1 2 3 4 5 6 7 8

A A

B B

C C

D D

Date of Checked : Drawing Number

Checked by : Plant :

Approved by : File Name


E E
Number of Pages : 23 2C50FB2B-5C3A-4BC0-8C0F-2E827CCE6565.VSD
D:\working\waccache\wac\visiowebeditcache\NT AUTHORITY_NETWORK SERVICE\
Directory :
e02f2177-c619-49a9-bc37-f063e7cf7e58\

F F

G G

C DATE 23-07-2006 DESCRIPTION EQUIPMENT NUMBER DRAWING NUMBER


H B DRAWN ASRUL.A COVER SHEET H

A CHECKED PURW AKARTA - IN DO NE SIA PLANT / LOCATION FEEDER FILE NAME PRINTED PAGE NUMBER
E LECTRI C DE PARTM ENT
REVISION NAME DATE APPROVED 2C50FB2B-5C3A-4BC0-8C0F-2E827CCE6565.VSD 14 NOV, 2022 1 OF 23

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A NO NAME OF EQU IPMEN TS E. NUMBER CUBICAL PAGE A


1 COVER SHEETS 1
2 DRAWING LIST 2
3 AC DISTRIBUTION CIRCUITS 3
4 110 VDC DISTRIBUTION CIRCUITS 4
5 24 VDC DISTRIBUTION CIRCUITS 5
6 SLD TURBINE CONTROL PANEL 6
7 THREE PHAS E CT- PT CIRCUITS 7
B 8 GENERATOR PROTECTION RELAY ( P343 ) CIRCUITS 8 B
9 MASTER ( MF R3 ) CONTROL CONNECTION CIRCUITS 9
10 GOVERNOR WOODWARD ( 505 ) CONNECTION 10
11 AVR CONTROL CIRCUITS 11
12 SYNCHRONIZING CHECK & METERING CIRCUITS 12
13 86 G & 86 T TRIP RELAY CIRCUITS 13
14 TURBINE ALARM & TRIP CIRCUITS 14
15 24 VDC RELAY CIRCUITS 15
C 16 52 GCB CONTROL CIRCUITS ( CLOSING & TRIPPING ) 16 C
17 VCB CIRCUITS 17
18 TEMP.SCANNER (ALTERNATOR WINDING & BEARING) 18
19 EXHAUST TEMPERATURE SENSING CIRCUITS 19
20 PLC TERMINAL DIAGRAM 20
21 TURBINE CTRL.PNL.ENGINE SPEED & LOAD SHARING 21
22 - 22
23 - 23
D 24 - 24 D
25 25
26
27
28
29
30
31
E E
32
33
34
35
36
37
38
39
F F
40
41
42
43
44
45

G G

DESCRIPTION EQUIPMENT NUMBER DRAWING NUMBER


C DATE 23-07-2006
H B DRAWN ASRUL.A H
PLANT / LOCATION FEEDER FILE NAME PRINTED PAGE NUMBER
A CHECKED PURW AKARTA - IN DO NE SIA
2C50FB2B-5C3A-4BC0-8C0F-2E827CCE6565.VSD 14 NOV, 2022 2 OF 23
E LECTRI C DE PARTM ENT
REVISION NAME DATE APPROVED

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

TB-220 VAC:L1 TB A L1
INPUT 1-PH L1
From Panel
TB-220 VAC:N TB A N
Auxiliary N
A A
Lub Oil

220 VAC / 50 Hz

B B

1 1 1 1 1 1 1 1 1 1 1 1
FS 1 FS 2 FS 3 FS 4 FS 5 FS 6 FS 7 FS 8 FS 9 FS 10 FS 11 FS 12
6A 2 2 6A 2A 2 2 2A 4A 2 2 4A 20A 2 2 20A 10A 2 2 10A 10A 2 2 10A
C C

TB A 1 2

01
52GX
02
Thermostat
3
3
DOOR
D SW SWITCH D
4 4
1 1
Space
Heater
TL1 TL2
2 2
L1 N
L1 N
TB A 3 4 5 6 7 8 9 10 11 12

E E

page 20 /B. 1

page 20 /B. 1
TBH TBH

H1
page 18 /A.2
page 18 /A.1

1 2

not yet in stall 220V AC ON

Space Heater
Alternator
Indication
MX 3-1 MX 3-N

F F
(Alternator Winding & Bearing)

Voltage Tranducer
PLC Terminal
Diagram
Temp eratu re
Scanner

G G

DESCRIPTION EQUIPMENT NUMBER DRAWING NUMBER


C DATE 23-07-2006
H AC DISTRIBUTION CIRCUITS H
B DRAWN ASRUL.A
PLANT / LOCATION FEEDER FILE NAME PRINTED PAGE NUMBER
A CHECKED PURW AKARTA - IN DO NE SIA
2C50FB2B-5C3A-4BC0-8C0F-2E827CCE6565.VSD 14 NOV, 2022 3 OF 23
E LECTRI C DE PARTM ENT
REVISION NAME DATE APPROVED

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

T B-110 VD C: 01
+110 V
Input From 110V
JB Q3 T B-110 VD C: 02
A -110 V A

110 VDC
+

B - B

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1FS 1 1FS 2 1FS 3 1FS 4 1FS 5 1FS 6 1FS 7 1FS 8 1FS 9 1FS 10 1FS 13 1FS 1 4 1FS15 1 FS 16 1FS11 1FS12
6A 6A 6A 6A 6A 6A 10A 10A 6A 6A 4A 4A 6A 6A
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
C C

page 13/A.1

page 13/A.4

page 13/A.5

page 13/A.7

page 14/A.2

page 14/F.2
110V DC ON
Indication
1 2
+ - + - + - + -
H2
+ - + - TBXC :+ TBXC :- PB01
J1 J2 1 2 Test Button F
D DC Supervisio n Relay D

