Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 25

PEKERJAAN GALIAN BIASA

Badan Jalan & Bahu Jalan


Luas Area pada
Panjang jalan
No. Station ACAD
M3 M
1 3+050 - 3+075 2.771 25
2 3+075 - 3+100 3.747 25
3 3+100 - 3+125 1.797 25
4 3+125 - 3+150 5.994 25
5 3+150 - 3+175 49.428 25
6 3+250 - 3+275 25.26 25
7 3+275 - 3+300 2.187 25
8 3+300 - 3+325 2.667 25
9 3+325 - 3+350 17.394 25
10 3+350 - 3+375 41.036 25
11 3+375 - 3+400 53.636 25
12 3+400 - 3+425 12.447 25
13 3+500 - 3+525 4.169 25
14 3+525- 3+550 3.874 25
15 3+550 - 3+575 2.408 25
16 3+600 - 3+625 0.35 25
17 3+775 - 3+800 34.89 25
18 3+975 - 4+000 25.576 25
19 4+150 - 4+175 0.14 25
20 4+175 - 4+200 kalipang
21 4+200 - 4+225
22 4+225 - 4+250 kalipang
23 4+300 - 4+325 5.659 25
24 4+325 - 4+350 1.874 25
25 4+350 - 4+375 15.944 25
26 4+375 - 4+400 34.702 25
27 4+400 - 4+425 20.637 25
28 4+425 - 4+450 11.279 25
29 4+450 - 4+475 4.92 25
30 4+475 - 4+500 12.884 25
31 4+500 - 4+525 66.029 25
32 4+525- 4+550 90.31 25
33 4+550 - 4+575 40.403 25
34 4+575 - 4+600 6.694 25
35 4+600 - 4+625 8.923 25
36 4+625 - 4+650 29.657 25
37 4+650 - 4+675 40.099 25
38 4+675 - 4+700 30.852 25
39 4+700 - 4+725 0.114 25
40 4+800 - 4+825 13.012 25
41 4+825 - 4+850 17.078 25
42 4+850 - 4+875 7.826 25
43 4+875 - 4+900 4.181 25
44 4+900 - 4+925 14.787 25
45 5+150 - 5+175 21.244 25
46 5+175 - 5+200 17.359 25
47 5+325 - 5+350 42.074 25
48 5+450 - 5+475 36.565 25
49 5+600 - 5+625 1.817 25
50 5+625 - 5+650 2.725 25
51 5+675 - 5+700 10.689 25
52 5+700 - 5+725 48.28 25
53 5+725 - 5+750 6.478 25
54 5+775 - 5+800 38.162 25
55 5+900 - 5+925 1.955 25
56 TOTAL VOLUME TIMBUNAN BIASA
SA PEKERJAAN TIMBUNAN BIASA
Badan Jalan & Bahu Jalan
Luas Area pada Luas Area pada
Vol. Pek.
No. Station ACAD ACAD
M3 M3 M
69.275 1 3+025 - 3+050 37.832
93.675 2 3+050 - 3+075 22.402
44.925 3 3+075 - 3+100 14.964
149.850 4 3+100 - 3+125 13.677
1235.700 5 3+125 - 3+150 1.268
631.500 6 3+275 - 3+300 2.779
54.675 7 3+300 - 3+325 2.957
66.675 8 3+425 - 3+450 9.426
434.850 9 3+450 - 3+475 12.912
1025.900 10 3+475 - 3+500 5.975
1340.900 11 3+550 - 3+575 1.073
311.175 12 3+575 - 3+600 8.941
104.225 13 3+600 - 3+625 5.771
96.850 14 3+625 - 3+650 0.553
10.881 15 3+800 - 3+825 25.208
8.750 16 3+825 -3+850 68.617
872.250 17 3+850 - 3+875 86.623
639.400 18 3+875 - 3+900 94.833
