Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 40

DETAIL ENGINEERING DESIGN

PABRIK BAJA
PT. WIKA INDUSTRI DAN KONSTRUKSI

NO. REKAPITULASI JUMLAH

1 POWER HOUSE Rp -

SUB TOTAL 0.00

PEMBULATAN 0.00

PPN 10% 0.00

TOTAL 0.00
DETAIL ENGINEERING DESIGN
PABRIK BAJA
PT. WIKA INDUSTRI DAN KONSTRUKSI

HARGA SATUAN JUMLAH


NO. URAIAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.)

PEKERJAAN ELEKTRIKAL
1 PEKERJAAN GENERATOR SET
1 #NAME? Set 1.00 Err:509 Err:509
#NAME?
#NAME?

2 #NAME? Set 1.00 Err:509 Err:509


#NAME?
#NAME?
#NAME?

SUBTOTAL 1 Err:509

2 PEKERJAAN PANEL TEGANGAN RENDAH


2.1 PEKERJAAN PANEL TEGANGAN RENDAH - LVMDP & ACTS
1 Low Voltage Main Distribution Panel Set 1.00 #NAME? #NAME?
#NAME?
#NAME?
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME?
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include

2 #NAME? Set 1.00 #NAME? #NAME?


#NAME? #NAME? 1.00 Include
#NAME? #NAME? 2.00 Include
#NAME? #NAME? 1.00 Include
#NAME? #NAME? 1.00 Include
#NAME? #NAME? 1.00 Include
#NAME? #NAME? 1.00 Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
DETAIL ENGINEERING DESIGN
PABRIK BAJA
PT. WIKA INDUSTRI DAN KONSTRUKSI

HARGA SATUAN JUMLAH


NO. URAIAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.)

3 Grounding System LVMDP & ACTS, Genset, dan PKG


BC 120 sqmm m 30.00 #NAME? #NAME?
Cable Scoon 120 sqmm pcs 4.00 #NAME? #NAME?
Cadwelding point 5.00 #NAME? #NAME?
copper rod 5/8" Length 4m bar 1.00 #NAME? #NAME?

SUBTOTAL 2.1 #NAME?


DETAIL ENGINEERING DESIGN
PABRIK BAJA
PT. WIKA INDUSTRI DAN KONSTRUKSI

HARGA SATUAN JUMLAH


NO. URAIAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.)
2.2 PEKERJAAN PANEL TEGANGAN RENDAH - KANTOR PELABUHAN
1 #NAME? Set 1.00 #NAME? #NAME?
#NAME?
#NAME?
#NAME? #NAME? 1.00 Include
#NAME? #NAME? 1.00 Include
#NAME? #NAME? 1.00 Include
#NAME? #NAME? 1.00 Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include

2 #NAME? Set 1.00 #NAME? #NAME?


#NAME?
#NAME?
#NAME? #NAME? 1.00 Include
#NAME? #NAME? 1.00 Include
#NAME? #NAME? 1.00 Include
#NAME? #NAME? 1.00 Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include

3 Grounding System PP dan P.HVAC Kantor Pelabuhan


BC 16 sqmm m 7.00 #NAME? #NAME?
Cable Scoon 16 sqmm pcs 2.00 #NAME? #NAME?
Cadwelding point 3.00 #NAME? #NAME?
copper rod 5/8" Length 4m bar 1.00 #NAME? #NAME?

SUBTOTAL 2.2 #NAME?

2.3 PEKERJAAN PANEL TEGANGAN RENDAH - KANTOR TERPADU


1 #NAME? Set 1.00 #NAME? #NAME?
#NAME?
#NAME?
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
DETAIL ENGINEERING DESIGN
PABRIK BAJA
PT. WIKA INDUSTRI DAN KONSTRUKSI

HARGA SATUAN JUMLAH


NO. URAIAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.)
2 #NAME? Set 1.00 Err:509 Err:509
#NAME?
#NAME?
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include

3 Grounding System PP dan P.HVAC Kantor Terpadu


BC 16 sqmm m 7.00 #NAME? #NAME?
Cable Scoon 16 sqmm pcs 2.00 #NAME? #NAME?
Cadwelding point 3.00 #NAME? #NAME?
copper rod 5/8" Length 4m bar 1.00 #NAME? #NAME?

SUBTOTAL 2.3 #NAME?

2.4 PEKERJAAN PANEL TEGANGAN RENDAH - KLINIK


1 #NAME? set 1.00 Err:509 Err:509
#NAME?
#NAME?
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include

2 #NAME? set 1.00 Err:509 Err:509


#NAME?
#NAME?
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include
#NAME? #NAME? #NAME? Include

3 Grounding System PP dan P.HVAC Klinik


BC 16 sqmm m 9.00 #NAME? #NAME?
Cable Scoon 16 sqmm pcs 2.00 #NAME? #NAME?
Cadwelding point 3.00 #NAME? #NAME?
copper rod 5/8" Length 4m bar 1.00 #NAME? #NAME?

SUBTOTAL 2.4 #NAME?


DETAIL ENGINEERING DESIGN
PABRIK BAJA
PT. WIKA INDUSTRI DAN KONSTRUKSI

HARGA SATUAN JUMLAH


NO. URAIAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.)
2.5 PEKERJAAN PANEL TEGANGAN RENDAH - MASJID
1 #NAME? Set 1.00 Err:509 Err:509
#NAME?
#NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?

2 Grounding System PP. Masjid


BC 16 sqmm m 6.00 #NAME? #NAME?
Cable Scoon 16 sqmm pcs 2.00 #NAME? #NAME?
Cadwelding point 3.00 #NAME? #NAME?
copper rod 5/8" Length 4m bar 1.00 #NAME? #NAME?

SUBTOTAL 2.5 #NAME?

2.6 PEKERJAAN PANEL TEGANGAN RENDAH - GUDANG 1 s/d 4


#NAME? Set 4.00 Err:509 Err:509
#NAME?
#NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?

2 Grounding System PP. Gudang


BC 16 sqmm m 36.00 #NAME? #NAME?
Cable Scoon 16 sqmm pcs 8.00 #NAME? #NAME?
Cadwelding point 12.00 #NAME? #NAME?
copper rod 5/8" Length 4m bar 4.00 #NAME? #NAME?

SUBTOTAL 2.6 #NAME?

2.7 PEKERJAAN PANEL TEGANGAN RENDAH - POWER HOUSE


1 #NAME? Set 1.00 Err:509 Err:509
#NAME?
#NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
DETAIL ENGINEERING DESIGN
PABRIK BAJA
PT. WIKA INDUSTRI DAN KONSTRUKSI

HARGA SATUAN JUMLAH


NO. URAIAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.)
#NAME? #NAME? #NAME?
DETAIL ENGINEERING DESIGN
PABRIK BAJA
PT. WIKA INDUSTRI DAN KONSTRUKSI

HARGA SATUAN JUMLAH


NO. URAIAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.)
2 Grounding System PP. Power House
BC 16 sqmm m 6.00 #NAME? #NAME?
Cable Scoon 16 sqmm pcs 2.00 #NAME? #NAME?
Cadwelding point 3.00 #NAME? #NAME?
copper rod 5/8" Length 4m bar 1.00 #NAME? #NAME?

SUBTOTAL 2.7 #NAME?

2.8 PEKERJAAN PANEL TEGANGAN RENDAH - POS JAGA


1 #NAME? Set 1.00 Err:509 Err:509
#NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?

SUBTOTAL 2.8 Err:509

2.9 PEKERJAAN PANEL TEGANGAN RENDAH - PHM


1 #NAME? Set 1.00 #NAME? #NAME?
#NAME?
#NAME?
#NAME? #NAME? 1.00
#NAME? #NAME? 1.00
#NAME? #NAME? 1.00
#NAME? #NAME? 1.00
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?

2 Grounding System PHM


BC 16 sqmm m 6.00 #NAME? #NAME?
Cable Scoon 16 sqmm pcs 2.00 #NAME? #NAME?
Cadwelding point 3.00 #NAME? #NAME?
copper rod 5/8" Length 4m bar 1.00 #NAME? #NAME?

SUBTOTAL 2.9 #NAME?


SUBTOTAL 2 Err:509

3 PEKERJAAN KABEL FEEDER


From GENERATOR To INCOMING PKG
2 x NYY 4C x 50mm2 m 28.80 Rp - Rp -
From OUTGOING PKG To INCOMING 2 LVMDP
2 x NYY 4C x 50mm2 m 28.80 Rp - Rp -
From LVMDP To PP-KANTOR PELABUHAN
NYFGBY 4C x 16mm2 m 102.00 Rp - Rp -
From LVMDP To P.HVAC KANTOR PELABUHAN
NYFGBY 4C x 10mm2 m 108.00 Rp - Rp -
From LVMDP To PP-KANTOR TERPADU
NYFGBY 4C x 10mm2 m 48.00 Rp - Rp -
From LVMDP To P.HVAC KANTOR TERPADU
NYFGBY 4C x 10mm2 m 42.00 Rp - Rp -
From LVMDP To PP-KLINIK
NYY 4C x 10mm2 m 96.00 Rp - Rp -
From LVMDP To P.HVAC KLINIK
NYFGBY 4C x 10mm2 m 93.60 Rp - Rp -
From LVMDP To PP-MASJID
NYFGBY 4C x 10mm2 m 176.00 Rp - Rp -
From LVMDP To PP-GUDANG 1
NYFGBY 4C x 35mm2 m 159.50 Rp - Rp -
From LVMDP To PP-GUDANG 2
DETAIL ENGINEERING DESIGN
PABRIK BAJA
PT. WIKA INDUSTRI DAN KONSTRUKSI

HARGA SATUAN JUMLAH


NO. URAIAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.)
NYFGBY 4C x 35mm2 m 198.00 Rp - Rp -
From LVMDP To PP-GUDANG 3
NYFGBY 4C x 35mm2 m 236.50 Rp - Rp -
From LVMDP To PP-GUDANG 4
NYFGBY 4C x 35mm2 m 275.00 Rp - Rp -
From LVMDP To PP-POWER HOUSE
NYY 4C x 10mm2 m 18.00 Rp - Rp -
From LVMDP To MCB BOX POS JAGA
NYFGBY 4C x 10mm2 m 110.00 Rp - Rp -
From LVMDP To PHM
NYFGBY 4C x 10mm2 m 198.00 Rp - Rp -

SUBTOTAL 3 Rp -

4 PEKERJAAN PENERANGAN DAN STOP KONTAK


4.1 PEKERJAAN PENERANGAN DAN STOP KONTAK - KLINIK
1 Sistem Penerangan
CR446B W31L125 1xLED 75 W ea 6.00 Rp -
RC463B W31L125 1xLED 32 W ea 4.00 Rp -
RC463B W62L62 1xLED 32 W ea 9.00
BN120C L1200 1xLED 40 W ea 5.00
DN570B 1xLED 20 W ea 9.00
MCS145 1x70 W ea 1.00 Rp -
Single Switch ea 3.00 Rp -
Double Switch ea 8.00 Rp -
Lighting & Fan Cable 0.6/1kV NYY 3 x 2.5 Sqmm
m 297.00 Rp -
PVC Cable Duct m #NAME?
Accessories + Lem ls 1.00 Rp - Rp -

2 Pekerjaan Stop Kontak


Inbow General Receptacle 250 W ea 16.00 Rp -
Receptacle VAC Unit ea 5.00 Rp -
Receptacle Cable 0.6/1kV NYY 3 x 4 Sqmm
m 114.40 Rp -
VAC Cable 0.6/1kV NYY 3 x 4 Sqmm
m 57.20 Rp -
Pump Cable 0.6/1kV NYY 3 x 4 Sqmm
m 60.00 Rp -
PVC Cable Duct m 54.00 #NAME? #NAME?
Accessories + Lem ls 1.00 #NAME? #NAME?