Spare
Spare
80DC
page 8/A.5 page 12/D.8 7 8

Turbine alarm
Tripping Relay

Tripping Relay

& Trip Circuit


86 G & 86 T

86 G & 86 T
GPR CIRCUTOR 3 4
110VDC

Circuits
Circuits

Supply Fail
F Indication
1 2

Check & MeteringCircuit


3 4
H3

Synchroniz ing
E E

5 F 6 page 20 /B. 7
MX 3-1
PLC Terminal
page 20 /B. 1 Diagram
MX 3-21

F F

G G

DESCRIPTION EQUIPMENT NUMBER DRAWING NUMBER


C DATE 23-07-2006
H 110 VDC DISTRIBUTION CIRCUITS H
B DRAWN ASRUL.A
PLANT / LOCATION FEEDER FILE NAME PRINTED PAGE NUMBER
A CHECKED PURW AKARTA - IN DO NE SIA
2C50FB2B-5C3A-4BC0-8C0F-2E827CCE6565.VSD 14 NOV, 2022 4 OF 23
E LECTRI C DE PARTM ENT
REVISION NAME DATE APPROVED

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

TB-24VDC:01
Fro m +
A Battery A
Charger TB-24VDC:02
-

B B

1 1 1 1 1 1 1 1
2FS 1 2FS 2 2FS 3 2FS 4 2FS 5 2FS 6 2FS 7 2FS 8
6A 2 2 6A 6A 2 2 6A 2 2 6A 2 2 6A
C C

+ - + -
+ -
Page 9/H.7

Page 9/H.7
Page 15/A.1

Page 15/F.1

+ -

D 122 121 D
1 2 H4
1 2

page 10/H.7 24VDC Supply


GOVERNOR ON I ndication

SPARE
24VDC Relay Circuits

MULTI FUNCTION RELAY (MFR 3 ) CIRCUITS

E PB02 E
Test Button 24 VDC
Supervision CKT

1 2
+ -
F1
F1 24 VDC Supply Fail Indication
1 2
3 4
F H5 F

F1

5 6 page 20 /B. 7
MX 3-1
PLC Terminal Diagram
page 20 /B. 1
MX 3-22
G G

DESCRIPTION EQUIPMENT NUMBER DRAWING NUMBER


C DATE 23-07-2006
H 24 VDC DISTRIBUTION CIRCUITS H
B DRAWN ASRUL.A
PLANT / LOCATION FEEDER FILE NAME PRINTED PAGE NUMBER
A CHECKED PURW AKARTA - IN DO NE SIA
2C50FB2B-5C3A-4BC0-8C0F-2E827CCE6565.VSD 14 NOV, 2022 5 OF 23
E LECTRI C DE PARTM ENT
REVISION NAME DATE APPROVED

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

MAIN BUSBAR
2xPT
6.6K/110V
TB1-PT TB1-PT
A 1,2,3,4 1,2,3 A

2-3,4-5

25
CAHECK
SYNCH
TB1-CT TB1-CT SPMA
1,2,3,4,5 ,6 1,2,3
R10
B 6-7,8-9 B
2xPT
6.6K/110V PTT
TB2-PT TB2-PT
1,2,3,4 1,2,3
1 2
R
3xPT
12 OHM
6.6K/110V
TB3-PT TB3-PT
1,2,3,4,5 ,6 1,2,3,4
C C
GENERATOR SWITCH GEAR PANEL C19,C2 0,C21,C22 20,21,22 50,51,52 23,24
14,13,12

10,9 RT0 1
2xPT
6.6K/110V SWIT CH
TD1,TD2,TD3 Auto -
Ma nua l 1,2,3
T01,T02,T03
1xPT
6.6K/110V
AVR P343 MFR 3 10,11,12
TA1,TA2 TR 1: 86 G (NO)
1,2
D TR1 ,TR2 TR 2: A-M SWITC H
TVM D
C1,C4, C7 C2,C5, C8 CIRCUTOR

5,6 AL01
C13,C1 4 C10,C1 1 26,30,32 25,29,31 5,7,9 4,6,8
EXCITER E+1,E-1 E+1,E-1
3XC T TB2-CT TB2-CT CTT
200/5A 1,2,3,4,5 ,6 1,2,3,4
3XC T
E 1Y1,1Y 2 E
400/5A 1Y1,1Y 2

GENERATOR

F F
VC
1XC T TB-64 TB-64
500/5A 8,9 8,9

G G

1XC T TB-CTN TB-CTN


50/5A 1,2 1,2
NEUTRAL GROUNDING
RESISTANCE PANEL
DESCRIPTION EQUIPMENT NUMBER DRAWING NUMBER
C DATE 23-07-2006
H TURBINE CONTROL PANEL - SINGLE LINE DIAGRAM H
B add Circutor, MFR3 ASRUL.A 22 Juni 04 DRAWN ASRUL.A
PLANT / LOCATION REVER DRG FILE NAME PRINTED PAGE NUMBER
A modify from drw.pg 1 ASRUL.A 1 April 04 CHECKED TRI WIBOWO PURW AKARTA - IN DO NE SIA
TURBINE 1 TUR \ GA\ 3 2C50FB2B-5C3A-4BC0-8C0F-2E827CCE6565.VSD 14 NOV, 2022 6 OF 23
E LECTRI C DE PARTM ENT
REVISION NAME DATE APPROVED KAMATH

1 2 3 4 5 6 7 8
VC
1 2 3 4 5 6 7 8
MA IN BU SBAR
L1
L2
L3
2XPT 6600/ 110V TB M AIN BUS
200VA
U U BLUE TB1-PT.02 page 11/D .2
P2 S2 TB1-PT:01 (UR)

V V RED
A P1 S1 TB1-PT.01 TB1-PT:02 (US) page 11/D .2
A
TO AVR CONTROL CI RCUI TS ( R T 01)
U
P2 S2 U BLUE TB1-PT.03 TB1-PT:03 (UT) page 11/D .2

V S1 V YELLOW TB1-PT.04
P1

52 G TB G ENERA TOR

TB1-CT.01 TB1-CT.01
TB1-CT.02 TB1-CT.02
TB1-CT.03 TB1-CT.03

3XCT 200/ 5A
S1 S1 S1

B B
S2 S2 S2 TB1-CT.04 TB1-CT.04
PTT
2XPT 6600/ 110V
200VA
U
P2 S2 U TB2-PT.01 TB2-PT.01 1 2 page 9/F. 3
20
V V TB2-PT.02 3 4 page 9/F. 3
P1 S1 TB2-PT.02
21
U S2 U TB2-PT.04
P2

V S1 V TB2-PT.03 TB2-PT.03 5 6 page 9/F. 3


P1 M FR 3
22
3XPT 6600/ 110V
200VA
U U page 8/C.4
P2 S2 TB3-PT.01 TB3-PT.01
C19
V V
C P1 S1
C
U U page 8/C.4
P2 S2 TB3-PT.02 TB3-PT.02
C20
V V
P1 S1

