PROJECT CODE : 719002

Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001


Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G1 TO COLUMN
I. MATERIAL
Bolt
Grade 8.8
Ultimate strength of bolt Fu = 80 kN/cm²
Nominal tensile strength Fnt = 60 kN/cm² (Table J3.2)
Nominal shear strength Fnv = 36 kN/cm² (Table J3.2)

Plate
Material A572 Gr 50
Tensile strength Fu = 44.8 kN/cm²
Yeild strength Fy = 34.5 kN/cm²

Beam
Material A572 Gr 50
Ultimate tensile strength Fu = 44.8 kN/cm²
Yeild strength Fy = 34.5 kN/cm²
Elastic module E= 20000 kN/cm²

II. INTERNAL FORCE FOR CALCULATING

Combo Axial (kN) V2 (kN) M33 (kNm)


Moment max -53.828 -247.655 -1447.4598
Axial force max -82.176 139.118 -457.987
Shear max -53.828 -498.82138 -769.425

III. DIMENSION
Beam section
Height h= 650 mm
Flange width bf = 248 mm
Web thickness tw = 10 mm
Flange thickness tf = 30 mm
Beam setback sb = 10 mm

Web Plate
Thickness twp = 14 mm
Height Lp = 360 mm
Double plate

Flange Plate
Thickness tfp = 35 mm
Width b= 248 mm
Consider interior plate

Bolts for Web


Type M20
Bolt rows n= 3
Bolt columns nc = 2
Gage - transverse spacing g= 120 mm
Pitch - longitudinal spacing s= 120 mm
Vertical edge distance Lev = 60 mm
Horizontal edge distance Leh = 60 mm
PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G1 TO COLUMN
Longitudinal distance to edge ef = 65 mm
Eccentric distance e= 130 mm

Bolts for Flange


Type M27
Bolt rows n= 2
Bolt columns nc = 4
Gage - transverse spacing g= 120 mm
Pitch - longitudinal spacing s= 120 mm
Vertical edge distance Lev = 60 mm
Horizontal edge distance Leh = 64 mm
Longitudinal distance to edge ef = 64 mm

IV. SHEAR WEB PLATE DESIGN


1. Plate (beam side)
Bolt shear
∅𝑅 = ∅𝐶𝐹 𝐴 𝑛 = 797.40 kN AISC J3-1

With: Φ= 0.75
nv = 2
C= 4.70 Tables (7-1..14)
Demand shear Va = 498.82 kN
Ratio demand/capacity D/C = 0.63 OK

Bolt bearing under shear load

∅𝑅 = ∅ Cmin( 𝑟 , r , 𝑟 ( )) = 2123.38 kN AISC J3-6

With: Φ= 0.75
𝑟= 1.2𝑙 𝑡𝐹 = 368.93 kN
𝑟 = 1.2𝑙 𝑡𝐹 = 737.85 kN
𝑟 ( ) = 2.4𝑑𝑡𝐹 = 301.16 kN
𝑙 = 𝐿 − 𝑑 /2 = 49.00 mm
𝑙 =𝑠−𝑑 = 98.00 mm
C= 4.70 Tables (7-1..14)

Demand shear Va = 498.82 kN


Ratio demand/capacity D/C = 0.23 OK

Shear yielding
∅𝑅 = ∅0.6𝐹 𝐴 = 2084.99 kN AISC J4-3

With: Φ= 1
𝐴 =𝐿 𝑡 = 5040 mm² Sec. D3-1
Demand shear Va = 498.82 kN
Ratio demand/capacity D/C = 0.24 OK
PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G1 TO COLUMN
Shear rupture
∅𝑅 = ∅0.6𝐹 𝐴 = 1633.06 kN AISC J4-4

With: Φ= 0.75
𝐴 = [L − n( d + 1.6)]𝑡 = 4048.80 mm Sec. J4-2
Demand shear Va = 498.82 kN
Ratio demand/capacity D/C = 0.31 OK

Block shear rupture

∅𝑅 = ∅[U 𝐹 𝐴 + min( 0.6𝐹 𝐴 ; 0.6𝐹 𝐴 )] = 1983.56 kN AISC J4-5

With: Ubs = 0.50 Sec. J4-3


𝐴 = [(𝑛 − 1)𝑠 + 𝐿 − (𝑛 − 0.5)(𝑑 + 1.6)] t = 3374.00 mm² Sec. J4-3
𝐴 = [𝐿 + (𝑛 − 1) s − (𝑛 − 0.5)(𝑑 + 1.6)]𝑡 = 2024.40 mm² Sec. J4-3
𝐴 = [(𝑛 − 1)𝑠 + 𝐿 ]𝑡 = 4200 mm² Sec. J4-3
Φ= 0.75
Demand shear Va = 498.82 kN
Ratio demand/capacity D/C = 0.25 OK

Flexure rupture
∅𝑀 = ∅𝐹 𝑍 = 251.65 kNm p. 9-6

With: 𝑡
𝑍 = [L − 𝑠 𝑛(𝑛 − 1)(d + 1.6)/𝐿 ] = 3
374346 mm
4
Φ= 0.75
Demand moment 𝑀 = 𝑉 𝑒 = 64.846779 kNm
Ratio demand/capacity D/C = 0.26 OK

Flexure yielding
𝑀 = ∅𝐹 𝑍 = 281.47 kNm p. 15-7

𝑡 𝐿 3
With: 𝑍 = = 453600 mm
4
Φ= 0.9
Demand moment 𝑀 = 𝑉 𝑒 = 64.846779 kNm
Ratio demand/capacity D/C = 0.23 OK

2. Beam
Bolt bearing under shear load

∅𝑅 = ∅ Cmin( 𝑟 , r , 𝑟 ( )) = 758.35 kN AISC J3-6

With: Φ= 0.75
𝑟 = 1.2𝑙 𝑡𝐹 = 1043.32 kN
𝑟 = 1.2𝑙 𝑡𝐹 = 527.04 kN
𝑟 ( ) = 2.4𝑑𝑡𝐹 = 215.12 kN
𝑙 = 𝐿 − 𝑑 /2 = 194.00 mm
𝑙 = 𝑠−𝑑 = 98.00 mm
C= 4.70 Tables (7-1..14)
PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G1 TO COLUMN
Demand shear Va = 498.82 kN
Ratio demand/capacity D/C = 0.66 OK

Shear yielding
∅𝑅 = ∅0.6𝐹 𝐴 = 1344.49 kN AISC J4-3

With: Φ= 1
𝐴 = ℎ𝑡 = 6500 mm² Sec. D3-1
Demand shear Va = 498.82 kN
Ratio demand/capacity D/C = 0.37 OK