SUBTOTAL 4.1 #NAME?

4.2 PEKERJAAN PENERANGAN DAN STOP KONTAK - KANTOR TERPADU


1 Sistem Penerangan
RC165V W30L120 1xLED 40 W ea 14.00 Rp - Rp -
BN120C L1200 1xLED 40W ea 7.00 Rp - Rp -
DN135B 1xLED 28 W ea 3.00 Rp - Rp -
RC165V W60L60 1xLED 40 W ea 2.00 Rp - Rp -
RC120B W60L60 1xLED 40 W ea 9.00 Rp - Rp -
Single Switch ea 4.00 Rp - Rp -
Double Switch ea 6.00 Rp - Rp -
Lighting & Fan Cable 0.6/1kV NYY 3 x 2.5 Sqmm
m 401.50 Rp - Rp -
PVC Cable Duct m 61.00 #NAME? #NAME?
Accessories + Lem ls 1.00 #NAME? #NAME?

2 Pekerjaan Stop Kontak


Inbow General Receptacle 250 W ea 18.00 Rp - Rp -
Receptacle VAC Unit ea 5.00 Rp - Rp -
Receptacle Cable 0.6/1kV NYY 3 x 4 Sqmm
m 195.80 Rp - Rp -
VAC Cable 0.6/1kV NYY 3 x 4 Sqmm
m 85.00 Rp - Rp -
Pump Cable 0.6/1kV NYY 3 x 4 Sqmm
m 66.00 Rp - Rp -
PVC Cable Duct m 31.00 #NAME? #NAME?
Accessories + Lem ls 1.00 #NAME? #NAME?

SUBTOTAL 4.2 #NAME?


DETAIL ENGINEERING DESIGN
PABRIK BAJA
PT. WIKA INDUSTRI DAN KONSTRUKSI

HARGA SATUAN JUMLAH


NO. URAIAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.)
4.3 PEKERJAAN PENERANGAN DAN STOP KONTAK - KLINIK
1 Sistem Penerangan
RC463B W31L125 1xLED 35 W ea 10.00 Rp - Rp -
BN120C L1200 1xLED 40W ea 2.00 Rp - Rp -
DN135B 1xLED 28 W ea 2.00 Rp - Rp -
RC165V W60L60 1xLED 40 W ea 11.00 Rp - Rp -
RC120B W60L60 1xLED 40 W ea 10.00 Rp - Rp -
Single Switch ea 4.00 Rp - Rp -
Double Switch ea 7.00 Rp - Rp -
Lighting & Fan Cable 0.6/1kV NYY 3 x 2.5 Sqmm
m 409.20 Rp - Rp -
PVC Cable Duct m 62.00 #NAME? #NAME?
Accessories + Lem ls 1.00 #NAME? #NAME?

2 Pekerjaan Stop Kontak


Inbow General Receptacle 250 W ea 25.00 Rp - Rp -
Receptacle VAC Unit ea 4.00 Rp - Rp -
Receptacle Cable 0.6/1kV NYY 3 x 4 Sqmm
m 301.40 Rp - Rp -
VAC Cable 0.6/1kV NYY 3 x 4 Sqmm
m 94.60 Rp - Rp -
PVC Cable Duct m 46.00 #NAME? #NAME?
Accessories + Lem ls 1.00 #NAME? #NAME?

SUBTOTAL 4.3 #NAME?

4.4 PEKERJAAN PENERANGAN DAN STOP KONTAK - MASJID


1 Sistem Penerangan
BN120C L1200 1xLED 40W ea 5.00 Rp - Rp -
BN120C L600 1xLED 20W ea 2.00 Rp - Rp -
RC165V W30L120 1xLED 40 W ea 9.00 Rp - Rp -
RC165V W60L60 1xLED 40 W ea 1.00 Rp - Rp -
Single Switch ea 1.00 Rp - Rp -
Double Switch ea 2.00 Rp - Rp -
Lighting & Fan Cable 0.6/1kV NYY 3 x 2.5 Sqmm
m 108.90 Rp - Rp -
PVC Cable Duct m 17.00 #NAME? #NAME?
Accessories + Lem ls 1.00 #NAME? #NAME?

2 Pekerjaan Stop Kontak


Inbow General Receptacle 250 W ea 5.00 Rp - Rp -
Receptacle Cable 0.6/1kV NYY 3 x 4 Sqmm
m 40.70 Rp - Rp -
PVC Cable Duct m 18.00 #NAME? #NAME?
Accessories + Lem ls 1.00 #NAME? #NAME?

SUBTOTAL 4.4 #NAME?

4.5 PEKERJAAN PENERANGAN DAN STOP KONTAK - GUDANG Set 4.00


1 Sistem Penerangan
HPK138 1xSON 270 W ea 24.00 Rp - Rp -
BN120C L1200 1xLED 40W ea 8.00 Rp - Rp -
Single Switch ea 12.00 Rp - Rp -
Lighting & Fan Cable 0.6/1kV NYY 3 x 2.5 Sqmm
m 752.40 Rp - Rp -
PVC Cable Duct m 336.00 #NAME? #NAME?
Accessories + Lem ls 1.00 #NAME? #NAME?

2 Pekerjaan Stop Kontak


Outbow General Receptacle 250 W ea 24.00 Rp - Rp -
HD Receptacle 1500 W ea 24.00 Rp - Rp -
Receptacle Cable 0.6/1kV NYY 3 x 4 Sqmm
m 453.20 Rp - Rp -
HD Receptacle Cable 0.6/1kV NYY 4 x 4 Sqmm
m 453.20 Rp - Rp -
PVC Cable Duct m 160.00 #NAME? #NAME?
Accessories + Lem ls 1.00 #NAME? #NAME?

SUBTOTAL 4.5 #NAME?

4.6 PEKERJAAN PENERANGAN DAN STOP KONTAK - POWER HOUSE


1 Sistem Penerangan
BN120C L1200 1xLED 40W ea 6.00 Rp - Rp -
Single Switch ea 2.00 Rp - Rp -
Lighting & Fan Cable 0.6/1kV NYY 3 x 2.5 Sqmm
m 42.90 Rp - Rp -
DETAIL ENGINEERING DESIGN
PABRIK BAJA
PT. WIKA INDUSTRI DAN KONSTRUKSI

HARGA SATUAN JUMLAH


NO. URAIAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.)
PVC Cable Duct m 17.00 #NAME? #NAME?
Accessories + Lem ls 1.00 #NAME? #NAME?

2 Pekerjaan Stop Kontak


Inbow General Receptacle 250 W ea 2.00 Rp - Rp -
HD Receptacle 1500 W ea 2.00 Rp - Rp -
Receptacle Cable 0.6/1kV NYY 3 x 4 Sqmm
m 51.70 Rp - Rp -
HD Receptacle Cable 0.6/1kV NYY 4 x 4 Sqmm
m 11.00 Rp - Rp -
PVC Cable Duct m 7.00 #NAME? #NAME?
Accessories + Lem ls 1.00 #NAME? #NAME?

SUBTOTAL 4.6 #NAME?

4.7 PEKERJAAN PENERANGAN DAN STOP KONTAK - POS JAGA


1 Sistem Penerangan
BN120C L1200 1xLED 40W ea 1.00 Rp - Rp -
BN120C L600 1xLED 20W ea 5.00 Rp - Rp -
DN135B 1xLED 28 W ea 1.00 Rp - Rp -
Single Switch ea 2.00 Rp - Rp -
Double Switch ea 1.00 Rp - Rp -
Lighting & Fan Cable 0.6/1kV NYY 3 x 2.5 Sqmm
m 40.70 Rp - Rp -
PVC Cable Duct m 13.00 #NAME? #NAME?
Accessories + Lem ls 1.00 #NAME? #NAME?

2 Pekerjaan Stop Kontak


Inbow General Receptacle 250 W ea 2.00 Rp - Rp -
Receptacle Cable 0.6/1kV NYY 3 x 4 Sqmm
m 14.30 Rp - Rp -
PVC Cable Duct m 5.00 #NAME? #NAME?
Accessories + Lem ls 1.00 #NAME? #NAME?

SUBTOTAL 4.7 #NAME?


SUBTOTAL 4 #NAME?

5 PEKERJAAN ELEKTRONIK
5.1 PEKERJAAN ELEKTRONIK - KANTOR PELABUHAN
1 Pekerjaan Sistem Telepon
Main Equipment
PABX 4 Line 40 Extension set 1.00 Err:509 Err:509
- Power Supply + UPS
- Grounding system (Max 2Ω completed with electrode/GIP, clamp,
BC 4 Sqmm cable, Grounding Box. Labeling/ grouping, Etc)
- Lightning Arrester
- Testing and Commissioning
MDF-TP 50 pair set 1.00 Err:509 Err:509
Outlet Telephone pcs 7.00 Err:509 Err:509
Telephone Cable ITC 2 x 0.6mm2 dalam conduit
titik 7.00 #NAME? #NAME?

2 Pekerjaan Sistem Data


Main Equipment Set 1.00 Err:509 Err:509
#NAME? set 1.00 Include
#NAME? unit 1.00 Include
#NAME? lot 1.00 Include
Switch HUB 8 Port PoE unit 1.00 Err:509 Err:509
Access Point unit 1.00 Err:509 Err:509
LAN Outlet pcs 5.00 Err:509 Err:509
Instalasi LAN Outlet, UTP Cat 6 dalam conduit titik 5.00 #NAME? #NAME?