U U
P2 S2 TB3-PT.03 TB3-PT.03 page 8/C.4
C21
V V TB3-PT.04 TB3-PT.04 page 8/C.4
P1 S1
C22
GPR

3XSC

D D
SWI TCH GE AR

P2 S2 37 TD3 T03 page 11/D .3


3
P1 S1 38 TD2 T02 page 11/D .3
2
P2 S2

P1 S1 39 TD1 T0 1 page 11/D .3 AVR RT 01


1
P2 S2 TA 1 TR 1 page 11/C. 5
2
E P1 S1 TA 2 TR 2 page 11/C. 5
AVR AL 01
E
1

CTT

A 1 2 page 8/A.4
C1
BLUE TB3-CT:01 TB1-CT:01
3 4
3 YELLOW TB2-CT:02 TB2-CT:02 page 8/A.4
C4
2 BLACK TB1-CT:03 TB3-CT:03
5 6 page 8/A.4
3XCT 200/ 5A 1 GPR
S1 S1 S1 C7

S2 S2 S2 YELLOW G REEN 4 7 8 page 12/E ,F ,G .6 TO SYI NCH RONIZING C HECK & METER ING CIRCUITS ( CIRCUTOR )
4 4
TERM INA L 4,6, 8
F S2 P2 S2 1Y2 1Y2 page 11/D .2
9
F
1XCT 400/ 5A
P1 S1 1Y1 1Y1 page 11/D .2 AVR RT 01
S1 10
GE N ERATO R

VC

TB-64.8 TB-64.8 page 8/C.4


C13

500/ 5
TB-64.9 TB-64.9 page 8/C.4
C14
G G
R 12 OHM

TB-CTN .1 TB-CTN .1 page 8/B.4


C10

500/ 5
TB-CTN .2 TB-CTN .2 page 8/B.4 GPR
C11

N EU TRAL RE SIS T ANCE GRO UN DI NG CON TRO L PA NE L

DESCRIPTION EQUIPMENT NUMBER DRAWING NUMBER


C DATE 23-07-2006
H THREE PHASE CT,PT CIRCUITS H
B DRAWN ASRUL.A
PLANT / LOCATION FEEDER FILE NAME PRINTED PAGE NUMBER
A A: MO DI F. ANT I CL OCKWIS E HERY.P 26.09.2006 CHECKED PURW AKARTA - IN DO NE SIA
2C50FB2B-5C3A-4BC0-8C0F-2E827CCE6565.VSD 14 NOV, 2022 7 OF 23
E LECTRI C DE PARTM ENT
REVISION NAME DATE APPROVED

1 2 3 4 5 6 7 8
CT1:
1 2 3 4 5 6 7 8

M FR 3 FROM 110VDC DISTRIBUTION CIRCUITS


page 9/B.1 + -
page 4/B.2 page 4/B.2

26 30 32 J1 J2 J13 page 20/B.6


A M X 3-17 A
page 7/F.3 C1
WATCH DOG PLC TERMINAL
IA
J14 DIAGRAM
C2 page 20/B.6
M X 3-1
THREE PHASE CT,PT CIRCUITS page 7/F.3 C4 H1 page 13/A.1
IB
C5
RL 1 86G & 86T TRIPPING RELAY CIRCUITS
page 7/F.3 C7 H2 page 13/A.2
IC
B C8 H3 page 13/A.6 B
page 7/G.3 C10
51G RL 2 86G & 86T TRIPPING RELAY CIRCUITS
page 7/G.3 C11 H4 page 13/A.5
THREE PHASE CT,PT CIRCUITS
page 7/G.3 C13 H5 page 20/B.5
64 M X 3-16
page 7/G.3 C14
RL 3 PLC TERMINAL
page 7/C.3 DIAGRAM
C19 H6 page 20/B.5
Van M X 3-1
THREE PHASE CT,PT CIRCUITS page 7/C.3 C20 H8
C C
Vbn
page 7/C.3 C21
Vcn RL 4
C22 H9
+ H11
J7
12 11 10 13 48VDC VOLTAGE OUTPUT
-
J9 RL 5
Page 12/C. 6 H12
CIRCUT OR VCB 52G D1
CVMK
21 22 OPTO 1
D T BS 7 T BS 8 H14 D
D2

D3 RL 6
86T OPTO 2
11 9 H15
D4
H17
D5
86G OPTO 3
16 14 D6 RL 7
H18
C7(SOL) D7
OPTO 4
E 24 23 D8 E

D9
C2(52MX) OPTO 5
44 43 D10

D11
J17
SPARE OPTO 6
D12
J18 RS 485 PORT
D13
F SPARE OPTO 7 F
J16
D14

D15
SPARE OPTO 8
D16

F1
SPARE OPTO 9
F2

F3
G SPARE OPTO 10 G
F4 GROUND ALSTOM P343
(PE)

DESCRIPTION EQUIPMENT NUMBER DRAWING NUMBER


C DATE 23-07-2006
H GENERATOR PROTECTION RELAY (ALSTOM P343 ) CIRCUITS H
B DRAWN ASRUL.A
PLANT / LOCATION FEEDER FILE NAME PRINTED PAGE NUMBER
A CHECKED PURW AKARTA - IN DO NE SIA
2C50FB2B-5C3A-4BC0-8C0F-2E827CCE6565.VSD 14 NOV, 2022 8 OF 23
E LECTRI C DE PARTM ENT
REVISION NAME DATE APPROVED

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

page 12/E.3
SPMD
20 21 81
RELAY 4
page 7/C.3 COMM. ALARM
22 V L3 80 A1
A A
page 7/C.3
Three Phase CT,PT Circuits
+ page 20/E.4 R1
21 VL2 GENERATOR VOLTAGE 130 MX 5-9
ANALOG OUTPUT A2
page 7/C.3 page 20/E.4 PLC TERMINAL DI AGRAM
20 VL1 KW (4-20mA) 131 - MX 5-10