V. FLANGE PLATED
1. Plate
Compression
∅𝑅 = ∅𝐹 𝐴 = 4951.85 kN AISC E3-1

With: Φ= 0.9
𝑏 = 𝑏 − 𝑡 − 30 = 208.00 mm
𝐴 = 𝑏𝑡 + 𝑏 𝑡 = 15960.00 mm²
yg = 52.85 mm
Iyg = 1.84E+07 mm3
r= 33.91 mm
KL/r = 2.49
Fe = 31797.42 kN/cm²
Fcr = 34.47 kN/cm² Sec.E3

Demand compression load Pa = 2139.99 kN


Ratio demand/capacity D/C = 0.43 OK

Tension yielding
∅𝑅 = ∅𝐹 𝐴 = 4951.85 kN AISC E3-1

With: Φ= 0.9
𝐴 = 𝑏𝑡 +𝑏 𝑡 = 15960.00 mm²
Demand tension load Pa = 2086.17 kN
Ratio demand/capacity D/C = 0.42 OK

Bolt shear
∅𝑅 = ∅𝐶𝐹 𝐴 𝑛 = 2473.44 kN AISC J3-1

With: Φ= 0.75
nv = 2
C= 8.00 Tables (7-1..14)
Demand shear Va = 2253.78 kN
Ratio demand/capacity D/C = 0.91 OK

Bolt bearing under axial load

∅𝑅 = ∅ Cmin( 𝑟 , r , 𝑟 ( )) = 10164.27 kN AISC J3-6


PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G1 TO COLUMN
With: Φ= 0.75
𝑟= 1.2𝑙 𝑡𝐹 = 847.02 kN
𝑟 = 1.2𝑙 𝑡𝐹 = 1694.04 kN
𝑟 ( ) = 2.4𝑑𝑡𝐹 = 1016.43 kN
𝑙 = 𝐿 − 𝑑 /2 = 45.00 mm
𝑙 =𝑠−𝑑 = 90.00 mm
C= 8.00 Tables (7-1..14)

Demand axial load Pa = 2253.78 kN


Ratio demand/capacity D/C = 0.22 OK

Tear out under axial load


∅𝑅 = ∅𝑅 + ∅𝑅 = 7226.19 kN

With: Φ= 0.75
∅𝑅 = ∅[U 𝐹 𝐴 + min( 0.6𝐹 𝐴 ; 0.6𝐹 𝐴 )] = 2912.29 kN AISC J4-5

With: Ubs = 1.00 Sec. J4-3


𝐴
= min( 𝑔, 𝑏 − 𝑔)𝑡 = 4200.00 mm²
𝐴 = 𝐴 − (𝑑 + 1.6)𝑡 = 3094.44 mm² Sec. J4-3
𝐴 = 2(𝐿 + (𝑛 − 1) s) t = 12600 mm² Sec. J4-3

𝐴 =𝐴 − 2(𝑛 − 0.5)(d + 1.6) t = 9283.31 mm² Sec. J4-3

∅𝑅 = ∅[U 𝐹 𝐴 + min( 0.6𝐹 𝐴 ; 0.6𝐹 𝐴 )] = 4313.90 kN AISC J4-5

With: Ubs = 1.00 Sec. J4-3


𝐴 = min( 2𝐿 , 𝑏 − 2𝐿 ) t = 2800.00 mm²
𝐴 = 𝐴 − (𝑑 + 1.6)𝑡 = 1694.44 mm² Sec. J4-3
𝐴 = 𝑛 (𝐿 + (𝑛 − 1) s) t = 25200 mm² Sec. J4-3

𝐴 = 𝐴 − 𝑛 (𝑛 − 0.5)(d + 1.6) t = 18566.63 mm² Sec. J4-3

Demand axial load Pa = 2086.17 kN


Ratio demand/capacity D/C = 0.29 OK

Tension rupture
∅𝑅 = ∅𝑅 + ∅𝑅 = 2391.66 kN
With: Φ= 0.75
∅𝑅 = ∅𝐹 𝐴 = 1431.11 kN AISC J4-2

With: 𝐴 = [𝑏 − n ( d + 1.6)]𝑡 = 4257.75 mm² Sec. D3-2

𝐴 = min( 0.85𝐴 , 𝐴 ) = 4257.75 mm² Sec. J4-1

∅𝑅 = ∅𝐹 𝐴 = 960.55 kN AISC J4-2

With: 𝐴 = [𝑏 − n ( d + 1.6)]𝑡 = 2857.75 mm² Sec. D3-2

𝐴 = min( 0.85𝐴 , 𝐴 ) = 2857.75 mm² Sec. J4-1


Demand axial load Pa = 2086.17 kN
Ratio demand/capacity D/C = 0.87 OK
PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G1 TO COLUMN
2. Beam
Flange bending
ΦMn = 1481.93 kNm AISC Eq. F13-1

With: Φ= 0.9
𝐴 =𝑏 𝑡 = 7440.00 mm² Sec. D3-1
𝐴 = [𝑏 − n ( d + 1.6)]𝑡 = 5544.75 mm² Sec. D3-2
Yt = 1.00 Sec, F13.1

𝐹𝑍 = 1890.23 kNm
𝐹𝑆 = 2209.41 kNm
Demand moment Ma = 1447.46 kNm
Ratio demand/capacity D/C = 0.98 OK

Bolt bearing under axial load

∅𝑅 = ∅ Cmin( 𝑟 , r , 𝑟 ( )) = 4356.12 kN AISC J3-6

With: Φ= 0.75
𝑟 = 1.2𝑙 𝑡𝐹 = 726.02 kN
𝑟 = 1.2𝑙 𝑡𝐹 = 1452.04 kN
𝑟 ( ) = 2.4𝑑𝑡𝐹 = 871.22 kN
𝑙 = 𝐿 − 𝑑 /2 = 45.00 mm
𝑙 =𝑠−𝑑 = 90.00 mm
C= 8.00 Tables (7-1..14)

Demand axial load Pa = 2307.70 kN


Ratio demand/capacity D/C = 0.53 OK

Tear out under axial load


∅𝑅 = ∅[U 𝐹 𝐴 + min( 0.6𝐹 𝐴 ; 0.6𝐹 𝐴 )] = 4278.45 kN AISC J4-5

With: Φ= 0.75
Ubs = 1.00 Sec. J4-3
𝐴= (𝑏 − 𝑔)𝑡 = 3840.00 mm²
𝐴 = 𝐴 − (𝑑 + 1.6)𝑡 = 2892.38 mm² Sec. J4-3
𝐴 = 𝑛 (𝐿 + (𝑛 − 1) s) t = 22080 mm² Sec. J4-3