3.500 19 3+900 - 3+925 63.147
20 3+925 - 3+950 23.729
21 3+950 - 3+975 11.295
22 4+150 - 4+175 17.939
141.475 23 4+250 - 4+275 43.529
46.850 24 4+275 - 4+300 27.966
398.600 25 4+300 - 4+325 2.5
867.550 26 4+325 - 4+350 3.002
515.925 27 4+425 - 4+450 3.023
281.975 28 4+450 - 4+475 7.611
123.000 29 4+475 - 4+500 0.475
322.100 30 4+575 - 4+600 7.087
1650.725 31 4+600 - 4+625 2.197
2257.750 32 4+700 - 4+725 9.464 0.418
1010.075 33 4+725 - 4+750 49.585
167.350 34 4+750 - 4+775 51.365
223.075 35 4+775 - 4+800 43.514
741.425 36 4+800 - 4+825 19.874
1002.475 37 4+825 - 4+850 13.85
771.300 38 4+850 - 4+875 14.994
2.850 39 4+875 - 4+900 22.702
325.300 40 4+900 - 4+925 0.479
426.950 41 5+000 - 5+025 3.448
195.650 42 5+150 - 5+175 0.212
104.525 43 5+175 - 5+200 0.228
369.675 44 5+200 - 5+225 8.281
531.100 45 5+225 - 5+250 36.677
433.975 46 5+250 - 5+275 54.539
1051.850 47 5+275 - 5+300 50.435
914.125 48 5+300 - 5+325 20.404
45.425 49 5+475 - 5+500 52.634
68.125 50 5+500 - 5+525 91.422
267.225 51 5+525- 5+550 80.908
1207.000 52 5+550 - 5+575 55.515
161.950 53 5+575 - 5+600 26.63
954.050 54 5+600 - 5+625 13.275
12.049 55 5+625 - 5+650 11.33
24,788.430 56 5+650 - 5+675 15.243
57 5+725 - 5+750 1.67
58 5+750 - 5+775 8.724
59 5+900 - 5+925 1.427
60 5+925 - 5+950 64.364
61 5+950 - 5+975 86.967
62 5+975 - 6+000 75.936
63 TOTAL VOLUME TIMBUNAN BIASA
AN BIASA
u Jalan No. Bagian Volume
1
Panjang jalan Vol. Pek.
2
M M3
25 945.800
25 560.050
25 374.100
25 341.925
25 31.700
25 69.475
25 73.925
25 235.650
25 322.800
25 149.375
25 26.825
25 223.525
25 144.275
25 13.825
25 630.200
25 1715.425
25 2165.575
25 2370.825
25 1578.675
25 593.225
25 282.375
25 448.475
25 1088.225
25 699.150
25 62.500
25 75.050
25 75.575
25 190.275
25 11.875
25 177.175
25 54.925
25 247.050
25 1239.625
25 1284.125
25 1087.850
25 496.850
25 346.250
25 374.850
25 567.550
25 11.975
25 86.200
25 5.300
25 5.700
25 207.025
25 916.925
25 1363.475
25 1260.875
25 510.100
25 1315.850
25 2285.550
25 2022.700
25 1387.875
25 665.750
25 331.875
25 283.250
25 381.075
25 41.750
25 218.100
25 35.675
25 1609.100
25 2174.175
25 1898.400
IASA 40395.625
Badan Jalan & Bahu Jalan
Luas Area pada Luas Area pada
Panjang jalan
No. Station ACAD ACAD
M3 M M
1 3+175 - 3+200 82.663 25
2 3+200 - 3+225 109.068 25
3 3+225 - 3+250 86.067 25
4 3+625 - 3+650 0.693 25