SUBTOTAL 5.1 Err:509

5.2 PEKERJAAN ELEKTRONIK - KANTOR TERPADU


1 Pekerjaan Sistem Telepon
Main Equipment
PABX 4 Line 40 Extension set 1.00 Err:509 Err:509
- Power Supply + UPS
- Grounding system (Max 2Ω completed with electrode/GIP, clamp,
BC 4 Sqmm cable, Grounding Box. Labeling/ grouping, Etc)
- Lightning Arrester
DETAIL ENGINEERING DESIGN
PABRIK BAJA
PT. WIKA INDUSTRI DAN KONSTRUKSI

HARGA SATUAN JUMLAH


NO. URAIAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.)
- Testing and Commissioning
MDF-TP 50 pair set 1.00 Err:509 Err:509
Outlet Telephone pcs 2.00 Err:509 Err:509
Telephone Cable ITC 2 x 0.6mm2 dalam conduit
titik 2.00 #NAME? #NAME?
DETAIL ENGINEERING DESIGN
PABRIK BAJA
PT. WIKA INDUSTRI DAN KONSTRUKSI

HARGA SATUAN JUMLAH


NO. URAIAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.)
2 Pekerjaan Sistem Data
Main Equipment Set 1.00 Err:509 Err:509
#NAME? set 1.00 Include
#NAME? unit 1.00 Include
#NAME? lot 1.00 Include
Switch HUB 8 Port PoE unit 1.00 Err:509 Err:509
Access Point unit 1.00 Err:509 Err:509
LAN Outlet pcs 3.00 Err:509 Err:509
Instalasi LAN Outlet, UTP Cat 6 dalam conduit titik 3.00 #NAME? #NAME?

SUBTOTAL 5.2 Err:509

5.3 PEKERJAAN ELEKTRONIK - KLINIK


1 Pekerjaan Sistem Telepon
Main Equipment
PABX 4 Line 40 Extension set 1.00 Err:509 Err:509
- Power Supply + UPS
- Grounding system (Max 2Ω completed with electrode/GIP, clamp,
BC 4 Sqmm cable, Grounding Box. Labeling/ grouping, Etc)
- Lightning Arrester
- Testing and Commissioning
MDF-TP 50 pair set 1.00 Err:509 Err:509
Outlet Telephone pcs 4.00 Err:509 Err:509
Telephone Cable ITC 2 x 0.6mm2 dalam conduit
titik 4.00 #NAME? #NAME?

2 Pekerjaan Sistem Data


Main Equipment Set 1.00 Err:509 Err:509
#NAME? set 1.00 Include
#NAME? unit 1.00 Include
#NAME? lot 1.00 Include
Switch HUB 8 Port PoE unit 1.00 Err:509 Err:509
Access Point unit 1.00 Err:509 Err:509
LAN Outlet pcs 2.00 Err:509 Err:509
Instalasi LAN Outlet, UTP Cat 6 dalam conduit titik 2.00 #NAME? #NAME?

SUBTOTAL 5.3 Err:509

5.4 PEKERJAAN ELEKTRONIK - MASJID


1 Pekerjaan Sistem Penegeras Suara
Main Equipment
#NAME? unit 1.00 Err:509 Err:509
#NAME? unit 1.00 Include
#NAME? unit 1.00 Include
#NAME? ls 1.00 Include
Column Speaker 15W pcs 2.00 Err:509 Err:509
Horn Speaker 30W pcs 2.00 Err:509 Err:509
Instalasi Speaker, NYMHY 2 x 1.5mm2 dalam conduit titik 2.00 #NAME? #NAME?
Instalasi Mixer ke MDF, NYMHY 3 x 1.5mm2 dalam conduit m 18.00 #NAME? #NAME?

SUBTOTAL 5.4 Err:509

5.5 PEKERJAAN ELEKTRONIK - POS JAGA


1 Pekerjaan Sistem Telepon
Main Equipment
MDF-TP 50 pair set 1.00 Err:509 Err:509
Outlet Telephone pcs 1.00 Err:509 Err:509
Telephone Cable ITC 2 x 0.6mm2 dalam conduit
titik 1.00 #NAME? #NAME?
Telephone Cable ITC 50 x 2 x 0.6mm2 dalam conduit
m 37.00 Rp - Rp -

SUBTOTAL 5.5 Err:509


SUBTOTAL 5 Err:509

6 PEKERJAAN PENERANGAN JALAN


1 Pekerjaan Penerangan Highmast
Tiang Highmast Monopole Tipe Tangga, Tinggi 20 meter ea 1.00 Rp - Rp -
c/w Anchor, Bolt and Nut
BVP650 G2 25K 1xLED 200 W ea 6.00 Rp - Rp -
DETAIL ENGINEERING DESIGN
PABRIK BAJA
PT. WIKA INDUSTRI DAN KONSTRUKSI

HARGA SATUAN JUMLAH


NO. URAIAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.)
Lighting Cable 0.6/1kV NYY 3 x 2.5 Sqmm
m 31.20 Rp - Rp -
DETAIL ENGINEERING DESIGN
PABRIK BAJA
PT. WIKA INDUSTRI DAN KONSTRUKSI

HARGA SATUAN JUMLAH


NO. URAIAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.)
2 Pekerjaan Penerangan Jalan Umum
Tiang Lampu PJU Solar Cell lengkap dengan Anchor, Bolt dan Nut Set 33.00
Octagonal Single Parabole, Tinggi 9 meter set 33.00 Rp - Rp -
BGP214 1xLED 100 W set 33.00 Rp - Rp -
Solar Cell Mono 300WP set 33.00 Rp - Rp -
BCR 20A, 12/24VDC set 33.00 Rp - Rp -
VRLA Battery 80AH, 12VDC set 33.00 Rp - Rp -
Battery Box, Single Deck Finishing unit 33.00 Rp - Rp -
Solar Inverter Unit unit 33.00 Rp - Rp -
MCB, 1Ø, 10A, 4.5kA pcs 33.00 #NAME? #NAME?
Timer RE17RAMU 24VDC/24-240 VAC (8A), 1 s/d 100 jam pcs 33.00 #NAME? #NAME?
Contactor 3Ø, 16 A ea 33.00 #NAME? #NAME?
Kabel Lampu, NYY 3C x 2.5mm2 m 231.00 Rp - Rp -
Kabel Kontrol, NYAF 1C x 4mm2 m 231.00 Rp - Rp -
Aksesoris ls 1.00 #NAME? #NAME?

SUBTOTAL 6 #NAME?

7 PEKERJAAN PENANGKAL PETIR


1 Sistem Penangkal Petir - Kantor Pelabuhan set 1.00 Rp - Rp -
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?

2 Sistem Penangkal Petir - Pos Jaga set 1.00 Rp - Rp -


#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?

3 Sistem Penangkal Petir - Klinik set 1.00 Rp - Rp -


#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?

4 Sistem Penangkal Petir - Masjid set 1.00 Rp - Rp -


#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?

5 Sistem Penangkal Petir - Kantor Terpadu set 1.00 Rp - Rp -


#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
DETAIL ENGINEERING DESIGN
PABRIK BAJA
PT. WIKA INDUSTRI DAN KONSTRUKSI

HARGA SATUAN JUMLAH


NO. URAIAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.)
6 Sistem Penangkal Petir - Gudang set 4.00 Rp - Rp -
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?

7 Sistem Penangkal Petir - Highmast set 1.00 Rp - Rp -


#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?

SUBTOTAL 7 Rp -
SUBTOTAL PEKERJAAN ELEKTRIKAL #NAME?
DETAIL ENGINEERING DESIGN
PABRIK BAJA
PT. WIKA INDUSTRI DAN KONSTRUKSI

HARGA SATUAN JUMLAH


NO. URAIAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.)

1 POWER HOUSE
1.1 PEKERJAAN PANEL & GENERATOR
1 MV-ATS (20kV)
- 1 unit MV. Cubicle Double Incoming type NSM (SF6-LBS)Motorized set 1.00 Rp -
1 buah ATS relay Easergy T200 S (PLN dan Generator) include
3 buah Ring CT Sensor include
1 buah Shunt Trip 220 VAC + 1 buah Motorized 48 VDC include
1 buah Heater 220 VAC ; 50 W include

- 1 unit MV. Cubicle Metering type CM (SF6-LBS) set 1.00 Rp -


3 buah Fuse 6,3 A include
3 buah VT 20.000 V / V3 / 100 V / V3 include
1 buah Digital Multimeter PM 5560 + 1 buah Heater 220 VAC ; 50 W include

- MV. Cubicle Outgoing type DM1-A (SF6-CB)Motorized set 4.00 Rp -


O/C + E/F Relay Easergy P3U20 include
CT x/5-5A Class 0,5 include
Motorized 220 VAC include
Shunt Trip 220 VAC include
Heater 220 VAC ; 50 W include

2 Pekerjaan Pemasangan dan Pengadaan LV-Panel Contol Genset (380V) 4000A set - Rp - Rp -
- LV-Panel Contol Genset (380V) 4000A set 1.00 include
Automatic Main Failure and Load Sharing for 3 Genset include
ATS / AMF Synchronizing Controller for 3 Genset include
1 Lot control wiring + aksesoris include
Jasa Pemasangan + Setting Genset Control Panel ls 1.00 include

3 Pekerjaan Pemasangan dan Pengadaan LV-Panel Control Genset (380V) 1250A set - Rp - Rp -
- LV-Panel Control Genset (380V) 1250A set 1.00 include
Automatic Main Failure include
ATS / AMF include
1 Lot control wiring + aksesoris include
Jasa Pemasangan + Setting Genset Control Panel ls 1.00 include

4 BUSDUCT
Horizontal Elbow Workmanship ea - Rp - Rp -

From OUTGOING GENSET 1 To INCOMING 1 PKG GENSET


BUSDUCT 1250A ea - Rp - Rp -
From OUTGOING GENSET 2 To INCOMING 2 PKG GENSET
BUSDUCT 1250A ea - Rp - Rp -
From OUTGOING GENSET 3 To INCOMING 3 PKG GENSET
BUSDUCT 1250A ea - Rp - Rp -
From OUTGOING PKG GENSET To TRAFO STEP UP 20KV
BUSDUCT 4000A ea - Rp - Rp -
From OUTGOING GENSET 4 To INCOMING 1 PKG GENSET
BUSDUCT 1250A ea - Rp - Rp -
From OUTGOING PKG GENSET To INCOMING ATS 1 0.4 kV
BUSDUCT 1250A ea - Rp - Rp -
From OUTGOING TRAFO STEPDOWN 0.4 kV To INCOMING ATS 2 0.4 kV
BUSDUCT 1000A ea 8.40 Rp - Rp -

5 Diesel Engine Generator 750kVA set - Rp - Rp -


Diesel Engine Generator 750kVA include
Caterpillar C18 (Turbocharged) packaged Generator Set, include
arranged for 560 kW / 750 kVA Prime Rating @ 0.8 PF, 400 include
Volt, 3 Phase, 50 Hertz, at 1500 RPM complete with Standard include
Accessories include

6 Transformator Step Up 2500kVA 0.4/20kV


Pekerjaan Pemasangan dan Pengadaan Transformer Step Up 2500kVA, 20kV-400/231V ea - Rp - Rp -
Cap. 2500kVA, 400-20kV/231V unit 1.00
MV. Plug in Bushing 50 mm / Elastimol
DMCR
Jasa Pemasangan + Setting ls 1.00

7 Transformator Step Down 630kVA 20/0.4 kV


Pekerjaan Pemasangan dan Pengadaan Transformer Step Down 630kVA, 20kV-400/231V ea 1.00 Rp - Rp -
Cap. 630kVA, 20kV-400/231V unit 1.00
MV. Plug in Bushing 50 mm / Elastimol
DMCR
Jasa Pemasangan + Setting ls 1.00
-
DETAIL ENGINEERING DESIGN
PABRIK BAJA
PT. WIKA INDUSTRI DAN KONSTRUKSI

HARGA SATUAN JUMLAH


NO. URAIAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.)