𝐴 = 𝐴 − 𝑛 (𝑛 − 0.5)(d + 1.6) t = 16394.25 mm² Sec. J4-3

Demand axial load Pa = 2307.70


Ratio demand/capacity D/C = 0.54 OK

Global critical strength ratio 0.98


PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G2 TO COLUMN
I. MATERIAL
Bolt
Grade 8.8
Ultimate strength of bolt Fu = 80 kN/cm²
Nominal tensile strength Fnt = 60 kN/cm² (Table J3.2)
Nominal shear strength Fnv = 36 kN/cm² (Table J3.2)

Plate
Material A572 Gr 50
Tensile strength Fu = 44.8 kN/cm²
Yeild strength Fy = 34.5 kN/cm²

Beam
Material A572 Gr 50
Ultimate tensile strength Fu = 44.8 kN/cm²
Yeild strength Fy = 34.5 kN/cm²
Elastic module E= 20000 kN/cm²

II. INTERNAL FORCE FOR CALCULATING

Combo Axial (kN) V2 (kN) M33 (kNm)


Moment max -61.53 -934.831 -1710.2551
Axial force max -67.955 -903.846 -930.83
Shear max -61.53 -799.14519 -952.954

III. DIMENSION
Beam section
Height h= 650 mm
Flange width bf = 248 mm
Web thickness tw = 10 mm
Flange thickness tf = 40 mm
Beam setback sb = 10 mm

Web Plate
Thickness twp = 20 mm
Height Lp = 360 mm
Double plate

Flange Plate
Thickness tfp = 50 mm
Width b= 248 mm
Consider interior plate

Bolts for Web


Type M27
Bolt rows n= 3
Bolt columns nc = 2
Gage - transverse spacing g= 120 mm
Pitch - longitudinal spacing s= 120 mm
Vertical edge distance Lev = 60 mm
Horizontal edge distance Leh = 60 mm
PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G2 TO COLUMN
Longitudinal distance to edge ef = 65 mm
Eccentric distance e= 130 mm

Bolts for Flange


Type M30
Bolt rows n= 2
Bolt columns nc = 4
Gage - transverse spacing g= 120 mm
Pitch - longitudinal spacing s= 120 mm
Vertical edge distance Lev = 60 mm
Horizontal edge distance Leh = 64 mm
Longitudinal distance to edge ef = 64 mm

IV. SHEAR WEB PLATE DESIGN


1. Plate (beam side)
Bolt shear
∅𝑅 = ∅𝐶𝐹 𝐴 𝑛 = 1453.26 kN AISC J3-1

With: Φ= 0.75
nv = 2
C= 4.70 Tables (7-1..14)
Demand shear Va = 799.15 kN
Ratio demand/capacity D/C = 0.55 OK

Bolt bearing under shear load

∅𝑅 = ∅ Cmin( 𝑟 , r , 𝑟 ( )) = 3412.57 kN AISC J3-6

With: Φ= 0.75
𝑟= 1.2𝑙 𝑡𝐹 = 484.01 kN
𝑟 = 1.2𝑙 𝑡𝐹 = 968.03 kN
𝑟 ( ) = 2.4𝑑𝑡𝐹 = 580.82 kN
𝑙 = 𝐿 − 𝑑 /2 = 45.00 mm
𝑙 =𝑠−𝑑 = 90.00 mm
C= 4.70 Tables (7-1..14)

Demand shear Va = 799.15 kN


Ratio demand/capacity D/C = 0.23 OK

Shear yielding
∅𝑅 = ∅0.6𝐹 𝐴 = 2978.55 kN AISC J4-3

With: Φ= 1
𝐴 =𝐿 𝑡 = 7200 mm² Sec. D3-1
Demand shear Va = 799.15 kN
Ratio demand/capacity D/C = 0.27 OK
PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G2 TO COLUMN
Shear rupture
∅𝑅 = ∅0.6𝐹 𝐴 = 2139.34 kN AISC J4-4

With: Φ= 0.75
𝐴 = [L − n( d + 1.6)]𝑡 = 5304.00 mm Sec. J4-2
Demand shear Va = 799.15 kN
Ratio demand/capacity D/C = 0.37 OK

Block shear rupture

∅𝑅 = ∅[U 𝐹 𝐴 + min( 0.6𝐹 𝐴 ; 0.6𝐹 𝐴 )] = 2674.17 kN AISC J4-5

With: Ubs = 0.50 Sec. J4-3


𝐴 = [(𝑛 − 1)𝑠 + 𝐿 − (𝑛 − 0.5)(𝑑 + 1.6)] t = 4420.00 mm² Sec. J4-3
𝐴 = [𝐿 + (𝑛 − 1) s − (𝑛 − 0.5)(𝑑 + 1.6)]𝑡 = 2652.00 mm² Sec. J4-3
𝐴 = [(𝑛 − 1)𝑠 + 𝐿 ]𝑡 = 6000 mm² Sec. J4-3
Φ= 0.75
Demand shear Va = 799.15 kN
Ratio demand/capacity D/C = 0.30 OK

Flexure rupture
∅𝑀 = ∅𝐹 𝑍 = 333.69 kNm p. 9-6

With: 𝑡
𝑍 = [L − 𝑠 𝑛(𝑛 − 1)(d + 1.6)/𝐿 ] = 3
496380 mm
4
Φ= 0.75
Demand moment 𝑀 = 𝑉 𝑒 = 103.88887 kNm
Ratio demand/capacity D/C = 0.31 OK

Flexure yielding
𝑀 = ∅𝐹 𝑍 = 402.10 kNm p. 15-7

𝑡 𝐿 3
With: 𝑍 = = 648000 mm
4
Φ= 0.9
Demand moment 𝑀 = 𝑉 𝑒 = 103.88887 kNm
Ratio demand/capacity D/C = 0.26 OK

2. Beam
Bolt bearing under shear load

∅𝑅 = ∅ Cmin( 𝑟 , r , 𝑟 ( )) = 1023.77 kN AISC J3-6

With: Φ= 0.75
𝑟 = 1.2𝑙 𝑡𝐹 = 1021.80 kN
𝑟 = 1.2𝑙 𝑡𝐹 = 484.01 kN
𝑟 ( ) = 2.4𝑑𝑡𝐹 = 290.41 kN
𝑙 = 𝐿 − 𝑑 /2 = 190.00 mm
𝑙 = 𝑠−𝑑 = 90.00 mm
C= 4.70 Tables (7-1..14)
PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G2 TO COLUMN
Demand shear Va = 799.15 kN
Ratio demand/capacity D/C = 0.78 OK

