ISGEC / IMS / SP / OCP – 11 / F-17 Rev-00 12.12.

19

JOB SAFETY ANALYSIS (JSA)

Site Name : FGD NTPC- Kudgi Date: 23-11-2023 Revision-00


JSA No. ISGEC /JSA- 54
Project code : FE 0001
Activity name: Pickling & Passivation work

Equipment: Hydro jet machine. Supervisor: H.Giri Prepared by: Mr.Ramesh Palnati

Department: Mechanical Location: U-1 Absorber Reviewed by: Mr.Arun

a) Required Personal Protective Equipment (PPE):

Eye Clothing Foot Face Hand Respiratory Head Hearing Other ____________________

(b) Equipment Operated (Yes / No):

(c) Environmental Conditions:

Inside Outside Cold Heat Wet Dust Vapours / Mist Noise Vibration Other____________________

(d) Primary Positions:

Lifting Grasping Pushing Sitting Reaching Bending Kneeling Standing Pulling Squatting Other__________________________

(e) Potential Hazards

Others Site Work: - Site Conditions___Fuel / Lubricants___ Hazardous Chemicals___Mobile Plant / Vehicles___ Deep Excavation_____Vibration___ Explosion__ Work Near Water___ Falls
From Height__ Trips / Falls___ Fall of Material__ Fumes / Gas__ Lifting Operations___ Flying Particles__ Collapse of Structure___ Contaminated Ground___ Soft Ground___ Poor Light /
Visibility_____ Buried Services___ Manual Handling___Vehicle Overturning___ Adverse Weather Dust___ Heat__ Eye Hazard__ Ear Hazard__ Respiratory Hazard__

1
Head Hazard__ Hand Hazard__ Foot Hazard__ Radiation Hazard__ Electrical Hazard__ Fire Hazard__ Other Hazards

(f) List of specific hazards :


1. Fall of material 2. Falling of personnel 3. Defective equipment 4. Contact with chemicals 5. Improper storage & handling of chemicals 6.Poor illumination & ventilation

Sl.
Sequence of Operation – Activity Steps Hazard Recommended safe job procedures Action by
No.

1.Working platform with safe access/egress shall be


ensured, clearance should be taken from HSE dept
2.Complete working platform without gaps shall be
 Improper access/egress
ensured
 Incomplete working 3.Double handrail must be installed to working platform
platform 4.Job material shall be securely stacked & unwanted
 Gaps between working loose material should be removed
platform 5.Full body harness must be worn and anchored to rigid
Provision of Safe working  Working platform without Site Engineer /
1 support
platform or Man lifter edge protection Supervisor
6.Only trained & skilled manpower shall be engaged
 Unsecure material 7 Only authorized & competent operator shall be
 Fall of men & material engaged for safe operation of man lifter.
 Unauthorized operation 8. All hydraulic hose pipes shall be inspected for
 Hydraulic oil leakages
leakages & attended immediately prior to start the job.
 Defective equipment
9. Physical inspection of Man lifter to be ensured for
defects & emergency stop knob shall be in working
condition.
2 Mechanical cleaning work inside  Airborne particulates 1.Job specific PPEs shall be worn while cleaning with SS Site Engineer /
Absorber( Inside of Turret, cone &  Metal dust brush/Nylon brush Supervisor
shell )  Fall of men & material 2.Safe working platform with safe access & egress to be
 Improper access & egress provided
 Defective equipment 3.Job material shall be securely placed & unwanted
 Failure of equipment loose material should be removed
2
Sl.
Sequence of Operation – Activity Steps Hazard Recommended safe job procedures Action by
No.

4.Safe access with double handrail working platform


shall be provided
 Damaged hydro jet hose 5. Full body harness must be worn and anchored to rigid
support at all the time
6.Ensure Calibration certificate to Hydro jet machine &
all parts should be free from damage & defects
3 Degreasing, Pickling &  Spillage of chemicals 1.Chemicals should be storage properly Site Engineer /
Passivation work  Contact with Chemicals 2.Coverall shall be worn to avoid chemical contact & Supervisor
agents spillages
 Unauthorized entry 3.Only authorized & trained skill personnel shall be
 Corrosive skin & eye burns deployed
 Inhalation of chemical 4.Job specific PPE(Coverall, respiratory mask, rubber
fumes hand gloves & Goggles should be worn during chemical
 Fall of men & material handling
 Improper storage & 5. Safe access with double handrail working platform
handling of chemicals shall be provided
 Poor illumination & 6.Full body harness must be worn and anchored to rigid
ventilation support at all the time
 Poor housekeeping 6.MSDS shall be communicated and displayed at work
place
7.Chemicals shall be handled as per MSDS
8. Water to be kept nearby while handling chemicals&
resin the water in case of contact
9.Safe storage of chemicals shall be made as per MSDS
10.Sufficient illumination to be ensured & Exhaust
blower shall be installed to purge the fresh air
11.Hydro jet machine should be calibrated, water hose
should be securely clamped at fitting area & inspected
on daily basis
3
Sl.
Sequence of Operation – Activity Steps Hazard Recommended safe job procedures Action by
No.

12.Authorized electrician shall be available during the


work
13.Generated scrap & wastages disposed as per MSDS
 Damaged hose 1.Air hose should be free from damage & leakages
 Hit by hose during 2.Trained workmen shall be engaged
operation 3.working platform should be free from obstacles &
Shell surface drying by  Trips hose should be routed safely Site Engineer /
4
compressed air  Defective equipment 4.Tested equipment’s & trained workmen shall be Supervisor
 Failure of equipment engaged
5.Equipments shall be inspected on daily basis for
defects and rectified

 Fall of men & material 1.Full body harness must be worn & anchored to rigid
 Insufficient illumination & support during inspection
ventilation 2.Sufficient illumination & ventilation shall be ensured Site Engineer /
5 Visual inspection
 Hit by structure while carryout the inspection Supervisor
 Trips 3.Access & working platforms shall be free from loose
materials & obstacles

1. Proper training on emergency to all workmen shall be


All workmen who involving in the conducted to avoid panic situation during emergency Site Engineer /
6 Emergency
work condition. Supervisor
2. Emergency no displayed on site.

7 Night work Visibility. Site Engineer /


Fatigue 1. Low visibility hazard must be emphasized in tool box Supervisor
meeting
4
Sl.
Sequence of Operation – Activity Steps Hazard Recommended safe job procedures Action by
No.

2. Ensure sufficient site lighting for job where required.


3. Adhere to good fatigue management practices.
4. Get a good session of sleep prior to commencing
shift.
5. Report to foremen/supervisor when symptoms of
fatigue affect safe operation.

8 If any

Signature: Signature:
Name of site Safety In-charge : Mr. Arun Name of Site In-charge : Mr.Kumar Babu