23 Rejected Material Handling Procedure
23 Rejected Material Handling Procedure
Table of Contents
Document Control Log...............................................................................................................................................1
1. Introduction........................................................................................................................................................... 3
1.1. Objectives of the Procedure.............................................................................................................................3
2. Scope......................................................................................................................................................................3
3. References............................................................................................................................................................. 3
4. Acronyms............................................................................................................................................................... 3
5. Users Of This Document.........................................................................................................................................3
6. Activity-Responsibility Matrix.................................................................................................................................3
7. Inputs..................................................................................................................................................................... 4
8. Outputs.................................................................................................................................................................. 4
9. Procedure...............................................................................................................................................................4
9.1. Receiving of materials and Inspection..............................................................................................................4
9.2. Issue................................................................................................................................................................. 5
9.3. Handling...........................................................................................................................................................5
9.4. Storage & Preservation.....................................................................................................................................5
9.5. Handling, Storage and Preservation Guidelines Raw Material Stores..............................................................7
9.6. Procedure for Storage & Usage of Repaired Modules (Bought Out)................................................................8
10. Appendices...........................................................................................................................................................9
10.1. Associated documents...................................................................................................................................9
10.2. Associated From / Record..............................................................................................................................9
1.Introduction
This Document briefs about the Material Management & Stores and Preservation activity at
Eficaa.
1.1. Objectives of the Procedure
To develop and establish a documented procedure for maintaining procedures for handling,
storage, packaging, preservation and delivery at various stages of manufacture starting from
raw material to finished goods at Eficaa.
2.Scope
This procedure covers all the products coming into Eficaa, including raw materials, bought out
items and consumable inspection.
3.References
ISO 9001: 2008 Clause 7.5.5 : Preservation of the product
ISO 9001: 2008 Clause 7.5.3 : Identification and traceability
ISO 9001: 2008 Clause 7.4.3 : Verification of purchased product
4.Acronyms
MD : Managing Director
MR : Management representative
VPO : Vice President Operations
CSRV : Certified stores receipt voucher
MIR : Material Issue Requisition
MRN : Material Return Note
GP : Gate pass
DC : Delivery Challan
HSP : Handling Storage and Preservation
PP : Preservation Process
SFG : Semi Finished Goods
FG : Finished Goods
PPC : Production Planning Control
PO : Purchase Order
PM : Project Manager.
GM (P) : General Manager Projects.
CPC : Chief projects coordinator
6.Activity-Responsibility Matrix
Activity Primary Responsibility Secondary Responsibility
Overall responsibility of
R.M.Stores In charge
stores activities
Ensure labeling /
identification of material R.M.Stores In charge
in stores.
Update the stock register
after receiving / issuing R.M.Stores In charge
the materials
Prepare stores related R.M.Stores In charge
records like CSRV, GP etc.
CSRV Approval after QAS Manager / dept.
QAS Supervisor or Engineer.
inspection. heads.
Interact with QA Engineer
R.M.Stores In charge
for incoming inspection.
Approve gate pass VPO
Issue the materials to
R.M.Stores In charge
against respective MIR
Ensure good housekeeping
R.M.Stores In charge
in stores.
Responsibility of Accounts,
administration, Admin officer
department activities
Interact with AO for
PPC
dispatches.
Responsibility of storage of
PPC Production in charge
FG & SFG Goods
Overall responsibility for
Administration
dispatch finished goods in G.M projects
Officer/project in charge
coordination with PPC.
Responsible for the entire
central excise related Administration Officer
activities
7.Inputs
Purchase order
MIR
Material return note(MRN)
Incoming material
8.Outputs
Issued Material
CSRV
9.Procedure
9.1. Receiving of materials and Inspection
Security guard/RM Stores In charge shall check the Challan or any document as available and
put the stamp for acknowledgment of entry into Eficaa Premises.
RM Stores in charge shall receive the materials and check and count the materials with
reference to the PO / DC/Invoice / any other document received along with the material for
quantity and shall update material inward register.
RM Stores in charge shall prepare Material Arrival Note cum Initial Survey Report, CSRV on
DC/Invoice / any document received and the same shall be forwarded to QA section. The
CSRV also contains information regarding shortages / excesses of material received, with
reference to the Purchase Order. Material Arrival Note cum Initial Survey Report copies shall
be sent on daily basis to Materials Manager and Production Manager.
RM Stores in charge shall update the stock register after completion of QA Inspection of
accepted material.
On receipt of information from stores, QA Engineer shall check the incoming material for
quality with reference to the following
Plant standards/Quality plan (raw material)/.Mfgr’s specification or data sheets
Concerned department heads shall approve other items except the items checked by QA
department.
QA Manager/ department heads shall approve CSRV. In some special cases, rejections are
made after the VPO approval.
QA Manager/Concerned department head shall forward the above approved CSRV (4copies)
to stores along with an inspection report which shall be forwarded to finance & account
section for their process.
The accepted materials shall be placed in storage area and identified accordingly after the
inspection by the concerned departments.
When the results are not satisfactory during inspection, based on inspection report given by
QA Manager/concerned department heads, stores shall prepare a material rejection report
(CSRV) and forward the same to purchase department. Vendor shall be informed by purchase
department and if required a joint inspection shall be carried out in the presence of vendor
representative. Purchase department shall co-ordinate with concerned vendor and take the
actions for lifting the rejected material accordingly.
Material officer/ AO shall prepare delivery Challan /gate pass, in case of the material sent to
vendor for rejection / rework / repair/job work and the same shall be authorized by the
VPO/Authorized Manager.
When replacement material is received RM stores in charge shall raise fresh CSRV and
forward to QA for inspection. This fresh CSRV shall cover the old CSRV no for traceability and
reference.
9.2. Issue
Store In charge shall issue the required material to production department and other
department, on receipt of MIR and record of the same shall be maintained in stock register by
giving MIR No.
Incoming material is released for production usage only after inspection by QA Engineer and
the material meets conformity to specified requirement. Without prior inspection of QA
Engineer the material shall not be placed in main stores area.
Current stock of all materials shall be available in the stock register. Minimum stock level of
critical items shall be mentioned in the stock register.
Materials, which are not used by the production department, shall be returned to the stores
through MRN. Only such material inspected and acceptance by QA will be reentered in to the
stores.
9.3. Handling
All safety procedures shall be followed while handling materials.
Generally plastic crates are used.
Handling, storage and preservation of all material shall be as per clause 9.6, HSP guidelines.
9.4. Storage & Preservation
The materials shall be stored in the specified area. These areas are designated as
10. Appendices
10.1. Associated documents
Work instructions for packing.
Procedure for replacement of rejected material, SD/P07/MMS
Procedure for returning of material through material return note (MRN), (SD/P05/GNL)
Purchasing Process
10.2. Associated From / Record
Material Receipt control Register (in place of)Material Inward Register.
Material Issue Requisition.
CSRV.
Purchase requisition Slip.
Material return note.
Delivery Chelan.
Stock register.
Finished goods register.
Gate passes (Returnable/nonreturnable).
Purchase Recommendation Form.
Maintenance Service Request.
Material Arrival note cum initial survey note.
Defective Material Follow-up Register (DMFR).