REFLECTOR IMMEDIATELY BE BROUGHT TO THE NOTICE OF
CF5 PAINT FINISH CONCRETE 2-20W 220 VOLT LIGHTING FIXTURE 'BGHMC' PRIOR TO EXECUTION.
CEILING FINISH INDICATOR
CF1 7. OTHER CEILING FIXTURES ARE INDICATED IN
VERTICAL DOWNLIGHT SURFACE TYPE THE ELECTRICAL & ELECTRONICS PLAN
SHEET NO.
BAGUIO CITY
2 100
DEPARTMENT OF HEALTH
REPUBLIC OF THE PHILIPPINES
4 575
1 500
1 500
1 500
1 500
3 325
1 825
1 825
CF1
2500
ARCHITECT OF RECORD
4
ROOF
DECK
26 800
5
SEE ROOF FRAMING PLAN
RA 9266 SECTION 33
CF1
ROOF -
DECK CF1
2500
6 075
6 075
4 800
LOCATION
PROJECT TITLE
ISOLATION ROOMS
41 800
41 800
8
9
1 850
1 850
10
AS SHOWN
SHEET CONTENTS
3 750
3 750
11
3 750
3 750
EXISTING INFECTIOUS
DESEASE BUILDING
CHECKED
15 000
13
3 750
3 750
14
VILMA O. MOLTIO, MPA
Chief Administrative Officer
RECOMMENDING APPROVAL
A 5b SCALE 1: 100MTS
PVC LAMINATED BOARD ON 1- 34" x1- 34" ALUMINUM T-RUNNER - ANODIZED FINISHED 60X120 cm AND ACTUAL CONDITION.
STANDARD INSTALLATION PROCEDURE. APPLY SILICON SEALANT ON ALL SIDES/CORNERS HEPA FILTER 4. ALL DRAWINGS ARE IN MILLIMETERS.
OF EACH PANEL
Baguio General Hospital & Medical Center
CF4 200MM PVC CEILING PANELS W/ COMPLETE 60 x 60 cm x 40-WATT LED PANEL LIGHT, APPROVAL OF THE 'BGHMC'.
ACCESSORIES ON LIGHT STEEL FRAMING SYSTEM. RECESSED MOUNTED, CLEAN ROOM RATED, 6. THIS DRAWINGS SHOULD BE READ IN
FOLLOW CEILING PATTERN AND DESIGN AS INDICATED. TOTALLY SEALED HOUSING, 4000K = 55pcs CONJUNCTION WITH RELEVANT
ARCHITECTURAL/ENGINEERING DRAWINGS,
ANY DISCREPANCY NOTED SHOULD
SURFACE TYPE with ALUMINUM REFLECTOR IMMEDIATELY BE BROUGHT TO THE NOTICE OF
CF5 PAINT FINISH CONCRETE 2-20W 220 VOLT LIGHTING FIXTURE 'BGHMC' PRIOR TO EXECUTION.
CEILING FINISH INDICATOR
CF1 7. OTHER CEILING FIXTURES ARE INDICATED IN
VERTICAL DOWNLIGHT SURFACE TYPE THE ELECTRICAL & ELECTRONICS PLAN
SHEET NO.
2 2
STORAGE
1 500
1 500
3 3 12
11 13
10 14
9 15
8 31 16
7 30 17 RDF LEVEL
3 500
3 500
ELEV +12 M
6 600
6 600
4 6 -6 4 29 18
69
RD
5 -5 28 19
4 -4 27 20
1 400
3 -3 26 21
2 -2 25 22
1 -1 24 23 3F CL 3F STAIR
GF 2F LANDING
Up Dn Up Dn 58
57
1 600
1 600
2 500
5 5 3F LEVEL
ELEV +8.1 M
3F
@ GROUND FLOOR @ SECOND FLOOR 47
900
1 400
A B C A B C
500
3 500 250 3 500 250 2F CL 2F STAIR
1 750 1 750 1 750 1 750 LANDING
300 300
35
34
12 700
2 2
2 500
1 500
1 500
2F LEVEL
ELEV +4.20 M
2F
3 35 3 58 24
900
34 36 57 59
1 400
33 37 56 60
32 38 55 61
500
54 39 54 62
GF CL GF STAIR
53 40 53 63
LANDING
6 600
6 600
4 52 41 4 52 64
11
12
51 42 51 65 10
9
50 43 50 66
2 500
8
7
49 44 49 67 6
5
48 45 48 68 4
3
47 46 47 69 GF LEVEL 2
3F RD ELEV + 0.30 M 1
Up Dn Dn GF
300
-1
-2
ROAD LEVEL
1 000
-3
ELEV ± 0.00 M -4
-5
-6
5 5
@ THIRD FLOOR @ ROOF DECK
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A-6
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
10mm (3/8") X 10mm (3/8")
150
37.5mm (1-1/2") Ø X 1.5mm
050
STAINLESS STEEL (SUS304)
TUBING SATIN FINISH
150
950
6 6
050
750
150
1 625
1 625
050
150
Up Dn Up 12.5mm (1/2") X 12.5mm (1/2")
GF 1 27 SOLID STAINLESS STEEL (SUS304)
SQUARE BAR VERTICAL
1 -1 2 26 RAILINGS SATIN FINISH
2 -2 3 25
3 -3 4 24 12.5mm (1/2") X 12.5mm (1/2")
STAINLESS STEEL (SUS304)
4 -4 5 23 SQUARE BAR VERTICAL
RAILINGS SATIN FINISH
5 -5 6 22
6 425
6 425
6 -6 7 21 CONCRETE
3 600
3 600
8 20 RDF LEVEL
9
10
19
18
ELEV +12 M
3 BLOW-UP DETAIL
A 6a SCALE 1: 20 MTS
11 17
12 16
1 973
13 15 100
14 40mm (1-3/4") Ø X 1.5mm 40mm (1-3/4") Ø X 1.5mm
3F STAIR STAINLESS STEEL (SUS304) STAINLESS STEEL (SUS304)
1 200
1 200
200
200
7 7 37.5mm (1-1/2") Ø X 1.5mm STAINLESS
STEEL (SUS304) TUBING SATIN FINISH
37.5mm (1-1/2") Ø X 1.5mm
STAINLESS STEEL (SUS304)
TUBING SATIN FINISH
1 927
@ GROUND FLOOR @ SECOND FLOOR
3F LEVEL 12.5mm (1/2") X 12.5mm (1/2")
050
ELEV +8.1 M SOLID STAINLESS STEEL (SUS304) 12.5mm (1/2") X 12.5mm (1/2")
SQUARE BAR VERTICAL SOLID STAINLESS STEEL
RAILINGS SATIN FINISH (SUS304)
950
150
950
SQUARE BAR VERTICAL
H J H J RAILINGS SATIN FINISH
750
050
750
1 973
10mm (3/8") X 10mm (3/8")
2 200 2 200 SOLID STAINLESS STEEL
150
(SUS304)
WALL
2F STAIR SQUARE BAR HOR. RAILINGS
SATIN FIN.
050
LANDING
6 6
150
12 700
STAIR STAIR
RUN FFL RUN FFL
1 625
1 625
1 927
Up Dn Dn
28 54 54 2F LEVEL
29 53 29 53 ELEV +4.20 M
27 4a 4b
30 52 30 52 26
25
31
32
51
50
31
32
51
50
24
22
23 4 RAILING SECTION DETAIL
1 973
21 A 6a SCALE 1: 20 MTS
33 49 33 49 20
19
6 425
6 425
34 48 34 48 18
3 600
3 600
GF STAIR 17
35 47 35 47 16
LANDING 15 RUN=300mm
36 46 36 46 14 300MM X 300MM FIRST
13
37 45 37 45 12 CLASS NON-SKID STAIR
11 PORCELAIN FLOOR TILES
38 44 38 44 10
9 W/ EMBOSS NOSING
39 43 39 43 8
1 927
7
40 42 40 42 6
5
VERIFY
41 41 GF LEVEL 4
3
ELEV + 0.30 M 2 300MM X 300MM FIRST
1 200
1 200
1b
ROAD LEVEL 2b PORCELAIN FLOOR TILES
1 000
3b
7 7 ELEV 0.00 M
5b
4b FOR STAIR RISE
6b
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A-6a
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
D E F
3 000 4 000 1 000
F E D
40mm (1-3/4") Ø X 1.5mm
STAINLESS STEEL (SUS304)
1 000 1 000 1 000 1 000 1 050 300 TUBING SATIN FINISH
7 300 200
200
40mm (1-3/4") Ø X 1.5mm
STAINLESS STEEL (SUS304)
TUBING SATIN FINISH
8
12.5mm (1/2") X 12.5mm (1/2")
ACCESS SOLID STAINLESS STEEL
Ramp Up
(SUS304)
GOING FROM GROUND FCL SQUARE BAR VERTICAL
RAILINGS SATIN FINISH
2 650
DELTA E.R.
950
6mm (14")THK x40mm (1-3/4")
5 000
750
FLAT BAR VERTICAL SUPPORT
3 000
40mm (1-3/4") Ø X 1.5mm
9 STAINLESS STEEL (SUS304)
TUBING SATIN FINISH
200
IDB GROUND FFL
200
400 200
750
1 850
600
600
GROUND FFL
10
D E F 10 9 8 7 7 8 9 10
RAMP FCL
RAMP FCL
500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 1 000 1 000 1 000 1 300 1 300 1 000 1 000 1 000
3 000
3 000
3 000
3 400
200
200
200
750
750
750
IDB FFL
400 200
400
GROUND FFL GROUND FFL GROUND FFL
1 RAMP 1 DETAIL
A 6b SCALE 1: 50 MTS
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A-6b
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
7 8 9 10 11 12 13 14
20 000
200 2 950 1 850 3 750 3 750 3 750 3 750
J
5 6 7 8
Ramp Up
Ramp Dn
PERSONNEL ACCESS
G' A
1a PLAN
RAILING
A 6c SCALE 1: 100 MTS
ROOF DECK
7 8 9 10 11 12 13 14
20 000 RAILING
425 1 000 1 000 1 000 1 000 425 225 1 000 1 000 1 000 225
386 500 500 500 500 500 500 2b BLOW-UP DETAIL
A 6c SCALE 1: 50 MTS
GROUND FFL
ELEV - 0.70 M ROAD LEVEL
ELEV ± 0.00 M
300
700
5 6 7 8
1b SECTION ELEVATION E
A 6c SCALE 1: 100 MTS
2"X2" STAINLESS
STEEL TUBULAR
1mm THK
14 13 12 11 10 9 8 7
20 000
3 750 3 750 3 750 3 750 1 850 2 950 200
2"X3" STAINLESS
STEEL TUBULAR
1mm THK
500 500 500 500 500 500 500
ROAD LEVEL
ELEV ± 0.00 M
300
300
700
GROUND FFL
ELEV - 0.70 M
2b BLOW-UP DETAIL
1c SECTION ELEVATION F A 6c SCALE 1: 50 MTS
A 6c SCALE 1: 100 MTS
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A-6c
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
A B C D E F G G' H J
22 750
3 500 250 4 300 4 000 4 200 4 300 2 200
2 575 1 725 2 700 1 300 1 000 2 500 700 1 875 1 750 675
NORTH
W W W
2 2 1 1
1 A 8
2
BAGUIO CITY
A 11a
AIRLOCK WF-2
D AIRLOCK
W
2 100
D 2 D ENSUITE
3 1 6
DEPARTMENT OF HEALTH
BEDROOM DIRTY 1 T&B D
A 8d
D UTILITIY 3
4 575
2
WF-2
1
2 475
1 500
1 500
ED A 8
1 WF-2
ENSUITE
2 1 D 1
D D AIRLOCK
T&B
W
A6
WF-2 ENSUITE A 11a AIRLOCK
1 1 6
1 500
1 500
3 T&B D
STORAGE D 3
3 D
3 325
3 D 2
1 1 1
A 8
D A 8m
1 825
1 825
AIRLOCK 2
D BEDROOM
3
ARCHITECT OF RECORD
4 1 D
D A 8e
2 DIRTY
D 1 1
1 775
3 275
3 275
FD Up Dn ROOM WF-2
EMERGENCY WF-2 D D D
1 1 2 6 6
EXIT FD
1 500
A 11b
2
2
26 800
Y
5 A 11c
PPE D
LAB GOWN
A
2 2
3 050
3 050
2 ANTE ROOM D
RA 9266 SECTION 33
A 8 2
350
1 FD
A
6 D A 11 D D 2
1
2 2
H
1
1 275
2 938
3 NURSE COMMON
D STATION LOUNGE
1
D WF-2
EXIT STAFF
6 075
6 075
4 1 350 1
CHANGING A 8c
D D ROOM
1 412
4 800
2 D 3 1
LOCATION
2 DIRTY
A 8c D D
BEDROOM UTILITIY
D 6
PROJECT TITLE
D 6
D DECONTAMINATION 3 D
& WASTE HOLDING AREA GARBAGE
4
AIRLOCK
ISOLATION ROOMS
2 CHUTE
2
1 725
41 800
41 800
7 W
ENTRANCE
2 950
2 950
9 W W
7 8
1
1 850
1 850
A 6b
10
AS SHOWN
SHEET CONTENTS
3 750
3 750
11
3 750
3 750
EXISTING INFECTIOUS
DESEASE BUILDING
CHECKED
15 000
13
3 750
3 750
Ramp Dn
14
VILMA O. MOLTIO, MPA
Chief Administrative Officer
RECOMMENDING APPROVAL
ROAD
ITAL
HOSP
3 500 250 1 300 3 000 4 000 4 200 3 625 675 2 200
22 750
CONCURRED
NOTES
1. USE OF FIRST CLASS QUALITY
MATERIALS/OR PRODUCTS FOR ALL ARCHITECTURAL WORKS
APPROVED AND ACCEPTABLE TO THE 'BGHMC'. PRIOR
APPROVED
EXECUTION/INSTALLATION.
A-7
A B C D E F G G' H J
22 750
3 500 250 4 300 4 000 4 200 4 300 2 200
2 575 1 725 2 700 1 300 1 000 2 500 700 1 875 1 750 675
NORTH
1
1 A8
2
BAGUIO CITY
A 11a
AIRLOCK D ENSUITE
AIRLOCK
T&B
2 100
D 2 D
1
DEPARTMENT OF HEALTH
BEDROOM DIRTY 3 1 D
A 8d
D UTILITIY 3
4 575
2
1
2 475
1 500
1 500
ED A8
1
ENSUITE
2 1 1
D D AIRLOCK
T&B
A6
ENSUITE A 11a AIRLOCK
1 1
1 500
1 500
T&B D
D 3
3 D
3 325
3 D 2
1 1 1
A8
D A 8m
1 825
1 825
AIRLOCK 2
D BEDROOM
3
ARCHITECT OF RECORD
4 1 D
D D A 8e
2 DIRTY
1 1
1 775
3 275
3 275
Up Dn ROOM
D D D
FD 1 2 3 3
1 500
A 11b
2
2
26 800
5 A 11c
PPE D
LAB GOWN
2
3 050
3 050
2 ANTE ROOM D
RA 9266 SECTION 33
1
D A 11 D D
6 1 2 FD
D 2
H HA AL LL LW WA AY Y
2 1
1 275
2 ENSUITE 1 Up 6a
AIRLOCK Dn A
T&B A 11a 1
A 8d
D
3 NURSE DOCTORS'
D STATION LOUNGE
1
STAFF
DECONTAMINATION CHANGING
6 075
6 075
D 3 1
LOCATION
2 DIRTY
A 8c D D
BEDROOM UTILITIY
D 6
PROJECT TITLE
6
3 D
GARBAGE
ISOLATION ROOMS
AIRLOCK 2
CHUTE
41 800
41 800
2 950
2 950
8 ELEVATOR
ROOF
1 850
1 850
10
AS SHOWN
SHEET CONTENTS
3 750
3 750
11 ROOF
3 750
3 750
EXISTING INFECTIOUS
DESEASE BUILDING
CHECKED
15 000
13
3 750
3 750
14
VILMA O. MOLTIO, MPA
Chief Administrative Officer
RECOMMENDING APPROVAL
NOTES
1. USE OF FIRST CLASS QUALITY
MATERIALS/OR PRODUCTS FOR ALL ARCHITECTURAL WORKS
APPROVED AND ACCEPTABLE TO THE 'BGHMC'. PRIOR
APPROVED
EXECUTION/INSTALLATION.