Shear yielding
∅𝑅 = ∅0.6𝐹 𝐴 = 1344.49 kN AISC J4-3

With: Φ= 1
𝐴 = ℎ𝑡 = 6500 mm² Sec. D3-1
Demand shear Va = 799.15 kN
Ratio demand/capacity D/C = 0.59 OK

V. FLANGE PLATED
1. Plate
Compression
∅𝑅 = ∅𝐹 𝐴 = 7074.06 kN AISC E3-1

With: Φ= 0.9
𝑏 = 𝑏 − 𝑡 − 30 = 208.00 mm
𝐴 = 𝑏𝑡 + 𝑏 𝑡 = 22800.00 mm²
yg = 73.95 mm
Iyg = 5.06E+07 mm3
r= 47.09 mm
KL/r = 1.79
Fe = 61309.71 kN/cm²
Fcr = 34.47 kN/cm² Sec.E3

Demand compression load Pa = 2473.99 kN


Ratio demand/capacity D/C = 0.35 OK

Tension yielding
∅𝑅 = ∅𝐹 𝐴 = 7074.06 kN AISC E3-1

With: Φ= 0.9
𝐴 = 𝑏𝑡 +𝑏 𝑡 = 22800.00 mm²
Demand tension load Pa = 2412.46 kN
Ratio demand/capacity D/C = 0.34 OK

Bolt shear
∅𝑅 = ∅𝐶𝐹 𝐴 𝑛 = 3053.63 kN AISC J3-1

With: Φ= 0.75
nv = 2
C= 8.00 Tables (7-1..14)
Demand shear Va = 2661.93 kN
Ratio demand/capacity D/C = 0.87 OK

Bolt bearing under axial load

∅𝑅 = ∅ Cmin( 𝑟 , r , 𝑟 ( )) = 14036.37 kN AISC J3-6


PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G2 TO COLUMN
With: Φ= 0.75
𝑟= 1.2𝑙 𝑡𝐹 = 1169.70 kN
𝑟 = 1.2𝑙 𝑡𝐹 = 2339.40 kN
𝑟 ( ) = 2.4𝑑𝑡𝐹 = 1613.38 kN
𝑙 = 𝐿 − 𝑑 /2 = 43.50 mm
𝑙 =𝑠−𝑑 = 87.00 mm
C= 8.00 Tables (7-1..14)

Demand axial load Pa = 2661.93 kN


Ratio demand/capacity D/C = 0.19 OK

Tear out under axial load


∅𝑅 = ∅𝑅 + ∅𝑅 = 9950.03 kN

With: Φ= 0.75
∅𝑅 = ∅[U 𝐹 𝐴 + min( 0.6𝐹 𝐴 ; 0.6𝐹 𝐴 )] = 4019.24 kN AISC J4-5

With: Ubs = 1.00 Sec. J4-3


𝐴
= min( 𝑔, 𝑏 − 𝑔)𝑡 = 6000.00 mm²
𝐴 = 𝐴 − (𝑑 + 1.6)𝑡 = 4270.63 mm² Sec. J4-3
𝐴 = 2(𝐿 + (𝑛 − 1) s) t = 18000 mm² Sec. J4-3

𝐴 =𝐴 − 2(𝑛 − 0.5)(d + 1.6) t = 12811.88 mm² Sec. J4-3

∅𝑅 = ∅[U 𝐹 𝐴 + min( 0.6𝐹 𝐴 ; 0.6𝐹 𝐴 )] = 5930.80 kN AISC J4-5

With: Ubs = 1.00 Sec. J4-3


𝐴 = min( 2𝐿 , 𝑏 − 2𝐿 ) t = 4000.00 mm²
𝐴 = 𝐴 − (𝑑 + 1.6)𝑡 = 2270.63 mm² Sec. J4-3
𝐴 = 𝑛 (𝐿 + (𝑛 − 1) s) t = 36000 mm² Sec. J4-3

𝐴 = 𝐴 − 𝑛 (𝑛 − 0.5)(d + 1.6) t = 25623.75 mm² Sec. J4-3

Demand axial load Pa = 2412.46 kN


Ratio demand/capacity D/C = 0.24 OK

Tension rupture
∅𝑅 = ∅𝑅 + ∅𝑅 = 3013.32 kN
With: Φ= 0.75
∅𝑅 = ∅𝐹 𝐴 = 1842.78 kN AISC J4-2

With: 𝐴 = [𝑏 − n ( d + 1.6)]𝑡 = 5482.50 mm² Sec. D3-2

𝐴 = min( 0.85𝐴 , 𝐴 ) = 5482.50 mm² Sec. J4-1

∅𝑅 = ∅𝐹 𝐴 = 1170.54 kN AISC J4-2

With: 𝐴 = [𝑏 − n ( d + 1.6)]𝑡 = 3482.50 mm² Sec. D3-2

𝐴 = min( 0.85𝐴 , 𝐴 ) = 3482.50 mm² Sec. J4-1


Demand axial load Pa = 2412.46 kN
Ratio demand/capacity D/C = 0.80 OK
PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G2 TO COLUMN
2. Beam
Flange bending
ΦMn = 1792.09 kNm AISC Eq. F13-1

With: Φ= 0.9
𝐴 =𝑏 𝑡 = 9920.00 mm² Sec. D3-1
𝐴 = [𝑏 − n ( d + 1.6)]𝑡 = 7153.00 mm² Sec. D3-2
Yt = 1.00 Sec, F13.1

𝐹𝑍 = 2366.11 kNm
𝐹𝑆 = 2761.48 kNm
Demand moment Ma = 1710.26 kNm
Ratio demand/capacity D/C = 0.95 OK

Bolt bearing under axial load

∅𝑅 = ∅ Cmin( 𝑟 , r , 𝑟 ( )) = 5614.55 kN AISC J3-6

With: Φ= 0.75
𝑟 = 1.2𝑙 𝑡𝐹 = 935.76 kN
𝑟 = 1.2𝑙 𝑡𝐹 = 1871.52 kN
𝑟 ( ) = 2.4𝑑𝑡𝐹 = 1290.70 kN
𝑙 = 𝐿 − 𝑑 /2 = 43.50 mm
𝑙 =𝑠−𝑑 = 87.00 mm
C= 8.00 Tables (7-1..14)

