CHAPTER 3

Bill of Quantities
Project Name:
Date of preparation:

- Engineering Cost of Civil Works


- Cost of Equipment and Land, Contingencies

Unit Cost Analysis

- Amount of work to be done


- Quantity of materials
- Manpower to execute the work
- Equipment to be used
- Other costs

DESCRIPTION (1) UNIT QUANTITY

A. EIGHT-CLASSROOMS

I. MOBILIZATION / DEMOBILIZATION l.s 1.00

II. TEMPORARY FACILITIES mo 8.00

III. SAFETY AND HEALTH

Item SPL-1 Personal Protective Equipment (PPE) md 21,340.00

Item SPL-2 Safety and Health Personnel md 16.00

Item SPL-3 Signages and Barricades sets 7.00

IV. EARTHWORKS

Item 803(1) Excavation and Footing & Wall Footing m³ 1,219.43

Item 804(1)a Backfilling of Excavated Materials m³ 874.78

Item 804(1)b Embankment m³ 87.14


Item 8004(3) Gravel Bedding @ CWF, TG, SOF m³ 60.48

V. TERMITE CONTROL WORKS

Item 1000(1) Soil Poisoning liter 459.16

VI. CONCRETE WORKS

Item 900(1)c1 R.C. for Stair m³ 22.91

Item 404(1)a Rein. Steel for Stair kg 5,151.64

Item 900(1)c1 R.C. for Sun Breaker m³ 10.15

Item 404(1)a Rein. Steel for Sun Breaker kg 1,027.15

Item 900(1)c1 R.C. for Column Footing & WF m³ 331.11

Item 404(1)a Rein. Steel for Column Footing & WF kg 34,351.67

Item 900(1)c1 R.C. for SOF, Corridor and Ramp m³ 58.16

Item 404(1)a Rein. Steel for SOF, Corridor and kg 2,071.52


Ramp

Item 900(1)c1 R.C. for Stair on Grade m³ 2.20

Item 404(1)a Rein. Steel for Stair on Grade kg 153.24

Item 900(1)c1 R.C. for Footing Tie Beam m³ 57.98

Item 404(1)a Rein. Steel for Footing Tie Beam kg 23,266.87

Item 900(1)c1 R.C. for Column, PC & Stiffener m³ 146.86

Item 404(1)a Rein. Steel for Column, PC & Stiffener kg 49,299.86

Item 900(1)c1 R.C. for Second floor Slab m³ 39.30

Item 404(1)a Rein. Steel for Second floor Slab kg 5,697.32

Item 900(1)c1 R.C. for Third floor Slab m³ 39.94

Item 404(1)a Rein. Steel for Third floor Slab kg 5,697.32

Item 900(1)c1 R.C. for Fourth floor Slab m³ 39.34

Item 404(1)a Rein. Steel for Fourth floor Slab kg 5,697.32


Item 900(1)c1 R.C. for Roof Deck for Water Tank m³ 6.25

Item 404(1)a Rein. Steel for Roof Deck for Water Tank kg 621.47

Item 900(1)c1 R.C. for Second floor Beam m³ 42.08

Item 404(1)a Rein. Steel for Second floor Beam kg 8,523.23

Item 900(1)c1 R.C. for Third floor Beam m³ 42.08

Item 404(1)a Rein. Steel for Third floor Beam kg 7,727.18

Item 900(1)c1 R.C. for Fourth floor Beam m³ 42.08

Item 404(1)a Rein. Steel for Fourth floor Beam kg 7,727.18

Item 900(1)c1 R.C. for Roof Beam m³ 29.06

Item 404(1)a Rein. Steel for Roof Beam kg 4,976.66

VII. MASONRY WORKS

Item 1046(2)a1 Masonry Units (100m Wall) m³ 447.50

Item 1046(2)a2 Masonry Units (150m Wall) m³ 1,558.86

VIII. FABRICATED MATERIALS AND HARDWARES

Item 1010(2)b (0.90 x 2.40m) Mahogany Panel Door m³ 86.60


with Hardware and Accessories-Cylinder Type Lockset(D-
1)

Item 1010(1)b 50x150mm THK. Mahogany Jamb with set 40.00


Fixed Clear Glass Transom (D-1)