5 3+650 - 3+675 36.745 25
6 3+675 - 3+700 49.764 25
7 3+700 - 3+725 96.395 25
8 3+725 - 3+750 116.796 25
9 3+750 - 3+775 96.685 25
10 4+000 - 4+025 64.159 25
11 4+025 - 4+050 89.34 25
12 4+050 - 4+075 107.734 25
13 4+075 - 4+100 97.225 25
14 4+100 - 4+125 75.268 25
15 4+125 - 4+150 31.355 25
16 4+925 - 4+950 58.85 25
17 4+950 - 4+975 79.246 25
18 4+975 - 5+000 37.016 25
19 5+000 - 5+025 13.867 25
20 5+025 - 5+050 37.971 25
21 5+050 - 5+075 93.86 25
22 5+075 - 5+100 106.379 25
23 5+100 - 5+125 55.306 25
24 5+350 - 5+375 158.835 25
25 5+375 - 5+400 217.064 25
26 5+400 - 5+425 258.013 25
27 5+425 - 5+450 188.581 25
28 5+800 - 5+825 151.402 25
29 5+825 - 5+850 208.604 25
30 5+850 - 5+875 215.78 25
31 5+875 - 5+900 118.61 25
32 TOTAL VOLUME GALIAN BATU
Vol. Pek.
M3
2066.575
2726.700
2151.675
17.325
918.625
1244.100
2409.875
2919.900
2417.125
1603.975
2233.500
2693.350
2430.625
1881.700
783.875
1471.250
1981.150
925.400
346.675
949.275
2346.500
2659.475
1382.650
3970.875
5426.600
6450.325
4714.525
3785.050
5215.100
5394.500
2965.250
78,483.525
Badan Jalan
Lajur Kanan Lajur Kiri
No. Station Lebar Tinggi/Tebal Luas Lebar Tinggi/Tebal
M M M2 M M
1 3+025 - 3+050 7.5 0.2 1.5
2 3+050 - 3+075 7.5 0.2 1.5
3 3+075 - 3+100 7.5 0.2 1.5
4 3+100 - 3+125 7.5 0.2 1.5
5 3+125 - 3+150 7.5 0.2 1.5 1.444 0.2
6 3+150 - 3+175 - - - - -
7 3+175 - 3+200 - - - - -
8 3+200 - 3+225 - - - - -
9 3+225 - 3+250 - - - - -
10 3+250 - 3+275 - - - - -
11 3+275 - 3+300 7.5 0.2 1.5
12 3+300 - 3+325 7.5 0.2 1.5
13 3+325 - 3+350 7.5 0.2 1.5
14 3+350 - 3+375 - - - - -
15 3+375 - 3+400 - - - - -
16 3+400 - 3+425 - - - - -
17 3+425 - 3+450 - - - - -
18 3+450 - 3+475 7.5 0.2 1.5
19 3+475 - 3+500 7.5 0.2 1.5
20 3+500 - 3+525 7.5 0.2 1.5
21 3+525- 3+550 7.5 0.2 1.5
22 3+550 - 3+575 7.5 0.2 1.5
23 3+575 - 3+600 7.5 0.2 1.5
24 3+600 - 3+625 7.5 0.2 1.5
25 3+625 - 3+650 - - - - -
26 3+650 - 3+675 - - - - -
27 3+675 - 3+700 - - - - -
28 3+700 - 3+725 - - - - -
29 3+725 - 3+750 - - - - -
30 3+750 - 3+775 - - - - -
31 3+775 - 3+800 - - - - -
32 3+800 - 3+825 7.5 0.2 1.5
33 3+825 -3+850 7.5 0.2 1.5
34 3+850 - 3+875 7.5 0.2 1.5
35 3+875 - 3+900 7.5 0.2 1.5
36 3+900 - 3+925 7.5 0.2 1.5
37 3+925 - 3+950 7.5 0.2 1.5
38 3+950 - 3+975 7.5 0.2 1.5
39 3+975 - 4+000 - - - - -
40 4+000 - 4+025 - - - - -
41 4+025 - 4+050 - - - - -