Demand axial load Pa = 2772.93 kN


Ratio demand/capacity D/C = 0.49 OK

Tear out under axial load


∅𝑅 = ∅[U 𝐹 𝐴 + min( 0.6𝐹 𝐴 ; 0.6𝐹 𝐴 )] = 5519.06 kN AISC J4-5

With: Φ= 0.75
Ubs = 1.00 Sec. J4-3
𝐴= (𝑏 − 𝑔)𝑡 = 5120.00 mm²
𝐴 = 𝐴 − (𝑑 + 1.6)𝑡 = 3736.50 mm² Sec. J4-3
𝐴 = 𝑛 (𝐿 + (𝑛 − 1) s) t = 29440 mm² Sec. J4-3

𝐴 = 𝐴 − 𝑛 (𝑛 − 0.5)(d + 1.6) t = 21139.00 mm² Sec. J4-3

Demand axial load Pa = 2772.93


Ratio demand/capacity D/C = 0.50 OK

Global critical strength ratio 0.95


PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G3 TO COLUMN
I. MATERIAL
Bolt
Grade 8.8
Ultimate strength of bolt Fu = 80 kN/cm²
Nominal tensile strength Fnt = 60 kN/cm² (Table J3.2)
Nominal shear strength Fnv = 36 kN/cm² (Table J3.2)

Plate
Material A572 Gr 50
Tensile strength Fu = 44.8 kN/cm²
Yeild strength Fy = 34.5 kN/cm²

Beam
Material A572 Gr 50
Ultimate tensile strength Fu = 44.8 kN/cm²
Yeild strength Fy = 34.5 kN/cm²
Elastic module E= 20000 kN/cm²

II. INTERNAL FORCE FOR CALCULATING

Combo Axial (kN) V2 (kN) M33 (kNm)


Moment max 157.947 -687.211 -1293.1197
Axial force max 157.947 -687.211 -714.646
Shear max 157.064 -601.1911 -713.389

III. DIMENSION
Beam section
Height h= 650 mm
Flange width bf = 212 mm
Web thickness tw = 10 mm
Flange thickness tf = 40 mm
Beam setback sb = 10 mm

Web Plate
Thickness twp = 14 mm
Height Lp = 360 mm
Double plate

Flange Plate
Thickness tfp = 40 mm
Width b= 212 mm
Consider interior plate

Bolts for Web


Type M20
Bolt rows n= 3
Bolt columns nc = 2
Gage - transverse spacing g= 120 mm
Pitch - longitudinal spacing s= 120 mm
Vertical edge distance Lev = 60 mm
Horizontal edge distance Leh = 60 mm
PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G3 TO COLUMN
Longitudinal distance to edge ef = 65 mm
Eccentric distance e= 130 mm

Bolts for Flange


Type M30
Bolt rows n= 2
Bolt columns nc = 3
Gage - transverse spacing g= 120 mm
Pitch - longitudinal spacing s= 120 mm
Vertical edge distance Lev = 60 mm
Horizontal edge distance Leh = 46 mm
Longitudinal distance to edge ef = 46 mm

IV. SHEAR WEB PLATE DESIGN


1. Plate (beam side)
Bolt shear
∅𝑅 = ∅𝐶𝐹 𝐴 𝑛 = 797.40 kN AISC J3-1

With: Φ= 0.75
nv = 2
C= 4.70 Tables (7-1..14)
Demand shear Va = 601.19 kN
Ratio demand/capacity D/C = 0.75 OK

Bolt bearing under shear load

∅𝑅 = ∅ Cmin( 𝑟 , r , 𝑟 ( )) = 2123.38 kN AISC J3-6

With: Φ= 0.75
𝑟= 1.2𝑙 𝑡𝐹 = 368.93 kN
𝑟 = 1.2𝑙 𝑡𝐹 = 737.85 kN
𝑟 ( ) = 2.4𝑑𝑡𝐹 = 301.16 kN
𝑙 = 𝐿 − 𝑑 /2 = 49.00 mm
𝑙 =𝑠−𝑑 = 98.00 mm
C= 4.70 Tables (7-1..14)

Demand shear Va = 601.19 kN


Ratio demand/capacity D/C = 0.28 OK

Shear yielding
∅𝑅 = ∅0.6𝐹 𝐴 = 2084.99 kN AISC J4-3

With: Φ= 1
𝐴 =𝐿 𝑡 = 5040 mm² Sec. D3-1
Demand shear Va = 601.19 kN
Ratio demand/capacity D/C = 0.29 OK
PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G3 TO COLUMN
Shear rupture
∅𝑅 = ∅0.6𝐹 𝐴 = 1633.06 kN AISC J4-4

With: Φ= 0.75
𝐴 = [L − n( d + 1.6)]𝑡 = 4048.80 mm Sec. J4-2
Demand shear Va = 601.19 kN
Ratio demand/capacity D/C = 0.37 OK

Block shear rupture

∅𝑅 = ∅[U 𝐹 𝐴 + min( 0.6𝐹 𝐴 ; 0.6𝐹 𝐴 )] = 1983.56 kN AISC J4-5

With: Ubs = 0.50 Sec. J4-3


𝐴 = [(𝑛 − 1)𝑠 + 𝐿 − (𝑛 − 0.5)(𝑑 + 1.6)] t = 3374.00 mm² Sec. J4-3
𝐴 = [𝐿 + (𝑛 − 1) s − (𝑛 − 0.5)(𝑑 + 1.6)]𝑡 = 2024.40 mm² Sec. J4-3
𝐴 = [(𝑛 − 1)𝑠 + 𝐿 ]𝑡 = 4200 mm² Sec. J4-3
Φ= 0.75
Demand shear Va = 601.19 kN
Ratio demand/capacity D/C = 0.30 OK

Flexure rupture
∅𝑀 = ∅𝐹 𝑍 = 251.65 kNm p. 9-6

With: 𝑡
𝑍 = [L − 𝑠 𝑛(𝑛 − 1)(d + 1.6)/𝐿 ] = 3
374346 mm
4
Φ= 0.75
Demand moment 𝑀 = 𝑉 𝑒 = 78.154843 kNm
Ratio demand/capacity D/C = 0.31 OK

Flexure yielding
𝑀 = ∅𝐹 𝑍 = 281.47 kNm p. 15-7

𝑡 𝐿 3
With: 𝑍 = = 453600 mm
4
Φ= 0.9
Demand moment 𝑀 = 𝑉 𝑒 = 78.154843 kNm
Ratio demand/capacity D/C = 0.28 OK

2. Beam
Bolt bearing under shear load

∅𝑅 = ∅ Cmin( 𝑟 , r , 𝑟 ( )) = 758.35 kN AISC J3-6

With: Φ= 0.75
𝑟 = 1.2𝑙 𝑡𝐹 = 1043.32 kN
𝑟 = 1.2𝑙 𝑡𝐹 = 527.04 kN
𝑟 ( ) = 2.4𝑑𝑡𝐹 = 215.12 kN
𝑙 = 𝐿 − 𝑑 /2 = 194.00 mm
𝑙 = 𝑠−𝑑 = 98.00 mm
C= 4.70 Tables (7-1..14)
PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G3 TO COLUMN
Demand shear Va = 601.19 kN
Ratio demand/capacity D/C = 0.79 OK