132 + page 20/E.3


MX 5-11
page 8/A.3 ANALOG OUTPUT
PLC TERMINAL DI AGRAM
GPR
C8 32 KVAR (4-20mA) 133 - page 20/E.3
MX 5-12
IL3
B 31 136 B
IMPULSE OUTPUT KWH
C5 30 OPEN COLLECTOR 137 38
IL2
29 8 36
+ 505
GOVERNOR
C2 26 SPEED COMMAND 9
IL1 -
25 10 37
C 2 C
5 7 9 11
page 12/E,F.6 3
CIRCUTOR CVMK VOLTAGE PF 12 7 AVR

T BS 18
61
4 REPLY GCB OPEN 13 8 RT. 01
1
52G TBS CONTROL
VCB PANEL
62

T BS 19 15 COMMAND
D GCB CLOSED D
14 COMMON 60

61

42 COMMAND COMMON 7
GCB OPEN
41 ENABLE MONITORING 6 R4
14 13
E ENABLE GCB 3 E
24 BUS VOLTAGE L2 0V 2

23 BUS VOLTAGE L1 24 VDC 1

AVR CONTROL N 0
CIRCUITS page 11/D.2 1
6T3 52 L3 SW-4 0 I
page 11/D.2
GCB
F R10 4T2 51 L2 MAIN VOLTAGE ENABLE 2 86 T 86 G F
page 11/D.2 4 2 4 2 A1 A2
2T1 50 L1 R4
A1 A1
24 23 R2 R3

A2 A2
page 12/C.3
SPMD
G G

+ -
1 2
page 5/D.2 page 5/D.2
Multi function Relay (MFR 3) Circuits
DESCRIPTION EQUIPMENT NUMBER DRAWING NUMBER
C DATE 23-07-2006
H MULTI FUNCTION
GOVERNOR
RELAY ( 505
MFR 3 ) CIRCUITS H
B DRAWN ASRUL.A
PLANT / LOCATION FEEDER FILE NAME PRINTED PAGE NUMBER
A CHECKED PURW AKARTA - IN DO NE SIA
2C50FB2B-5C3A-4BC0-8C0F-2E827CCE6565.VSD 14 NOV, 2022 9 OF 23
E LECTRI C DE PARTM ENT
REVISION NAME DATE APPROVED

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

103 page 14/A.5

page 5/D.3 SHUT DOWN


A - 121 TURBINE ALARM & TRIP CIRCUITS A
24 VDC Distribution Circuits RELAY
page 5/D.3 INPUT page 14/B.5
+ 122 104
POWER SUPPLY
123
+
TBEB 38 LX 3-5 LX 6-5
3
-
TBEB 39 LX 3-6 LX 6-6 Actuator
45 ACTUATOR 20-160mA 4
GCB CLOSE TBEB 40 JB near Turbine
B 46 5 B

page 20/E.1
48 9 MX 5-1
MCB C LOSE READ OUT 1 PLC TERMINAL DI AGRAM
page 20/E.1
49 4-20mA 10 MX 5-2
SPEED INPUT
11
C + page 20/E.2 C
8 36 READ OUT 2 12 MX 5-3 PLC TERMINAL DI AGRAM
- 4-20mA page 20/E.2
page 9/C.5 10 37 REMOTE SPEED 13 MX 5-4
MFR 3 REF. 4-20mA ACTUATOR 1
38 POSITI ON 14
LX 6-7 LX 3-7 TBEB 41 + page 20/E.2
33 15 MX 5-13
Press Exhaus t READ OUT 3 PLC TERMINAL DI AGRAM
LX 6-8 LX 3-8 TBEB 42 - CASCADE I/P page 20/E.2
34 4-20mA 16 MX 5-14
4-20mA
D SPEED REF. D
will be modification 35 17
rate d spee d page 20/E.3
18 MX 5-15
1

READ OUT 4 PLC TERMINAL DI AGRAM


page 20/E.3
idle
57 4-20mA 19 MX 5-16
0

IIP 1 CASCADE I NPUT


58 20

E E
LX 3-1 TBEB 32 + -
LX 6-1 21 98 page 20/B.7 MX 3-20
MPU 1 LX 3-2 TBEB 33 -
LX 6-2 22 ALARM RELAY PLC TERMINAL DI AGRAM
+
TBEB 34 page 20/B.7
23 99 MX 3-1
LX 3-3 TBEB 35 +
LX 6-3 24
MPU 2 LX 3-4 -
TBEB 36 page 14/A.5
F LX 6-4 25 101 F
TBEB 37
26 OVER SPEED RELAY TURBINE ALARM & TRIP CIRCUITS
JB near Turbine
102 page 14/B.5
C7
43 44
39

40
G MX 4 - 9 page 20/E.6 page 20/E.7 G
60 63 MX 4 - 10
MX 4 - 8 page 20/E.6 page 20/E.7 PLC TERMINAL DI AGRAM
PLC TERMINAL DI AGRAM 61 64 MX 4 - 11
page 20/E.6 page 20/E.7
62 65

DESCRIPTION EQUIPMENT NUMBER DRAWING NUMBER


C DATE 23-07-2006
H GOVERNOR ( WOOD WARD 505 ) CIRCUIT H
B DRAWN ASRUL.A
PLANT / LOCATION FEEDER FILE NAME PRINTED PAGE NUMBER
A CHECKED PURW AKARTA - IN DO NE SIA
2C50FB2B-5C3A-4BC0-8C0F-2E827CCE6565.VSD 14 NOV, 2022 10 OF 23
E LECTRI C DE PARTM ENT
REVISION NAME DATE APPROVED

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

ROTOR EXCITER
+RP

A A

-RP

- +
B B
E1- E1+
THREE PHAS E CT,PT CIRCUITS

THREE PHAS E CT,PT CIRCUITS

THREE PHAS E CT,PT CIRCUITS


THREE PHAS E CT,PT CIRCUITS

TR1 TR2

page 7/E.3

page 7/E.3
page 9/F.3 page 12/D.2 page 9/C.5
MFR 3 5
C MFR 3 SPMA 4 C
86 G
50 51 52 6 8 13 12 11 7
A

page 7/E.3
page 7/F.3
page 7/F.3

page 7/E.3

page 7/E.3
page 7/A.3
page 7/A.3

page 7/A.3

3
1 SWITCH K01 SWITCH K01
V 2

T02

T01
T03
14 MA 12 MA
D D
2T1 4T2 6T3 13 11
R10
1L1 3L2 5L3
SWITCH K01 SWITCH K01
MA 1 3 5 9 M A 7 M A
23 SWITCH K01
C2 2 4 6
E 10 8 E
(5 2MX)
24
2