Item 1010(2)a (0.90 x 2.40m) Hollow Core Flush Type m³ 3.78


Swing Door with Marine Plywood Facing Inside and
Ordinary Outside with complete Hardware and
Accessories with Stainless Steel Kicking Plate (D-2)

Item 1010(1) 50x150mm THK. Mahogany Door Jamb set 2.00


(D-2)

Item 1010(2)a (0.80x2.10m) Hollow Core Flush Type m³ 16.80


Swing Door with Marine Plywood Facing Inside and
Ordinary Outside complete with Hardware and
Accessories (D-3)

Item 1010(1) 50x150mm THK. Mahogany Jamb (D-3) set 10.00


Item 1010(2)a (0.80x2.10m) Louvre Door with Complete m³ 8.40
Hardware and Accessories (D-4)

Item 1010(1) 50x150mm THK. Mahogany Jamb (D-4) set 5.00

Item 1010(2)a (0.60x2.10m) Bar Door complete with m³ 12.96


Hardware and Accessories (BD-1)

Item 1010(1) 50x100mm Hollow Core Flush Type Door set 18.00
Jamb (BD-1)

Item 1005(6) (3.60x1.70m) Steel Casement Window l.s. 1.00


6mm THK. Clear Glass Above (W-1)

Item 1009(1)a1 (1.60x1.70m) 5mm THK. Jalousie m³ 108.80


Windows with Clear Glass Blades on Standard Jalouplus
Casing and 50x150mm Concrete Door Jamb Complete
with Hardware and Accessories with 12mm square
security grills (W-2)

Item 1009(1)a1 (1.9X0.635m) 5mm THK. Jalousie m³ 9.65


Windows with Clear Glass Blades on Standard Jalouplus
Casing and 50x150mm Concrete Door Jamb Complete
with Hardware and Accessories (W-3)

Item 1009(1)a2 (0.60x0.635m) 5mm THK. Jalousie m³ 1.91


Windows with Clear Glass Blades on Standard Jalouplus
Casing and 50x150mm Concrete Door Jamb Complete
with Hardware and Accessories (W-4)