Shear yielding
∅𝑅 = ∅0.6𝐹 𝐴 = 1344.49 kN AISC J4-3

With: Φ= 1
𝐴 = ℎ𝑡 = 6500 mm² Sec. D3-1
Demand shear Va = 601.19 kN
Ratio demand/capacity D/C = 0.45 OK

V. FLANGE PLATED
1. Plate
Compression
∅𝑅 = ∅𝐹 𝐴 = 4765.69 kN AISC E3-1

With: Φ= 0.9
𝑏 = 𝑏 − 𝑡 − 30 = 172.00 mm
𝐴 = 𝑏𝑡 + 𝑏 𝑡 = 15360.00 mm²
yg = 64.17 mm
Iyg = 2.64E+07 mm3
r= 41.42 mm
KL/r = 2.04
Fe = 47438.02 kN/cm²
Fcr = 34.47 kN/cm² Sec.E3

Demand compression load Pa = 1795.11 kN


Ratio demand/capacity D/C = 0.38 OK

Tension yielding
∅𝑅 = ∅𝐹 𝐴 = 4765.69 kN AISC E3-1

With: Φ= 0.9
𝐴 = 𝑏𝑡 +𝑏 𝑡 = 15360.00 mm²
Demand tension load Pa = 1953.06 kN
Ratio demand/capacity D/C = 0.41 OK

Bolt shear
∅𝑅 = ∅𝐶𝐹 𝐴 𝑛 = 2290.22 kN AISC J3-1

With: Φ= 0.75
nv = 2
C= 6.00 Tables (7-1..14)
Demand shear Va = 2068.39 kN
Ratio demand/capacity D/C = 0.90 OK

Bolt bearing under axial load

∅𝑅 = ∅ Cmin( 𝑟 , r , 𝑟 ( )) = 8421.82 kN AISC J3-6


PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G3 TO COLUMN
With: Φ= 0.75
𝑟= 1.2𝑙 𝑡𝐹 = 935.76 kN
𝑟 = 1.2𝑙 𝑡𝐹 = 1871.52 kN
𝑟 ( ) = 2.4𝑑𝑡𝐹 = 1290.70 kN
𝑙 = 𝐿 − 𝑑 /2 = 43.50 mm
𝑙 =𝑠−𝑑 = 87.00 mm
C= 6.00 Tables (7-1..14)

Demand axial load Pa = 2068.39 kN


Ratio demand/capacity D/C = 0.25 OK

Tear out under axial load


∅𝑅 = ∅𝑅 + ∅𝑅 = 6550.05 kN

With: Φ= 0.75
∅𝑅 = ∅[U 𝐹 𝐴 + min( 0.6𝐹 𝐴 ; 0.6𝐹 𝐴 )] = 2838.94 kN AISC J4-5

With: Ubs = 1.00 Sec. J4-3


𝐴
= min( 𝑔, 𝑏 − 𝑔)𝑡 = 3680.00 mm²
𝐴 = 𝐴 − (𝑑 + 1.6)𝑡 = 2296.50 mm² Sec. J4-3
𝐴 = 2(𝐿 + (𝑛 − 1) s) t = 14400 mm² Sec. J4-3

𝐴 =𝐴 − 2(𝑛 − 0.5)(d + 1.6) t = 10249.50 mm² Sec. J4-3

∅𝑅 = ∅[U 𝐹 𝐴 + min( 0.6𝐹 𝐴 ; 0.6𝐹 𝐴 )] = 3711.12 kN AISC J4-5

With: Ubs = 1.00 Sec. J4-3


𝐴 = min( 2𝐿 , 𝑏 − 2𝐿 ) t = 3200.00 mm²
𝐴 = 𝐴 − (𝑑 + 1.6)𝑡 = 1816.50 mm² Sec. J4-3
𝐴 = 𝑛 (𝐿 + (𝑛 − 1) s) t = 21600 mm² Sec. J4-3

𝐴 = 𝐴 − 𝑛 (𝑛 − 0.5)(d + 1.6) t = 15374.25 mm² Sec. J4-3

Demand axial load Pa = 1953.06 kN


Ratio demand/capacity D/C = 0.30 OK

Tension rupture
∅𝑅 = ∅𝑅 + ∅𝑅 = 2372.67 kN
With: Φ= 0.75
∅𝑅 = ∅𝐹 𝐴 = 1455.23 kN AISC J4-2

With: 𝐴 = [𝑏 − n ( d + 1.6)]𝑡 = 4329.50 mm² Sec. D3-2

𝐴 = min( 0.85𝐴 , 𝐴 ) = 4329.50 mm² Sec. J4-1

∅𝑅 = ∅𝐹 𝐴 = 917.44 kN AISC J4-2

With: 𝐴 = [𝑏 − n ( d + 1.6)]𝑡 = 2729.50 mm² Sec. D3-2

𝐴 = min( 0.85𝐴 , 𝐴 ) = 2729.50 mm² Sec. J4-1


Demand axial load Pa = 1953.06 kN
Ratio demand/capacity D/C = 0.82 OK
PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G3 TO COLUMN
2. Beam
Flange bending
ΦMn = 1450.05 kNm AISC Eq. F13-1

With: Φ= 0.9
𝐴 =𝑏 𝑡 = 8480.00 mm² Sec. D3-1
𝐴 = [𝑏 − n ( d + 1.6)]𝑡 = 5713.00 mm² Sec. D3-2
Yt = 1.00 Sec, F13.1

𝐹𝑍 = 2063.29 kNm
𝐹𝑆 = 2391.51 kNm
Demand moment Ma = 1293.12 kNm
Ratio demand/capacity D/C = 0.89 OK

Bolt bearing under axial load

∅𝑅 = ∅ Cmin( 𝑟 , r , 𝑟 ( )) = 4210.91 kN AISC J3-6

With: Φ= 0.75
𝑟 = 1.2𝑙 𝑡𝐹 = 935.76 kN
𝑟 = 1.2𝑙 𝑡𝐹 = 1871.52 kN
𝑟 ( ) = 2.4𝑑𝑡𝐹 = 1290.70 kN
𝑙 = 𝐿 − 𝑑 /2 = 43.50 mm
𝑙 =𝑠−𝑑 = 87.00 mm
C= 6.00 Tables (7-1..14)