13 13
R10 1 3
52 G
14 14

F 7 F

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 7 6 5 4 3 2 1 0

220V 7
3
6
100V
AVR RT 01 AVR AL 01 2 5
AC
0V 4
G 1 CR#5 + G

DESCRIPTION EQUIPMENT NUMBER DRAWING NUMBER


C DATE 23-07-2006
H AVR CONTROL CIRCUIT H
B DRAWN ASRUL.A
PLANT / LOCATION FEEDER FILE NAME PRINTED PAGE NUMBER
A CHECKED PURW AKARTA - IN DO NE SIA
2C50FB2B-5C3A-4BC0-8C0F-2E827CCE6565.VSD 14 NOV, 2022 11 OF 23
E LECTRI C DE PARTM ENT
REVISION NAME DATE APPROVED

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+ 110 VDC

13
A A
R2 METERING
14

R24
24VDC
A1 33 43 page 16/D.1 A-2000
RELAY A2
34 44
B B
X1
L3
H1 C21 8
TRANDUCER ISOLATOR
X2
L2
- 0 VDC C20 5
20 L1
C C19 2 C

N
page 9/A.2
C22 11
MFR 3
20 14 15 page 8/D.3
GPR
37 + page 4/D.5
1FS 9
GENERATOR
110 VDC DISTRIBUTION
21 VOLTAGE
21 BREAKER C LOSED 38 -
CIRCUITS
1FS 10
D COMMAND D
page 9/C.2 page 4/D.5
23 MFR 3
23 3 L3
MAIN BUS 13 31 1
page 9/G.1 24
SPMD 4 C2
MFR 3 SHYNCHRONIZER 14
3
E
24 0 1 2 7 52 GX
61
E

L2
62 29 4
23
R4
24 6

F L1 F
25 7

G + - page 7/F.4
G
24VDC
see pg.4/C.7 & C.8
THREE PHASE CT,PT CIRCUITS

DESCRIPTION EQUIPMENT NUMBER DRAWING NUMBER


C DATE 23-07-2006
H SYNCHRONIZING CHECK & METERING CIRCUIT H
B DRAWN ASRUL.A
PLANT / LOCATION FEEDER FILE NAME PRINTED PAGE NUMBER
A CHECKED PURW AKARTA - IN DO NE SIA
2C50FB2B-5C3A-4BC0-8C0F-2E827CCE6565.VSD 14 NOV, 2022 12 OF 23
E LECTRI C DE PARTM ENT
REVISION NAME DATE APPROVED

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

86 T
+ 110 VD C 0V
GPR P343
A A
H1 H2 27 28 + 110 VD C 0V
H1 H2
86 G GPR P343
H4 H3 27 28
86 T

SOLENOID
MVAJ23
C7
B 72 71 B

52 MX
61 62

86 T
15 13
C C

86G 86T
page 16/A.3 9
page 8/D.3 9
52 GCB C ONTROL CIRCUITS GENERATOR PROTECTION RELAY
page 16/A.3 11 (C LOSING & TRIPPING COIL)
page 8/D.3 11 (ALSTOM P343) CI RCUI TS

D page 16/B.1 1 page 14/C.6 1 D


52 GCB C ONTROL CIRCUITS TURBINE ALARM & TRIP CIRCUITS
page 16/C.1 3 (C LOSING & TRIPPING COIL) page 14/D.6 3

10 10

12 SPARE 12

E page 9/F.6 2
page 9/F.6 2 E
MULTI FUNCTION RELAY MULTI FUNCTION RELAY
page 9/F.6 4 (MFR3) CIRCUITS page 9/F.6 4 (MFR3) CIRCUITS

13
/C.2 13
86 G & 86 T TRIPPING RELAY CIRCUITS
15 /C.1 15

F page 8/E.3 14 page 20/B.4 14 MX 3-11 F


GENERATOR PROTECTION RELAY PLC TERMINAL DI AGRAM
page 8/E.3 16 (ALSTOM P343) CI RCUI TS page 20/B.4 16 MX 3-1

page 11/C.5 5 5
Spare
page 11/C.5 7
AVR CONTROL CIRC UITS 7

G page 20/B.4 17 17 G
MX 3-12
PLC TERMINAL DI AGRAM Spare
page 20/B.4 19 19
MX 3-1 6
6
Spare
Spare 8
8
DESCRIPTION EQUIPMENT NUMBER DRAWING NUMBER
C DATE 23-07-2006
H 86 G & 86 T TRIPPING RELAY CIRCUITS H
B DRAWN ASRUL.A
PLANT / LOCATION FEEDER FILE NAME PRINTED PAGE NUMBER
A CHECKED PURW AKARTA - IN DO NE SIA
2C50FB2B-5C3A-4BC0-8C0F-2E827CCE6565.VSD 14 NOV, 2022 13 OF 23
E LECTRI C DE PARTM ENT
REVISION NAME DATE APPROVED

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

TBXC:+110V
page 4/D.4
A TBXC:13 TBXC:15 A
TBXC:11
TBS:65 A5
T BXC: 01 5 103 101
1 13
PB 1 SHUT DOWN BY OVER SPEED C1
52M
EMG 52 G LS GOVERNOR RELAY
2 14
T BXC: 02
T BXC: 03 6 TBS:66 104 102
A4 WOODWARD
1 TBXC:12 TBXC:14
PB 2 MAIN TBXC:16
B GCB CONTACT 1 13 B
EMG BREKER TG 1 T&T VALVE
2 6 KV L-2 MULTIPLIER LIMIT SWITCH PB C7
(VALVE STATUS) RESET
T BXC: 04
2 14