8 LVMDP 01 set 1.00 Rp - Rp -


Indoor Type Sheet Steel with Powder Coating,
Aluminium Gland Plate, Thickness 2mm, IP 65
Dimensi (LxWxD) = 1800 x 800 x 400 mm set 4.00
PVC Cable Duct m 4.00
Busbar, 100 x 1000 mm ls 4.00
ACB , 3Ø, 800A, 65kA ea 1.00
MCCB, 3Ø, 350A, 36kA ea 1.00
MCCB, 3Ø, 200A, 50kA ea 1.00
MCCB, 3Ø, 125A, 18kA ea 1.00
MCCB, 3Ø, 50A, 18kA ea 2.00
MCCB, 3Ø, 30A, 18kA ea 1.00
MCCB, 3Ø, 25A, 10kA ea 2.00
Pilot Lamp ea 3.00
Fuse, 1Ø, 2A ea 3.00
Voltmeter ea 3.00
Amperemeter ea 1.00
Power Meter PM2230 ea 1.00
Current Transformer 800/5A ea 3.00
Selector Switch ea 1.00
Grounding BC 16 sqmm set 1.00

9 PP - POWER HOUSE ea 1.00 Rp - Rp -


Indoor Type Sheet Steel with Powder Coating,
Aluminium Gland Plate, Thickness 2mm, IP 65
Dimensi (LxWxD) = 600 x 400 x 250 mm set 1.00
PVC Cable Duct m 4.00
Busbar, 30 x 300 mm ls 4.00
MCCB, 3Ø, 25A, 10kA ea 1.00
MCCB, 3Ø, 16A, 10kA ea 11.00
MCB, 1Ø, 10A, 6kA ea 1.00
Pilot Lamp ea 3.00
Fuse, 1Ø, 2A ea 3.00
Voltmeter ea 1.00
Selector Switch ea 1.00
Grounding BC 16 sqmm set 1.00

10 Capacitor Bank 20KVAR ea 6.00 Rp - Rp -

SUBTOTAL 1.1 Rp -

1.2 PEKERJAAN PENERANGAN DAN RECEPTACLE


1 PENERANGAN
BN120C L1200 1xLED 40 W ea 18.00 Rp - Rp -
BN120C L600 1xLED 19S 20 W ea 12.00 Rp - Rp -
Sakelar Ganda ea 5.00 Rp - Rp -
Inbow General Receptacle 250 W ea 3.00 Rp - Rp -
HD Receptacle 1500 W (wall mounted ip 67) ea 2.00 Rp - Rp -

2 KABEL & TRAY


Lighting & Receptacle Cable
NYY 3C x 2.5 mm² m 408.00 Rp - Rp -
Exhaust Cable
NYY 4C x 2.5 mm² m 132.00 Rp - Rp -
From LVMDP 1 To PP-POWER HOUSE
NYY 4C x 4mm2 m 11.00 Rp - Rp -
From OUTGOING CUBICLE 20 kV (Gardu Wikon) To INCOMING MV-ATS 2 20 kV
(12/20kV) 3x N2XSY 1C x 70mm2 m 336.00 Rp - Rp -
From OUTGOING MV-ATS 20 kV To TRAFO STEP DOWN 20/0.4 KV
(12/20kV) 3x N2XSY 1C x 70mm2 m 13.20 Rp - Rp -
From OUTGOING TRAFO STEP UP 20kV To INCOMING ATS 1 (20kV)
(12/20kV) 3x N2XSY 1C x 70mm2 m - Rp - Rp -

PVC AW Conduit 1 1/4" (42mm) m 139.20 Rp - Rp -


Straight Tray, W 200mm x H 50mm (Hotdip Galvanized) ea 42.00 Rp - Rp -
Horizontal Elbow Tray, W 200mm x H 50mm (Hotdip Galvanized) ea 2.00 Rp - Rp -

SUBTOTAL 1.2 Rp -
SUBTOTAL Rp -

SUBTOTAL ELEKTRIKAL Rp -
REKAP ANALISA HARGA SATUAN PEKERJAAN ELEKTRIKAL

KODE URAIAN SATUAN MATERIAL UPAH DAN ALAT HARGA SATUAN

AN. 1 Pekerjaan Pemasangan dan Pengadaan MV-ATS (20kV) set


AN. 2 Pekerjaan Pemasangan dan Pengadaan Transformer Step Up 2500kVA, 20kV-400/231V set
AN. 3 Pekerjaan Pemasangan dan Pengadaan Transformer Step Down 630kVA, 20kV-400/231V set
AN. 4 Pekerjaan Pemasangan dan Pengadaan LV-Panel Contol Genset (380V) 4000A set
AN. 5 Pekerjaan Pemasangan dan Pengadaan LV-Panel Control Genset (380V) 1250A set
AN. 6 Pekerjaan Pemasangan dan Pengadaan Diesel Engine Generator 750kVA set
AN. 7 Pekerjaan Pemasangan dan Pengadaan LVMDP 01 set
AN. 8 Pekerjaan Pemasangan dan Pengadaan Capacitor Bank 20KVAR ea
AN. 9 Pekerjaan Pemasangan dan Pengadaan BUSDUCT Straight feeder 5000A ea
AN. 10 Pekerjaan Pemasangan dan Pengadaan BUSDUCT Straight feeder 1250A ea
AN. 11 Pekerjaan Pemasangan dan Pengadaan BUSDUCT Straight feeder 1000A ea
AN. 12 Pekerjaan Pemasangan dan Pengadaan Horizontal Elbow Workmanship ea
AN. 13 Pekerjaan Pemasangan dan Pengadaan PP - POWER HOUSE ea
AN. 14 Pekerjaan Pemasangan dan Pengadaan BN120C L600 1xLED 19S 20 W ea
AN. 15 Pekerjaan Pemasangan dan Pengadaan BN120C L1200 1xLED 40 W ea
AN. 16 Pekerjaan Pemasangan dan Pengadaan Inbow General Receptacle 250 W ea
AN. 17 Pekerjaan Pemasangan dan Pengadaan Outbow General Receptacle 250 W ea
AN. 18 Pekerjaan Pemasangan dan Pengadaan VAC Receptacle ea
AN. 19 Pekerjaan Pemasangan dan Pengadaan 2 Gang Floor Receptacle ea
AN. 20 Pekerjaan Pemasangan dan Pengadaan HD Receptacle 1500 W ea
AN. 21 Pekerjaan Pemasangan dan Pengadaan Sakelar Tunggal ea
AN. 22 Pekerjaan Pemasangan dan Pengadaan Sakelar Ganda ea
AN. 23 Pekerjaan Pemasangan dan Pengadaan NYY 3C x 2.5 mm² m
AN. 24 Pekerjaan Pemasangan dan Pengadaan NYY 3C x 4 mm² m
AN. 25 Pekerjaan Pemasangan dan Pengadaan NYY 3C x 16 mm² m
AN. 26 Pekerjaan Pemasangan dan Pengadaan NYY 3C x 25 mm² m
AN. 27 Pekerjaan Pemasangan dan Pengadaan NYY 4C x 2.5 mm² m
AN. 28 Pekerjaan Pemasangan dan Pengadaan NYY 4C x 4 mm² m
AN. 29 Pekerjaan Pemasangan dan Pengadaan 3 x N2XSY 1C x 70 mm² m
AN. 30 Pekerjaan Pemasangan dan Pengadaan PVC AW Conduit 1 1/4" (42mm) m
AN. 31 Pekerjaan Pemasangan dan Pengadaan PVC AW Conduit 1/2" (22mm) m
AN. 32 Pekerjaan Pemasangan dan Pengadaan Three Way Tee Type m
AN. 33 Pekerjaan Pemasangan dan Pengadaan Four Way Type m
AN. 34 Pekerjaan Pemasangan dan Pengadaan Grounding BC 16 sqmm set
AN. 35 Pekerjaan Pemasangan dan Pengadaan Straight Tray, W 150mm x H 100mm (Hotdip Galvanized) m
AN. 36 Pekerjaan Pemasangan dan Pengadaan Tee Tray, W 150mm x H 100mm (Hotdip Galvanized) ea
AN. 37 Pekerjaan Pemasangan dan Pengadaan Cross Tray, W 150mm x H 100mm (Hotdip Galvanized) ea
AN. 38 Pekerjaan Pemasangan dan Pengadaan Straight Tray, W 200mm x H 50mm (Hotdip Galvanized) ea
AN. 39 Pekerjaan Pemasangan dan Pengadaan Horizontal Elbow Tray, W 200mm x H 50mm (Hotdip Galvanized) ea
ANALISIS HARGA SATUAN PEKERJAAN ELEKTRIKAL

KODE ANALISIS 1 : AN. 1


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan MV-ATS (20kV)
VOLUME : 1
SATUAN : set
NO. URAIAN KODE UNIT VOLUME
A. MATERIAL
MV-ATS (20kV)
1 unit MV. Cubicle Double Incoming type NSM (SF6-LBS)Motorized set 1.00
1 buah ATS relay Easergy T200 S (PLN dan Generator)
3 buah Ring CT Sensor
1 buah Shunt Trip 220 VAC + 1 buah Motorized 48 VDC
1 buah Heater 220 VAC ; 50 W

1 unit MV. Cubicle Metering type CM (SF6-LBS) set 1.00


3 buah Fuse 6,3 A
3 buah VT 20.000 V / V3 / 100 V / V3
1 buah Digital Multimeter PM 5560 + 1 buah Heater 220 VAC ; 50 W

MV. Cubicle Outgoing type DM1-A (SF6-CB)Motorized set 4.00


O/C + E/F Relay Easergy P3U20
CT x/5-5A Class 0,5
Motorized 220 VAC
Shunt Trip 220 VAC
Heater 220 VAC ; 50 W