Item SPL-4 Blackboard sets 20.00

Item SPL-4 Rail Guard l.s. 1.00

IX. FINISHING WORKS

Item 1018(1) 200x200mm Vitrified Glazed Tiles Wall m³ 264.90


Finish

Item 1018(2) 200x200mm Vitrified Unglazed Tiles Floor m³ 97.73


Finish

Item 1021(1)a Plain cement Finish with Floor Hardener m³ 1,961.17


non-skid

Item 1021(5) Non-skid Cement Floor Finish w/ 6mm m³ 9.10


groove lines

Item 1027(1) Plain Cement Plaster Finish m³ 8,453.29


X. CARPENTRY WORKS

Item 1003 Carpentry for Ceiling with Insulation m³ 570.74

XI. ROOF AND FRAMING WORKS

Item 1013 Pre-Painted Metal Sheets (0.50mm) l.s. 1.00

Item 403(5) Steel Trusses and Lateral Struts kg 7,244.93

Item 403(5) Purlins and Channel Beam kg 7,708.18

Item 403(5) Purlins (Ceiling Support) kg 1,698.45

Item 403(5) Sag Rod kgs. 266.81

Item 404(1)a Cross-Bracing kgs. 351.96

SPL 905 Turn Buckle each 44.00

XII. PAINTING WORKS

Item 1032(1)a Masonry Painting m² 8,267.71

Item 1032(1)b Wooden Painting m² 373.84

Item 1032(1)c Metal Painting m² 195.71

XIII. ELECTRICAL WORKS

Item 1100 Conduits, Boxes and Fitting l.s. 1.00

Item 1101 Wires and Wiring Devices l.s. 1.00

Item 1102 Lighting Fixtures l.s. 1.00

Item 1103 Panel Board and Cabinets l.s. 1.00

Item 1208 Fire alarm Systems l.s. 26.00

XIV. PLUMBING / SANITARY WORKS

Item 1001 Sewer Line Works l.s. 1.00

Item 1002 Sanitary Fixtures l.s. 1.00


Item 1001(9) Downspout/Storm Drainage l.s. 1.00

Item 1002 Cold Waterline Works l.s. 1.00

Item SPL-7 Septic Tank l.s. 1.00

Item SPL–8 Catch Basin units 26.00

XV. MECHANICAL WORKS

Item SPL-9 Fire protection System l.s. 1.00

DESCRIPTION (2) UNIT QUANTITY

A. EIGHT-CLASSROOMS

I. MOBILIZATION / DEMOBILIZATION l.s 1.00

II. TEMPORARY FACILITIES mo 8.00

III. SAFETY AND HEALTH

Item SPL-1 Personal Protective Equipment (PPE) md 18,744.00

Item SPL-2 Safety and Health Personnel md 16.00

Item SPL-3 Signages and Barricades sets 6.00

IV. EARTHWORKS

Item 803(1) Excavation and Footing & Wall Footing m³ 1,033.43

Item 804(1)a Backfilling of Excavated Materials m³ 737.27

Item 804(1)b Embankment m³ 72.70

Item 8004(3) Gravel Bedding @ CWF, TG, SOF m³ 51.98


V. TERMITE CONTROL WORKS

Item 1000(1) Soil Poisoning liter 387.92

VI. CONCRETE WORKS

Item 900(1)c1 R.C. for Stair m³ 22.91

Item 404(1)a Rein. Steel for Stair kg 5,151.94

Item 900(1)c1 R.C. for Sun Breaker m³ 8.79

Item 404(1)a Rein. Steel for Sun Breaker kg 890.71

Item 900(1)c1 R.C. for Column Footing & WF m³ 280.71

Item 404(1)a Rein. Steel for Column Footing & WF kg 29,105.31

Item 900(1)c1 R.C. for SOF, Corridor and Ramp m³ 49.66

Item 404(1)a Rein. Steel for SOF, Corridor and kg 1,755.86


Ramp

Item 900(1)c1 R.C. for Stair on Grade m³ 2.20

Item 404(1)a Rein. Steel for Stair on Grade kg 153.24

Item 900(1)c1 R.C. for Footing Tie Beam m³ 48.86

Item 404(1)a Rein. Steel for Footing Tie Beam kg 19,965.76

Item 900(1)c1 R.C. for Column, PC & Stiffener m³ 124.54

Item 404(1)a Rein. Steel for Column, PC & Stiffener kg 41,734.13

Item 900(1)c1 R.C. for Second floor Slab m³ 32.23

Item 404(1)a Rein. Steel for Second floor Slab kg 4,754.28

Item 900(1)c1 R.C. for Third floor Slab m³ 32.26

Item 404(1)a Rein. Steel for Third floor Slab kg 4,754.28

Item 900(1)c1 R.C. for Fourth floor Slab m³ 30.82

Item 404(1)a Rein. Steel for Fourth floor Slab kg 4,754.28

Item 900(1)c1 R.C. for Roof Deck for Water Tank m³ 6.25
Item 404(1)a Rein. Steel for Roof Deck for Water Tank kg 621.47

Item 900(1)c1 R.C. for Second floor Beam m³ 35.59

Item 404(1)a Rein. Steel for Second floor Beam kg 7,260.01

Item 900(1)c1 R.C. for Third floor Beam m³ 35.59

Item 404(1)a Rein. Steel for Third floor Beam kg 6,719.84

Item 900(1)c1 R.C. for Fourth floor Beam m³ 35.59

Item 404(1)a Rein. Steel for Fourth floor Beam kg 6,657.91

Item 900(1)c1 R.C. for Roof Beam m³ 25.49

Item 404(1)a Rein. Steel for Roof Beam kg 4,447.26

VII. MASONRY WORKS

Item 1046(2)a1 Masonry Units (100m Wall) m³ 407.40

Item 1046(2)a2 Masonry Units (150m Wall) m³ 1,344.90

VIII. FABRICATED MATERIALS AND HARDWARES

Item 1010(2)b (0.90 x 2.40m) Mahogany Panel Door m³ 69.12


with Hardware and Accessories-Cylinder Type Lockset(D-
1)

Item 1010(1)b 50x150mm THK. Mahogany Jamb with set 32.00


Fixed Clear Glass Transom (D-1)