T BXC: 05
61
R6
C PB 3 C
SWG. EMG
62
T BXC: 06

1
T BXC: 07 86T
EMG PB
3
(SPARE)
LOOP

D T BXC: 10 D
61
C5

62

13 61
E C6 E
C3

14 62

A1 A1 A1 1 A1 A1 A1 A1
F F
C1(EMG ) C2 (52 MX) C3(52 GX) C4 C5 C6 C7
A2 A2 A2 A2 A2 A2 A2
2
page 4/D.4
TB-XC:-110V
/7.B 13 14 13 14 13 14 VCB ON 13 14
/E.4 page 20/B.4 13 14 page 20/B.3 13 14 /B.7 13 14
23 24 23 24 page 20/B.5 23 24 page 20/B.3 23 24 23 24 23 24 page 8/E.3 23 24
33 34 33 34 Old Status LMS 43 44 33 34 33 34 33 34 page 15/B.8 37 38
43 44 43 44 page 16/A.4 37 38 43 44 43 44 43 44 page 10/G.2 43 44
53 54 page 20/B.5 37 38 New Status LMS 53 54 53 54 53 54 53 54 53 54
G page 16/B.4 61 62 page 13/C.5 61 62 61 62 61 62 /D.6 61 62 /E.6 61 62 page 20/B.3 61 62 G
page 20/B.8 71 72 71 72 71 72 71 72 71 72 71 72 page 13/B.1 71 72
81 82 81 82 81 82 81 82 81 82 81 82 81 82
91 92 91 92 91 92 91 92 91 92 91 92 91 92
01 02 01 02 Space heater 01 02 01 02 01 02 01 02 01 02

DESCRIPTION EQUIPMENT NUMBER DRAWING NUMBER


C DATE 23-07-2006
H TURBINE ALARM & TRIP CIRCUITS H
B DRAWN ASRUL.A
PLANT / LOCATION REVER DRG FILE NAME PRINTED PAGE NUMBER
A modify freom drw.pg 1 ASRUL.A 1 April 04 CHECKED TRI WIBOWO PURW AKARTA - IN DO NE SIA
TURBINE 1 TUR \ CD \ 2 2C50FB2B-5C3A-4BC0-8C0F-2E827CCE6565.VSD 14 NOV, 2022 14 OF 23
E LECTRI C DE PARTM ENT
REVISION NAME DATE APPROVED KAMATH

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

TBC:+24V DC
page 5/D.1
TBC:21 TBC:23 TBC:25 TBC:27 TBC:29
A A

A5 A32 A40
80 15 42 A32 A48
0 1
P P P P
MFR3 SW-4
GCB ENABLE
P P
38
A4 A31 A39 C7
81 14 41 2
A31 A47
86T TBC:22 TBC:24 TBC:26 TBC:28 TBC:30 37
B VOSH-110 TSH - 212 PS L - 108 B
4
OIL FILTER OIL COOLER LUB OIL LOW
2 DIFF.PRESS OUTLET TEMP PRESSURE
HIGH HIGH ALARM SWITCH
86G
4

PS L - 106 PS L - 107
AUX. LUB OIL LOW
OIL PUMP PRESSURE
HIGH-LOW TRIP S WITCH
C PRESSURE
C
SWITCH

D D

disconnected

E E
A1
R5.1
A2

21 22 TBC 31 TBC 33
se ri es wi th
R5 NO 23-24

A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 1
F F
R1 R2 R3 R4 R5 R6 R7 R8 R9 R10
A2 A2 A2 A2 A2 A2 A2 A2 A2 A2
TBC:-24V DC 2
TBC 32 TBC 34
page 5/D.1
13 14 Ready Solenoid
13 14 13 14 13 14 page 20/B.2 13 14 page 20/B.2 13 14 page 20/B.2 13 14 page 20/B.3 13 14 page 20/B.2 13 14 page 11/D.2 1L1 2T1
23 24 23 24 23 24 23 24 to Start Coil
oil pmp pnl.int 23 24 23 24 23 24 23 24 23 24 page 11/D.2 3L2 4T2
33 34 33 34 33 34 33 34 33 34 33 34 33 34 33 34 33 34 page 11/D.2 5L3 6T3
43 44 43 44 43 44 43 44 43 44 43 44 43 44 43 44 43 44 page 11/F.1 13 14
53 54 53 54 53 54 53 54 53 54 53 54 53 54 53 54 53 54
G 61 62 61 62 61 62 61 62 61 62 61 62 61 62 61 62 61 62 G
71 72 71 72 71 72 71 72 71 72 71 72 71 72 71 72 71 72
81 82 81 82 81 82 81 82 81 82 81 82 81 82 81 82 81 82
91 92 91 92 91 92 91 92 91 92 91 92 91 92 91 92 91 92
01 02 01 02 01 02 01 02 01 02 01 02 01 02 01 02 01 02

DESCRIPTION EQUIPMENT NUMBER DRAWING NUMBER


C DATE 23-07-2006
H 24V DC RELAY CIRCUITS H
B DRAWN ASRUL.A
PLANT / LOCATION FEEDER FILE NAME PRINTED PAGE NUMBER
A CHECKED PURW AKARTA - IN DO NE SIA
2C50FB2B-5C3A-4BC0-8C0F-2E827CCE6565.VSD 14 NOV, 2022 15 OF 23
E LECTRI C DE PARTM ENT
REVISION NAME DATE APPROVED

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

TBS 110VDC TBS 110VDC


+ +

A 37 A

PB 3 52GX
9 13
SWG.EMER 3 1
38
86 G R3
BREAKER 4 2 61
11 14
1
OL CLOSING ENABLE C1
2 3
B 62 B

86 G

page 14/C.2

page 14/C.2
C C
see page 12 / B.5

D TBS:3 D
TBS:5

52 G CC 52 T TC

0V
TBS:4 TBS:6
E E

F F

G G

DESCRIPTION EQUIPMENT NUMBER DRAWING NUMBER


C DATE 23-07-2006
H 52 GCB CONTROL CIRCUIT ( CLOSING & TRIPPING COIL ) H
B DRAWN ASRUL.A
PLANT / LOCATION FEEDER FILE NAME PRINTED PAGE NUMBER
A CHECKED PURW AKARTA - IN DO NE SIA
2C50FB2B-5C3A-4BC0-8C0F-2E827CCE6565.VSD 14 NOV, 2022 16 OF 23
E LECTRI C DE PARTM ENT
REVISION NAME DATE APPROVED