A-7a
A B C D E F G G' H J
22 750
3 500 250 4 300 4 000 4 200 4 300 2 200
2 575 1 725 2 700 1 300 1 000 2 500 700 1 875 1 750 675
NORTH
BAGUIO CITY
1
2 100
DEPARTMENT OF HEALTH
REPUBLIC OF THE PHILIPPINES
A A
D WC WC D
3 TOILET 1 TOILET 2 3
1' ELECTRICAL SINK SHOWER SINK 7 BED WARDS
1 1
1 500
1 500
ROOM ED A 8h A 8i
SINK SHOWER SINK
1
2 1
D TOILET 3 TOILET 4 D
3 WC WC 3
A6
1 500
1 500
3 325
3
1
D ANTE D A 8m
1 825
1 825
1 ROOM 1
ARCHITECT OF RECORD
4
D
6
3 275
3 275
Dn
D D D
2 3 3
FD
1 500
26 800
1
A
5 A 8d
D
D 1
A 8b
2
A
350
1
A 8l FD
H
6 D D
2 2 2
1
1 275
Up Dn A 6a
SHOWER
D
3
NURSE
STATION
ANTE
8 BED-WARDS
6 075
6 075
6 075
D ROOM D
1 1
LOCATION
4 800
1
A 8k 1
PROJECT TITLE
DECONTAMINATION
D A 8b
D 1 6
ISOLATION ROOMS
GARBAGE
3 A 8n
TOILET WC
41 800
41 800
2 950
2 950
8 ELEVATOR
ROOF
1 850
1 850
AS SHOWN
10
SHEET CONTENTS
3 750
3 750
11
3 750
3 750
EXISTING INFECTIOUS
CHECKED
DESEASE BUILDING
15 000
13
3 750
3 750
14
RECOMMENDING APPROVAL
NOTES
1. USE OF FIRST CLASS QUALITY
MATERIALS/OR PRODUCTS FOR ALL ARCHITECTURAL WORKS
APPROVED AND ACCEPTABLE TO THE 'BGHMC'. PRIOR
APPROVED
EXECUTION/INSTALLATION.
A-7b
AND INFORM THE 'BGHMC' IN ANY DISCREPANCIES NOTED IN THE
TO EXECUTION/INSTALLATION, SUBMIT SAMPLE FOR APPROVAL.
MATERIALS/OR PRODUCTS FOR ALL ARCHITECTURAL WORKS
EXECUTION/INSTALLATION.
2 100 2 475 1 500 1 500 1 825 1 275 4 800
NOTES
2.
3.
4.
5.
6.
1.
6a
1
A
J
Dn
FD
2
FF-6
2 200
2 200
FF-6
H
675
675
ROOF
DECK
G'
D
5
3 625
3 625
G
1: 100 MTS
ROOF DECK KEY PLAN
4 200
4 200
F
22 750
4 000
4 000
E
3 000
(PROPOSED DELTA E.R.)
EXISTING INFECTIOUS
DESEASE BUILDING
B C D
SCALE
250 1 300
250 1 300
FD
A 7c
2
Dn
1
FF-6
ROOF
DECK
3 500
3 500
FF-6
A
A6
1
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
A-7c
and documents of the architect,
whether the object for which they are THREE-STOREY BUILDING FOR
MARK ANDREW B. PINOS-AN made is executed or not. It shall be
AND MEDICAL CENTER unlawful for any person to duplicate ISOLATION ROOMS
or make copies of said documents for AS SHOWN
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
2 275
LEGEND
FLOOR FINISHES :
2 275
METALLIC EPOXY FINISH
APPLICATION BY APPROVED MANUFACTURER
WALL FINISHES :
100% ACRYLIC ALL WEATHER PROTECTIVE
2 400
1 775
FIXTURES / FITTINGS :
FIRST CLASS CLOSE-COUPLED DUAL FLUSH
WALL-DISCHARGE WATER CLOSET WITH SOFT
CLOSE SEAT AND COVER. PROVIDE WITH
PLAN COMPLETE FITTINGS AND ACCESSORIES.
SECTION A
FIRST CLASS PEDESTAL TYPE LAVATORY WITH
COMPLETE FITTINGS AND ACCESSORIES.
1 775 1 775 2 275
2 400
2 422
2 100
LEGEND :
CFL - CEILING FINISH LINE
985
TFFL - TOILET FINISH FLOOR LINE
FFL - FINISH FLOOR LINE
150
150
SECTION B SECTION C SECTION D
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A8
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
1 350
2 850
2 850
LEGEND
1 350 1 350
FLOOR FINISHES :
988
WALL FINISHES :
2 175
2 400
1 038
FIXTURES / FITTINGS :
2 170
FIRST CLASS CLOSE-COUPLED DUAL FLUSH
150
WALL-DISCHARGE WATER CLOSET WITH SOFT
CLOSE SEAT AND COVER. PROVIDE WITH
COMPLETE FITTINGS AND ACCESSORIES.
PLAN
SECTION A FIRST CLASS PEDESTAL TYPE LAVATORY WITH
COMPLETE FITTINGS AND ACCESSORIES.
2 175
2 400
2 400
TOILET PARTITION SYSTEM WITH
2 100
2 000
2 000
COMPLETE ACCESSORIES :
> 12MM THICK COMPACT LAMINATE PANEL
(DOOR & WALL PANELS) AS SHOWN
> ALUMINUM ANODISED CORNER CHANNEL
> ALUMINUM ANODISED 'U' CHANNEL
> ALUMINUM ANODISED TOP ROUND CHANNEL
150
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A8a
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
1 750
1 750
LEGEND
FLOOR FINISHES :
2 075
WALL FINISHES :
1 000 100% ACRYLIC ALL WEATHER PROTECTIVE
COATING PAINT FINISH (MININUM OF 2-COATS)
FIXTURES / FITTINGS :
FIRST CLASS CLOSE-COUPLED DUAL FLUSH
WALL-DISCHARGE WATER CLOSET WITH SOFT
PLAN CLOSE SEAT AND COVER. PROVIDE WITH
COMPLETE FITTINGS AND ACCESSORIES.
SECTION A
FIRST CLASS PEDESTAL TYPE LAVATORY WITH
COMPLETE FITTINGS AND ACCESSORIES.
2 275
2 400
2 400
LEGEND :
CFL - CEILING FINISH LINE
TFFL - TOILET FINISH FLOOR LINE
FFL - FINISH FLOOR LINE
150
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A8b
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
LEGEND
1 938 FLOOR FINISHES :
705
1 938
705 METALLIC EPOXY FINISH
APPLICATION BY APPROVED MANUFACTURER
WALL FINISHES :
100% ACRYLIC ALL WEATHER PROTECTIVE
COATING PAINT FINISH (MININUM OF 2-COATS)
1 761
2 400
FIXTURES / FITTINGS :
617
150
SECTION A FIRST CLASS PEDESTAL TYPE LAVATORY WITH
COMPLETE FITTINGS AND ACCESSORIES.
2 400
2 400
LEGEND :
CFL - CEILING FINISH LINE
TFFL - TOILET FINISH FLOOR LINE
FFL - FINISH FLOOR LINE
150
150
150
SECTION B SECTION C SECTION D
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A8d
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
925 1 200
LEGEND
FLOOR FINISHES :
2 275 METALLIC EPOXY FINISH
925 1 200
APPLICATION BY APPROVED MANUFACTURER
WALL FINISHES :
100% ACRYLIC ALL WEATHER PROTECTIVE
1 500
FIXTURES / FITTINGS :
850
FIRST CLASS CLOSE-COUPLED DUAL FLUSH
107
WALL-DISCHARGE WATER CLOSET WITH SOFT
PLAN CLOSE SEAT AND COVER. PROVIDE WITH
COMPLETE FITTINGS AND ACCESSORIES.
150
LEGEND :
SECTION B SECTION C SECTION D CFL - CEILING FINISH LINE
TFFL - TOILET FINISH FLOOR LINE
FFL - FINISH FLOOR LINE
1 TOILET & BATH DETAIL
A 8c SCALE 1: 25MTS
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A8c
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
LEGEND
2 150
FLOOR FINISHES :
WALL FINISHES :
100% ACRYLIC ALL WEATHER PROTECTIVE
2 400
COATING PAINT FINISH (MININUM OF 2-COATS)
2 850
FIXTURES / FITTINGS :
FIRST CLASS CLOSE-COUPLED DUAL FLUSH
150
WALL-DISCHARGE WATER CLOSET WITH SOFT
CLOSE SEAT AND COVER. PROVIDE WITH
COMPLETE FITTINGS AND ACCESSORIES.
SECTION A
PLAN FIRST CLASS PEDESTAL TYPE LAVATORY WITH
COMPLETE FITTINGS AND ACCESSORIES.
2 400
GRAB / RAIL FULLY ANCHORED TO WALL AND FLOOR
2 400
LEGEND :
150
150
150
SECTION B SECTION D
SECTION C
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A8e
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
LEGEND
A B FLOOR FINISHES :
WALL FINISHES :
100% ACRYLIC ALL WEATHER PROTECTIVE
2 425
C COATING PAINT FINISH (MININUM OF 2-COATS)
1 800
SHOWER
D
FIXTURES / FITTINGS :
FIRST CLASS CLOSE-COUPLED DUAL FLUSH
WALL-DISCHARGE WATER CLOSET WITH SOFT
CLOSE SEAT AND COVER. PROVIDE WITH
025
COMPLETE FITTINGS AND ACCESSORIES.
PLAN SECTION A
FIRST CLASS PEDESTAL TYPE LAVATORY WITH
COMPLETE FITTINGS AND ACCESSORIES.
2 425
2 425
LEGEND :
CFL - CEILING FINISH LINE
800
025
SECTION B SECTION C SECTION D
1 SHOWER DETAIL
A 8l SCALE 1: 25MTS
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A8l
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
A B LEGEND
1 500
FLOOR FINISHES :
C WALL FINISHES :
2 350
2 425
COATING PAINT FINISH (MININUM OF 2-COATS)
1 770
FIXTURES / FITTINGS :
FIRST CLASS CLOSE-COUPLED DUAL FLUSH
WALL-DISCHARGE WATER CLOSET WITH SOFT
CLOSE SEAT AND COVER. PROVIDE WITH
025
COMPLETE FITTINGS AND ACCESSORIES.
PLAN
SECTION A
FIRST CLASS PEDESTAL TYPE LAVATORY WITH
COMPLETE FITTINGS AND ACCESSORIES.
2 425
1 500
LEGEND :
CFL - CEILING FINISH LINE
TFFL - TOILET FINISH FLOOR LINE
FFL - FINISH FLOOR LINE
025
025
SECTION B SECTION C
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A8m
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
LEGEND
A
2 700 FLOOR FINISHES :
WALL FINISHES :
B
100% ACRYLIC ALL WEATHER PROTECTIVE
1 500
FIXTURES / FITTINGS :
FIRST CLASS CLOSE-COUPLED DUAL FLUSH
WALL-DISCHARGE WATER CLOSET WITH SOFT
PLAN CLOSE SEAT AND COVER. PROVIDE WITH
COMPLETE FITTINGS AND ACCESSORIES.
2 425
LEGEND :
CFL - CEILING FINISH LINE
SECTION B SECTION A TFFL
FFL
-
-
TOILET FINISH FLOOR LINE
FINISH FLOOR LINE
NURSE STATION
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A8n
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
LEGEND
A B FLOOR FINISHES :
2 200
400
C
WALL FINISHES :
100% ACRYLIC ALL WEATHER PROTECTIVE
1 800
TOILET 1
2 425
D COATING PAINT FINISH (MININUM OF 2-COATS)
FIXTURES / FITTINGS :
FIRST CLASS CLOSE-COUPLED DUAL FLUSH
600 400 WALL-DISCHARGE WATER CLOSET WITH SOFT
CLOSE SEAT AND COVER. PROVIDE WITH
025
COMPLETE FITTINGS AND ACCESSORIES.
PLAN SECTION A
FIRST CLASS PEDESTAL TYPE LAVATORY WITH
COMPLETE FITTINGS AND ACCESSORIES.
2 425
1 770
LEGEND :
CFL - CEILING FINISH LINE
800
800
800
TFFL - TOILET FINISH FLOOR LINE
FFL - FINISH FLOOR LINE
025
025
025
SECTION B SECTION C SECTION D
1 TOILET DETAIL
A 8f SCALE 1: 25MTS
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A8f
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
LEGEND
A B FLOOR FINISHES :
2 200
C WALL FINISHES :
1 800 TOILET 3 100% ACRYLIC ALL WEATHER PROTECTIVE
2 425
D
COATING PAINT FINISH (MININUM OF 2-COATS)
FIXTURES / FITTINGS :
400 FIRST CLASS CLOSE-COUPLED DUAL FLUSH
WALL-DISCHARGE WATER CLOSET WITH SOFT
PLAN CLOSE SEAT AND COVER. PROVIDE WITH
025
COMPLETE FITTINGS AND ACCESSORIES.
SECTION A
FIRST CLASS PEDESTAL TYPE LAVATORY WITH
COMPLETE FITTINGS AND ACCESSORIES.
2 425
2 425
LEGEND :
CFL - CEILING FINISH LINE
TFFL - TOILET FINISH FLOOR LINE
FFL - FINISH FLOOR LINE
025
025
025
SECTION B SECTION C SECTION D
1 SHOWER DETAIL
A 8g SCALE 1: 25MTS
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
PROPOSED COMPLETION OF BGHMC
A8g
service, are the intellectual property
BAGUIO GENERAL HOSPITAL and documents of the architect,
whether the object for which they are THREE-STOREY BUILDING FOR
MARK ANDREW B. PINOS-AN made is executed or not. It shall be
AND MEDICAL CENTER unlawful for any person to duplicate ISOLATION ROOMS
or make copies of said documents for AS SHOWN
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
LEGEND
A B
2 200
FLOOR FINISHES :
400 400
SINK SHOWER
C WALL FINISHES :
1 800
2 425
COATING PAINT FINISH (MININUM OF 2-COATS)
WC
400
FIXTURES / FITTINGS :
800
FIRST CLASS CLOSE-COUPLED DUAL FLUSH
WALL-DISCHARGE WATER CLOSET WITH SOFT
PLAN
025
CLOSE SEAT AND COVER. PROVIDE WITH
COMPLETE FITTINGS AND ACCESSORIES.
SECTION A
FIRST CLASS PEDESTAL TYPE LAVATORY WITH
COMPLETE FITTINGS AND ACCESSORIES.
2 425
2 425
LEGEND :
CFL - CEILING FINISH LINE
800
800
800
TFFL - TOILET FINISH FLOOR LINE
FFL - FINISH FLOOR LINE
025
025
025
1 TOILET DETAIL
A 8h SCALE 1: 25MTS
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A8h
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
LEGEND
FLOOR FINISHES :
A B
1 925
METALLIC EPOXY FINISH
400
APPLICATION BY APPROVED MANUFACTURER
SHOWER SINK
WALL FINISHES :
C TOILET 4 100% ACRYLIC ALL WEATHER PROTECTIVE
1 800
2 425
WC
FIXTURES / FITTINGS :
800
FIRST CLASS CLOSE-COUPLED DUAL FLUSH
WALL-DISCHARGE WATER CLOSET WITH SOFT
CLOSE SEAT AND COVER. PROVIDE WITH
PLAN COMPLETE FITTINGS AND ACCESSORIES.
025
SECTION A FIRST CLASS PEDESTAL TYPE LAVATORY WITH
COMPLETE FITTINGS AND ACCESSORIES.
2 425
LEGEND :
CFL - CEILING FINISH LINE
800
800
TFFL - TOILET FINISH FLOOR LINE
FFL - FINISH FLOOR LINE
025
025
SECTION B SECTION C
1 TOILET 4 DETAIL
A 8i SCALE 1: 25MTS
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A8i
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
LEGEND
A B
2 100
FLOOR FINISHES :
C 1 100
WALL FINISHES :
D SHOWER 100% ACRYLIC ALL WEATHER PROTECTIVE
1 950
2 425
FIXTURES / FITTINGS :
FIRST CLASS CLOSE-COUPLED DUAL FLUSH
99
0
025
SECTION A FIRST CLASS PEDESTAL TYPE LAVATORY WITH
COMPLETE FITTINGS AND ACCESSORIES.
2 425
2 425
LEGEND :
CFL - CEILING FINISH LINE
800
800
TFFL - TOILET FINISH FLOOR LINE
FFL - FINISH FLOOR LINE
025
025
025
SECTION B SECTION C SECTION D
1 SHOWER DETAIL
A 8j SCALE 1: 25MTS
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
PROPOSED COMPLETION OF BGHMC
A8j
service, are the intellectual property
BAGUIO GENERAL HOSPITAL and documents of the architect,
whether the object for which they are THREE-STOREY BUILDING FOR
MARK ANDREW B. PINOS-AN made is executed or not. It shall be
AND MEDICAL CENTER unlawful for any person to duplicate ISOLATION ROOMS
or make copies of said documents for AS SHOWN
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
LEGEND
FLOOR FINISHES :
A B
2 100
METALLIC EPOXY FINISH
1 400
APPLICATION BY APPROVED MANUFACTURER
0
99
WALL FINISHES :
C 100% ACRYLIC ALL WEATHER PROTECTIVE
COATING PAINT FINISH (MININUM OF 2-COATS)
2 425
1 800
TOILET
D
1 100
FIXTURES / FITTINGS :
FIRST CLASS CLOSE-COUPLED DUAL FLUSH
WALL-DISCHARGE WATER CLOSET WITH SOFT
CLOSE SEAT AND COVER. PROVIDE WITH
025
COMPLETE FITTINGS AND ACCESSORIES.
2 425
2 425
LEGEND :
CFL - CEILING FINISH LINE
800
025
025
SECTION B SECTION C SECTION D
1 TOILET DETAIL
A 8k SCALE 1: 25MTS
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A8k
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
SET/S 30 SET SET/S 45 SETS 34 SETS
STEEL DOOR : STEEL DOOR :
. .