42 4+050 - 4+075 - - - - -
43 4+075 - 4+100 - - - - -
44 4+100 - 4+125 - - - - -
45 4+125 - 4+150 7.5 0.2 1.5
46 4+150 - 4+175 jembatan kalipang
47 4+175 - 4+200
48 4+200 - 4+225
49 4+225 - 4+250 jembatan kalipang
50 4+250 - 4+275 7.5 0.2 1.5
51 4+275 - 4+300 7.5 0.2 1.5
52 4+300 - 4+325 7.5 0.2 1.5
53 4+325 - 4+350 7.5 0.2 1.5
54 4+350 - 4+375 - - - - -
55 4+375 - 4+400 - - - - -
56 4+400 - 4+425 - - - - -
57 4+425 - 4+450 1.02 0.2 0.204 - -
58 4+450 - 4+475 7.5 0.2 1.5 0.139 0.2
59 4+475 - 4+500 - - - - -
60 4+500 - 4+525 - - - - -
61 4+525- 4+550 - - - - -
62 4+550 - 4+575 - - - - -
63 4+575 - 4+600 1.494 0.2
64 4+600 - 4+625 - - - - -
65 4+625 - 4+650 - - - - -
66 4+650 - 4+675 - - - - -
67 4+675 - 4+700 - - - - -
68 4+700 - 4+725 7.5 0.2 1.5
69 4+725 - 4+750 7.5 0.2 1.5
70 4+750 - 4+775 7.5 0.2 1.5
71 4+775 - 4+800 7.5 0.2 1.5
72 4+800 - 4+825 7.5 0.2 1.5
73 4+825 - 4+850 7.5 0.2 1.5
74 4+850 - 4+875 7.5 0.2 1.5
75 4+875 - 4+900 7.5 0.2 1.5
76 4+900 - 4+925 - - - - -
77 4+925 - 4+950 - - - - -
78 4+950 - 4+975 - - - - -
79 4+975 - 5+000 - - - - -
80 5+000 - 5+025 0.384 0.2 0.0768
81 5+025 - 5+050 - - - - -
82 5+050 - 5+075 - - - - -
83 5+075 - 5+100 - - - - -
84 5+100 - 5+125 - - - - -
85 5+125 - 5+150 - - - - -
86 5+150 - 5+175 - - - - -
87 5+175 - 5+200 - - - - -
88 5+200 - 5+225 7.5 0.2 1.5
89 5+225 - 5+250 7.5 0.2 1.5
90 5+250 - 5+275 7.5 0.2 1.5
91 5+275 - 5+300 7.5 0.2 1.5
92 5+300 - 5+325 7.5 0.2 1.5
93 5+325 - 5+350 7.5 0.2 1.5
94 5+350 - 5+375 7.5 0.2 1.5
95 5+375 - 5+400 7.5 0.2 1.5
96 5+400 - 5+425 7.5 0.2 1.5
97 5+425 - 5+450 7.5 0.2 1.5
98 5+450 - 5+475 7.5 0.2 1.5
99 5+475 - 5+500 7.5 0.2 1.5
100 5+500 - 5+525 7.5 0.2 1.5
101 5+525- 5+550 7.5 0.2 1.5
102 5+550 - 5+575 7.5 0.2 1.5
103 5+575 - 5+600 7.5 0.2 1.5
104 5+600 - 5+625 7.5 0.2 1.5
105 5+625 - 5+650 7.5 0.2 1.5
106 5+650 - 5+675 7.5 0.2 1.5
107 5+675 - 5+700 7.5 0.2 1.5
108 5+700 - 5+725 7.5 0.2 1.5
109 5+725 - 5+750 7.5 0.2 1.5
110 5+750 - 5+775 7.5 0.2 1.5
111 5+775 - 5+800 7.5 0.2 1.5
112 5+800 - 5+825 7.5 0.2 1.5
113 5+825 - 5+850 7.5 0.2 1.5
114 5+850 - 5+875 7.5 0.2 1.5
115 5+875 - 5+900 7.5 0.2 1.5
116 5+900 - 5+925 7.5 0.2 1.5
117 5+925 - 5+950 7.5 0.2 1.5
118 5+950 - 5+975 7.5 0.2 1.5
119 5+975 - 6+000 7.5 0.2 1.5
TOTAL VOLUME
PEKERJAAN TANAH
Pekerjaan Timbunan Pilihan