TOTAL MATERIAL

B. UPAH DAN ALAT


UPAH
Pekerja Man/Day
Tukang Listrik Man/Day
Kepala Tukang Man/Day
Mandor Man/Day

ALAT
Alat Bantu Elektrikal Hour
Forklift Hour

TOTAL UPAH DAN ALAT

C. TOTAL (A+B)

KODE ANALISIS 2 : AN. 2


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan Transformer Step Up 2500kVA, 20kV-400/231V
VOLUME : 1
SATUAN : set
NO. URAIAN KODE UNIT VOLUME
A. MATERIAL
Transformer Step Up 2500kVA, 20kV-400/231V
Cap. 2500kVA, 400-20kV/231V unit 1.00
MV. Plug in Bushing 50 mm / Elastimol
DMCR
Jasa Pemasangan + Setting ls 1.00

TOTAL MATERIAL

B. UPAH DAN ALAT


UPAH
Pekerja Man/Day
Tukang Listrik Man/Day
Kepala Tukang Man/Day
Mandor Man/Day

ALAT
Alat Bantu Elektrikal Hour
Forklift Hour

TOTAL UPAH DAN ALAT

C. TOTAL (A+B)
ANALISIS HARGA SATUAN PEKERJAAN ELEKTRIKAL

KODE ANALISIS 3 : AN. 3


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan Transformer Step Down 630kVA, 20kV-400/231V
VOLUME : 1
SATUAN : set
NO. URAIAN KODE UNIT VOLUME
A. MATERIAL
Transformer Step Down 630kVA, 20kV-400/231V
Cap. 630kVA, 20kV-400/231V unit 1.00
MV. Plug in Bushing 50 mm / Elastimol
DMCR
Jasa Pemasangan + Setting ls 1.00

TOTAL MATERIAL

B. UPAH DAN ALAT


UPAH
Pekerja Man/Day
Tukang Listrik Man/Day
Kepala Tukang Man/Day
Mandor Man/Day

ALAT
Alat Bantu Elektrikal Hour
Forklift Hour

TOTAL UPAH DAN ALAT

C. TOTAL (A+B)

KODE ANALISIS 4 : AN. 4


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan LV-Panel Contol Genset (380V) 4000A
VOLUME : 1
SATUAN : set
NO. URAIAN KODE UNIT VOLUME
A. MATERIAL
LV-Panel Contol Genset (380V) 4000A set 1.00
Automatic Main Failure and Load Sharing for 3 Genset
ATS / AMF Synchronizing Controller for 3 Genset
1 Lot control wiring + aksesoris
Jasa Pemasangan + Setting Genset Control Panel ls 1.00
TOTAL MATERIAL

B. UPAH DAN ALAT


UPAH
Pekerja Man/Day
Tukang Listrik Man/Day
Kepala Tukang Man/Day
Mandor Man/Day

ALAT
Alat Bantu Elektrikal Hour
Forklift Hour

TOTAL UPAH DAN ALAT

C. TOTAL (A+B)

KODE ANALISIS 5 : AN. 5


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan LV-Panel Control Genset (380V) 1250A
VOLUME : 1
SATUAN : set
NO. URAIAN KODE UNIT VOLUME
A. MATERIAL
LV-Panel Control Genset (380V) 1250A set 1.00
Automatic Main Failure
ATS / AMF
1 Lot control wiring + aksesoris
Jasa Pemasangan + Setting Genset Control Panel ls 1.00
TOTAL MATERIAL

B. UPAH DAN ALAT


UPAH
Pekerja Man/Day
Tukang Listrik Man/Day
Kepala Tukang Man/Day
Mandor Man/Day

ALAT
Alat Bantu Elektrikal Hour
Forklift Hour

TOTAL UPAH DAN ALAT

C. TOTAL (A+B)
ANALISIS HARGA SATUAN PEKERJAAN ELEKTRIKAL

KODE ANALISIS 6 : AN. 6


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan Diesel Engine Generator 750kVA
VOLUME : 1
SATUAN : set
NO. URAIAN KODE UNIT VOLUME
A. MATERIAL
Diesel Engine Generator 750kVA
Caterpillar C18 (Turbocharged) packaged Generator Set, set 1.00
arranged for 560 kW / 750 kVA Prime Rating @ 0.8 PF, 400
Volt, 3 Phase, 50 Hertz, at 1500 RPM complete with Standard
Accessories

TOTAL MATERIAL

B. UPAH DAN ALAT


UPAH
Pekerja Man/Day
Tukang Listrik Man/Day
Kepala Tukang Man/Day
Mandor Man/Day

ALAT
Alat Bantu Elektrikal Hour
Forklift Hour

TOTAL UPAH DAN ALAT

C. TOTAL (A+B)

KODE ANALISIS 7 : AN. 7


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan LVMDP 01
VOLUME : 1
SATUAN : set
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
LVMDP 01
Indoor Type Sheet Steel with Powder Coating,
Aluminium Gland Plate, Thickness 2mm, IP 65
Dimensi (LxWxD) = 1800 x 800 x 400 mm set 4.00
PVC Cable Duct m 4.00
Busbar, 100 x 1000 mm ls 4.00
ACB , 3Ø, 800A, 65kA ea 1.00
MCCB, 3Ø, 350A, 36kA ea 1.00
MCCB, 3Ø, 200A, 50kA ea 1.00
MCCB, 3Ø, 125A, 18kA ea 1.00
MCCB, 3Ø, 50A, 18kA ea 2.00
MCCB, 3Ø, 30A, 18kA ea 1.00
MCCB, 3Ø, 25A, 10kA ea 2.00
Pilot Lamp ea 3.00
Fuse, 1Ø, 2A ea 3.00
Voltmeter ea 3.00
Amperemeter ea 1.00
Power Meter PM2230 ea 1.00
Current Transformer 800/5A ea 3.00
Selector Switch ea 1.00
Grounding BC 16 sqmm set 1.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.13
Tukang Listrik Man/Day 0.06
Kepala Tukang Man/Day 0.01
Mandor Man/Day 0.01

ALAT
Alat Bantu Elektrikal Hour 0.17

TOTAL UPAH & ALAT

C. TOTAL (A+B)

KODE ANALISIS 8 : AN. 8


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan Capacitor Bank 20KVAR
VOLUME : 1
SATUAN : ea
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
Capacitor Bank 20KVAR unit 1.00
Contactor 3Ø, 400A ea 1.00
MCCB, 3Ø, 400A, 25kA ea 1.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.25
Tukang Listrik Man/Day 0.13
Kepala Tukang Man/Day 0.03
Mandor Man/Day 0.01

ALAT
Alat Bantu Elektrikal Hour 1.00

TOTAL UPAH & ALAT

C. TOTAL (A+B)
ANALISIS HARGA SATUAN PEKERJAAN ELEKTRIKAL

KODE ANALISIS 9 : AN. 9


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan BUSDUCT Straight feeder 5000A
VOLUME : 1
SATUAN : ea
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
BUSDUCT Straight feeder 5000A
BUSDUCT Straight feeder EX - WAY 5,000A 4W+GEAL - AL IP 54 m 1.00
Hanger Bar pcs 1.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.25
Tukang Listrik Man/Day 0.13
Kepala Tukang Man/Day 0.03
Mandor Man/Day 0.01

ALAT
Alat Bantu Elektrikal Hour 1.00

TOTAL UPAH & ALAT

C. TOTAL (A+B)

KODE ANALISIS 10 : AN. 10


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan BUSDUCT Straight feeder 1250A
VOLUME : 1
SATUAN : ea
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
BUSDUCT Straight feeder 1250A
BUSDUCT Straight feeder EX - WAY 1250A 4W+GEAL - AL IP 54 m 1.00
Hanger Bar pcs 1.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.25
Tukang Listrik Man/Day 0.13
Kepala Tukang Man/Day 0.03
Mandor Man/Day 0.01

ALAT
Alat Bantu Elektrikal Hour 1.00

TOTAL UPAH & ALAT

C. TOTAL (A+B)

KODE ANALISIS 11 : AN. 11


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan BUSDUCT Straight feeder 1000A
VOLUME : 1
SATUAN : ea
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
BUSDUCT Straight feeder 1000A
BUSDUCT Straight feeder EX - WAY 1000A 4W+GEAL - AL IP 54 m 1.00
Hanger Bar pcs 1.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.25
Tukang Listrik Man/Day 0.13
Kepala Tukang Man/Day 0.03
Mandor Man/Day 0.01

ALAT
Alat Bantu Elektrikal Hour 1.00

TOTAL UPAH & ALAT

C. TOTAL (A+B)
ANALISIS HARGA SATUAN PEKERJAAN ELEKTRIKAL

KODE ANALISIS 12 : AN. 12


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan Horizontal Elbow Workmanship
VOLUME : 1
SATUAN : ea
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
Horizontal Elbow Workmanship pcs 1.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.25
Tukang Listrik Man/Day 0.13
Kepala Tukang Man/Day 0.03
Mandor Man/Day 0.01

ALAT
Alat Bantu Elektrikal Hour 1.00

TOTAL UPAH & ALAT

C. TOTAL (A+B)

KODE ANALISIS 13 : AN. 13


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan PP - POWER HOUSE
VOLUME : 1
SATUAN : ea
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
PP - POWER HOUSE
Indoor Type Sheet Steel with Powder Coating,
Aluminium Gland Plate, Thickness 2mm, IP 65
Dimensi (LxWxD) = 600 x 400 x 250 mm set 1.00
PVC Cable Duct m 4.00
Busbar, 30 x 300 mm ls 4.00
MCCB, 3Ø, 25A, 10kA ea 1.00
MCCB, 3Ø, 16A, 10kA ea 11.00
MCB, 1Ø, 10A, 6kA ea 1.00
Pilot Lamp ea 3.00
Fuse, 1Ø, 2A ea 3.00
Voltmeter ea 1.00
Selector Switch ea 1.00
Grounding BC 16 sqmm set 1.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.50
Tukang Listrik Man/Day 0.25
Kepala Tukang Man/Day 0.05
Mandor Man/Day 0.03

ALAT
Alat Bantu Elektrikal Hour 2.00

TOTAL UPAH & ALAT

C. TOTAL (A+B)

KODE ANALISIS 14 : AN. 14


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan BN120C L600 1xLED 19S 20 W
VOLUME : 1
SATUAN : ea
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
BN120C L600 1xLED 19S 20 W ea 1.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.08
Tukang Listrik Man/Day 0.04
Kepala Tukang Man/Day 0.01
Mandor Man/Day 0.00

ALAT
Alat Bantu Elektrikal Hour 0.17

TOTAL UPAH & ALAT

C. TOTAL (A+B)
ANALISIS HARGA SATUAN PEKERJAAN ELEKTRIKAL

KODE ANALISIS 15 : AN. 15


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan BN120C L1200 1xLED 40 W
VOLUME : 1
SATUAN : ea
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
BN120C L1200 1xLED 40 W ea 1.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.08
Tukang Listrik Man/Day 0.04
Kepala Tukang Man/Day 0.01
Mandor Man/Day 0.00