DOOR 44MM THICK STEEL DOOR, 1.2mm HOLLOW CORE (BY DOOR 44MM THICK STEEL DOOR, 1.2mm HOLLOW CORE (BY WOOD DOOR (WD) :
APPROVED MANUFACTURER). APPROVED MANUFACTURER). 44MM THICK FLUSH DOOR (6MM THICK MARINE PLYWOOD DOOR
DOOR FACES, VACUUM TREATED WITH WOOD PRESERVATIVE, KILN DRIED S4S
JAMB STEEL DOOR JAMBS : JAMB STEEL DOOR JAMBS : FRAMES (BY APPROVED BRAND AND SASH FACTORY).
1 200
TYPE (2.0MM) SINGLE RABBET DOOR JAMB (45MM X 800
TYPE (2.0MM) SINGLE RABBET DOOR JAMB (45MM X 800
900 300 100MM). (BY APPROVED MANUFACTURER). 150 500 150 100MM). (BY APPROVED MANUFACTURER). WOOD DOOR JAMBS :
.
150 600 150 - FIRST CLASS HEAVY DUTY CYLINDRICAL LEVERSET, JAMB FROM 50mm X 150mm (2"X6") VACUUM TREATED WITH WOOD
SATIN STAINLESS STEEL (BY APPROVED - FIRST CLASS HEAVY DUTY CYLINDRICAL LEVERSET, TYPE PRESERVATIVE, KILN DRIED AND MACHINE FINISH DOOR
MANUFACTURER). SATIN STAINLESS STEEL (BY APPROVED JAMBS (USE 1ST CLASS GRADE & BRAND)
MANUFACTURER).
- FIRST CLASS HEAVY DUTY DEADBOLT, SATIN FIRST CLASS HEAVY DUTY CYLINDRICAL LEVERSET, SATIN
STAINLESS STEEL (BY APPROVED MANUFACTURER). - FIRST CLASS HEAVY DUTY DEADBOLT, SATIN
150
150
STAINLESS STEEL (BY APPROVED MANUFACTURER).
HARDWARES / STAINLESS STEEL (BY APPROVED MANUFACTURER).
- FIRST CLASS HEAVY DUTY STAINLES STEEL CONCEALED HARDWARES /
ACCESSORIES
800
FLUSH BOLT FOR BOTH HEADER & FOOTER (BY ACCESSORIES - FIRST CLASS HEAVY DUTY DOOR CLOSER (BY APPROVED FIRST CLASS HEAVY DUTY DOOR CLOSER (BY APPROVED
F F
900
900
APPROVED MANUFACTURER). MANUFACTURER). HARDWARES / MANUFACTURER).
- FIRST CLASS HEAVY DUTY DOOR CLOSER (BY ACCESSORIES
- 4-PCS STAINLESS STEEL BALL BEARING (1ST CLASS) 4-PCS STAINLESS STEEL BALL BEARING (1ST CLASS)
400
APPROVED MANUFACTURER).
2 100
2 100
2 100
HEAVY DUTY HINGES ON EACH PANEL (BY APPROVED HEAVY DUTY HINGES ON EACH PANEL (BY APPROVED
- 4-PCS STAINLESS STEEL BALL BEARING (1ST CLASS) MANUFACTURER). MANUFACTURER).
HEAVY DUTY HINGES ON EACH PANEL (BY APPROVED
MANUFACTURER).
1 050
1 050
900
600
GLAZING 6mm THICK TEMPERED CLEAR GLASS (OR AS INDICATED) GLAZING 6mm THICK TEMPERED CLEAR GLASS (OR AS INDICATED) GLAZING NONE
300
300
FFL FFL FFL
STEEL DOOR & DOOR JAMBS : STEEL DOOR & DOOR JAMBS : EPOXY PAINT FINISH :
. . .
FINISH FIRST CLASS QUICK DRYING ENAMEL SYSTEM SPRAY FINISH FIRST CLASS QUICK DRYING ENAMEL SYSTEM SPRAY FINISH FIRST CLASS EPOXY PAINT FINISH (BY APPROVED PAINT
APPLIED (BY APPROVED PAINT MANUFACTURER). APPLIED (BY APPROVED PAINT MANUFACTURER). MANUFACTURER).
STAINLESS
D STAINLESS
D D
KICK PLATE 1 DOOR
3 - DOOR SILCENCER FOR STEEL DOOR KICK PLATE 2 DOOR
3 - DOOR SILCENCER FOR STEEL DOOR 3 DOOR
3 - WOOD DOOR SILCENCER
SILCENCER SILCENCER SILCENCER
LOCATION SEE CONSTRUCTION PLAN LOCATION SEE CONSTRUCTION PLAN LOCATION SEE CONSTRUCTION PLAN
SET/S 2 SET SET/S 1 SETS SET/S 9 SETS
STEEL DOOR :
.
DOOR 44MM THICK STEEL DOOR, 1.2mm HOLLOW CORE (BY DOOR STEEL FIRE DOOR DOOR STEEL FIRE RATED DOOR
APPROVED MANUFACTURER).
1 600
STEEL DOOR JAMBS : STEEL DOOR JAMBS : STEEL DOOR JAMBS :
JAMB (2.0MM) SINGLE RABBET DOOR JAMB (45MM X JAMB (2.0MM) SINGLE RABBET DOOR JAMB (45MM X JAMB (2.0MM) SINGLE RABBET DOOR JAMB (45MM X
800 800
TYPE 100MM). (BY APPROVED MANUFACTURER). TYPE 100MM). (BY APPROVED MANUFACTURER). TYPE 100MM). (BY APPROVED MANUFACTURER).
350 300 150 150 300 350
- FIRST CLASS HEAVY DUTY CYLINDRICAL LEVERSET, - FIRST CLASS HEAVY DUTY DOOR CLOSER (BY - FIRST CLASS HEAVY DUTY CYLINDRICAL LEVERSET,
1 200 1 200
SATIN STAINLESS STEEL (BY APPROVED APPROVED MANUFACTURER). SATIN STAINLESS STEEL (BY APPROVED
MANUFACTURER). MANUFACTURER).
- FIRST CLASS HEAVY DUTY DEADBOLT, SATIN - 4-PCS STAINLESS STEEL BALL BEARING (1ST CLASS)
150
HEAVY DUTY HINGES ON EACH PANEL (BY APPROVED - FIRST CLASS HEAVY DUTY DOOR CLOSER (BY
STAINLESS STEEL (BY APPROVED MANUFACTURER). APPROVED MANUFACTURER).
MANUFACTURER).
- FIRST CLASS HEAVY DUTY STAINLES STEEL CONCEALED - 4-PCS STAINLESS STEEL BALL BEARING (1ST CLASS)
1 050
HARDWARES / HARDWARES / HARDWARES /
F F
1 200
- UL LISTED FIRST CLASS HEAVY DUTY PANIC DEVICE
900
ACCESSORIES FLUSH BOLT FOR BOTH HEADER & FOOTER (BY ACCESSORIES ACCESSORIES HEAVY DUTY HINGES ON EACH PANEL (BY APPROVED
APPROVED MANUFACTURER). PER DOOR SIZE AND ASSEMBLY (BY APPROVED MANUFACTURER).
MANUFACTURER).
- FIRST CLASS HEAVY DUTY DOOR CLOSER (BY
2 100
2 100
2 100
2 100
2 100
APPROVED MANUFACTURER).
- 4-PCS STAINLESS STEEL BALL BEARING (1ST CLASS)
1 050
1 050
HEAVY DUTY HINGES ON EACH PANEL (BY APPROVED
1 000
900
900
MANUFACTURER).
300
FFL GLAZING 6mm THICK TEMPERED CLEAR GLASS (OR AS INDICATED) FFL GLAZING NONE FFL GLAZING NONE
STEEL DOOR & DOOR JAMBS : STEEL DOOR & DOOR JAMBS : STEEL DOOR & DOOR JAMBS :
. . .
FINISH FIRST CLASS QUICK DRYING ENAMEL SYSTEM SPRAY FINISH FIRST CLASS QUICK DRYING ENAMEL SYSTEM SPRAY FINISH FIRST CLASS QUICK DRYING ENAMEL SYSTEM SPRAY
STAINLESS
D APPLIED (BY APPROVED PAINT MANUFACTURER).
FD APPLIED (BY APPROVED PAINT MANUFACTURER).
FD APPLIED (BY APPROVED PAINT MANUFACTURER).
KICK PLATE 4 1 2
DOOR DOOR DOOR
3 - DOOR SILCENCER FOR STEEL DOOR
SILCENCER SILCENCER SILCENCER
LOCATION SEE CONSTRUCTION PLAN LOCATION SEE CONSTRUCTION PLAN LOCATION SEE CONSTRUCTION PLAN
1 DOORS SCHEDULE
A 9 SCALE 1: 30MTS
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A9
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
SET/S 30 SET SET/S 45 SETS 34 SETS
STEEL DOOR : STEEL DOOR :
. .
DOOR 44MM THICK STEEL DOOR, 1.2mm HOLLOW CORE (BY DOOR 44MM THICK STEEL DOOR, 1.2mm HOLLOW CORE (BY WOOD DOOR (WD) :
APPROVED MANUFACTURER). APPROVED MANUFACTURER). 44MM THICK FLUSH DOOR (6MM THICK MARINE PLYWOOD DOOR
DOOR FACES, VACUUM TREATED WITH WOOD PRESERVATIVE, KILN DRIED S4S
JAMB STEEL DOOR JAMBS : JAMB STEEL DOOR JAMBS : FRAMES (BY APPROVED BRAND AND SASH FACTORY).
1 200
TYPE (2.0MM) SINGLE RABBET DOOR JAMB (45MM X 800
TYPE (2.0MM) SINGLE RABBET DOOR JAMB (45MM X 800
900 300 100MM). (BY APPROVED MANUFACTURER). 150 500 150 100MM). (BY APPROVED MANUFACTURER). WOOD DOOR JAMBS :
.
150 600 150 - FIRST CLASS HEAVY DUTY CYLINDRICAL LEVERSET, JAMB FROM 50mm X 150mm (2"X6") VACUUM TREATED WITH WOOD
SATIN STAINLESS STEEL (BY APPROVED - FIRST CLASS HEAVY DUTY CYLINDRICAL LEVERSET, TYPE PRESERVATIVE, KILN DRIED AND MACHINE FINISH DOOR
MANUFACTURER). SATIN STAINLESS STEEL (BY APPROVED JAMBS (USE 1ST CLASS GRADE & BRAND)
MANUFACTURER).
- FIRST CLASS HEAVY DUTY DEADBOLT, SATIN FIRST CLASS HEAVY DUTY CYLINDRICAL LEVERSET, SATIN
STAINLESS STEEL (BY APPROVED MANUFACTURER). - FIRST CLASS HEAVY DUTY DEADBOLT, SATIN
150
150
STAINLESS STEEL (BY APPROVED MANUFACTURER).
HARDWARES / STAINLESS STEEL (BY APPROVED MANUFACTURER).
- FIRST CLASS HEAVY DUTY STAINLES STEEL CONCEALED HARDWARES /
ACCESSORIES
800
FLUSH BOLT FOR BOTH HEADER & FOOTER (BY ACCESSORIES - FIRST CLASS HEAVY DUTY DOOR CLOSER (BY APPROVED FIRST CLASS HEAVY DUTY DOOR CLOSER (BY APPROVED
F F
900
900
APPROVED MANUFACTURER). MANUFACTURER). HARDWARES / MANUFACTURER).
- FIRST CLASS HEAVY DUTY DOOR CLOSER (BY ACCESSORIES
- 4-PCS STAINLESS STEEL BALL BEARING (1ST CLASS) 4-PCS STAINLESS STEEL BALL BEARING (1ST CLASS)
400
APPROVED MANUFACTURER).
2 100
2 100
2 100
HEAVY DUTY HINGES ON EACH PANEL (BY APPROVED HEAVY DUTY HINGES ON EACH PANEL (BY APPROVED
- 4-PCS STAINLESS STEEL BALL BEARING (1ST CLASS) MANUFACTURER). MANUFACTURER).
HEAVY DUTY HINGES ON EACH PANEL (BY APPROVED
MANUFACTURER).
1 050
1 050
900
600
GLAZING 6mm THICK TEMPERED CLEAR GLASS (OR AS INDICATED) GLAZING 6mm THICK TEMPERED CLEAR GLASS (OR AS INDICATED) GLAZING NONE
300
300
FFL FFL FFL
STEEL DOOR & DOOR JAMBS : STEEL DOOR & DOOR JAMBS : EPOXY PAINT FINISH :
. . .
FINISH FIRST CLASS QUICK DRYING ENAMEL SYSTEM SPRAY FINISH FIRST CLASS QUICK DRYING ENAMEL SYSTEM SPRAY FINISH FIRST CLASS EPOXY PAINT FINISH (BY APPROVED PAINT
APPLIED (BY APPROVED PAINT MANUFACTURER). APPLIED (BY APPROVED PAINT MANUFACTURER). MANUFACTURER).
STAINLESS
D STAINLESS
D D
KICK PLATE 1 DOOR
3 - DOOR SILCENCER FOR STEEL DOOR KICK PLATE 2 DOOR
3 - DOOR SILCENCER FOR STEEL DOOR 3 DOOR
3 - WOOD DOOR SILCENCER
SILCENCER SILCENCER SILCENCER
LOCATION SEE CONSTRUCTION PLAN LOCATION SEE CONSTRUCTION PLAN LOCATION SEE CONSTRUCTION PLAN
SET/S 2 SET SET/S 1 SETS SET/S 9 SETS
STEEL DOOR :
.
DOOR 44MM THICK STEEL DOOR, 1.2mm HOLLOW CORE (BY DOOR STEEL FIRE DOOR DOOR STEEL FIRE RATED DOOR
APPROVED MANUFACTURER).
1 600
STEEL DOOR JAMBS : STEEL DOOR JAMBS : STEEL DOOR JAMBS :
JAMB (2.0MM) SINGLE RABBET DOOR JAMB (45MM X JAMB (2.0MM) SINGLE RABBET DOOR JAMB (45MM X JAMB (2.0MM) SINGLE RABBET DOOR JAMB (45MM X
800 800
TYPE 100MM). (BY APPROVED MANUFACTURER). TYPE 100MM). (BY APPROVED MANUFACTURER). TYPE 100MM). (BY APPROVED MANUFACTURER).
350 300 150 150 300 350
- FIRST CLASS HEAVY DUTY CYLINDRICAL LEVERSET, - FIRST CLASS HEAVY DUTY DOOR CLOSER (BY - FIRST CLASS HEAVY DUTY CYLINDRICAL LEVERSET,
1 200 1 200
SATIN STAINLESS STEEL (BY APPROVED APPROVED MANUFACTURER). SATIN STAINLESS STEEL (BY APPROVED
MANUFACTURER). MANUFACTURER).
- FIRST CLASS HEAVY DUTY DEADBOLT, SATIN - 4-PCS STAINLESS STEEL BALL BEARING (1ST CLASS)
150
HEAVY DUTY HINGES ON EACH PANEL (BY APPROVED - FIRST CLASS HEAVY DUTY DOOR CLOSER (BY
STAINLESS STEEL (BY APPROVED MANUFACTURER). APPROVED MANUFACTURER).
MANUFACTURER).
- FIRST CLASS HEAVY DUTY STAINLES STEEL CONCEALED - 4-PCS STAINLESS STEEL BALL BEARING (1ST CLASS)
1 050
HARDWARES / HARDWARES / HARDWARES /
F F
1 200
- UL LISTED FIRST CLASS HEAVY DUTY PANIC DEVICE
900
ACCESSORIES FLUSH BOLT FOR BOTH HEADER & FOOTER (BY ACCESSORIES ACCESSORIES HEAVY DUTY HINGES ON EACH PANEL (BY APPROVED
APPROVED MANUFACTURER). PER DOOR SIZE AND ASSEMBLY (BY APPROVED MANUFACTURER).
MANUFACTURER).
- FIRST CLASS HEAVY DUTY DOOR CLOSER (BY
2 100
2 100
2 100
2 100
2 100
APPROVED MANUFACTURER).
- 4-PCS STAINLESS STEEL BALL BEARING (1ST CLASS)
1 050
1 050
HEAVY DUTY HINGES ON EACH PANEL (BY APPROVED
1 000
900
900
MANUFACTURER).
300
FFL GLAZING 6mm THICK TEMPERED CLEAR GLASS (OR AS INDICATED) FFL GLAZING NONE FFL GLAZING NONE
STEEL DOOR & DOOR JAMBS : STEEL DOOR & DOOR JAMBS : STEEL DOOR & DOOR JAMBS :
. . .
FINISH FIRST CLASS QUICK DRYING ENAMEL SYSTEM SPRAY FINISH FIRST CLASS QUICK DRYING ENAMEL SYSTEM SPRAY FINISH FIRST CLASS QUICK DRYING ENAMEL SYSTEM SPRAY
STAINLESS
D APPLIED (BY APPROVED PAINT MANUFACTURER).
FD APPLIED (BY APPROVED PAINT MANUFACTURER).
FD APPLIED (BY APPROVED PAINT MANUFACTURER).
KICK PLATE 4 1 2
DOOR DOOR DOOR
3 - DOOR SILCENCER FOR STEEL DOOR
SILCENCER SILCENCER SILCENCER
LOCATION SEE CONSTRUCTION PLAN LOCATION SEE CONSTRUCTION PLAN LOCATION SEE CONSTRUCTION PLAN
1 DOORS SCHEDULE
A 9 SCALE 1: 30MTS
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A9
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
SET/S 3 SETS 1 SET 18 SETS
STEEL DOOR : STEEL DOOR :
. .