Item 1010(2)a (0.90 x 2.40m) Hollow Core Flush Type m³ 3.78


Swing Door with Marine Plywood Facing Inside and
Ordinary Outside with complete Hardware and
Accessories with Stainless Steel Kicking Plate (D-2)

Item 1010(1) 50x150mm THK. Mahogany Door Jamb set 2.00


(D-2)

Item 1010(2)a (0.80x2.10m) Hollow Core Flush Type m³ 16.80


Swing Door with Marine Plywood Facing Inside and
Ordinary Outside complete with Hardware and
Accessories (D-3)

Item 1010(1) 50x150mm THK. Mahogany Jamb (D-3) set 10.00

Item 1010(2)a (0.80x2.10m) Louvre Door with Complete m³ 8.40


Hardware and Accessories (D-4)

Item 1010(1) 50x150mm THK. Mahogany Jamb (D-4) set 5.00

Item 1010(2)a (0.60x2.10m) Bar Door complete with m³ 12.96


Hardware and Accessories (BD-1)

Item 1010(1) 50x100mm Hollow Core Flush Type Door set 18.00
Jamb (BD-1)

Item 1005(6) (3.60x1.70m) Steel Casement Window l.s. 1.00


6mm THK. Clear Glass Above (W-1)

Item 1009(1)a1 (1.60x1.70m) 5mm THK. Jalousie m³ 87.04


Windows with Clear Glass Blades on Standard Jalouplus
Casing and 50x150mm Concrete Door Jamb Complete
with Hardware and Accessories with 12mm square
security grills (W-2)

Item 1009(1)a1 (1.9X0.635m) 5mm THK. Jalousie m³ 9.65


Windows with Clear Glass Blades on Standard Jalouplus
Casing and 50x150mm Concrete Door Jamb Complete
with Hardware and Accessories (W-3)

Item 1009(1)a2 (0.60x0.635m) 5mm THK. Jalousie m³ 1.91


Windows with Clear Glass Blades on Standard Jalouplus
Casing and 50x150mm Concrete Door Jamb Complete
with Hardware and Accessories (W-4)

