Tower Crane Erect and Operation
Tower Crane Erect and Operation
Tower Crane Erect and Operation
Consequences (C)
Catastrophic E E H M
Major E H M L
Moderate H M L L
Minor M L L L
Risk Score
Work not to proceed until further mitigation implemented
E Extreme
Require National review and approval to perform this
H High activity
Requires location/sector review and approval to perform
M Medium this activity
L Low cab be performed using standard controls and plan.
Hazard Identification and Risk A
Name Of Project :- New TDE Shop Maruti Manesar Risk Assessment Team 1
Name of Activity:-Erection and operation of Tower Crane 2
Risk Level
Sr.No Steps to be performed during execution of Task Hazard Risk
Like hood Consequences Risk Rating
3 Open the Out rigger and levelled the crane Rash Operating Hand Injury /Foot injury Very Minor L
Unlikely
4 Erection of Vertical mast and Jib Boom Collapse of tower crane Body Injury/ Temporary Unlikely Major M
due to Failure of /Permanent
Erection Wire rope disability/Fatality
5 Lock the Erected Mast by Lock pin Sharp edge Hand injury Very Minor L
Unlikely
6 Check the Swing Radius collapse of crane due to Body Injury/ Temporary Unlikely Major M
Struck by nearby /Permanent
structure disability/Fatality
7 Load Test-Fixing the Slings Fixing the Slings Cut Injury /Pinching Very Minor L
Unlikely
8 Load Test Toppled the Crane Body Injury/ Temporary Unlikely Major M
/Permanent
disability/Fatality