DOOR 44MM THICK STEEL LOUVER DOOR, 1.2mm (BY 44MM THICK STEEL DOOR, 1.2mm HOLLOW CORE (BY 700
WOOD DOOR (WD) :
APPROVED MANUFACTURER). APPROVED MANUFACTURER). 44MM THICK FLUSH DOOR (6MM THICK MARINE PLYWOOD DOOR
DOOR DOOR FACES, VACUUM TREATED WITH WOOD PRESERVATIVE, KILN DRIED S4S
900
STEEL DOOR JAMBS : FRAMES (BY APPROVED BRAND AND SASH FACTORY).
100 650 100 JAMB (2.0MM) SINGLE RABBET DOOR JAMB (45MM X
TYPE 100MM). (BY APPROVED MANUFACTURER).
STEEL DOOR JAMBS : WOOD DOOR JAMBS :
.
- FIRST CLASS HEAVY DUTY CYLINDRICAL LEVERSET, JAMB (2.0MM) SINGLE RABBET DOOR JAMB (45MM X JAMB FROM 50mm X 150mm (2"X6") VACUUM TREATED WITH WOOD
SATIN STAINLESS STEEL (BY APPROVED TYPE 100MM). (BY APPROVED MANUFACTURER). TYPE PRESERVATIVE, KILN DRIED AND MACHINE FINISH DOOR
MANUFACTURER). 1 000 JAMBS (USE 1ST CLASS GRADE & BRAND)
- FIRST CLASS HEAVY DUTY DEADBOLT, SATIN HEAVY DUTY STAINLESS STEEL GATE LOCK FIRST CLASS HEAVY DUTY CYLINDRICAL LEVERSET, SATIN
1 050
STAINLESS STEEL (BY APPROVED MANUFACTURER). STAINLESS STEEL (BY APPROVED MANUFACTURER).
3-PCS STAINLESS STEEL BALL BEARING (1ST CLASS)
- FIRST CLASS HEAVY DUTY STAINLES STEEL CONCEALED HEAVY DUTY HINGES ON EACH PANEL (BY APPROVED
450
HARDWARES /
FLUSH BOLT FOR BOTH HEADER & FOOTER (BY MANUFACTURER). FIRST CLASS HEAVY DUTY DOOR CLOSER (BY APPROVED
2 100
2 100
2 100
ACCESSORIES
APPROVED MANUFACTURER). HARDWARES / HARDWARES / MANUFACTURER).
ACCESSORIES ACCESSORIES
1 450
- FIRST CLASS HEAVY DUTY DOOR CLOSER (BY
APPROVED MANUFACTURER). 4-PCS STAINLESS STEEL BALL BEARING (1ST CLASS)
1 050
1 000
HEAVY DUTY HINGES ON EACH PANEL (BY APPROVED
900
- 4-PCS STAINLESS STEEL BALL BEARING (1ST CLASS) MANUFACTURER).
FFL HEAVY DUTY HINGES ON EACH PANEL (BY APPROVED FFL FFL
MANUFACTURER).
GLAZING NONE GLAZING NONE GLAZING NONE
STEEL DOOR & DOOR JAMBS : D EPOXY PAINT FINISH : D EPOXY PAINT FINISH :
ED .
5 .
6 .
1 FINISH FIRST CLASS QUICK DRYING ENAMEL SYSTEM SPRAY FINISH FIRST CLASS EPOXY PAINT FINISH (BY APPROVED PAINT FINISH FIRST CLASS EPOXY PAINT FINISH (BY APPROVED PAINT
APPLIED (BY APPROVED PAINT MANUFACTURER). MANUFACTURER). MANUFACTURER).
DOOR DOOR DOOR
3 - DOOR SILCENCER FOR STEEL DOOR 3 - DOOR SILCENCER FOR STEEL DOOR 3 - WOOD DOOR SILCENCER
SILCENCER SILCENCER SILCENCER
LOCATION SEE COMPOSITE PLAN LOCATION SEE CONSTRUCTION PLAN LOCATION SEE CONSTRUCTION PLAN
SET/S 3 SETS
STEEL DOOR :
.
DOOR 44MM THICK STEEL DOOR, 1.2mm HOLLOW CORE (BY
APPROVED MANUFACTURER).
1 000
JAMB STEEL DOOR JAMBS :
150 700 150 TYPE (2.0MM) SINGLE RABBET DOOR JAMB (45MM X
100MM). (BY APPROVED MANUFACTURER).
HARDWARES /
F
900
900
300
1 DOORS SCHEDULE
A 9a SCALE 1: 30MTS
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A9a
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
SET/S 3 SETS SET/S 18 SETS SET/S 2 SETS
FIXED AND AWNING WINDOW : FIXED WINDOW : FIXED WINDOW :
. . .
1 600
WINDOW POWDER COATED ALUMINUM FRAMING 1 500
WINDOW POWDER COATED ALUMINUM FRAMING WINDOW POWDER COATED ALUMINUM FRAMING
800 800 TYPE SYSTEM WITH COMPLETE AND REQUIRED 200x100mm TYPE SYSTEM WITH COMPLETE AND REQUIRED TYPE SYSTEM WITH COMPLETE AND REQUIRED
100
200x100mm
ACCESSORIES CONCRETE LEDGE ACCESSORIES 1 600
ACCESSORIES
100
CONCRETE LEDGE
200x100mm
CONCRETE LEDGE
1 500
1 400
. . .
900
PROVIDE FIRST CLASS APPROPRIATE PROVIDE FIRST CLASS APPROPRIATE PROVIDE FIRST CLASS APPROPRIATE
SEALANTS SEALANT ON JOINTS AS PER MANUFACURER SEALANTS SEALANT ON JOINTS AS PER MANUFACURER SEALANTS SEALANT ON JOINTS AS PER MANUFACURER
100
SPECIFICATIOSN AND AS INSTRUCTED BY SPECIFICATIOSN AND AS INSTRUCTED BY SPECIFICATIOSN AND AS INSTRUCTED BY
'BGHMC' ARCHITECTS/ENGINEERS. 'BGHMC' ARCHITECTS/ENGINEERS. 'BGHMC' ARCHITECTS/ENGINEERS.
100
100x100mm
12mm THICK TEMPERED ONE-WAY 12mm THICK TEMPERED ONE-WAY CONCRETE MOLD 12mm THICK TEMPERED ONE-WAY
100x100mm GLAZING 100x100mm GLAZING GLAZING
MIRROR GLASS MIRROR GLASS MIRROR GLASS
1 200
CONCRETE MOLD CONCRETE MOLD
900
900
WINDOW/DOOR FINISH : WINDOW/DOOR FINISH : WINDOW/DOOR FINISH :
. . .
FFL FINISH POWDER COATED OR COMMERCIALLY FFL FINISH POWDER COATED OR COMMERCIALLY FFL FINISH POWDER COATED OR COMMERCIALLY
AVAILABLE REQUIRED COATINGS AVAILABLE REQUIRED COATINGS AVAILABLE REQUIRED COATINGS
W APPROVED & ACCEPTABLE TO 'BGHMC. W APPROVED & ACCEPTABLE TO 'BGHMC. W APPROVED & ACCEPTABLE TO 'BGHMC.
1 LOCATION SEE CONSTRUCTION PLAN 2 LOCATION SEE CONSTRUCTION PLAN 3 LOCATION SEE CONSTRUCTION PLAN
100
2 100
500
. . .
PROVIDE FIRST CLASS APPROPRIATE PROVIDE FIRST CLASS APPROPRIATE PROVIDE FIRST CLASS APPROPRIATE
SEALANTS SEALANT ON JOINTS AS PER MANUFACURER SEALANTS SEALANT ON JOINTS AS PER MANUFACURER SEALANTS SEALANT ON JOINTS AS PER MANUFACURER
SPECIFICATIOSN AND AS INSTRUCTED BY SPECIFICATIOSN AND AS INSTRUCTED BY SPECIFICATIOSN AND AS INSTRUCTED BY
100
100x100mm
'BGHMC' ARCHITECTS/ENGINEERS. 'BGHMC' ARCHITECTS/ENGINEERS. CONCRETE MOLD
'BGHMC' ARCHITECTS/ENGINEERS.
6mm THICK TEMPERED ONE-WAY 6mm THICK TEMPERED ONE-WAY 6mm THICK TEMPERED ONE-WAY
1 500
1 500
GLAZING GLAZING GLAZING
MIRROR GLASS MIRROR GLASS MIRROR GLASS
800
FFL FINISH POWDER COATED OR COMMERCIALLY FFL FINISH POWDER COATED OR COMMERCIALLY FFL FINISH POWDER COATED OR COMMERCIALLY
AVAILABLE REQUIRED COATINGS AVAILABLE REQUIRED COATINGS AVAILABLE REQUIRED COATINGS
APPROVED & ACCEPTABLE TO 'BGHMC. APPROVED & ACCEPTABLE TO 'BGHMC. APPROVED & ACCEPTABLE TO 'BGHMC.
W W W
LOCATION SEE CONSTRUCTION PLAN LOCATION SEE CONSTRUCTION PLAN LOCATION SEE CONSTRUCTION PLAN
4 5 6
1 WINDOW SCHEDULE
A 10 SCALE 1: 25MTS
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
A10
and documents of the architect,
whether the object for which they are THREE-STOREY BUILDING FOR
MARK ANDREW B. PINOS-AN made is executed or not. It shall be
AND MEDICAL CENTER unlawful for any person to duplicate ISOLATION ROOMS
or make copies of said documents for AS SHOWN
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
SET/S 9 SETS SET/S 1 SET/S
2 600
FIXED WINDOW : 3 EQUAL PANELS FIXED AND AWNING WINDOW :
. .
WINDOW POWDER COATED ALUMINUM FRAMING WINDOW POWDER COATED ALUMINUM FRAMING
TYPE SYSTEM WITH COMPLETE AND REQUIRED TYPE SYSTEM WITH COMPLETE AND REQUIRED
ACCESSORIES ACCESSORIES
950
500
1 900
SEALANT : SEALANT :
. .
SEALANTS SEALANTS
950
SEALANT ON JOINTS AS PER MANUFACURER SEALANT ON JOINTS AS PER MANUFACURER
SPECIFICATIOSN AND AS INSTRUCTED BY SPECIFICATIOSN AND AS INSTRUCTED BY
'BGHMC' ARCHITECTS/ENGINEERS. 'BGHMC' ARCHITECTS/ENGINEERS.
1 000
900
FFL FINISH POWDER COATED OR COMMERCIALLY FFL FINISH POWDER COATED OR COMMERCIALLY
AVAILABLE REQUIRED COATINGS AVAILABLE REQUIRED COATINGS
IW APPROVED & ACCEPTABLE TO 'BGHMC. W APPROVED & ACCEPTABLE TO 'BGHMC.
1 LOCATION SEE CONSTRUCTION PLAN 7 LOCATION SEE COMPOSITE PLAN
SEALANT : SEALANT :
2 100
. .
1 225
PROVIDE FIRST CLASS APPROPRIATE PROVIDE FIRST CLASS APPROPRIATE
SEALANTS SEALANT ON JOINTS AS PER MANUFACURER SEALANTS SEALANT ON JOINTS AS PER MANUFACURER
SPECIFICATIOSN AND AS INSTRUCTED BY SPECIFICATIOSN AND AS INSTRUCTED BY
'BGHMC' ARCHITECTS/ENGINEERS. 'BGHMC' ARCHITECTS/ENGINEERS.
1 050
GLAZING
6mm THICK TEMPERED ONE-WAY IW GLAZING 8mm THICK TEMPERED GLASS
MIRROR GLASS 2
1 200
WINDOW/DOOR FINISH : WINDOW/DOOR FINISH :
. .
800
1 WINDOW SCHEDULE
A 10a SCALE 1: 25MTS
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A10a
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
SET/S 1 SETS SET/S 3 SETS
FIXED WINDOW : FIXED AND AWNING WINDOW :
1 000 . .
WINDOW POWDER COATED ALUMINUM FRAMING WINDOW POWDER COATED ALUMINUM FRAMING
TYPE SYSTEM WITH COMPLETE AND REQUIRED
2 550
TYPE SYSTEM WITH COMPLETE AND REQUIRED
ACCESSORIES 865 865 815 ACCESSORIES
SEALANT : SEALANT :
. .
1 500
SEALANTS SEALANT ON JOINTS AS PER MANUFACURER SEALANTS SEALANT ON JOINTS AS PER MANUFACURER
SPECIFICATIOSN AND AS INSTRUCTED BY SPECIFICATIOSN AND AS INSTRUCTED BY
'BGHMC' ARCHITECTS/ENGINEERS. 'BGHMC' ARCHITECTS/ENGINEERS.
1 620
3RD FFL AVAILABLE REQUIRED COATINGS 10 AVAILABLE REQUIRED COATINGS
APPROVED & ACCEPTABLE TO 'BGHMC. APPROVED & ACCEPTABLE TO 'BGHMC.
5 900
FFL
W
900
9
2ND FFL
1 WINDOW SCHEDULE
A 10b SCALE 1: 25MTS
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A10b
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
LEGEND
C
POLISHED GRANITE SLAB
COUNTER/SIDINGS & SPLASH
A 3 750
GUARD (CUT TO ACTUAL LAYOUT)
3
4" THK. LAMINATED MARINE
PLYWOOD W/ WOOD EDGING
3
4" THK. MARINE PLYWOOD W/
WOOD EDGING - AUTOMOTIVE
600
FINISH
1
2 " THK. MARINE PLYWOOD W/
WOOD EDGING - AUTOMOTIVE
FINISH
750
B 36" FULL EXTENSION DRAWER
GUIDE
LEGEND :
CFL - CEILING FINISH LINE
TFL - FINISH FLOOR LINE
1 700
150
750
600
LEG
ROOM
LEG
ROOM
NOTES:
1. USE OF FIRST CLASS QUALITY MATERIALS/OR PRODUCTS
FOR ALL ARCHITECTURAL WORKS APPROVED AND
ACCEPTABLE TO THE 'BGHMC'. PRIOR TO
EXECUTION/INSTALLATION, SUBMIT SAMPLE FOR APPROVAL.
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A11
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
LEGEND
POLISHED GRANITE SLAB
COUNTER/SIDINGS & SPLASH
GUARD (CUT TO ACTUAL LAYOUT)
B
B 1 300 1 400 3
4" THK. LAMINATED MARINE
PLYWOOD W/ WOOD EDGING
3
4" THK. MARINE PLYWOOD W/
WOOD EDGING - AUTOMOTIVE
FINISH
600
600
1
2 " THK. MARINE PLYWOOD W/
WOOD EDGING - AUTOMOTIVE
FINISH
900
900
LEGEND :
1 650
1 650
650
2 400
2 400
2 400
650
550
400 850
600 COUNTER TOP COUNTER TOP
DESK TOP DESK TOP
850
850
750
750
LEG
100
ROOM
NOTES:
ELEVATION A SECTION B ELEVATION A SECTION B 1. USE OF FIRST CLASS QUALITY MATERIALS/OR PRODUCTS
FOR ALL ARCHITECTURAL WORKS APPROVED AND
ACCEPTABLE TO THE 'BGHMC'. PRIOR TO
EXECUTION/INSTALLATION, SUBMIT SAMPLE FOR APPROVAL.
1 WORK TABLE DETAIL 2 SINK COUNTER DETAIL 6. THIS DRAWINGS SHOULD BE READ IN CONJUNCTION WITH
RELEVANT ARCHITECTURAL/ENGINEERING DRAWINGS, ANY
DISCREPANCY NOTED SHOULD IMMEDIATELY BE BROUGHT
A 11a SCALE 1: 25MTS A 11a SCALE 1: 25MTS
TO THE NOTICE OF 'BGHMC' PRIOR TO EXECUTION.
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A11a
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
2 300 B LEGEND
POLISHED GRANITE SLAB
COUNTER/SIDINGS & SPLASH
GUARD (CUT TO ACTUAL LAYOUT)
C
600
LAB GOWN
3
B 4" THK. LAMINATED MARINE
PLYWOOD W/ WOOD EDGING
1 850
3
4" THK. MARINE PLYWOOD W/
WOOD EDGING - AUTOMOTIVE
FINISH
PLAN
A 1
2 " THK. MARINE PLYWOOD W/
WOOD EDGING - AUTOMOTIVE
FINISH
600
2" x 2" x 2mm THK. GI TUBULAR
2 300 600
1 150 1 150 STAINLESS STEEL CONCEALED
HYDRAULIC HINGE
2 400
FIRST CLASS STAINLESS STEEL
400
1 650
1 950
COUNTER MOUNTED LABORATORY
EYEWASH
150
150
FIRSTH CLASS 20mm THK.
STAINLESS STEEL PIPE
2 400
650
600
2 300 LEGEND :
1 150 1 150 CFL - CEILING FINISH LINE
TFL - FINISH FLOOR LINE
NOTE :
- INCLUDE MAGNETIC CATCHES
850
850
NOTES:
2 400
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A11b
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
600 550 550 B 550 600 550 550 B 550 LEGEND
POLISHED GRANITE SLAB
COUNTER/SIDINGS & SPLASH
GUARD (CUT TO ACTUAL LAYOUT)
C PPE CABINET
C PPE CABINET
600
600
3
4" THK. LAMINATED MARINE
PLYWOOD W/ WOOD EDGING
3
4" THK. MARINE PLYWOOD W/
WOOD EDGING - AUTOMOTIVE
FINISH
PLAN PLAN
A A 1
2 " THK. MARINE PLYWOOD W/
WOOD EDGING - AUTOMOTIVE
FINISH
450
450
GUIDE
450
450
CLASS STAINLESS STEEL FAUCET
1 950
1 950
FIRST CLASS STAINLESS STEEL
450
450
COUNTER MOUNTED LABORATORY
EYEWASH
450
SILICON SEALANT
150
150
150
FIRSTH CLASS 20mm THK.