ALAT
Alat Bantu Elektrikal Hour 0.17

TOTAL UPAH & ALAT

C. TOTAL (A+B)

KODE ANALISIS 16 : AN. 16


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan Inbow General Receptacle 250 W
VOLUME : 1
SATUAN : ea
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
Inbow General Receptacle 250 W pcs 1.00
Inbow Doost pcs 1.00
PVC HI Conduit 25 mm m 3.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.13
Tukang Listrik Man/Day 0.06
Kepala Tukang Man/Day 0.01
Mandor Man/Day 0.01

ALAT
Alat Bantu Elektrikal Hour 0.17

TOTAL UPAH & ALAT

C. TOTAL (A+B)

KODE ANALISIS 17 : AN. 17


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan Outbow General Receptacle 250 W
VOLUME : 1
SATUAN : ea
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
Outbow General Receptacle 250 W pcs 1.00
PVC HI Conduit 25 mm m 5.00
Clamp Conduit 25 mm pcs 5.00
Nail and Fischer set 5.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.13
Tukang Listrik Man/Day 0.06
Kepala Tukang Man/Day 0.01
Mandor Man/Day 0.01

ALAT
Alat Bantu Elektrikal Hour 0.17

TOTAL UPAH & ALAT

C. TOTAL (A+B)
ANALISIS HARGA SATUAN PEKERJAAN ELEKTRIKAL

KODE ANALISIS 18 : AN. 18


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan VAC Receptacle
VOLUME : 1
SATUAN : ea
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
VAC Receptacle pcs 1.00
Inbow Doost pcs 1.00
PVC HI Conduit 25 mm m 3.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.13
Tukang Listrik Man/Day 0.06
Kepala Tukang Man/Day 0.01
Mandor Man/Day 0.01

ALAT
Alat Bantu Elektrikal Hour 0.17

TOTAL UPAH & ALAT

C. TOTAL (A+B)

KODE ANALISIS 19 : AN. 19


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan 2 Gang Floor Receptacle
VOLUME : 1
SATUAN : ea
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
2 Gang Floor Receptacle pcs 1.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.13
Tukang Listrik Man/Day 0.06
Kepala Tukang Man/Day 0.01
Mandor Man/Day 0.01

ALAT
Alat Bantu Elektrikal Hour 0.17

TOTAL UPAH & ALAT

C. TOTAL (A+B)

KODE ANALISIS 20 : AN. 20


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan HD Receptacle 1500 W
VOLUME : 1
SATUAN : ea
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
HD Receptacle 1500 W pcs 1.00
EMT Conduit E-19 m 5.00
EMT Clamp Conduit 20 mm pcs 5.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.13
Tukang Listrik Man/Day 0.06
Kepala Tukang Man/Day 0.01
Mandor Man/Day 0.01

ALAT
Alat Bantu Elektrikal Hour 0.17

TOTAL UPAH & ALAT

C. TOTAL (A+B)
ANALISIS HARGA SATUAN PEKERJAAN ELEKTRIKAL

KODE ANALISIS 21 : AN. 21


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan Sakelar Tunggal
VOLUME : 1
SATUAN : ea
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
Sakelar Tunggal pcs 1.00
Inbow Doost pcs 1.00
PVC HI Conduit 25 mm m 3.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.13
Tukang Listrik Man/Day 0.06
Kepala Tukang Man/Day 0.01
Mandor Man/Day 0.01

ALAT
Alat Bantu Elektrikal Hour 0.17

TOTAL UPAH & ALAT

C. TOTAL (A+B)

KODE ANALISIS 22 : AN. 22


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan Sakelar Ganda
VOLUME : 1
SATUAN : ea
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
Sakelar Ganda pcs 1.00
Inbow Doost pcs 1.00
PVC HI Conduit 25 mm m 3.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.13
Tukang Listrik Man/Day 0.06
Kepala Tukang Man/Day 0.01
Mandor Man/Day 0.01

ALAT
Alat Bantu Elektrikal Hour 0.17

TOTAL UPAH & ALAT

C. TOTAL (A+B)

KODE ANALISIS 23 : AN. 23


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan NYY 3C x 2.5 mm²
VOLUME : 1
SATUAN : m
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
NYY 3C x 2.5 mm² m 1.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.01
Tukang Listrik Man/Day 0.00
Kepala Tukang Man/Day 0.00
Mandor Man/Day 0.00

ALAT
Alat Bantu Elektrikal Hour 0.03

TOTAL UPAH & ALAT

C. TOTAL (A+B)
ANALISIS HARGA SATUAN PEKERJAAN ELEKTRIKAL

KODE ANALISIS 24 : AN. 24


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan NYY 3C x 4 mm²
VOLUME : 1
SATUAN : m
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
NYY 3C x 4 mm² m 1.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.01
Tukang Listrik Man/Day 0.00
Kepala Tukang Man/Day 0.00
Mandor Man/Day 0.00

ALAT
Alat Bantu Elektrikal Hour 0.03

TOTAL UPAH & ALAT

C. TOTAL (A+B)

KODE ANALISIS 25 : AN. 25


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan NYY 3C x 16 mm²
VOLUME : 1
SATUAN : m
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
NYY 3C x 16 mm² m 1.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.02
Tukang Listrik Man/Day 0.01
Kepala Tukang Man/Day 0.00
Mandor Man/Day 0.00

ALAT
Alat Bantu Elektrikal Hour 0.08

TOTAL UPAH & ALAT

C. TOTAL (A+B)

KODE ANALISIS 26 : AN. 26


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan NYY 3C x 25 mm²
VOLUME : 1
SATUAN : m
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
NYY 3C x 25 mm² m 1.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.02
Tukang Listrik Man/Day 0.01
Kepala Tukang Man/Day 0.00
Mandor Man/Day 0.00

ALAT
Alat Bantu Elektrikal Hour 0.08

TOTAL UPAH & ALAT

C. TOTAL (A+B)
ANALISIS HARGA SATUAN PEKERJAAN ELEKTRIKAL

KODE ANALISIS 27 : AN. 27


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan NYY 4C x 2.5 mm²
VOLUME : 1
SATUAN : m
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
NYY 4C x 2.5 mm² m 1.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.01
Tukang Listrik Man/Day 0.00
Kepala Tukang Man/Day 0.00
Mandor Man/Day 0.00

ALAT
Alat Bantu Elektrikal Hour 0.03

TOTAL UPAH & ALAT

C. TOTAL (A+B)

KODE ANALISIS 28 : AN. 28


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan NYY 4C x 4 mm²
VOLUME : 1
SATUAN : m
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
NYY 4C x 4 mm² m 1.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.01
Tukang Listrik Man/Day 0.00
Kepala Tukang Man/Day 0.00
Mandor Man/Day 0.00

ALAT
Alat Bantu Elektrikal Hour 0.03

TOTAL UPAH & ALAT

C. TOTAL (A+B)

KODE ANALISIS 29 : AN. 29


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan 3 x N2XSY 1C x 70 mm²
VOLUME : 1
SATUAN : m
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
3 x N2XSY 1C x 70 mm²
N2XSY 1C x 70 mm² m 3.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.09
Tukang Listrik Man/Day 0.05
Kepala Tukang Man/Day 0.01
Mandor Man/Day 0.00

ALAT
Alat Bantu Elektrikal Hour 0.38

TOTAL UPAH & ALAT

C. TOTAL (A+B)
ANALISIS HARGA SATUAN PEKERJAAN ELEKTRIKAL

KODE ANALISIS 30 : AN. 30


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan PVC AW Conduit 1 1/4" (42mm)
VOLUME : 1
SATUAN : m
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
PVC AW Conduit 1 1/4" (42mm) m 1.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.03
Tukang Listrik Man/Day 0.02
Kepala Tukang Man/Day 0.00
Mandor Man/Day 0.00

ALAT
Alat Bantu Elektrikal Hour 0.13

TOTAL UPAH & ALAT

C. TOTAL (A+B)

KODE ANALISIS 31 : AN. 31


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan PVC AW Conduit 1/2" (22mm)
VOLUME : 1
SATUAN : m
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
PVC AW Conduit 1/2" (22mm) m 1.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.02
Tukang Listrik Man/Day 0.01
Kepala Tukang Man/Day 0.00
Mandor Man/Day 0.00

ALAT
Alat Bantu Elektrikal Hour 0.08

TOTAL UPAH & ALAT

C. TOTAL (A+B)

KODE ANALISIS 32 : AN. 32


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan Three Way Tee Type
VOLUME : 1
SATUAN : m
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
Three Way Tee Type pcs 1.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.02
Tukang Listrik Man/Day 0.01
Kepala Tukang Man/Day 0.00
Mandor Man/Day 0.00

ALAT
Alat Bantu Elektrikal Hour 0.08

TOTAL UPAH & ALAT

C. TOTAL (A+B)
ANALISIS HARGA SATUAN PEKERJAAN ELEKTRIKAL

KODE ANALISIS 33 : AN. 33


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan Four Way Type
VOLUME : 1
SATUAN : m
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
Four Way Type pcs 1.00

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.02
Tukang Listrik Man/Day 0.01
Kepala Tukang Man/Day 0.00
Mandor Man/Day 0.00

ALAT
Alat Bantu Elektrikal Hour 0.08

TOTAL UPAH & ALAT

C. TOTAL (A+B)

KODE ANALISIS 34 : AN. 34


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan Grounding BC 16 sqmm
VOLUME : 1
SATUAN : set
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
Grounding BC 16 sqmm
Cable Bc, 16 Sqmm m 5.00
Cable Scoon 16sqmm pcs 4.00
Caperod 20mm ea 3.00
Cadweld ea 1.00
Excavation ls 1.00

TOTAL MATERIALS

B. UPAH DAN ALAT


UPAH
Pekerja Man/Day 0.02
Tukang Listrik Man/Day 0.01
Kepala Tukang Man/Day 0.00
Mandor Man/Day 0.00

ALAT
Alat Bantu Elektrikal Hour 0.08

TOTAL UPAH DAN ALAT

C. TOTAL (A+B)

KODE ANALISIS 35 : AN. 35


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan Straight Tray, W 150mm x H 100mm (Hotdip Galvanized)
VOLUME : 1
SATUAN : m
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
Straight Tray, W 150mm x H 100mm (Hotdip Galvanized) m 1.00
Bracket Support, W 150 pcs 0.67
Jointing Set, Include with 4 set Bolt pcs 0.67

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.11
Tukang Listrik Man/Day 0.06
Kepala Tukang Man/Day 0.01
Mandor Man/Day 0.01

ALAT
Alat Bantu Elektrikal Hour 0.45

TOTAL UPAH & ALAT

C. TOTAL (A+B)
ANALISIS HARGA SATUAN PEKERJAAN ELEKTRIKAL

KODE ANALISIS 36 : AN. 36


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan Tee Tray, W 150mm x H 100mm (Hotdip Galvanized)
VOLUME : 1
SATUAN : ea
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
Tee Tray, W 150mm x H 100mm (Hotdip Galvanized) pcs 1.00
Bracket Support, W 150 pcs 0.67
Jointing Set, Include with 4 set Bolt pcs 0.67