Demand axial load Pa = 2198.84 kN


Ratio demand/capacity D/C = 0.52 OK

Tear out under axial load


∅𝑅 = ∅[U 𝐹 𝐴 + min( 0.6𝐹 𝐴 ; 0.6𝐹 𝐴 )] = 3533.65 kN AISC J4-5

With: Φ= 0.75
Ubs = 1.00 Sec. J4-3
𝐴= (𝑏 − 𝑔)𝑡 = 3680.00 mm²
𝐴 = 𝐴 − (𝑑 + 1.6)𝑡 = 2296.50 mm² Sec. J4-3
𝐴 = 𝑛 (𝐿 + (𝑛 − 1) s) t = 19920 mm² Sec. J4-3

𝐴 = 𝐴 − 𝑛 (𝑛 − 0.5)(d + 1.6) t = 13694.25 mm² Sec. J4-3

Demand axial load Pa = 2198.84


Ratio demand/capacity D/C = 0.62 OK

Global critical strength ratio 0.90


PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G4 TO COLUMN
I. MATERIAL
Bolt
Grade 8.8
Ultimate strength of bolt Fu = 80 kN/cm²
Nominal tensile strength Fnt = 60 kN/cm² (Table J3.2)
Nominal shear strength Fnv = 36 kN/cm² (Table J3.2)

Plate
Material A572 Gr 50
Tensile strength Fu = 44.8 kN/cm²
Yeild strength Fy = 34.5 kN/cm²

Beam
Material A572 Gr 50
Ultimate tensile strength Fu = 44.8 kN/cm²
Yeild strength Fy = 34.5 kN/cm²
Elastic module E= 20000 kN/cm²

II. INTERNAL FORCE FOR CALCULATING

Combo Axial (kN) V2 (kN) M33 (kNm)


Moment max -95.106 -207.766 -667.41664
Axial force max -109.987 107.415 -80.5281
Shear max -108.942 283.06299 -291.411

III. DIMENSION
Beam section
Height h= 520 mm
Flange width bf = 184 mm
Web thickness tw = 8 mm
Flange thickness tf = 30 mm
Beam setback sb = 10 mm

Web Plate
Thickness twp = 12 mm
Height Lp = 360 mm
Double plate

Flange Plate
Thickness tfp = 30 mm
Width b= 184 mm
Consider interior plate

Bolts for Web


Type M20
Bolt rows n= 3
Bolt columns nc = 2
Gage - transverse spacing g= 120 mm
Pitch - longitudinal spacing s= 120 mm
Vertical edge distance Lev = 60 mm
Horizontal edge distance Leh = 60 mm
PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G4 TO COLUMN
Longitudinal distance to edge ef = 65 mm
Eccentric distance e= 130 mm

Bolts for Flange


Type M30
Bolt rows n= 2
Bolt columns nc = 3
Gage - transverse spacing g= 100 mm
Pitch - longitudinal spacing s= 120 mm
Vertical edge distance Lev = 60 mm
Horizontal edge distance Leh = 42 mm
Longitudinal distance to edge ef = 42 mm

IV. SHEAR WEB PLATE DESIGN


1. Plate (beam side)
Bolt shear
∅𝑅 = ∅𝐶𝐹 𝐴 𝑛 = 797.40 kN AISC J3-1

With: Φ= 0.75
nv = 2
C= 4.70 Tables (7-1..14)
Demand shear Va = 283.06 kN
Ratio demand/capacity D/C = 0.35 OK

Bolt bearing under shear load

∅𝑅 = ∅ Cmin( 𝑟 , r , 𝑟 ( )) = 1820.04 kN AISC J3-6

With: Φ= 0.75
𝑟= 1.2𝑙 𝑡𝐹 = 316.22 kN
𝑟 = 1.2𝑙 𝑡𝐹 = 632.44 kN
𝑟 ( ) = 2.4𝑑𝑡𝐹 = 258.14 kN
𝑙 = 𝐿 − 𝑑 /2 = 49.00 mm
𝑙 =𝑠−𝑑 = 98.00 mm
C= 4.70 Tables (7-1..14)

Demand shear Va = 283.06 kN


Ratio demand/capacity D/C = 0.16 OK

Shear yielding
∅𝑅 = ∅0.6𝐹 𝐴 = 1787.13 kN AISC J4-3

With: Φ= 1
𝐴 =𝐿 𝑡 = 4320 mm² Sec. D3-1
Demand shear Va = 283.06 kN
Ratio demand/capacity D/C = 0.16 OK
PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G4 TO COLUMN
Shear rupture
∅𝑅 = ∅0.6𝐹 𝐴 = 1399.77 kN AISC J4-4

With: Φ= 0.75
𝐴 = [L − n( d + 1.6)]𝑡 = 3470.40 mm Sec. J4-2
Demand shear Va = 283.06 kN
Ratio demand/capacity D/C = 0.20 OK

Block shear rupture

∅𝑅 = ∅[U 𝐹 𝐴 + min( 0.6𝐹 𝐴 ; 0.6𝐹 𝐴 )] = 1700.19 kN AISC J4-5

With: Ubs = 0.50 Sec. J4-3


𝐴 = [(𝑛 − 1)𝑠 + 𝐿 − (𝑛 − 0.5)(𝑑 + 1.6)] t = 2892.00 mm² Sec. J4-3
𝐴 = [𝐿 + (𝑛 − 1) s − (𝑛 − 0.5)(𝑑 + 1.6)]𝑡 = 1735.20 mm² Sec. J4-3
𝐴 = [(𝑛 − 1)𝑠 + 𝐿 ]𝑡 = 3600 mm² Sec. J4-3
Φ= 0.75
Demand shear Va = 283.06 kN
Ratio demand/capacity D/C = 0.17 OK

Flexure rupture
∅𝑀 = ∅𝐹 𝑍 = 215.70 kNm p. 9-6

With: 𝑡
𝑍 = [L − 𝑠 𝑛(𝑛 − 1)(d + 1.6)/𝐿 ] = 3
320868 mm
4
Φ= 0.75
Demand moment 𝑀 = 𝑉 𝑒 = 36.798188 kNm
Ratio demand/capacity D/C = 0.17 OK

Flexure yielding
𝑀 = ∅𝐹 𝑍 = 241.26 kNm p. 15-7

𝑡 𝐿 3
With: 𝑍 = = 388800 mm
4
Φ= 0.9
Demand moment 𝑀 = 𝑉 𝑒 = 36.798188 kNm
Ratio demand/capacity D/C = 0.15 OK