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
+
TB-110

+ +
TB-S TB-S

3
5E
page 16/A.1 EMERGENCY page 16/A.3
STOP
4
B B
1 7 11 13
TB-S 3 5 TB-S TB-S TB-S
TB-S TB-S

1 3 5 7 9 11 13

ZB 52 Z0 520
C LS 1 LS 2 20 2B C
88M
52B
88M
VCB INTERNAL USED
LS 0

H
110 VDC LS 3
D D
88 SH
CC Z
88M M T

E 2 4 6 8 10 12 14 M MOTORISE UNIT E

2 4 6 8 10 12 14 LSO C.B CLOSE LIMIT SWI TCH


TB-S TB-S TB-S TB-S TB-S TB-S TB-S
LS1 START TO CHANGE-UP LIMIT SWITCH

LS2 FULLY CHARG E -UP LIMIT SWITCH

F 1 1 F
LS3 READY FOR CLOSING LIMI T SWITCH
PLG PLR
2 2
88M STARTIN G TO CAHRGE MOTOR
- CB MOTORIASE UNIT CB CLOSING COIL CB TRIPPING COIL CB TRIPPING LIGHT CB CLOSING LIGHT
TB-110
Z CLOSING BLOCKING COIL

CC CLOSING COIL
G G
SHT TRIPP ING COIL

DESCRIPTION EQUIPMENT NUMBER DRAWING NUMBER


C DATE 23-07-2006
H VCB CIRCUITS H
B DRAWN ASRUL.A
PLANT / LOCATION FEEDER FILE NAME PRINTED PAGE NUMBER
A CHECKED PURW AKARTA - IN DO NE SIA
2C50FB2B-5C3A-4BC0-8C0F-2E827CCE6565.VSD 14 NOV, 2022 17 OF 23
E LECTRI C DE PARTM ENT
REVISION NAME DATE APPROVED

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

5 L J5 O/P 1-8 A1 A1 A1 A1
A page 3/E.4 R1 R3 R5 R7 A
OUTPUT SENSOR A2 A2 A2 A2
6 N
page 3/E.4 TEMPERATURE INDICATOR MICRO SCANNER
INPUT SENSOR INPUT SENSOR no./1 13 14 no./1 13 14 no./1 13 14 no./1 13 14
J1 I/P 1-12 J2 I/P 13-16
2 3 14 15 26 27 38 39

WINDING ALTERNATOR PINION GEARBOX


B B

C C

INPUT 12 A

INPUT 13 A
INPUT 10 A

INPUT 11 A

INPUT 14 A

INPUT 15 A

INPUT 16 A
INPUT 11 B

INPUT 12 B

INPUT 13 B
INPUT 10 B

INPUT 14 B

INPUT 15 B

INPUT 16 B
COMMON

COMMON
INPUT 5 A
INPUT 1 A

INPUT 1 B

INPUT 2 A

INPUT 2 B

INPUT 3 B

INPUT 5 B
INPUT 3 A

INPUT 4 A

INPUT 4 B

INPUT 6 A

INPUT 6 B

INPUT 7 A

INPUT 7 B

INPUT 8 A

INPUT 8 B

INPUT 9 A

INPUT 9 B
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 -LX2
1 2 3 4 5 6 7 8 9 10 11 12
D -LX1 D

SPARE SPARE SPARE SPARE SPARE SPARE


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
-LX4

E E
SPARE

FIELD
WINDING TEMP. V
WINDING TEMP. U

WINDING TEMP. W

PINION FORE BEARING

F F
PINION AFTER BEARING
ALTERNATOR TEMP. B.SIDE
ALTERNATOR TEMP. A.SIDE

GEARBOX FORE BEARING

GEARBOX AFTER BEARING


400 TD-1

401 TD-2

402 TD-3

413 TI-204

414 TI-205

415 TI-206

416 TI-207
403 TI-202

404 TI-203

G G

DESCRIPTION EQUIPMENT NUMBER DRAWING NUMBER


C DATE 23-07-2006
H TEMPERATURE SCANNER (ALTERNATOR WINDING & BEARING) H
B DRAWN ASRUL.A
PLANT / LOCATION FEEDER FILE NAME PRINTED PAGE NUMBER
A CHECKED PURW AKARTA - IN DO NE SIA
2C50FB2B-5C3A-4BC0-8C0F-2E827CCE6565.VSD 14 NOV, 2022 18 OF 23
E LECTRI C DE PARTM ENT
REVISION NAME DATE APPROVED

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

PEN / 380 - 220 V / 50 Hz


/L1 L1 -
/L2 L2 -
A A
/L3 L3 -
/PEN PEN-
1
MCB
1 3 5 A
2

X1
B B
2 4 6
X2 X3
Range
Setting

X8 X10 X4 X6

C 1 3 5 1 3 5 13 13 C
OPEN CLOSE
K1 K2 OPEN CLOSE K1 K2
2 4 6 2 4 6 14 14

X9 X11 X5 X7

D D

A1 A1
K1 K2
A2 A2
TH1 1 3 5
21 21
Range A
2 4 6 K2 K1
Setting A
E 22 22 E

13 21
LS LS
14 22
U V W PE
1 1
OPEN CLOSE
F 2 2 F
96

M TH

3~ 95

KW AMP
RPM FRAME

G G

DESCRIPTION EQUIPMENT NUMBER DRAWING NUMBER


C DATE 23-07-2006
H CILANCER VENTING VALVE H
B DRAWN ASRUL.A
PLANT / LOCATION FEEDER FILE NAME PRINTED PAGE NUMBER
A CHECKED PURW AKARTA - IN DO NE SIA
2C50FB2B-5C3A-4BC0-8C0F-2E827CCE6565.VSD 14 NOV, 2022 19 OF 23
E LECTRI C DE PARTM ENT
REVISION NAME DATE APPROVED

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

DIGITAL OUTPUT MX 3
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
A A

14 14 14 14 14 14 62 14 14 16 19 24 38 H6 J14 14 99 6 6 72

13 13 13 13 13 13 61 13 13 14 17 23 37 H5 J13 13 98 5 5 71
B PH N B

TBA 9 TBA 10 R5 R6 R9 R7 R8 C6 C7 C4 C5 86T 86G C3(52 GX) C2 GPR P343 GPR P343 R1 GOV 505 F F1 C1

DIGITAL OUTPUT MX 3
25 26 27 28 29 30 31 32 33 34 35 37 38 39 40 41 42 43 44 45

C C

D PLC COMMON D
ANALOG OUT PUT (4-20 mA) MX 5 PLC COMMAND:
RAISE SPEED
PLC COMMAND:
LOWER SPEED
HIGH & LOW VALVE

1 2 PE 3 4 PE 13 14 PE 15 16 PE 11 12 PE 9 10 PE 5 6 PE

E MX 4 8 9 10 11 1 2 3 E
+ - + - + - + -
11 14 17 20 132 133 130 131 9 10 11
9 10 12 13 15 16 18 19

GOVERNOR 505 GOVERNOR 505 GOVERNOR 505 GOVERNOR 505 page 19/C.
MFR3
READ OUT1 READ OUT2 READ OUT3 READ OUT4 MFR3 CVMK 62 61 60 63 64 65 DIGITAL I NPUT
REACTI VE POWER
(4-20mA) (4-20mA) (4-20mA) (4-20mA) POWER (KW) VOLTAGE (VOLT)
(KVAR)
TURBINE SPEED ACTUATOR POSITION SPEED REF. EXHAUST PRESSURE
GOV. 505
34 33
F Disco nnected 35
- +
ANALOG I NPUT F