STAINLESS STEEL PIPE
1 700 2 300
450
NOTES:
450
450
1 800
1 800
450
450
150
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A11c
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
B LEGEND
3 400
600 POLISHED GRANITE SLAB
COUNTER/SIDINGS & SPLASH
GUARD (CUT TO ACTUAL LAYOUT)
3
4" THK. LAMINATED MARINE
PLYWOOD W/ WOOD EDGING
600
3
4" THK. MARINE PLYWOOD W/
WOOD EDGING - AUTOMOTIVE
FINISH
1
2 " THK. MARINE PLYWOOD W/
WOOD EDGING - AUTOMOTIVE
FINISH
1 850
A 2" x 2" x 2mm THK. GI TUBULAR
NURSE
STATION 6" STAINLESS STEEL HANDLE
600
36" FULL EXTENSION DRAWER
GUIDE
LEGEND :
CFL - CEILING FINISH LINE
TFL - FINISH FLOOR LINE
NOTE :
fixed - INCLUDE MAGNETIC CATCHES
FOR EVERY CABINET SWING
650
650
100
100
135
140
NOTES:
645
850
850
650
750
750
105
100
2. ALL LAYOUT SHOULD BE APPROVED BY 'BGHMC' PRIOR TO
EXECUTION/INSTALLATION.
2 PPE CABINET 2 2 PPE CABINET 2 6. THIS DRAWINGS SHOULD BE READ IN CONJUNCTION WITH
RELEVANT ARCHITECTURAL/ENGINEERING DRAWINGS, ANY
DISCREPANCY NOTED SHOULD IMMEDIATELY BE BROUGHT
TO THE NOTICE OF 'BGHMC' PRIOR TO EXECUTION.
A 11c SCALE 1: 25MTS A 11c SCALE 1: 25MTS
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A11d
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH
41 800
6 075 3 325 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
2 100 2 475 1 500 1 500 1 825 1 775 1 500 2 700 350 1 275 4 800
CRASH HANDRAIL
CORNER GUARD
CRASH RAIL
J
Dn
Ramp Up
Ramp Dn
2 200
2 200
PERSONNEL ACCESS PERSONNEL ACCESS
Up
H
675
675
CR CR CR
CHR
ANTE ROOM
LAB GOWN
CG
COMMON
CR
ENSUITE
ENSUITE
LOUNGE
T&B
T&B
1 750
G'
1 350
ELEVATOR
BED
D
CR
CR
4 300
ROA
CR
3 625
BEDROOM
BEDROOM
CR
1 875
ITAL
STATION
AIRLOCK
AIRLOCK
NURSE
PPE
1 350
CR
G
CG
CR
CR
HOSP
700
CHR
CHR CHR CHR CHR CHR CHR
CHR
ENTRANCE
2 500
Y A W L L A H
CHR
4 200
4 200
CG
CG
CHR CHR CHR CHR CHR
CR
1 000
CHR
F
CHANGING
CHANGING
CHANGING
CR
AIRLOCK
AIRLOCK
AIRLOCK
STAFF
STAFF
STAFF
ROOM
ROOM
ROOM
CR
CR
22 750
1 300
4 000
Y
CR
CR
AIRLOCK
AIRLOCK
AIRLOCK
UTILITIY
UTILITIY
UTILITIY
DIRTY
DIRTY
DIRTY
2 700
CR
W
CR
CR
L
E
CR CR CR
CHR
CG
L
RS
1 725
GOING FROM
DELTA E.R.
CR
ACCESS
CHR
3 000
H
CG
CG
EXISTING INFECTIOUS
BEDROOM
BEDROOM
BEDROOM
DESEASE BUILDING
CR
CR
4 300
CR
CR
CR
CR
B C D
2 575
ENSUITE
ENSUITE
ENSUITE
T&B
T&B
T&B
250 1 300
CR CR CR CR
250
GROUND FLOOR
CHR
GARBAGE
CHUTE
Dn
ELECTRICAL
ROOM
3 500
3 500
& WASTE HOLDING AREA
DECONTAMINATION
CHR
Up
STORAGE
CHR
EXIT
CHR CHR
SCALE
A
EMERGENCY
A 12
EXIT
1
200mm STRUCTURAL GAP
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
A12
and documents of the architect,
whether the object for which they are THREE-STOREY BUILDING FOR
MARK ANDREW B. PINOS-AN made is executed or not. It shall be
AND MEDICAL CENTER unlawful for any person to duplicate ISOLATION ROOMS
or make copies of said documents for AS SHOWN
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
NORTH 6 075 3 325 3 275 3 050 6 075
41 800
200 2 950 1 850 3 750 3 750 3 750 3 750
2 100 2 475 1 500 1 500 1 825 1 775 1 500 2 700 350 1 275 4 800
CRASH HANDRAIL
CORNER GUARD
CRASH RAIL
J
Dn
2 200
2 200
ROOF
Up
H
675
675
CR CR CR
ANTE ROOM
LAB GOWN
DOCTORS'
ENSUITE
ENSUITE
LOUNGE
T&B
T&B
1 750
G'
ELEVATOR
CHR
BED
CG
CR
CR
4 300
CR
BEDROOM
BEDROOM
3 625
CR
CR
1 875
STATION
AIRLOCK
AIRLOCK
NURSE
PPE
CHR
G
CR
CR
700
CG
CG
CHR CHR CHR CHR CHR CHR
CHR
2 500
Y A W L L A H
4 200
4 200
CHR
CG
CG
CHR CHR CHR
CG
CR
1 000
CHR
F
CHANGING
CHANGING
CHANGING
CR
AIRLOCK
AIRLOCK
AIRLOCK
STAFF
STAFF
STAFF
ROOM
ROOM
ROOM
CR
RS
22 750
22 750
1 300
4 000
4 000
Y
CR
AIRLOCK
AIRLOCK
AIRLOCK
UTILITIY
UTILITIY
UTILITIY
DIRTY
DIRTY
DIRTY
2 700
CR
W
CR
CR
CHR
ROOF
E
CR RS CR
CHR
1 725
3 000
H
CG
CG
EXISTING INFECTIOUS
BEDROOM
BEDROOM
BEDROOM
DESEASE BUILDING
CR
CR
4 300
CR
CR
CR
CR
B C D
2 575
ENSUITE
ENSUITE
ENSUITE
T&B
T&B
T&B
250 1 300
CR CR CR CR
250
GARBAGE
CHUTE
SECOND FLOOR
& WASTE HOLDING AREA
Dn
DECONTAMINATION
ELECTRICAL
ROOM
3 500
3 500
CHR
Up
CHR
A
A 12a SCALE
1
200mm STRUCTURAL GAP
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
A12a
and documents of the architect,
whether the object for which they are THREE-STOREY BUILDING FOR
MARK ANDREW B. PINOS-AN made is executed or not. It shall be
AND MEDICAL CENTER unlawful for any person to duplicate ISOLATION ROOMS
or make copies of said documents for AS SHOWN
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
41 800
6 075 3 325 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
2 100 2 475 1 500 1 500 1 825 1 775 1 500 2 700 350 1 275 4 800
CRASH HANDRAIL
CORNER GUARD
CRASH RAIL
J
Dn
NORTH
2 200
2 200
Up
H
675
675
LAB GOWN
ELEVATOR
1 750
G'
BED
CHR
CG
CR
4 300
STATION
CR
NURSE
3 625
7 BED WARDS
CR
ANTE ROOM
1 875
PPE
PPE
CG
CR
G
CR
700
CG
SHOWER
SHOWER
ELEVATOR LOBBY
CG
CHR CHR CHR
CR
CR
CHR
2 500
ROOM
Y A W L L A H
4 200
4 200
ANTE
CR
CR
CR
SHOWER
SHOWER
WC
WC
TOILET 1
TOILET 2
CHR CHR
CG
CG
CR
1 000
SINK
SINK
ROOM
CHR
ANTE
CG
SHOWER
CHR
TOILET
F
CR
CG
22 750
22 750
1 300
CR
CHR
4 000
4 000
Y
CR
CR
W
15 BED WARDS
L
E
L
1 725
8 BED-WARDS
250mm STRUCTURAL GAP
CR
3 000
CR
H
CHR
CR
B C D
2 575
CR
CR
CHR
250 1 300
CR CR CR CR
250
ELECTRICAL
Dn
ROOM
CR CR
THIRD FLOOR
3 500
3 500
& WASTE HOLDING
DECONTAMINATION
GARBAGE
CHUTE
CHR
A
SCALE
200mm STRUCTURAL GAP
6 075
A 12b
1
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
A12b
and documents of the architect,
whether the object for which they are THREE-STOREY BUILDING FOR
MARK ANDREW B. PINOS-AN made is executed or not. It shall be
AND MEDICAL CENTER unlawful for any person to duplicate ISOLATION ROOMS
or make copies of said documents for AS SHOWN
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
ALUMINUM RETAINER, TYP.
PVC BASEBOARD
ADHESIVE
VINYL TILE
VINYL COVER, TYP.
ADHESIVE
1
2" DIAMETER
CAPPING SEAL
FASTENER BY OTHERS
ANTI-STATIC
RUBBER FILLER VINYL SHEET
IMPACT CUSHION
ADHESIVE
ALUMINUM RETAINER
FASTENER BY OTHERS
LEVELING COMPOUND 3mm PRIMER
MOUNTING BRACKET
3 CRASH RAIL SECTION 4 CRASH HANDRAIL SECTION 5 VINYL SHEET WITH COVE
A 12c SCALE NTS A 12c SCALE NTS A 12c SCALE NTS
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER MARK ANDREW B. PINOS-AN
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be
unlawful for any person to duplicate
or make copies of said documents for
THREE-STOREY BUILDING FOR
ISOLATION ROOMS
AS SHOWN
A12c
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
500mm x 500mm 2mm THK STUDDED
F-12
F-1
1 804 1 500
200mm x 200mm NON-SKID CONCRETE
RUBBER-MODIFIED ACRYLIC FINISH
J
SEMI-GLOSS CHLORINATED
Dn
F-6a
F-6b
F-6b
Ramp Dn
2 200
2 200
F-10
F-2
PERSONNEL ACCESS
F-2
WAFFLE TILES
F-7
Up
H
675
675
1:100 MTS
GROUND FLOOR FINISH LAYOUT
F-2
F-10
F-7
F-7
ELEVATOR
F-7
F-8
1 750
G'
F-2
BED
F-7
D
4 300
3 625
F-2
F-2
L RO
1 875
F-2
F-2
F-2
F-2
PITA
F-2
300mm x 300mm NON-SKID PORCELAIN
F-7
FLOOR TILE with ANTI-SLIP GROOVES
G
METALLIC EPOXY CR FLOOR FINISH
700
HOS
F-2
F-2
2 500
F-2
4 200
4 200
FLOOR TILE
FINISH
1 000
F
F-6b
F-6a
F-2
F-7
F-2
F-7
F-7
F-7
22 750
22 750
1 300
F-11
4 000
4 000
F-2
F-2
F-2
F-2
F-2
F-2
2 700
300mm x 600mm NON-SKID PORCELAIN
FLOOR TILE with ANTI-SLIP GROOVES
F-2
E
600mm x 600mm PORCELAIN
1 725
FLOOR TILE FINISH
F-6b
F-11
3 000
(PROPOSED DELTA E.R.)
EXISTING INFECTIOUS
DESEASE BUILDING
F-2
F-2
F-2
4 300
FINISH
B C D
2 575
F-7
F-7
F-7
250 1 300
F-5a
F-6
250
Dn
F-2
F-2
SCALE
F-6b
F-6b
F-6a
F-2
3 500
3 500
CERAMIC FLOOR TILE FINISH
Up
A
A 13
1
F-4a
F-4
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
A13
and documents of the architect,
whether the object for which they are THREE-STOREY BUILDING FOR
MARK ANDREW B. PINOS-AN made is executed or not. It shall be
AND MEDICAL CENTER unlawful for any person to duplicate ISOLATION ROOMS
or make copies of said documents for AS SHOWN
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
500mm x 500mm 2mm THK STUDDED
F-12
F-1
200mm x 200mm NON-SKID CONCRETE
RUBBER-MODIFIED ACRYLIC FINISH
Dn
SEMI-GLOSS CHLORINATED
F-6a
F-6b
F-6b
2 200
2 200
ROOF
F-2
F-2
F-7
Up
H
WAFFLE TILES
675
675
F-2
F-7
F-7
ELEVATOR
F-2
BED
F-7
F-10
F-8
4 300
3 625
F-2
F-2
1 875
F-2
F-2
F-2
F-2
F-7
G
700
300mm x 300mm NON-SKID PORCELAIN
F-2
F-2
2 500
F-2
4 200
4 200
FLOOR TILE
1 000
FINISH
F-2
F
F-2
F-2
F-7
F-7
F-7
22 750
22 750
1 300
F-6b
F-6a
F-7
4 000
4 000
F-2
F-2
F-2
F-2
F-2
F-2
2 700
300mm x 600mm NON-SKID PORCELAIN
ROOF
E
FLOOR TILE with ANTI-SLIP GROOVES
F-2
1 725
600mm x 600mm PORCELAIN
3 000
(PROPOSED DELTA E.R.)
EXISTING INFECTIOUS
F-2
FLOOR TILE FINISH
DESEASE BUILDING
F-2
F-2
4 300
B C D
2 575
F-7
F-7
F-7
FINISH
250 1 300
F-5a
F-6
250
Dn
F-2
F-2
F-6b
F-6b
F-6a
3 500
3 500
SCALE
Up
CERAMIC FLOOR TILE FINISH
A 13a
1
F-4a
F-4
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800
F-2a
LEGEND:
F-2
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
A13a
and documents of the architect,
whether the object for which they are THREE-STOREY BUILDING FOR
MARK ANDREW B. PINOS-AN made is executed or not. It shall be
AND MEDICAL CENTER unlawful for any person to duplicate ISOLATION ROOMS
or make copies of said documents for AS SHOWN
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
500mm x 500mm 2mm THK STUDDED
F-12
F-1
200mm x 200mm NON-SKID CONCRETE
RUBBER-MODIFIED ACRYLIC FINISH
J
SEMI-GLOSS CHLORINATED
F-6a
F-6b
F-6b
2 200
2 200
F-1
F-7
WAFFLE TILES
Up
H
F-1
675
675
1:100 MTS
THIRD FLOOR FINISH LAYOUT
ELEVATOR
F-7
F-10
F-8
1 750
G'
BED
4 300
F-1
3 625
F-1
1 875
F-7
F-1
F-1
300mm x 300mm NON-SKID PORCELAIN
G
FLOOR TILE with ANTI-SLIP GROOVES
700
F-7
F-7
F-1
F-1
2 500
F-1
4 200
4 200
F-1
FLOOR TILE
F-7
F-7
FINISH
1 000
F-1
F
F-7
F-7
F-6b
F-6a
F-7
22 750
22 750
1 300
4 000
4 000
2 700
300mm x 600mm NON-SKID PORCELAIN
F-1
FLOOR TILE with ANTI-SLIP GROOVES
E
600mm x 600mm PORCELAIN
F-1
1 725
F-1
FLOOR TILE FINISH
F-1
3 000
(PROPOSED DELTA E.R.)
EXISTING INFECTIOUS
DESEASE BUILDING
4 300
FINISH
B C D
2 575
250 1 300
F-5a
F-6
250
SCALE
Dn
F-2
F-6b
F-6b
F-6a
3 500
3 500
CERAMIC FLOOR TILE FINISH
F-1
400mm x 400mm POLISHED
A 13b
300mm x 300mm NON-SKID
1
A
F-4a
F-4
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800
F-2a
LEGEND:
F-2
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
A13b
and documents of the architect,
whether the object for which they are THREE-STOREY BUILDING FOR
MARK ANDREW B. PINOS-AN made is executed or not. It shall be
AND MEDICAL CENTER unlawful for any person to duplicate ISOLATION ROOMS
or make copies of said documents for AS SHOWN
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
500mm x 500mm 2mm THK STUDDED
F-12
F-1
200mm x 200mm NON-SKID CONCRETE
RUBBER-MODIFIED ACRYLIC FINISH
J
SEMI-GLOSS CHLORINATED
Dn
F-6a
F-6b
F-6b
2 200
2 200
1:100 MTS
ROOF DECK FLOOR FINISH LAYOUT
WAFFLE TILES
H
675
675
G'
F-10
F-8
F-8
3 625
3 625
G
300mm x 300mm NON-SKID PORCELAIN
4 200
4 200
FLOOR TILE
FINISH
F-7
22 750
22 750
4 000
4 000
300mm x 600mm NON-SKID PORCELAIN
FLOOR TILE with ANTI-SLIP GROOVES
E
600mm x 600mm PORCELAIN
3 000
3 000
FLOOR TILE FINISH
B C D
250 1 300
250 1 300
F-5a
F-6
Dn
SCALE
F-6b
F-6b
F-6a
3 500
3 500
F-8
CERAMIC FLOOR TILE FINISH
A 13c
1
F-4a
F-4
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800
F-2a
LEGEND:
F-2
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES ARCHITECT OF RECORD Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL
A13c
and documents of the architect,
whether the object for which they are THREE-STOREY BUILDING FOR
MARK ANDREW B. PINOS-AN made is executed or not. It shall be
AND MEDICAL CENTER unlawful for any person to duplicate ISOLATION ROOMS
or make copies of said documents for AS SHOWN
LOCATION
use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA, JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer OIC,Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
author of said documents. Baguio General Hospital & Medical Center Chief Administrative Office - HOPSS Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
GENERAL NOTES :
1. ALL WORKS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE PHILIPPINE 9. WIRING DEVICES SHALL HAVE MINIMUM RATING OF 10 AMPERES, 250 VOLTS.