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.11
Tukang Listrik Man/Day 0.06
Kepala Tukang Man/Day 0.01
Mandor Man/Day 0.01

ALAT
Alat Bantu Elektrikal Hour 0.45

TOTAL UPAH & ALAT

C. TOTAL (A+B)

KODE ANALISIS 37 : AN. 37


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan Cross Tray, W 150mm x H 100mm (Hotdip Galvanized)
VOLUME : 1
SATUAN : ea
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
Cross Tray, W 150mm x H 100mm (Hotdip Galvanized) pcs 1.00
Bracket Support, W 150 pcs 0.67
Jointing Set, Include with 4 set Bolt pcs 0.67

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.11
Tukang Listrik Man/Day 0.06
Kepala Tukang Man/Day 0.01
Mandor Man/Day 0.01

ALAT
Alat Bantu Elektrikal Hour 0.45

TOTAL UPAH & ALAT

C. TOTAL (A+B)

KODE ANALISIS 38 : AN. 38


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan Straight Tray, W 200mm x H 50mm (Hotdip Galvanized)
VOLUME : 1
SATUAN : ea
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
Straight Tray, W 200mm x H 50mm (Hotdip Galvanized) m 1.00
Bracket Support, W 150 pcs 0.67
Jointing Set, Include with 4 set Bolt pcs 0.67

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.11
Tukang Listrik Man/Day 0.06
Kepala Tukang Man/Day 0.01
Mandor Man/Day 0.01

ALAT
Alat Bantu Elektrikal Hour 0.45

TOTAL UPAH & ALAT

C. TOTAL (A+B)
ANALISIS HARGA SATUAN PEKERJAAN ELEKTRIKAL

KODE ANALISIS 39 : AN. 39


NAMA PEKERJAAN : Pekerjaan Pemasangan dan Pengadaan Horizontal Elbow Tray, W 200mm x H 50mm (Hotdip Galvanized)
VOLUME : 1
SATUAN : ea
NO. URAIAN KODE UNIT VOLUME
A. MATERIALS
Horizontal Elbow Tray, W 200mm x H 50mm (Hotdip Galvanized) pcs 1.00
Bracket Support, W 150 pcs 0.67
Jointing Set, Include with 4 set Bolt pcs 0.67

TOTAL MATERIALS

B. UPAH & ALAT


UPAH
Pekerja Man/Day 0.11
Tukang Listrik Man/Day 0.06
Kepala Tukang Man/Day 0.01
Mandor Man/Day 0.01

ALAT
Alat Bantu Elektrikal Hour 0.45

TOTAL UPAH & ALAT

C. TOTAL (A+B)
PRICE LIST
IA. MATERIAL PRICES

CODE MATERIAL UNIT

GENSET
Caterpillar C18 (Turbocharged) packaged Generator Set, set
arranged for 560 kW / 750 kVA Prime Rating @ 0.8 PF, 400
Volt, 3 Phase, 50 Hertz, at 1500 RPM complete with Standard
Accessories

TRANSFORMATOR
Transformer Step Up
Cap. 2500kVA, 400-20kV/231V unit
MV. Plug in Bushing 50 mm / Elastimol
DMCR
Jasa Pemasangan + Setting ls

Transformer Step Down


Cap. 630kVA, 20kV-400/231V unit
MV. Plug in Bushing 50 mm / Elastimol
DMCR
Jasa Pemasangan + Setting ls

INCOMING & OUTGOING


MV-PLN (20kV)
1 unit MV. Cubicle Incoming type IM (SF6-LBS) set
1 buah Heater 220 VAC ; 50 W

1 unit MV. Cubicle Outgoing type DM1-A + set


Metering (SF6-CB)Motorized
3 buah CT x/5-5A Class 0,5
3 buah PT 20.000 V / 100 V Class 0,5
1 buah Digital Multimeter PM 5560 +
1 buah Motorized 220 VAC
1 buah Shunt Trip 220 VAC +
1 buah Heater 220 VAC ; 50 W

Cubicle (20kV)
1 unit MV. Cubicle Incoming type IM (SF6-LBS) set
1 buah Heater 220 VAC ; 50 W

1 unit MV. Cubicle Outgoing type DM1-A + set


Metering (SF6-CB)Motorized
3 buah CT x/5-5A Class 0,5
3 buah PT 20.000 V / 100 V Class 0,5
1 buah Digital Multimeter PM 5560 +
1 buah Motorized 220 VAC
1 buah Shunt Trip 220 VAC +
1 buah Heater 220 VAC ; 50 W

MV-ATS (20kV)
1 unit MV. Cubicle Double Incoming type NSM (SF6-LBS)Motorized set
1 buah ATS relay Easergy T200 S (PLN dan Generator)
3 buah Ring CT Sensor
1 buah Shunt Trip 220 VAC + 1 buah Motorized 48 VDC
1 buah Heater 220 VAC ; 50 W

1 unit MV. Cubicle Metering type CM (SF6-LBS) set


3 buah Fuse 6,3 A
3 buah VT 20.000 V / V3 / 100 V / V3
1 buah Digital Multimeter PM 5560 + 1 buah Heater 220 VAC ; 50 W

MV. Cubicle Outgoing type DM1-A (SF6-CB)Motorized set


O/C + E/F Relay Easergy P3U20
CT x/5-5A Class 0,5
Motorized 220 VAC
Shunt Trip 220 VAC
Heater 220 VAC ; 50 W

LV-Panel Contol Genset (380V) 4000A set


Automatic Main Failure and Load Sharing for 3 Genset
ATS / AMF Synchronizing Controller for 3 Genset
1 Lot control wiring + aksesoris
Jasa Pemasangan + Setting Genset Control Panel ls

LV-Panel Control Genset (380V) 1250A set


Automatic Main Failure
ATS / AMF
1 Lot control wiring + aksesoris
Jasa Pemasangan + Setting Genset Control Panel ls

BUSDUCT
BUSDUCT Straight feeder EX - WAY 5,000A 4W+GEAL - AL IP 54 m
BUSDUCT Straight feeder EX - WAY 1250A 4W+GEAL - AL IP 54 m
BUSDUCT Straight feeder EX - WAY 1000A 4W+GEAL - AL IP 54 m
Horizontal Elbow Workmanship pcs
Hanger Bar pcs

CAPASITOR BANK
Capacitor Bank 110KVAR unit
Capacitor Bank 50KVAR unit
Capacitor Bank 20KVAR unit
PRICE LIST
IA. MATERIAL PRICES

CODE MATERIAL UNIT

Panel Box Indoor


Indoor Type Sheet Steel with Powder Coating,
Aluminium Gland Plate, Thickness 2mm, IP 65
Dimensi (LxWxD) = 1800 x 800 x 400 mm set

Panel Box Indoor


Indoor Type Sheet Steel with Powder Coating,
Aluminium Gland Plate, Thickness 2mm, IP 65
Dimensi (LxWxD) = 1200 x 800 x 400 mm set

Panel Box Indoor


Indoor Type Sheet Steel with Powder Coating,
Aluminium Gland Plate, Thickness 2mm, IP 65
Dimensi (LxWxD) = 1000 x 800 x 400 mm set

Panel Box Indoor


Indoor Type Sheet Steel with Powder Coating,
Aluminium Gland Plate, Thickness 2mm, IP 65
Dimensi (LxWxD) = 800 x 600 x 400 mm set

Panel Box Indoor


Indoor Type Sheet Steel with Powder Coating,
Aluminium Gland Plate, Thickness 2mm, IP 65
Dimensi (LxWxD) = 700 x 500 x 250 mm set

Panel Box Indoor


Indoor Type Sheet Steel with Powder Coating,
Aluminium Gland Plate, Thickness 2mm, IP 65
Dimensi (LxWxD) = 600 x 400 x 250 mm set

Panel Box Indoor


Indoor Type Sheet Steel with Powder Coating,
Aluminium Gland Plate, Thickness 2mm, IP 65
Dimensi (LxWxD) = 500 x 400 x 200 mm set

Panel Box Indoor


Indoor Type Sheet Steel with Powder Coating,
Aluminium Gland Plate, Thickness 2mm, IP 65
Dimensi (LxWxD) = 400 x 300 x 200 mm set

Panel Box Outdoor


Outdoor Type Sheet Steel with Powder Coating,
Aluminium Gland Plate, Thickness 2mm, IP 65
Dimensi (L x W x D) = 400 x 300 x 200 mm Box Panel set

Busbar
Busbar, 15 x 3 sqmm ls
Busbar, 30 x 300 mm ls
Busbar, 50 x 500 mm ls
Busbar, 60 x 600 mm ls
Busbar, 100 x 1000 mm ls

Breaker
ACB , 3Ø, 4000A, 100kA ea
ACB , 3Ø, 4000A, 65kA ea
ACB , 3Ø, 1250A, 65kA ea
ACB , 3Ø, 800A, 65kA ea
MCCB, 3Ø, 800A, 65kA NS800N ea
MCCB, 3Ø, 500A, 50kA ea
MCCB, 3Ø, 400A, 25kA ea
MCCB, 3Ø, 350A, 50kA ea
MCCB, 3Ø, 350A, 36kA ea
MCCB, 3Ø, 200A, 50kA ea
MCCB, 3Ø, 160A, 25kA ea
MCCB, 3Ø, 125A, 25kA ea
MCCB, 3Ø, 125A, 18kA ea
MCCB, 3Ø, 100A, 18kA ea
MCCB, 3Ø, 100A, 30kA ea
MCCB, 3Ø, 80A, 30kA ea
MCCB, 3Ø, 75A, 18kA ea
MCCB, 3Ø, 60A, 18kA ea
MCCB, 3Ø, 50A, 18kA ea
MCCB, 3Ø, 40A, 18kA ea
MCCB, 3Ø, 30A, 18kA ea
MCCB, 3Ø, 20A, 18kA ea
MCCB, 3Ø, 15A, 18kA ea
MCCB, 3Ø, 40A, 10kA ea
MCCB, 3Ø, 50A, 10kA ea
MCCB, 3Ø, 30A, 10kA ea
MCCB, 3Ø, 25A, 10kA ea
MCCB, 3Ø, 20A, 10kA ea
MCCB, 3Ø, 16A, 10kA ea
MCCB, 3Ø, 15A, 10kA ea
MCB, 3Ø, 16A, 10kA ea
MCCB, 1Ø, 50A, 18kA ea
MCB, 1Ø, 32A, 10kA ea
MCB, 1Ø, 20A, 10kA ea
MCB, 1Ø, 16A, 10kA ea
MCB, 1Ø, 10A, 10kA ea
MCB, 1Ø, 16A, 6kA ea
MCB, 1Ø, 10A, 6kA ea
PRICE LIST
IA. MATERIAL PRICES