jur Kiri Lajur Kanan


Panjang Vol. Pek
Luas Lebar (a) Lebar (b) Tebal 1 Tebal 2
M2 M M3 M M M
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
0.2888 25 44.72 3.126 2.923 0.2 0.196
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 - - - -
- - - - - -
- - - - - -
- - - - - -
- - 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
25 75 - - - -
3.126 2.923 0.2 0.196
jembatan kali pang

jembatan kali pang


25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
- - - - - -
- - - - - -
- - - - - -
- 25 5.1 3.126 2.923 0.2 0.196
0.028 25 38.195 3.126 2.923 0.2 0.196
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
0.299 25 7.47 - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
- - - - - -
- - - - - -
- - - - - -
- - - - - -
25 1.92 3.126 2.923 0.2 0.196
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
25 75 3.126 2.923 0.2 0.196
5047.405
NAH
han
Bahu Jalan
nan Lajur Kiri
T rata-rata Luas Lebar (a) Lebar (b) Tebal 1 Tebal 2
M M2 M M M
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599 - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.198 0.599
0.198 0.599
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.198 0.599

0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
- - - - - -
- - - - - -
- - - - - -
0.198 0.599
0.198 0.599
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - 3.126 2.923 0.2 0.196
- - 3.129 2.923 0.2 0.196
- - - - - -
- - - - - -
- - - - - -
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599 0.787 0.787 0.2 0.198
0.198 0.599 0.504 0.504 0.2 0.2
0.198 0.599
0.198 0.599
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.198 0.599
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
0.198 0.599
TOTAL VOLUME
No. Bagian
ri 1 Badan jalan
Panjang Vol. Pek
T rata-rata Luas 2 Bahu jalan
M M2 M M3 TOTALVOLUME
25 29.943
25 29.943
25 29.943
25 29.943
- - 25 14.971
- - -
- - -
- - -
- - -
- - -
25 29.943
25 29.943
- - -
- - -
- - -
- - -
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
- - -
- - -
- - -
- - -
- - -
- - -
- - -
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
- - -
- - -
- - -
- - -
- - -
- - -
- - -
25 29.943

25 29.943
25 29.943
25 29.943
25 29.943
- - -
- - -
- - -
25 14.971
25 14.971
- - -
- - -
- - -
- - -
0.198 0.599 25 14.971
0.198 0.599 25 14.979
- - -
- - -
- - -
25 29.943
25 29.943
25 29.943
25 29.943
0.199 0.157 25 18.887
0.2 0.101 25 17.491
25 29.943
25 29.943
- - -
- - -
- - -
- - -
25 14.971
- - -
- - -
- - -
- - -
- - -
- - -
- - -
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
25 29.943
2042.536
Satuan Volume
M3 5,047.41
M3 2,042.54
7,089.94
pekerjaan Aggregate Base A
Aggregate Base A
Volume pekerjaan
Lebar atas Lebar Bawah
Tinggi (t) panjang (p)
No. Item Pekerjaan (a) (b)
M M M M
1a agregate Base A (badan jalan) 11.214 11.846 0.3 2775
2 AC-BC 7.586 7.71 0.06 2775
3 AC-WC 7.5 7.586 0.04 2775

Perhitungan trotoar
alas (a) tinggi (t) Panjang (p) Volume
No. Item Pekerjaan
M M M M3
1b agregate Base A (Trotoar) 1.752 0.1 2750 481.8
TOTAL VOLUME (1a + 1b) agregat Base A 10080.525

No. Bahan bagian Panjang (p) Lebar (l) Koefisien

1 Prime Coat Badan jalan 2775 7.5 0.8


2 Take Coat Badan jalan 2775 7.5 0.35
Volume

M3
9598.725
1273.392
837.273

Ket. Vol.

koefisien dari 16,650.00


peraturan Bina
Marga 7,284.37

You might also like