ELECTRICAL CODE, THE LOCAL ORDINANCES, THE RULES AND REGULATIONS OF THE
10. LIGHTING FIXTURES SHALL CONFORM WITH THE SCHEDULE AS PREPARED BY THE ARCHITECT.
LOCAL ENFORCING AUTHORITY, AND THE REQUIREMENTS OF THE LOCAL POWER COMPANY.
2. ALL WORKS HEREIN SHALL BE DIRECTLY SUPERVISED BY A DULY LICENSED ELECTRICAL 11. PANELBOARDS SHALL CONFORM TO THE LOAD SCHEDULE AS SHOWN ON PLANS WITH RESPECT
ENGINEER AS ENFORCED BY THE NEW ELECTRICAL ENGINEERING LAW OR R.A. 7920. TO BREAKER PHASE ARRANGEMENT, RATING, CAPACITY AND SHORT CIRCUIT CONSIDERATION.
3. ALL WORKS HEREIN SHALL BE DONE IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.
12. FIRE ALARM DEVICES SHALL COMPLY WITH THE NFPA PROVISIONS AND SHALL BEAR THE "UL"
4. ALL MATERIALS TO BE USED SHALL BE BRAND NEW, OF THE BEST QUALITY AND OF THE APPROVED
STANDARD MARK.
TYPE AND SHALL BEAR THE MANUFACTURER'S NAME INCLUDING THE "PSA" MARK. PULL BOXES
SHALL BE PROVIDED IN APPROPRIATE AREAS EVEN IF NOT INDICATED IN THE PLAN. 13. ALL NON-CURRENT CARRYING METALLIC PARTS, CABINETS AND EQUIPMENT FRAMES SHALL BE
5. POWER SUPPLY TO THE BUILDING SHALL BE 3 PHASE, 3-WIRE, 230 VOLTS. PROPERLY GROUNDED IN ACCORDANCE WITH THE GROUNDING REQUIREMENTS OF THE
LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE.
6. RACEWAY SCHEDULE SHALL BE AS FOLLOWS:
A. CONCRETE PEDESTAL TO MDP - UPVC PIPE SCHEDULE 40. 14. MOUNTING HEIGHTS SHALL BE AS FOLLOWS:
B. MDP TO DISTRIBUTION PANELBOARDS - RSC. MAGNETIC LOCK, DOUBLE DOOR,
A. WALL SWITCHES 1400 MM AFF TO CENTER OF DEVICE MAGNETIC LOCK
C. BRANCH CIRCUITS FOR POWER, LIGHTING AND AUXILIARY 12 VOLTS
B. WALL OUTLETS 300 MM AFF TO CENTER OF DEVICE
MINIMUM SIZE OF RACEWAY SHALL BE 15 MM. DIAMETER.
C. COUNTERTOP OUTLETS 150 MM TOP OF COUNTER TO CENTER OF DEVICE BUTTON EXIT BUTTON SENSOR, CONTACTLESS
D. INTERCOM OUTLETS 1400 MM AFF TO CENTER OF BOX
7. OUTLET BOXES SHALL HAVE A MINIMUM THICKNESS OF GA. # 16 WITH 1/2 KO AND SHALL BE
E. CONTROL CABINETS 1500 MM AFF TO TOP OF ENCLOSURE (VERTICAL)
PAINTED WITH RED LEAD PAINT PRIOR TO INSTALLATION. UPS WALL-MOUNTED UPS, 12 VOLTS
F. MANUAL STATION 1400 MM AFF TO CENTER OF DEVICE
G. BELL 200 MM BELOW BEAM OR FINISHED CEILING
8. WIRES AND CABLES SHALL BE OF THE APPROVED TYPE AND BEARING THE "PS" MARK UNLESS
H. EMERGENCY LIGHT 300 MM BELOW BEAM OR FINISHED CEILING ACCESS CONTROL TERMINAL,
SPECIFIED OR INDICATED OTHERWISE. ALL POWER AND LIGHTING CONDUCTORS SHALL BE
I. EXIT LIGHT 150 MM ABOVE DOOR JAMB FACE AND FINGERPRINT
INSULATED FOR 600 VOLTS MINIMUM. ACCESS CONTROL
VERIFICATION
LEGEND : sa SINGLE GANG SWITCH OVEN ELECTRIC OVEN OUTLET SD SMOKE DETECTOR
TIGHT , 4000K DAYLIGHT, 220V LIGHTING TYPE EXHAUST FAN PB TELEPHONE JACK
PANEL BOARD T
FIXTURE w/ ALUMINUM LOUVERS
CCTV
BULLET
BULLET TYPE CCTV CAMERA
VERTICAL DOWNLIGHT RECESSED TYPE 12W OVAL LED BUNKER WALL LIGHT with Dx2 DATA JACK OUTLET (2-GANG)
VERTICAL DOWNLIGHT RECESSED TYPE 150mm Ø WHITE , 220V with 5W LED BULB TAMPER PROOF CASEMENT - WARM WHITE, SPEAKER
150mm Ø WHITE , 220V with 7W LED BULB DAYLIGHT LIGHTING FIXTURE 50,000Hrs SP
ACCESS POINT
DAYLIGHT LIGHTING FIXTURE
18W (120mm) LED TUBE WALL LIGHT with 150W LED HIGH BAY LIGHT
EXHAUST SPECIAL LAMP HOLDER & WALL CASEMENT - WALL-MOUNTED VOICE OVER HBL PENDANT TYPE INDUSTRIAL, UFO
LED PANEL, ROUND DOWNLIGHT SURFACE TYPE INTERNET PROTOCOL (VOIP) HIGH EFFICIENCY
150mm Ø WHITE , 220V with 12W LED STRIP WARM WHITE, 50,000Hrs L85B15
IP PHONE PHONE UNIT 480W, 24.25'' x 24.25'' x11.42''
DAYLIGHT, CLEAN ROOM RATED CR EXHAUST
INDUSTRIAL TYPE WALL-MOUNTED
DC UNIVERSAL SERVER RACK, 42U EXHAUST VENTILATOR FAN, HEAVY
VERTICAL DOWNLIGHT SUFACE TYPE DUTY WITH METAL FRAME, GRILL
150mm Ø WHITE , 220V with 12W LED BULB WALL-MOUNTED DATA
DATA AND G.I SHEET HOOD,
DAYLIGHT LIGHTING FIXTURE CABINET CABINET FOR FIBER OPTIC
(9U) CONTROLLED NOISE, 3-BLADE,
SYSTEM, 9U, 600mm x 600mm x
10030 Cu. METER/ HOUR AIR
19" (WxDxH)
DELIVERY, 60 Hz- 220VAC
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES PREPARED BY: Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
BAGUIO GENERAL HOSPITAL COMPLETION OF BGHMC
E-2
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be THREE-STOREY BUILDING FOR ISOLATION ROOMS
AND MEDICAL CENTER unlawful for any person to duplicate
or make copies of said documents for AS SHOWN
LOCATION
DARYL M. PADILAN, EE use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
Administrative Assistant III, EFMO - HOPSS executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer, HOPSS OIC, Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
Baguio General Hospital & Medical Center author of said documents. Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
6 6 5 4 3 2 1'
APEX LINE
ROOF APEX LINE
STAIR
ROOF DECK FFL ROOF DECK LANDING
ELEV ± 12.0 M
THIRD FCL
TO WATER HEATER AND OTHER
SPECIAL PURPOSE LOADS
BUSBAR CONNECTED
PC
EX
REN
TO
SIN
O
LADS
5SETS OF 3- 80.0 sq. mm. THHN/ THWN Cu. WIRES
1 RISER DIAGRAM + 1 - 50.0 sq. mm. THHN/ THWN Cu. WIRE (GREEN)
IN 20 CM x 40 CM FACTORY FABRICATED CABLE TRAY
D
O
LIBADS
E 14 SCALE 1:100 MTS
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES PREPARED BY: Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
BAGUIO GENERAL HOSPITAL COMPLETION OF BGHMC
E-14
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be THREE-STOREY BUILDING FOR ISOLATION ROOMS
AND MEDICAL CENTER unlawful for any person to duplicate
or make copies of said documents for AS SHOWN
LOCATION
DARYL M. PADILAN, EE use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
Administrative Assistant III, EFMO - HOPSS executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer, HOPSS OIC, Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
Baguio General Hospital & Medical Center author of said documents. Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
A B C D E F G G' H J
22 750
3 500 250 4 300 4 000 4 200 4 300 2 200
2 575 1 725 2 700 1 300 1 000 2 500 700 1 875 1 750 675
NORTH
BAGUIO CITY
5 St
2 AIRLOCK 4 ENSUITE
f PB3 AIRLOCK
2 100
DEPARTMENT OF HEALTH
BEDROOM DIRTY Si Su
UTILITIY
4 575
v w
1 500
1 500
l l r
Sl Sab
ENSUITE
2 AIRLOCK
T&B
ENSUITE x y
AIRLOCK
1 500
1 500
T&Bs
e' e' t n t Sx Sy
Ss Spqr s
Stn
3 325
3 Sab
g
1 825
1 825
AIRLOCK
PREPARED BY:
p p a b
v r
Sg BEDROOM
DARYL M. PADILAN, EE
4 Svw
r q DIRTY x
1 775
w o p
UTILITIY
3 275
3 275
Up Dn ROOM
d' Sq q
v x
1 500
r q c
3WSm 3WSd'e' d
Y
Sc Sd
26 800
3WSno3WSa'b' r Sr
A
5 PPE
r
LAB GOWN
W
H A L L W A Y
ANTE ROOM
RA 9266 SECTION 33
o n n e
PB3 3WSno f
350
3 3WSvz
H
6 Skl Sh Si 3WStu
PB3 t t
r
1 275
Sbcd ENSUITE h
AIRLOCK
6 Up Dn
T&Be
b b k l k i
Se Sfg h
NURSE DOCTORS'
STATION LOUNGE
s
c c
STAFF
DECONTAMINATION Sk CHANGING h i
6 075
6 075
Sk Sm
LOCATION
b DIRTY
b BEDROOM UTILITIY r u
Sj
PROJECT TITLE
GARBAGE j k e m
COMPLETION OF BGHMC
AIRLOCK
j
CHUTE g f Sj Se
41 800
41 800
c i
200
200
7 Spq
p q
2 950
2 950
8 ELEVATOR
ROOF q
p
1 850
1 850
10
AS SHOWN
SHEET CONTENTS
3 750
3 750
11 ROOF
3 750
3 750
EXISTING INFECTIOUS
DESEASE BUILDING
CHECKED
15 000
13
3 750
3 750
14
VILMA O. MOLTIO, MPA
RECOMMENDING APPROVAL
ALUMINUM LOUVERS
CEILING FINISH INDICATOR 5. EVERY DIMENSION SHALL BE
RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
1 SP 13 WH
PB3
BAGUIO CITY
PB4
AIRLOCK 10 ENSUITE
PB3 AIRLOCK
T&B
2 100
3
7 PB4
DEPARTMENT OF HEALTH
BEDROOM DIRTY
UTILITIY
4 575
BEDROOM PB4
PB4 6
1' 9
ENSUITE
MP2 PB4 PB3
ELECTRICAL T&B SP
PB4 AIRLOCK
1 500
1 500
1 PB4 2ROOM WH
SP SP
WH WH
ENSUITE
2 PB4
8 AIRLOCK
PB4 T&B
ENSUITE
10 AIRLOCK
1 500
1 500
T&B PB3 14
1 825
1 825
AIRLOCK
PREPARED BY:
ABOVE FLOOR FINISH
BEDROOM
MOUNT OUTLET AT 1400MM
DARYL M. PADILAN, EE
4 WH
DIRTY
3 275
3 275
Up Dn ROOM 7
4 PB4
1 500
SP PB4 16
Y
WH
26 800
A
5 PPE
13 PB3 LAB GOWN
W
H A L L W A Y
3 050
3 050
RA 9266 SECTION 33
11
11 PB3
350
PB4
12
H
6
WH
1 275
ENSUITE
AIRLOCK Up Dn
T&B
NURSE DOCTORS'
STATION LOUNGE
17 PB4
ABOVE FLOOR FINISH
MOUNT OUTLET AT 1400MM
SP
STAFF
PB4
DECONTAMINATION 12 8
CHANGING
6 075
6 075
PB4
& WASTE HOLDING AREA ROOM
SP
ABOVE FLOOR FINISH
4 800
WH
LOCATION
DIRTY
BEDROOM UTILITIY
PROJECT TITLE
PB3
9 5 PB4
GARBAGE
COMPLETION OF BGHMC
AIRLOCK
CHUTE
41 800
41 800
200
200
2 950
2 950
8 ELEVATOR
ROOF
1 850
1 850
10
AS SHOWN
SHEET CONTENTS
3 750
3 750
11 ROOF
3 750
3 750
EXISTING INFECTIOUS
DESEASE BUILDING
CHECKED
15 000
13
3 750
3 750
14
VILMA O. MOLTIO, MPA
RECOMMENDING APPROVAL
ALUMINUM LOUVERS
CEILING FINISH INDICATOR 5. EVERY DIMENSION SHALL BE
RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
APEX LINE
ROOF APEX LINE
STAIR
ROOF DECK FFL ROOF DECK LANDING
ELEV ± 12.0 M
THIRD FCL
TO WATER HEATER AND OTHER
SPECIAL PURPOSE LOADS
BUSBAR CONNECTED
PC
EX
REN
TO
SIN
O
LADS
1 RISER DIAGRAM D
O
LIBADS
E 14 SCALE 1:100 MTS
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES PREPARED BY: Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
BAGUIO GENERAL HOSPITAL COMPLETION OF BGHMC
E-14
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be THREE-STOREY BUILDING FOR ISOLATION ROOMS
AND MEDICAL CENTER unlawful for any person to duplicate
or make copies of said documents for AS SHOWN
LOCATION
DARYL M. PADILAN, EE use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
Administrative Assistant III, EFMO - HOPSS executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer, HOPSS OIC, Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
Baguio General Hospital & Medical Center author of said documents. Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
41 800
6 075 3 325 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
2 100 2 475 1 500 1 500 1 825 1 775 1 500 2 700 350 1 275 4 800
1:100 MTS
J
Dn
3WSvz
v
NORTH 2 200
2 200
PB5
a
h
Up
Sa
Sh
5
z
H
S
675
675
PB5
Sf
6
f
b
ELEVATOR
i
e
e
m
p
1 750
l
p
k
G'
BED
Sde
m
l
4 300
STATION
Sb
NURSE
Si
3 625
d
Sg
7 BED WARDS
ANTE ROOM
m
l
o
1 875
l
o
g
PPE
c
c
j
Slm
Sp'q'
Sj
e
e
Sk
G
Sc
S
700
Snop
q'
q'
SHOWER
SHOWER
S
ELEVATOR LOBBY
n
3WSn'o'
c'
Sc'
o'
n'
n'
o'
n'
2 500
Y A W L L A H
ROOM
4 200
4 200
ANTE
3WSn'o'
SHOWER
SHOWER
WC
WC
TOILET 1
TOILET 2
p'
p'
c'
S
q
q
S
l'
1 000
S SINK
SINK
ROOM
Sq
ANTE
PB5
3WSl'm'
SHOWER
S TOILET
F
Sj'k'
Srst
22 750
22 750
Sf'g'
Sh'i'
1 300
Ss't'u'
S
m'
j'
s
i'
r
t
4 000
4 000
s'
u'
t'
f'
Y
2 700
A
h'
l'
W
15 BED WARDS
s'
u'
t'
L
k'
t
s
E
g'
L
m'
1 725
8 BED-WARDS
h'
250mm STRUCTURAL GAP
3 000
H
u'
t'
j'
i'
l'
s'
f'
s
r
t
B C D
2 575
PB5
250 1 300
2
s'
u'
t'
m'
250
1
PB5
a'
ELECTRICALr'
3WSd'e' 3WSa'b'
Dn
PB5
ROOM
3
b'
l'
3 500
3 500
Sr'
PB5
SCALE
3WSl'm'
PB6
w'
v'
w'
v'
a'
Sv'w'
DECONTAMINATION
GARBAGE
MP3
CHUTE
r'
A
5
6 075
1
E
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES PREPARED BY: Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
BAGUIO GENERAL HOSPITAL COMPLETION OF BGHMC
E-5
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be THREE-STOREY BUILDING FOR ISOLATION ROOMS
AND MEDICAL CENTER unlawful for any person to duplicate
or make copies of said documents for AS SHOWN
LOCATION
DARYL M. PADILAN, EE use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
Administrative Assistant III, EFMO - HOPSS executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer, HOPSS OIC, Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
Baguio General Hospital & Medical Center author of said documents. Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
41 800
6 075 3 325 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
2 100 2 475 1 500 1 500 1 825 1 775 1 500 2 700 350 1 275 4 800
SP
Dn
MOUNT OUTLET AT 300MM
NORTH 2 200
2 200
BELOW BEAM OR CEILING FINISH
PB6
14
Up
PB6
WH
7
H
675
675
LAB GOWN
15
WH
PB6
ELEVATOR
1 750
G'
PB6
1:100 MTS
4 300
STATION
NURSE
3 625
7 BED WARDS
SP
ANTE ROOM
1 875
15
PB6
PPE
PB5
SP
16
6
G
PB5
MOUNT OUTLET AT 300MM
BELOW BEAM OR CEILING FINISH
WH
700
SHOWER
12SHOWER
SP
ELEVATOR LOBBY
5
PB6
PB6
16
MOUNT OUTLET AT 300MM
WH
WH
BELOW BEAM OR CEILING FINISH
11
PB6
PB5
2 500
Y A W L L A H
ROOM
4 200
4 200
ANTE
14
WH SHOWER
SHOWER
WC
WC
1
10 2
PB6
TOILET
TOILET
WH
9
1 000
SINK
SINK
ROOM
ANTE
WH
PB6
SHOWER
TOILET
F
22 750
22 750
1 300
13
PB6
4 000
4 000
Y
2 700
A
W
15 BED WARDS
L
E
L
1 725
8 BED-WARDS
250mm STRUCTURAL GAP
3 000
H
PB5
7
B C D
2 575
PB5
8
PB5
10
250 1 300
SP
PB6
3
250
PB6
PB5
PB5
4
12
9
ELECTRICAL
SP
PB5
2 ROOM
SCALE
3 500
3 500
SP
13
PB6
11
PB6
PB5
& WASTE HOLDING
PB5
MOUNT OUTLET AT 1400MM
SP
GARBAGE
MP3
CHUTE
PB6 1
A
6
1
200mm STRUCTURAL GAP
6 075
E
4 575 1 500 1 500 1 825 3 275 3 050 6 075 200 2 950 1 850 3 750 3 750 3 750 3 750
26 800 15 000
41 800
10
11
12
13
14
1'
1
2
3
7
8
9
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES PREPARED BY: Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property
BAGUIO GENERAL HOSPITAL COMPLETION OF BGHMC
E-6
and documents of the architect,
whether the object for which they are
made is executed or not. It shall be THREE-STOREY BUILDING FOR ISOLATION ROOMS
AND MEDICAL CENTER unlawful for any person to duplicate
or make copies of said documents for AS SHOWN
LOCATION
DARYL M. PADILAN, EE use in the repetition of and for other RICHIE RHEY R. DIRIGE, CE VILMA O. MOLTIO, MPA LARRY C. HAYA JR., MD, DPCP RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESE
BAGUIO CITY projects or buildings, whether
BGHMC Compound, Baguio City
Administrative Assistant III, EFMO - HOPSS executed partly or in whole, without Engineer IV, Head EFMO - HOPSS Chief Administrative Officer, HOPSS OIC, Chief of Medical Professional Staff Medical Center Chief II
CORDILLERA ADMINISTRATIVE REGION the written consent of the architect or Cordillera Administrative Region
Baguio General Hospital & Medical Center author of said documents. Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center Baguio General Hospital & Medical Center
GENERAL NOTES :
1. ALL WORKS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE PHILIPPINE ELECTRONICS CODE (RA 12. FIRE ALARM DEVICES SHALL COMPLY WITH THE NFPA PROVISIONS AND SHALL BEAR THE "UL" STANDARD
9292), THE PHILIPPINE ELECTRICAL CODE (RA 7920), THE LOCAL ORDINANCES, THE RULES AND REGULATIONS MARK.