Item SPL-4 Blackboard sets 16.00

Item SPL-4 Rail Guard l.s. 1.00

IX. FINISHING WORKS

Item 1018(1) 200x200mm Vitrified Glazed Tiles Wall m³ 264.90


Finish

Item 1018(2) 200x200mm Vitrified Unglazed Tiles Floor m³ 97.73


Finish

Item 1021(1)a Plain cement Finish with Floor Hardener m³ 1,636.12


non-skid

Item 1021(5) Non-skid Cement Floor Finish w/ 6mm m³ 9.10


groove lines

Item 1027(1) Plain Cement Plaster Finish m³ 7,001.04


X. CARPENTRY WORKS

Item 1003 Carpentry for Ceiling with Insulation m³ 466.34

XI. ROOF AND FRAMING WORKS

Item 1013 Pre-Painted Metal Sheets (0.50mm) l.s. 1.00

Item 403(5) Steel Trusses and Lateral Struts kg 6,178.47

Item 403(5) Purlins and Channel Beam kg 6,652.84

Item 403(5) Purlins (Ceiling Support) kg 1,417.05

Item 403(5) Sag Rod kgs. 218.22

Item 404(1)a Cross-Bracing kgs. 280.82

SPL 905 Turn Buckle each 36.00

XII. PAINTING WORKS

Item 1032(1)a Masonry Painting m² 7,124.16

Item 1032(1)b Wooden Painting m² 322.48

Item 1032(1)c Metal Painting m² 165.40

XIII. ELECTRICAL WORKS

Item 1100 Conduits, Boxes and Fitting l.s. 1.00

Item 1101 Wires and Wiring Devices l.s. 1.00

Item 1102 Lighting Fixtures l.s. 1.00

Item 1103 Panel Board and Cabinets l.s. 1.00

Item 1208 Fire alarm Systems l.s. 1.00

XIV. PLUMBING / SANITARY WORKS

Item 1001 Sewer Line Works l.s. 1.00

Item 1002 Sanitary Fixtures l.s. 1.00

Item 1001(9) Downspout/Storm Drainage l.s. 1.00


Item 1002 Cold Waterline Works l.s. 1.00

Item SPL-7 Septic Tank l.s. 1.00

Item SPL–8 Catch Basin units 22.00

XV. MECHANICAL WORKS

Item SPL-9 Fire protection System l.s. 1.00

DESCRIPTION (3) UNIT QUANTITY

A. EIGHT-CLASSROOMS

I. MOBILIZATION / DEMOBILIZATION l.s 1.00

II. TEMPORARY FACILITIES mo 7.00

III. SAFETY AND HEALTH

Item SPL-1 Personal Protective Equipment (PPE) md 16,126.00

Item SPL-2 Safety and Health Personnel md 14.00

Item SPL-3 Signages and Barricades sets 5.00

IV. EARTHWORKS

Item 803(1) Excavation and Footing & Wall Footing m³ 847.43

Item 804(1)a Backfilling of Excavated Materials m³ 599.76

Item 804(1)b Embankment m³ 58.26

Item 8004(3) Gravel Bedding @ CWF, TG, SOF m³ 43.48

V. TERMITE CONTROL WORKS


Item 1000(1) Soil Poisoning liter 316.68

VI. CONCRETE WORKS

Item 900(1)c1 R.C. for Stair m³ 22.91

Item 404(1)a Rein. Steel for Stair kg 5,151.94

Item 900(1)c1 R.C. for Sun Breaker m³ 7.44

Item 404(1)a Rein. Steel for Sun Breaker kg 753.68

Item 900(1)c1 R.C. for Column Footing & WF m³ 280.31

Item 404(1)a Rein. Steel for Column Footing & WF kg 23,858.94

Item 900(1)c1 R.C. for SOF, Corridor and Ramp m³ 41.15

Item 404(1)a Rein. Steel for SOF, Corridor and kg 1,480.19


Ramp

Item 900(1)c1 R.C. for Stair on Grade m³ 2.20

Item 404(1)a Rein. Steel for Stair on Grade kg 153.24

Item 900(1)c1 R.C. for Footing Tie Beam m³ 39.75

Item 404(1)a Rein. Steel for Footing Tie Beam kg 16,664.66

Item 900(1)c1 R.C. for Column, PC & Stiffener m³ 102.21

Item 404(1)a Rein. Steel for Column, PC & Stiffener kg 34,238.39

Item 900(1)c1 R.C. for Second floor Slab m³ 25.15

Item 404(1)a Rein. Steel for Second floor Slab kg 3,811.24

Item 900(1)c1 R.C. for Third floor Slab m³ 25.18

Item 404(1)a Rein. Steel for Third floor Slab kg 3,811.24

Item 900(1)c1 R.C. for Fourth floor Slab m³ 22.30

Item 404(1)a Rein. Steel for Fourth floor Slab kg 3,811.24

Item 900(1)c1 R.C. for Roof Deck for Water Tank m³ 6.25

Item 404(1)a Rein. Steel for Roof Deck for Water Tank kg 621.47

Item 900(1)c1 R.C. for Second floor Beam m³ 29.10


Item 404(1)a Rein. Steel for Second floor Beam kg 5,996.78

Item 900(1)c1 R.C. for Third floor Beam m³ 29.10

Item 404(1)a Rein. Steel for Third floor Beam kg 5,714.16

Item 900(1)c1 R.C. for Fourth floor Beam m³ 29.10

Item 404(1)a Rein. Steel for Fourth floor Beam kg 5,588.64

Item 900(1)c1 R.C. for Roof Beam m³ 21.91

Item 404(1)a Rein. Steel for Roof Beam kg 3,917.86

VII. MASONRY WORKS

Item 1046(2)a1 Masonry Units (100m Wall) m³ 367.30

Item 1046(2)a2 Masonry Units (150m Wall) m³ 1,130.94

VIII. FABRICATED MATERIALS AND HARDWARES

Item 1010(2)b (0.90 x 2.40m) Mahogany Panel Door m³ 51.84


with Hardware and Accessories-Cylinder Type Lockset(D-
1)

Item 1010(1)b 50x150mm THK. Mahogany Jamb with set 24.00


Fixed Clear Glass Transom (D-1)

Item 1010(2)a (0.90 x 2.40m) Hollow Core Flush Type m³ 3.78


Swing Door with Marine Plywood Facing Inside and
Ordinary Outside with complete Hardware and
Accessories with Stainless Steel Kicking Plate (D-2)