CODE MATERIAL UNIT

Metering
Voltmeter ea
Amperemeter ea
Power Meter PM2230 ea
Current Transformer 40/5A ea
Current Transformer 50/5A ea
Current Transformer 100/5A ea
Current Transformer 400/5A ea
Current Transformer 800/5A ea
Current Transformer 4000/5A ea

Motor Starter
Star Delta Kit 18 s/d 38 A (Termasuk Timer) unit
Contactor 3Ø, 400A ea
Contactor 3Ø, 30 A set
Remote Terminal IP65 set

Accessories
Pilot Lamp ea
Selector Switch ea
Timer RE17RAMU 24VDC/24-240 VAC (8A), 1 s/d 100 jam ea
Contactor 3Ø, 40 A ea
Contactor 3Ø, 65 A ea
Contactor 3Ø, 16 A ea
Fuse, 1Ø, 2A ea
MCB BOX 4 slot ea

Cable
N2XSY 1C x 70 mm² m
NYFGBY 4C x 240 mm² m
NYFGBY 4C x 70 mm² m
NYFGBY 4C x 50 mm² m
NYFGBY 4C x 35 mm² m
NYFGBY 4C x 25 mm² m
NYFGBY 4C x 16 mm² m
NYFGBY 4C x 10 mm² m
NYFGBY 4C x 6 mm² m
NYFGBY 4C x 4 mm² m
NYFGBY 4C x 2,5 mm² m
NYFGBY 3C x 2,5 mm² m
NYY 4C x 50 mm² m
NYY 4C x 35 mm² m
NYY 4C x 25 mm² m
NYY 4C x 16 mm² m
NYY 4C x 10 mm² m
NYY 4C x 6 mm² m
NYY 4C x 4 mm² m
NYY 4C x 2.5 mm² m
NYY 3C x 25 mm² m
NYY 3C x 16 mm² m
NYY 3C x 4 mm² m
NYY 3C x 2.5 mm² m
NYM 3C x 2,5 mm² m
NYM 3C x 4 mm² m
NYA 1C x 4 mm² m

LIGHTING
CR446B W31L125 1xLED 75 W ea
CR446B W31L125 1xLED 88 / 940 ea
CR446B W62L62 1xLED 60 W ea
RC463B W31L125 1xLED 32 W ea
RC463B G2 PSD W31L125 1xLED 40S/830 ea
RC463B W62L62 1x LED 32 W ea
BN120C L1200 1xLED 40 W ea
BN120C L600 1xLED 19S 20 W ea
DN570B 1xLED 40 W ea
DN570B 1xLED 20 W ea
DN135B D165 1xLED 10S 11 W ea
MCS145 1x70 W ea
DN 135B D215 1xLED20S / 830 ea
RC165V W30L120 1xLED34S /830 PSD ea
RC165V W60L60 1xLED34S/ 830 ea
ST740T 1xLED17S/827 WB ea
FGW251 2xPL-C 54W ea
BPS460 W33L124 1xLED 40 W ea
BVP650 G2 25K 1xLED 200 W ea
BVP 651 LED65K 549 W ea
BGP214 T25 1xLED120 98 W ea
HPK138 1xSON400W IC 220 50 ea
HPK138 1xSON150W IC 220 50 ea
MVF606 C 1xSON-T70W K 220V-50Hz NB ea
BY698X LED200/CW PIR NB L3000 EN ea
Y698P LED200/NW PSU WB L3000 EN ea

Sensor Gerak pcs


Sensor Gerak Dinding pcs
Emergency Exit Light pcs
Sakelar Tunggal pcs
Sakelar Ganda pcs
Inbow Doost pcs
PRICE LIST
IA. MATERIAL PRICES

CODE MATERIAL UNIT

RECEPTACLE
Outbow General Receptacle 250 W pcs
Inbow General Receptacle 250 W pcs
HD Receptacle 1500 W pcs
2 Gang Floor Receptacle pcs
VAC Receptacle pcs
Universal Receptacle 3 pin 13A 250V pcs

CCTV
Set PC + Monitor 32" set
Network Video Recorder 16Ch IP&PoE, HDD 2TB set
Meja Peralatan ls
Testing Commisioning ls
IP Dome Camera pcs
IP Fixed Camera pcs

TELEPON
PABX 4 Line 40 Ext. set
Surge Protector pcs
Battery 12V, 12Ah pcs
DC UPS 24VDC w/ Batt Backup 7Ah pcs
Telephone Outlet pcs
MDF-TP 50 Pair set
Testing and Commissioning ls
Instalasi Telepon Outlet, ITC 2 x 0.6mm2 dalam conduit ls

LAN System
Main Equipment
1set PC set
Wireless Router + Modem ADSL unit
Switch HUB 8 Port PoE unit
Access Point unit
Testing and Commisioning lot
LAN Outlet pcs
Instalasi LAN Outlet, UTP Cat 6 dalam conduit titik

Fire Alarm
Addressable FACP 10 zones set
Annuciator set
Surge Protector set
Relay Module set
Battery 12V, 12Ah set
DC UPS 24VDC w/ Batt Backup 7Ah set
ROR Detector+C37 pcs
Smoke Detector pcs
I/O Module pcs
Combination Box c/w: set
-Manual Call Point
-Alarm Bell
-Indication Lamp
TB FA set
Twisted Shielded AWG 18 1 Pair
FRC 3C x 1.5mm2
Testing and Commisioning

Sound System
System Amplifier 360 W w/Emergency Panel, set
6-Zone Selector, Evacuation Mic,
Emergency Broadcast, Melodi Chime
Mixer Amplifier 120W c/w equalizer set
Remote Microphone 20Ch set
CD/MP3/DVD Player set
Cabinet Rack w/ Acc set

Ceilling Speaker 3W pcs


Horn Speaker 15W pcs
Column Spaeker 20W pcs
Attenuator 5-30W pcs
Instalasi Sound System, NYMHY 3C x 1.5mm2 dalam conduit m

Conduit
PVC HI Conduit 25 mm m
Clamp Conduit 25 mm pcs
PVC HI Conduit 32 mm m
Clamp Conduit 32 mm pcs
Nail and Fischer set
Flexible Conduit 32 mm m
PVC HI Conduit 50 mm m
Clamp Conduit 50 mm pcs
Three Way Tee Type pcs
Four Way Type pcs
EMT Conduit E-19 m
EMT Clamp Conduit 20 mm pcs
PVC Cable Duct m
PVC AW Conduit 1 1/4" (42mm) m
PVC AW Conduit 1/2" (22mm) m
PRICE LIST
IA. MATERIAL PRICES

CODE MATERIAL UNIT

Grounding System
Cable Bc, 16 Sqmm m
Cable Bc, 25 Sqmm m
Cable Bc, 120 Sqmm m
Cable NYA, 16 Sqmm m
Cable NYA, 25 sqmm m
Cable Scoon 16sqmm pcs
Cable Scoon 25 sqmm pcs
Cable Scoon 70 sqmm pcs
Cable Scoon 120 sqmm pcs
Caperod 20mm ea
Cadweld ea
Excavation ls

Penerangan Jalan
Penerangan High Mast 8 Lampu tinggi 25 m set
c/w Motorize dan aksesoris terpasang

Tiang PJU Octagonal Single T, Tinggi 12 meter set


Tiang PJU Octagonal Double T, Tinggi 12 meter set

Solar Cell
Modul Surya 300 WP pcs
Battery VRLA 80AH, 12V pcs
Battery Box Double Deck Finishing : Powder Coat set
Battery Box Double Deck Finishing : Powder Coat set
BCR 10Amp 12/24Volt pcs
Accessories Solar Cell set

Cable Tray
Straight Tray, W 150mm x H 100mm (Hotdip Galvanized) m
Tee Tray, W 150mm x H 100mm (Hotdip Galvanized) pcs
Cross Tray, W 150mm x H 100mm (Hotdip Galvanized) pcs
Straight Tray, W 200mm x H 50mm (Hotdip Galvanized) m
Horizontal Elbow Tray, W 200mm x H 50mm (Hotdip Galvanized) pcs

Bracket Support, W 150 pcs


Bracket Support, W 200 pcs
Jointing Set, Include with 4 set Bolt pcs

Lightning Protection
Head Terminal Radius 200 meter (Elektrostatis) pcs
Cable NYA, 70 Sqmm m
Conduit PVC High Impact 2 Inch set
Conduit PVC High Impact 1 inch m
Cadweld m
Cooper Rod 20mm lot
Cooper Bar point
Clamp Support c/w Bolt+Nut 4sets bar
Boring/ Excavation m
Site Casted Grounding Box pcs

Busduct
BUSDUCT Busduct EX - WAY 5,000A 4W+GE CU - AL IP 54 m
Hanger Bar pcs
HARGA SATUAN
IB. LABOUR COST

UNIT PRICE
CODE MATERIAL UNIT REMARKS
(Rp)

L.01 Pekerja Man/Day Journal Prices, East Java Province 2017


L.02 Tukang Listrik Man/Day Journal Prices, East Java Province 2017
L.03 Tukang AC Man/Day Journal Prices, East Java Province 2017
L.04 Tukang Pipa Man/Day Journal Prices, East Java Province 2017
L.05 Tukang Cat Man/Day Journal Prices, East Java Province 2017
L.06 Kepala Tukang Man/Day Journal Prices, East Java Province 2017
L.07 Mandor Man/Day Journal Prices, East Java Province 2017
L.08 Tukang Las Man/Day Journal Prices, East Java Province 2017
L.09 Operator Man/Day Journal Prices, East Java Province 2017
L.10 Ass. Operator Man/Day Journal Prices, East Java Province 2017
HARGA SATUAN
IC. TOOLS

UNIT PRICE
CODE MATERIAL UNIT REMARKS
(Rp)

E.01 Aksesoris Peralatan Bor unit PT Budi Perkasa Alam 2017


E.02 Bar Cutter Hour PT Budi Perkasa Alam 2017
E.03 Bar Bender Hour PT Budi Perkasa Alam 2017
E.04 Crawler Crane 35 tons Hour PT Budi Perkasa Alam 2017
E.05 Bor Tangan Hour PT Budi Perkasa Alam 2017
E.06 Generator Set 50 KVA Hour PT Budi Perkasa Alam 2017
E.07 Mesin Las Listrik (400A) Hour PT Budi Perkasa Alam 2017
E.08 Excavator Standart ZX-330 Hour PT Budi Perkasa Alam 2017
E.09 Alat Bantu Mekanikal (kunci pipa & tool) Hour PT Budi Perkasa Alam 2017
E.10 Alat Bantu Elektrikal Hour PT Budi Perkasa Alam 2017
E.11 Forklift Hour PT Budi Perkasa Alam 2017
E.12 Test Pump (manual operation) Hour PT Budi Perkasa Alam 2017