OF THE LOCAL ENFORCING AUTHORITY, AND THE REQUIREMENTS OF THE LOCAL POWER COMPANY.
13. ALL NON-CURRENT CARRYING METALLIC PARTS, CABINETS AND EQUIPMENT FRAMES SHALL BE PROPERLY
2. ALL WORKS HEREIN SHALL BE DIRECTLY SUPERVISED BY A DULY LICENSED ELECTRONICS ENGINEER OR A DULY GROUNDED IN ACCORDANCE WITH THE GROUNDING REQUIREMENTS OF THE LATEST EDITION OF THE
LICENSED ELECTRICAL ENGINEER AS ENFORCED BY THE NEW ELECTRICAL ENGINEERING LAW OR R.A. 7920. PHILIPPINE ELECTRICAL CODE.
3. ALL WORKS HEREIN SHALL BE DONE IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS. 14. MOUNTING HEIGHTS SHALL BE AS FOLLOWS:
4. ALL MATERIALS TO BE USED SHALL BE BRAND NEW, OF THE BEST QUALITY AND OF THE APPROVED TYPE AND A. WALL SWITCHES 1400 MM AFF TO CENTER OF DEVICE
SHALL BEAR THE MANUFACTURER'S NAME INCLUDING THE "PSA" MARK. PULL BOXES SHALL BE PROVIDED IN B. WALL OUTLETS 300 MM AFF TO CENTER OF DEVICE
APPROPRIATE AREAS EVEN IF NOT INDICATED IN THE PLAN. C. COUNTERTOP OUTLETS 150 MM TOP OF COUNTER TO CENTER OF DEVICE
D. INTERCOM OUTLETS 1400 MM AFF TO CENTER OF BOX
5. POWER SUPPLY TO THE BUILDING SHALL BE 3 PHASE, 3-WIRE, 230 VOLTS. E. CONTROL CABINETS 1500 MM AFF TO TOP OF ENCLOSURE (VERTICAL)
F. MANUAL STATION 1400 MM AFF TO CENTER OF DEVICE
6. RACEWAY SCHEDULE SHALL BE AS FOLLOWS: G. BELL 200 MM BELOW BEAM OR FINISHED CEILING
A. CONCRETE PEDESTAL TO MDP - UPVC PIPE SCHEDULE 40. H. EMERGENCY LIGHT 300 MM BELOW BEAM OR FINISHED CEILING
B. MDP TO DISTRIBUTION PANELBOARDS - RSC. I. EXIT LIGHT/OVER DOOR LIGHT 150 MM ABOVE DOOR JAMB
C. BRANCH CIRCUITS FOR POWER, LIGHTING AND AUXILIARY J. BEDSIDE CALL UNIT 1400 MM AFF TO CENTER OF DEVICE
K. ROOM CONTROL UNIT 1400 MM AFF TO CENTER OF DEVICE
7. OUTLET BOXES SHALL HAVE A MINIMUM THICKNESS OF GA. # 16 WITH 1/2 KO AND SHALL BE PAINTED WITH L. PULL-CORD CALL UNIT 1400 MM AFF TO CENTER OF DEVICE
RED LEAD PAINT PRIOR TO INSTALLATION.
15. ALL WIRES AND CABLES SHALL BE PROTECTED IN A CONDUIT PIPE OR ENCLOSED CABLE DUCT/TRAY/LADDER
8. WIRES AND CABLES SHALL BE OF THE APPROVED TYPE AND BEARING THE "PS" MARK UNLESS SPECIFIED OR OR OTHER RACEWAYS.
INDICATED OTHERWISE. ALL POWER AND LIGHTING CONDUCTORS SHALL BE INSULATED FOR 600 VOLTS
MINIMUM.
10. LIGHTING FIXTURES SHALL CONFORM WITH THE SCHEDULE AS PREPARED BY THE ARCHITECT.
11. PANELBOARDS SHALL CONFORM TO THE LOAD SCHEDULE AS SHOWN ON PLANS WITH RESPECT TO BREAKER
PHASE ARRANGEMENT, RATING, CAPACITY AND SHORT CIRCUIT CONSIDERATION.
LEGEND :
DATA
FACP FIRE ALARM CONTROL PANEL D RJ-45 JACK OUTLET (1-GANG) BUTTON CONTACTLESS EXIT BUTTON SENSOR SPEAKER CABINET WALL-MOUNTED DATA CABINET (6U) 600MM X 600MM X 1FT
(6U)
CABLE DATA
SD SMOKE DETECTOR Dx2 RJ-45 JACK OUTLET (2-GANG) MAGNETIC LOCK MAGNETIC DOOR LOCK TRAY CABINET WALL-MOUNTED DATA CABINET (12U) 600MM X 600MM X 2FT
VERTICALLY-MOUNTED CABLE TRAY (12U)
F FIRE ALARM MANUAL PULL STATION CATV CABLE TV OUTLET (1-GANG) UPS 12-VOLTS UPS FOR ACCESS CONTROL SQUARE BOX WITH COVER MONITOR CCTV MONITOR
SB 1400MM ABOVE FLOOR FINISH TO
CCTV
CENTER OF BOX
B FIRE ALARM BELL ACCESS CONTROL TERMINAL DOME/TURRET TYPE NETWORK CAMERA UTILITY BOX WITH BLANK PLATE
DOME HORIZONTAL CABLE TRAY (FOR UTP CAT-6 CABLES)
ACCESS CONTROL
UB AND COVER 1400MM ABOVE
FLOOR FINISH TO CENTER OF BOX
CCTV
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES PREPARED Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL and documents of the architect,
2 575 1 725 2 700 1 300 1 000 2 500 700 1 875 1 750 675
CORDILLERA ADMINISTRATIVE REGION
1 TO NETWORK SWITCH @
DATA CABINET
Dx2
2 100
AIRLOCK
AIRLOCK
TO PoE SWITCH
TO NETWORK SWITCH @ @ DATA
DATA CABINET CABINET
BEDROOM DIRTY
UTILITIY
4 575
TO ELECTRICAL
TO DATA ROOM CATV D
E
M
O
D
STAFF CABINET @
6 075
ELECTRICAL
C
TV
CHANGING ROOM
2 475
ROOM
TV
C
C
D
O
M
D CATV
E
PULLBOX
1 500
1 500
CABLE
TRAY
ELECTRICAL
AMPLIFIER AIRLOCK Dx2
DATA DATA ROOM
CABINET CABINET D
Baguio General Hospital & Medical Center
1 500
TO PoE SWITCH
WILSON F. RAMOS, ECE
TO NETWORK SWITCH
TO PoE SWITCH @ TO NETWORK AIRLOCK @ DATA CABINET
@ DATA
SWITCH @ DATA CABINET
Engineer II - EFMO
3
CABINET ROOM TO ELECTRICAL
PREPARED
3 325
ROOM
CATV D
E
M
O
D
D
O
M
D CATV
E
1 825
1 825
C
C
TV
TV
C
C
AIRLOCK
4 BEDROOM
1 775
DIRTY TO PoE
UTILITIY SWITCH @ TO NETWORK SWITCH @ Dx2
3 275
3 275
STAFF DATA DATA CABINET
BEDROOM CABINET
CHANGING
Up Dn ROOM
BULLET
CCTV TO PoE
1 500
CCTV SWITCH @
RA 9266 SECTION 33
whether the object for which they are
use in the repetition of and for other
BULLET
made is executed or not. It shall be
projects or buildings, whether
DATA
CABINET
26 800
Dx2
Drawings and specifications and
Y
TO NETWORK SWITCH @
DATA CABINET
A
TO PoE SWITCH @ TO DATA CABINET @ PPE
DATA CABINET ELECTRICAL ROOM LAB GOWN
2 700
3 050
3 050
TO AMPLIFIER @
BULLET
ELECTRICAL ROOM H A L L W A Y TO DATA CABINET@
L
CCTV
UPS
(UTP-CABLE)
L
BUTTON
TO NETWORK SWITCH @ TO NETWORK TO DATA CABINET @
DATA CABINET SWITCH @ DATA ELECTRICAL ROOM MAGNETIC LOCK
350
A
D
6
CABINET LINK TO FACP
(TF-WIRE)
TO DATA
H
ACCESS CONTROL
D CABINET @
1 275
Dx2
ELECTRICAL
PROPOSED COMPLETION OF BGHMC
ROOM
AIRLOCK Up Dn
THREE - STOREY BUILDING FOR
TO NETWORK Dx2
TO TO DATA CABINET @
SWITCH @ DATA
ELECTRICAL ELECTRICAL ROOM
TO PoE SWITCH @ CABINET
DATA CABINET ROOM
BGHMC Compound, Baguio City
Cordillera Administrative Region
NURSE DOCTORS'
LOUNGE
ISOLATION ROOMS
ELECTRICAL ROOM
E
PROJECT TITLE
TV
C
6 075
6 075
C
200mm STRUCTURAL GAP
STAFF Dx2
DECONTAMINATION TO DATA
CHANGING
LOCATION
CABINET @ DATA
& WASTE HOLDING AREA ROOM
4 800
ELECTRICAL CABINET
(6U) MONITOR
ROOM
PULLBOX
DIRTY
BEDROOM UTILITIY
41 800
41 800
GARBAGE TO NETWORK SWITCH AIRLOCK
CHUTE @ DATA CABINET
Dx2
7
200
200
8
2 950
2 950
TO NETWORK
SWITCH @ DATA TO PoE SWITCH @ BED
CABINET DATA CABINET
ELEVATOR
ROOF
TV
C
C
D
D
9
O
M
E
1 850
1 850
SHEET CONTENTS
AS SHOWN
10
3 750
3 750
11
Baguio General Hospital & Medical Center
ROOF
Engineer IV, Head EFMO - HOPSS
RICHIE RHEY R. DIRIGE, CE
3 750
3 750
CHECKED
EXISTING INFECTIOUS
15 000
12 DESEASE BUILDING
(PROPOSED DELTA E.R.)
3 750
3 750
13
Baguio General Hospital & Medical Center
Chief Administrative Officer, HOPSS
RECOMMENDING APPROVAL
VILMA O. MOLTIO, MPA
3 750
3 750
14
Baguio General Hospital & Medical Center
OIC, Chief of Medical Professional Staff
LARRY C. HAYA JR., MD, DPCP
CONCURRED
APPROVED
SD SMOKE DETECTOR Dx2 RJ-45 JACK OUTLET (2-GANG) MAGNETIC LOCK MAGNETIC DOOR LOCK HORIZONTAL CABLE TRAY 3. VERIFY EXISTING/ACTUAL CONDITION
PRIOR TO EXECUTION AND INFORM THE
(FOR UTP CABLES ONLY) 'BGHMC' IN ANY DISCREPANCIES NOTED IN
THE PLANS AND ACTUAL CONDITION.
F FIRE ALARM MANUAL PULL STATION CATV CABLE TV OUTLET (1-GANG) UPS 12-VOLS UPS FOR ACCESS CONTROL 4. ALL DRAWINGS ARE IN MILLIMETERS.
PULLBOX PULL BOX, POWDER
EC-2a
B
COATED WITH THE APPROVAL OF THE 'BGHMC'.
FIRE ALARM BELL ACCESS CONTROL TERMINAL DOME TYPE NETWORK CAMERA
SHEET NO.
