area of 5 hectares has a permanent on its vertical side. Neglecting uplift elevation 366 m. Assume all pipes
(el.395 m)
crest elevation of 75 m. How long pressure, what is the stress at the have the same friction factor
3
will it take for the water to be drawn heel? Wt. of concrete is 2200 kg/m f = 0.02 and pressure at point P is 130
2
from elevation 76.5 m to elevation a. 39 773 kg/m kPa. d e
75.5 m? Use Francis formula. b. 38 000 kg/m2 Pipeline Diameter Length
a. 65.14 mins c. 43 452 kg/m2 mm (m) (el.312 m)
P(el.366 m)
2
b. 23.51 mins d. 34 414 kg/m 1 200 1000
c. 49.81 mins 2 150 1500 c
d. 19.56 mins PROBLEM #18: 3 350 800 Figure H00 -1