Item 1010(1) 50x150mm THK. Mahogany Door Jamb set 2.00


(D-2)

Item 1010(2)a (0.80x2.10m) Hollow Core Flush Type m³ 16.80


Swing Door with Marine Plywood Facing Inside and
Ordinary Outside complete with Hardware and
Accessories (D-3)

Item 1010(1) 50x150mm THK. Mahogany Jamb (D-3) set 10.00

Item 1010(2)a (0.80x2.10m) Louvre Door with Complete m³ 8.40


Hardware and Accessories (D-4)

Item 1010(1) 50x150mm THK. Mahogany Jamb (D-4) set 5.00


Item 1010(2)a (0.60x2.10m) Bar Door complete with m³ 12.96
Hardware and Accessories (BD-1)

Item 1010(1) 50x100mm Hollow Core Flush Type Door set 18.00
Jamb (BD-1)

Item 1005(6) (3.60x1.70m) Steel Casement Window l.s. 1.00


6mm THK. Clear Glass Above (W-1)

Item 1009(1)a1 (1.60x1.70m) 5mm THK. Jalousie m³ 65.28


Windows with Clear Glass Blades on Standard Jalouplus
Casing and 50x150mm Concrete Door Jamb Complete
with Hardware and Accessories with 12mm square
security grills (W-2)

Item 1009(1)a1 (1.9X0.635m) 5mm THK. Jalousie m³ 9.65


Windows with Clear Glass Blades on Standard Jalouplus
Casing and 50x150mm Concrete Door Jamb Complete
with Hardware and Accessories (W-3)

Item 1009(1)a2 (0.60x0.635m) 5mm THK. Jalousie m³ 1.91


Windows with Clear Glass Blades on Standard Jalouplus
Casing and 50x150mm Concrete Door Jamb Complete
with Hardware and Accessories (W-4)

Item SPL-4 Blackboard sets 12.00

Item SPL-4 Rail Guard l.s. 1.00

IX. FINISHING WORKS

Item 1018(1) 200x200mm Vitrified Glazed Tiles Wall m³ 264.90


Finish

Item 1018(2) 200x200mm Vitrified Unglazed Tiles Floor m³ 97.73


Finish

Item 1021(1)a Plain cement Finish with Floor Hardener m³ 1,311.07


non-skid

Item 1021(5) Non-skid Cement Floor Finish w/ 6mm m³ 9.10


groove lines

Item 1027(1) Plain Cement Plaster Finish m³ 5,548.79

X. CARPENTRY WORKS

Item 1003 Carpentry for Ceiling with Insulation m³ 361.94


XI. ROOF AND FRAMING WORKS

Item 1013 Pre-Painted Metal Sheets (0.50mm) l.s. 1.00

Item 403(5) Steel Trusses and Lateral Struts kg 5,132.01

Item 403(5) Purlins and Channel Beam kg 5,597.50

Item 403(5) Purlins (Ceiling Support) kg 1,135.65

Item 403(5) Sag Rod kgs. 169.62

Item 404(1)a Cross-Bracing kgs. 209.68

SPL 905 Turn Buckle each 28.00

XII. PAINTING WORKS

Item 1032(1)a Masonry Painting m² 5,980.62

Item 1032(1)b Wooden Painting m² 271.12

Item 1032(1)c Metal Painting m² 135.09

XIII. ELECTRICAL WORKS

Item 1100 Conduits, Boxes and Fitting l.s. 1.00

Item 1101 Wires and Wiring Devices l.s. 1.00

Item 1102 Lighting Fixtures l.s. 1.00

Item 1103 Panel Board and Cabinets l.s. 1.00

Item 1208 Fire alarm Systems l.s. 1.00

XIV. PLUMBING / SANITARY WORKS

Item 1001 Sewer Line Works l.s. 1.00

Item 1002 Sanitary Fixtures l.s. 1.00

Item 1001(9) Downspout/Storm Drainage l.s. 1.00

Item 1002 Cold Waterline Works l.s. 1.00

Item SPL-7 Septic Tank l.s. 1.00


Item SPL–8 Catch Basin units 18.00

XV. MECHANICAL WORKS

Item SPL-9 Fire protection System l.s. 1.00

You might also like