2 575 1 725 2 700 1 300 1 000 2 500 700 1 875 1 750 675
CORDILLERA ADMINISTRATIVE REGION
1 D D D D D D D D
2 100
TO NETWORK SWITCH @ TO NETWORK SWITCH @ TO NETWORK SWITCH @
DATA CABINET DATA CABINET DATA CABINET
TO NETWORK SWITCH @ TO NETWORK SWITCH @ TO NETWORK SWITCH @ TO NETWORK SWITCH @
TO NETWORK
DATA CABINET DATA CABINET DATA CABINET DATA CABINET
SWITCH @ DATA
CABINET
4 575
TV
C
C
CCTV CCTV
DATA CABINET DATA CABINET
6 075
D
O
M
TO PoE SWITCH @ TO NETWORK
E
DOME DOME
15 BED WARDS
2 475
SWITCH @
C
DOME DOME
DATA CABINET
CCTV
TV
D DATA CABINET TO PoE
E
M
TO PoE SWITCH @ TO PoE SWITCH @
O
SWITCH @
D
CCTV CCTV DOME
DATA CABINET DATA CABINET DATA
CABINET TO PoE SWITCH @
WC DATA CABINET
PULLBOX
DOME
CCTV
ELECTRICAL SINK SHOWER 7 BED WARDS
1 500
1 500
CABLE
PULLBOX TRAY
TO NETWORK SWITCH @ TO NETWORK SWITCH @ TO NETWORK SWITCH @ D
FIBER OPTIC CABLE ROOM
DATA
CABINET
DATA CABINET
D
DATA CABINET
D
DATA CABINET
D
Baguio General Hospital & Medical Center
2
SINK SHOWER TO PoE
CABLE TV PROVIDER SWITCH @
PULLBOX TO NETWORK SWITCH @
DATA
D D D TOILET 2 SHOWER CABINET
DATA CABINET
1 500
1 500
WILSON F. RAMOS, ECE
WC
Engineer II - EFMO
3
PREPARED
3 325
TO NETWORK SWITCH
@ DATA CABINET
1 825
1 825
TO PoE SWITCH @
DATA CABINET
TO PoE SWITCH @
DATA CABINET
ANTE
TO PoE TO NETWORK SWITCH @
TO PoE SWITCH @
DATA CABINET
CCTV TO PoE SWITCH @
DATA CABINET
CCTV
ROOM SWITCH @ DATA CABINET D
DOME
CCTV
DATA
4
DOME DOME
DOME DOME CABINET
CCTV CCTV
TO NETWORK SWITCH @
1 775
TO NETWORK DATA CABINET
SWITCH @
DATA CABINET
D
3 275
3 275
TO NETWORK TO NETWORK
SWITCH @ DATA TO NETWORK SWITCH @ DATA TO NETWORK
Dn CABINET SWITCH @ DATA CABINET SWITCH @ DATA
CABINET CABINET D
1 500
RA 9266 SECTION 33
whether the object for which they are
use in the repetition of and for other
26 800
D D D D
Drawings and specifications and
Y
A
TO PoE SWITCH @
DATA CABINET
PPE LAB GOWN
2 700
TO PoE SWITCH @
3 050
TO NETWORK SWITCH
3 050
TO AMPLIFIER @ TO NETWORK DATA CABINET
H A L L W A Y
@ DATA CABINET
L
BULLET
ELECTRICAL ROOM
CCTV
SWITCH @ DATA
(2ND FLOOR) CABINET
TO PoE SWITCH @
DATA CABINET
ANTE ROOM
TO NETWORK SWITCH TO DATA CABINET@
@ DATA CABINET ELECTRICAL ROOM
L
TO DATA CABINET @
TO NETWORK (UTP-CABLE)
UPS
ELECTRICAL ROOM LINK TO
SWITCH @ DATA FACP
BULLET
A
CABINET
350
BUTTON
D (TF-WIRE)
6
CCTV
CCTV MAGNETIC LOCK
BULLET
H
DATA
CABINET
D D D
1 275
PULLBOX
(6U)
Dx2
PROPOSED COMPLETION OF BGHMC
D MONITOR MONITOR
ACCESS CONTROL
TO NETWORK
SWITCH @ DATA
SHOWER TO NETWORK Up Dn
THREE - STOREY BUILDING FOR
NURSE
BGHMC Compound, Baguio City
CABINET CABINET
ISOLATION ROOMS
TO NETWORK
SWITCH @ DATA
STATION
CCTV TO PoE SWITCH @ CCTV TO PoE SWITCH @
CABINET
PROJECT TITLE
6 075
6 075
200mm STRUCTURAL GAP
Dx2
DOME
DOME
8 BED-WARDS DOME
DOME
LOCATION
4 800
CCTV
DATA CABINET CCTV
TO NETWORK
SWITCH @ DATA
CABINET TO NETWORK
TO NETWORK SWITCH @ DATA
SWITCH @ DATA TO NETWORK CABINET
CABINET SWITCH @ DATA
41 800
41 800
GARBAGE
CHUTE
CABINET TOILET
D
D D D
7
200
200
TO PoE SWITCH @
ELECTRICAL ROOM
8 TO NETWORK
2 950
2 950
SWITCH @
ELECTRICAL
ELEVATOR LOBBY BED
ROOM
ELEVATOR
TV
C
C
D
D
9
O
M
E
1 850
1 850
SHEET CONTENTS
AS SHOWN
10
3 750
3 750
11
Baguio General Hospital & Medical Center
Engineer IV, Head EFMO - HOPSS
RICHIE RHEY R. DIRIGE, CE
3 750
3 750
CHECKED
EXISTING INFECTIOUS
15 000
12 DESEASE BUILDING
(PROPOSED DELTA E.R.)
3 750
3 750
13
Baguio General Hospital & Medical Center
Chief Administrative Officer, HOPSS
RECOMMENDING APPROVAL
VILMA O. MOLTIO, MPA
3 750
3 750
14
Baguio General Hospital & Medical Center
OIC, Chief of Medical Professional Staff
LARRY C. HAYA JR., MD, DPCP
CONCURRED
APPROVED
SD SMOKE DETECTOR Dx2 RJ-45 JACK OUTLET (2-GANG) MAGNETIC LOCK MAGNETIC DOOR LOCK HORIZONTAL CABLE TRAY 3. VERIFY EXISTING/ACTUAL CONDITION
PRIOR TO EXECUTION AND INFORM THE
(FOR UTP CABLES ONLY) 'BGHMC' IN ANY DISCREPANCIES NOTED IN
THE PLANS AND ACTUAL CONDITION.
F FIRE ALARM MANUAL PULL STATION CATV CABLE TV OUTLET (1-GANG) UPS 12-VOLS UPS FOR ACCESS CONTROL 4. ALL DRAWINGS ARE IN MILLIMETERS.
PULLBOX PULL BOX, POWDER
EC-2b
B
COATED WITH THE APPROVAL OF THE 'BGHMC'.
FIRE ALARM BELL ACCESS CONTROL TERMINAL DOME TYPE NETWORK CAMERA
SHEET NO.
2 575 1 725 2 700 1 300 1 000 2 500 700 1 875 1 750 675
CORDILLERA ADMINISTRATIVE REGION
2 100
AIRLOCK
AIRLOCK
BEDROOM DIRTY
UTILITIY
4 575
EOLR
STAFF
6 075
CHANGING SD
2 475
ROOM
1'
BEDROOM
1 500
1 500
ELECTRICAL AIRLOCK
PULLBOX
ROOM
Baguio General Hospital & Medical Center
FACP
2 PULLBOX
AIRLOCK
1 500
1 500
WILSON F. RAMOS, ECE
AIRLOCK
Engineer II - EFMO
3
PREPARED
3 325
1 825
1 825
AIRLOCK
4 SD
BEDROOM
1 775
DIRTY
UTILITIY
3 275
3 275
B
F
BEDROOM STAFF
CHANGING
Up Dn ROOM
1 500
RA 9266 SECTION 33
whether the object for which they are
use in the repetition of and for other
26 800
Drawings and specifications and
Y
F
A
ZONE 2 B PPE
To FACP @ LAB GOWN
W
GROUND
2 700
3 050
3 050
FLOOR
SD H A L L W A
SD Y
L
ANTE ROOM
B
L
F
350
A
6
1 275
PROPOSED COMPLETION OF BGHMC
AIRLOCK Up Dn
THREE - STOREY BUILDING FOR
BGHMC Compound, Baguio City
Cordillera Administrative Region
NURSE DOCTORS'
SD SD
LOUNGE
ISOLATION ROOMS
STATION
PROJECT TITLE
6 075
6 075
200mm STRUCTURAL GAP
STAFF
DECONTAMINATION CHANGING
LOCATION
4 800
SD
DIRTY
BEDROOM UTILITIY
41 800
41 800
GARBAGE AIRLOCK
CHUTE
7
200
200
8
2 950
2 950
BED
ELEVATOR
ROOF
9
1 850
1 850
SHEET CONTENTS
AS SHOWN
10
3 750
3 750
11
Baguio General Hospital & Medical Center
ROOF
Engineer IV, Head EFMO - HOPSS
RICHIE RHEY R. DIRIGE, CE
3 750
3 750
CHECKED
EXISTING INFECTIOUS
15 000
12 DESEASE BUILDING
(PROPOSED DELTA E.R.)
3 750
3 750
13
Baguio General Hospital & Medical Center
Chief Administrative Officer, HOPSS
RECOMMENDING APPROVAL
VILMA O. MOLTIO, MPA
3 750
3 750
14
Baguio General Hospital & Medical Center
OIC, Chief of Medical Professional Staff
LARRY C. HAYA JR., MD, DPCP
CONCURRED
APPROVED
SD SMOKE DETECTOR Dx2 RJ-45 JACK OUTLET (2-GANG) MAGNETIC LOCK MAGNETIC DOOR LOCK SQUARE BOX WITH COVER 3. VERIFY EXISTING/ACTUAL CONDITION
PRIOR TO EXECUTION AND INFORM THE
SB 1400MM ABOVE FLOOR 'BGHMC' IN ANY DISCREPANCIES NOTED IN
THE PLANS AND ACTUAL CONDITION.
F FIRE ALARM MANUAL PULL STATION CATV CABLE TV OUTLET (1-GANG) UPS 12-VOLS UPS FOR ACCESS CONTROL FINISH TO CENTER OF BOX 4. ALL DRAWINGS ARE IN MILLIMETERS.
EC-3a
2 575 1 725 2 700 1 300 1 000 2 500 700 1 875 1 750 675
CORDILLERA ADMINISTRATIVE REGION
2 100
4 575
6 075
15 BED WARDS
2 475
WC
1' ELECTRICAL
TOILET 1
SINK SHOWER
SHOWER
7 BED WARDS
1 500
1 500
PULLBOX
ROOM
Baguio General Hospital & Medical Center
2
SINK SHOWER
TOILET 2 SHOWER
1 500
1 500
WILSON F. RAMOS, ECE
WC
Engineer II - EFMO
3
PREPARED
3 325
1 825
1 825
ANTE
ROOM
4 ZONE 3
To FACP @
1 775
GROUND
FLOOR
3 275
3 275
Dn
1 500
SD
RA 9266 SECTION 33
whether the object for which they are
use in the repetition of and for other
B
F
26 800
Drawings and specifications and
Y
F
A
B
PPE LAB GOWN
2 700
EOLR
3 050
3 050
SD H A L LSD W A Y
L
ANTE ROOM SD
L
B
350
F
1 275
PROPOSED COMPLETION OF BGHMC
SHOWER Up Dn
THREE - STOREY BUILDING FOR
DECONTAMINATION
NURSE
BGHMC Compound, Baguio City
SD SD
ISOLATION ROOMS
STATION
PROJECT TITLE
ANTE
6 075
6 075
6 075
200mm STRUCTURAL GAP
8 BED-WARDS
LOCATION
ROOM
4 800
41 800
41 800
GARBAGE
CHUTE
TOILET
7
200
200
8
2 950
2 950
ELEVATOR
SD
LOBBY BED
ELEVATOR
9
1 850
1 850
SHEET CONTENTS
AS SHOWN
10
3 750
3 750
11
Baguio General Hospital & Medical Center
Engineer IV, Head EFMO - HOPSS
RICHIE RHEY R. DIRIGE, CE
3 750
3 750
CHECKED
EXISTING INFECTIOUS
15 000
12 DESEASE BUILDING
(PROPOSED DELTA E.R.)
3 750
3 750
13
Baguio General Hospital & Medical Center
Chief Administrative Officer, HOPSS
RECOMMENDING APPROVAL
VILMA O. MOLTIO, MPA
3 750
3 750
14
Baguio General Hospital & Medical Center
OIC, Chief of Medical Professional Staff
LARRY C. HAYA JR., MD, DPCP
CONCURRED
APPROVED
SD SMOKE DETECTOR Dx2 RJ-45 JACK OUTLET (2-GANG) MAGNETIC LOCK MAGNETIC DOOR LOCK SQUARE BOX WITH COVER 3. VERIFY EXISTING/ACTUAL CONDITION
PRIOR TO EXECUTION AND INFORM THE
SB 1400MM ABOVE FLOOR 'BGHMC' IN ANY DISCREPANCIES NOTED IN
THE PLANS AND ACTUAL CONDITION.
F FIRE ALARM MANUAL PULL STATION CATV CABLE TV OUTLET (1-GANG) UPS 12-VOLS UPS FOR ACCESS CONTROL FINISH TO CENTER OF BOX 4. ALL DRAWINGS ARE IN MILLIMETERS.
EC-3b
2 575 1 725 2 700 1 300 1 000 2 500 700 1 875 1 750 675
CORDILLERA ADMINISTRATIVE REGION
1 UB
150MM ABOVE
2 100
DOOR JAMB
AIRLOCK
SB
AIRLOCK
UB
BEDROOM DIRTY UB
UTILITIY
4 575
TO DATA
CABINET @
NURSE STATION
STAFF
6 075
CHANGING
2 475
ROOM
1'
UB BEDROOM
150MM ABOVE
DOOR JAMB
UB
1 500
1 500
ELECTRICAL AIRLOCK
ROOM
UB SB
Baguio General Hospital & Medical Center
2 TO DATA CABINET
150MM ABOVE
150MM ABOVE
DOOR JAMB
DOOR JAMB
@ NURSE STATION
AIRLOCK
1 500
1 500
UB
UB
WILSON F. RAMOS, ECE
AIRLOCK
Engineer II - EFMO
UB
3
PREPARED
3 325
UB
1 825
1 825
AIRLOCK
4 BEDROOM
1 775
DIRTY
UTILITIY
UB
3 275
3 275
BEDROOM STAFF
SB
CHANGING
Up Dn ROOM TO DATA CABINET
@ NURSE STATION
1 500
TO DATA
RA 9266 SECTION 33
whether the object for which they are
use in the repetition of and for other
CABINET @
NURSE STATION
26 800
Drawings and specifications and
Y
SB UB
A
PPE
LAB GOWN
2 700
3 050
3 050
H A L L W A Y
L
ANTE ROOM
L
150MM ABOVE DOOR JAMB
350
A
6
UB
1 275
PROPOSED COMPLETION OF BGHMC
AIRLOCK Up Dn
THREE - STOREY BUILDING FOR
UB
BGHMC Compound, Baguio City
Cordillera Administrative Region
NURSE DOCTORS'
LOUNGE
ISOLATION ROOMS
STATION
PROJECT TITLE
6 075
6 075
200mm STRUCTURAL GAP
STAFF
DECONTAMINATION CHANGING
LOCATION
4 800
DATA
CABINET
(6U)
DIRTY
BEDROOM UTILITIY
SB
41 800
41 800
TO DATA
GARBAGE CABINET @ AIRLOCK
CHUTE NURSE STATION
7 UB
200
200
8
2 950
2 950
BED
ELEVATOR
ROOF
9
1 850
1 850
SHEET CONTENTS
AS SHOWN
10
3 750
3 750
11
Baguio General Hospital & Medical Center
ROOF
Engineer IV, Head EFMO - HOPSS
RICHIE RHEY R. DIRIGE, CE
3 750
3 750
CHECKED
EXISTING INFECTIOUS
15 000
12 DESEASE BUILDING
(PROPOSED DELTA E.R.)
3 750
3 750
13
Baguio General Hospital & Medical Center
Chief Administrative Officer, HOPSS
RECOMMENDING APPROVAL
VILMA O. MOLTIO, MPA
3 750
3 750
14
Baguio General Hospital & Medical Center
OIC, Chief of Medical Professional Staff
LARRY C. HAYA JR., MD, DPCP
CONCURRED
APPROVED
SD SMOKE DETECTOR Dx2 RJ-45 JACK OUTLET (2-GANG) MAGNETIC LOCK MAGNETIC DOOR LOCK SQUARE BOX WITH COVER 3. VERIFY EXISTING/ACTUAL CONDITION
PRIOR TO EXECUTION AND INFORM THE
SB 1400MM ABOVE FLOOR 'BGHMC' IN ANY DISCREPANCIES NOTED IN
THE PLANS AND ACTUAL CONDITION.
F FIRE ALARM MANUAL PULL STATION CATV CABLE TV OUTLET (1-GANG) UPS 12-VOLS UPS FOR ACCESS CONTROL FINISH TO CENTER OF BOX 4. ALL DRAWINGS ARE IN MILLIMETERS.
EC-4a
CCTV
PoE SWITCH BULLET
DOME
ACCESS CONTROL
3RD FLOOR
DATA CABINET (12U) 10x 1-GANG RJ-45 OUTLETS
DATA CABINET (12U) DATA CABINET (6U)
PATCH PANEL PoE SWITCH NETWORK VIDEO RECORDER
8x 2-GANG RJ-45 OUTLETS
PATCH PANEL PoE SWITCH
PATCH PANEL
PULLBOX
2x SPARE CAT-6 UTP CABLE
6x DOME, 3x BULLET, 1x ACCESS CONTROL
CABLE MANAGER CCTV
CCTV
BULLET
PULLBOX
2ND FLOOR
CCTV
BULLET
DOME
ACCESS CONTROL DATA CABINET (6U)
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES PREPARED Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL and documents of the architect,
TO NETWORK
7x CEILING MOUNTED SPEAKER OPERATIONS CENTER
SOUND 1 ZONE 2
PB PB AMPLIFER (NOC) MAIN BUILDING
PB
FACP ZONE 2 5 ZONES VIA SERVICE ENTRANCE
4 ZONES
2ND FLOOR 2ND FLOOR
SOUND 1 ZONE 1
PB 7x CEILING MOUNTED SPEAKER
PB
ZONE 1
GROUND FLOOR GROUND FLOOR
CABLE TRAY
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES PREPARED Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL and documents of the architect,
APPROVED
SHEET NO.
Director IV
Leonita- Health
DOH P. Gorgolon,
FacilityMD, MHA, MCHM,Program
Enhancement CEO VI
A-2
5 6 7
TYPICAL RACEWAY PENETRATIONS WITH FIRESTOP CABLE TRUNKING DETAIL CONDUIT SUPPORT DETAIL
8 9 10
CONDUIT RISER DETAIL STRUCTURED CABLING SYSTEM CABLE TRUNKING DETAIL DOME TYPE
RA 9266 SECTION 33
REPUBLIC OF THE PHILIPPINES PREPARED Drawings and specifications and PROJECT TITLE SHEET CONTENTS CHECKED RECOMMENDING APPROVAL CONCURRED APPROVED SHEET NO.
DEPARTMENT OF HEALTH other contract documents duly signed,
stamped or sealed, as instruments of
service, are the intellectual property PROPOSED COMPLETION OF BGHMC
BAGUIO GENERAL HOSPITAL and documents of the architect,