7 8 PE 76 77 78 79 80 81 82 83 84 85
MX 4 PE 7 8

G - + G
9 10 11
4-20mA
EXHAUST
CVMK PRESSURE
CURRENT (AMP) TRANSMITTER

EARTH TERMINALS:#49,#50,#53,#56,#59,#62,#65,#68,#71,#74,#77,#80
DESCRIPTION EQUIPMENT NUMBER DRAWING NUMBER
C DATE 23-07-2006
H PLC TERMINAL DIAGRAMS H
B DRAWN ASRUL.A
PLANT / LOCATION FEEDER FILE NAME PRINTED PAGE NUMBER
A CHECKED PURW AKARTA - IN DO NE SIA
2C50FB2B-5C3A-4BC0-8C0F-2E827CCE6565.VSD 14 NOV, 2022 20 OF 23
E LECTRI C DE PARTM ENT
REVISION NAME DATE APPROVED

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

1 3 5 1 3 5

1 1 1 1 1 1 1
Q2 Q4 Q5 Q6 Q7 Q8 Q9
B A A A A A A A B
2 4 6 2 2 4 6 2 2 2 2 2 2
Q1 Q3
Range Range
Setting Setting

C 97 1 3 5 C
C1
OL 98 2 4 6

TB1 TB2

D INCOMING SUPPLY SUPPLY BATTERY D


R5-23 R5.1-21 VAPOR SPARE SPARE TO PANEL CILANCER
SUPPLY FROM 220 VAC 220 VAC CHARGER
U V W PE
MCC 3 WTM PANEL PANEL
TURBINE INSTRUMENT

A1
C1 M
E
A2
3~ E
N
KW AMP
RPM FRAME

CONTROL OI L PUMP OI L PUMP

F F

G G

DESCRIPTION EQUIPMENT NUMBER DRAWING NUMBER


C DATE 23-07-2006
H THREE PHASE DIAGRAM AUXILIARY OIL PUMP PANEL H
B DRAWN ASRUL.A
PLANT / LOCATION FEEDER FILE NAME PRINTED PAGE NUMBER
A CHECKED PURW AKARTA - IN DO NE SIA
2C50FB2B-5C3A-4BC0-8C0F-2E827CCE6565.VSD 14 NOV, 2022 21 OF 23
E LECTRI C DE PARTM ENT
REVISION NAME DATE APPROVED

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

1 3 1 3 1 3
CBT MCB CB
32 A 32 A
2 4 2 4 2 4
B B

+ - + - + -
OLD
B1 B2
C BATTERY C
ATAS BAWAH
CHARGER
+ -

A2 A1

TB L1 L1
D + - 1CB
D
NEW 100A

BATTERY
+ 1
CHARGER
-
+ - 2CB
2
30 A

E 1 E

2
+

-
1 3 1 3
F F
FUSE2 10 A
2A
2 4 2 4

G G
TB 1+ 1- 2+ 2- 3+ 3- 4+ 4- 5+ 5- 6+ 6-

CONTROL COMBRIDGE
NGR
PANEL TG#1

DESCRIPTION EQUIPMENT NUMBER DRAWING NUMBER


C DATE 23-07-2006
H TURBINE GENERATOR 1 BATTERY 24 VDC DISTRIBUTION H
B DRAWN ASRUL.A
PLANT / LOCATION FEEDER FILE NAME PRINTED PAGE NUMBER
A CHECKED PURW AKARTA - IN DO NE SIA
2C50FB2B-5C3A-4BC0-8C0F-2E827CCE6565.VSD 14 NOV, 2022 22 OF 23
E LECTRI C DE PARTM ENT
REVISION NAME DATE APPROVED

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

PLC

A DI A
1. T & T VALVE TRIP
2. LUBRICATING OIL PRESSURE LOW ALARM
3. AUX. OIL PUMP LOW OIL PRESSURE
4. OIL COOLER OUTLET TEMP.HIGH
5. OIL FILTER DIFF. PRESSURE HIGH ALARM
6. ALTERNATOR BEARING TEMPERATURE HIGH
7. EXHAUST TEMPERATURE HIGH
B 8. ALTERNATOR WINDING TEMPERATURE HIGH B
9. OVER SPEED RELAY OPERATED
10. EMERGENCY PUSH BUTTON OPERATED.

21. GCB 52 STATUS


22. GENERATOR PROTECTION RELAY HEALTHY
23. GENERATOR PROTECTION RELAY OPERATED GENERAL ALARM
C 24. MASTER TRIP RELAY 86 G OPERATED C
25. MASTER TRIP RELAY 86 T OPERATED
26. MFR 3 GENERAL ALARM
27. GOVERNOR 505 GENERAL ALARM

AI
D 1. TURBINE SPEED D
2. ACTUATOR POSITION
3. SPEED REFERENCE
4. EXHAUST PRESSURE
5. INPUT PRESSURE
6. STEAM INLET TEMP.
7. STEAM INLET FLOW
8. EXHAUST TEMPERATURE
E 9. LUB.OIL PRESSURE E
10. VOLTAGE
11. CURRENT
12. KW
13. PF

F F

G G

DESCRIPTION EQUIPMENT NUMBER DRAWING NUMBER


C DATE 23-07-2006
H B DRAWN ASRUL.A H
PLANT / LOCATION FEEDER FILE NAME PRINTED PAGE NUMBER
A CHECKED PURW AKARTA - IN DO NE SIA
2C50FB2B-5C3A-4BC0-8C0F-2E827CCE6565.VSD 14 NOV, 2022 23 OF 23