2. Beam
Bolt bearing under shear load

∅𝑅 = ∅ Cmin( 𝑟 , r , 𝑟 ( )) = 606.68 kN AISC J3-6

With: Φ= 0.75
𝑟 = 1.2𝑙 𝑡𝐹 = 555.00 kN
𝑟 = 1.2𝑙 𝑡𝐹 = 421.63 kN
𝑟 ( ) = 2.4𝑑𝑡𝐹 = 172.09 kN
𝑙 = 𝐿 − 𝑑 /2 = 129.00 mm
𝑙 = 𝑠−𝑑 = 98.00 mm
C= 4.70 Tables (7-1..14)
PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G4 TO COLUMN
Demand shear Va = 283.06 kN
Ratio demand/capacity D/C = 0.47 OK

Shear yielding
∅𝑅 = ∅0.6𝐹 𝐴 = 860.47 kN AISC J4-3

With: Φ= 1
𝐴 = ℎ𝑡 = 4160 mm² Sec. D3-1
Demand shear Va = 283.06 kN
Ratio demand/capacity D/C = 0.33 OK

V. FLANGE PLATED
1. Plate
Compression
∅𝑅 = ∅𝐹 𝐴 = 3071.63 kN AISC E3-1

With: Φ= 0.9
𝑏 = 𝑏 − 𝑡 − 30 = 146.00 mm
𝐴 = 𝑏𝑡 + 𝑏 𝑡 = 9900.00 mm²
yg = 48.45 mm
Iyg = 9.53E+06 mm3
r= 31.03 mm
KL/r = 2.72
Fe = 26623.95 kN/cm²
Fcr = 34.47 kN/cm² Sec.E3

Demand compression load Pa = 1261.04 kN


Ratio demand/capacity D/C = 0.41 OK

Tension yielding
∅𝑅 = ∅𝐹 𝐴 = 3071.63 kN AISC E3-1

With: Φ= 0.9
𝐴 = 𝑏𝑡 +𝑏 𝑡 = 9900.00 mm²
Demand tension load Pa = 1165.93 kN
Ratio demand/capacity D/C = 0.38 OK

Bolt shear
∅𝑅 = ∅𝐶𝐹 𝐴 𝑛 = 2290.22 kN AISC J3-1

With: Φ= 0.75
nv = 2
C= 6.00 Tables (7-1..14)
Demand shear Va = 1331.05 kN
Ratio demand/capacity D/C = 0.58 OK

Bolt bearing under axial load

∅𝑅 = ∅ Cmin( 𝑟 , r , 𝑟 ( )) = 6316.37 kN AISC J3-6


PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G4 TO COLUMN
With: Φ= 0.75
𝑟= 1.2𝑙 𝑡𝐹 = 701.82 kN
𝑟 = 1.2𝑙 𝑡𝐹 = 1403.64 kN
𝑟 ( ) = 2.4𝑑𝑡𝐹 = 968.03 kN
𝑙 = 𝐿 − 𝑑 /2 = 43.50 mm
𝑙 =𝑠−𝑑 = 87.00 mm
C= 6.00 Tables (7-1..14)

Demand axial load Pa = 1331.05 kN


Ratio demand/capacity D/C = 0.21 OK

Tear out under axial load


∅𝑅 = ∅𝑅 + ∅𝑅 = 4650.37 kN

With: Φ= 0.75
∅𝑅 = ∅[U 𝐹 𝐴 + min( 0.6𝐹 𝐴 ; 0.6𝐹 𝐴 )] = 2048.53 kN AISC J4-5

With: Ubs = 1.00 Sec. J4-3


𝐴
= min( 𝑔, 𝑏 − 𝑔)𝑡 = 2520.00 mm²
𝐴 = 𝐴 − (𝑑 + 1.6)𝑡 = 1482.38 mm² Sec. J4-3
𝐴 = 2(𝐿 + (𝑛 − 1) s) t = 10800 mm² Sec. J4-3

𝐴 =𝐴 − 2(𝑛 − 0.5)(d + 1.6) t = 7687.13 mm² Sec. J4-3

∅𝑅 = ∅[U 𝐹 𝐴 + min( 0.6𝐹 𝐴 ; 0.6𝐹 𝐴 )] = 2601.83 kN AISC J4-5

With: Ubs = 1.00 Sec. J4-3


𝐴 = min( 2𝐿 , 𝑏 − 2𝐿 ) t = 1860.00 mm²
𝐴 = 𝐴 − (𝑑 + 1.6)𝑡 = 822.38 mm² Sec. J4-3
𝐴 = 𝑛 (𝐿 + (𝑛 − 1) s) t = 16200 mm² Sec. J4-3

𝐴 = 𝐴 − 𝑛 (𝑛 − 0.5)(d + 1.6) t = 11530.69 mm² Sec. J4-3

Demand axial load Pa = 1165.93 kN


Ratio demand/capacity D/C = 0.25 OK

Tension rupture
∅𝑅 = ∅𝑅 + ∅𝑅 = 1234.99 kN
With: Φ= 0.75
∅𝑅 = ∅𝐹 𝐴 = 809.08 kN AISC J4-2

With: 𝐴 = [𝑏 − n ( d + 1.6)]𝑡 = 2407.13 mm² Sec. D3-2

𝐴 = min( 0.85𝐴 , 𝐴 ) = 2407.13 mm² Sec. J4-1

∅𝑅 = ∅𝐹 𝐴 = 425.91 kN AISC J4-2

With: 𝐴 = [𝑏 − n ( d + 1.6)]𝑡 = 1267.13 mm² Sec. D3-2

𝐴 = min( 0.85𝐴 , 𝐴 ) = 1267.13 mm² Sec. J4-1


Demand axial load Pa = 1165.93 kN
Ratio demand/capacity D/C = 0.94 OK
PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G4 TO COLUMN
2. Beam
Flange bending
ΦMn = 705.16 kNm AISC Eq. F13-1

With: Φ= 0.9
𝐴 =𝑏 𝑡 = 5520.00 mm² Sec. D3-1
𝐴 = [𝑏 − n ( d + 1.6)]𝑡 = 3444.75 mm² Sec. D3-2
Yt = 1.00 Sec, F13.1

𝐹𝑍 = 1078.35 kNm
𝐹𝑆 = 1255.53 kNm
Demand moment Ma = 667.42 kNm
Ratio demand/capacity D/C = 0.95 OK

Bolt bearing under axial load

∅𝑅 = ∅ Cmin( 𝑟 , r , 𝑟 ( )) = 3158.18 kN AISC J3-6

With: Φ= 0.75
𝑟 = 1.2𝑙 𝑡𝐹 = 701.82 kN
𝑟 = 1.2𝑙 𝑡𝐹 = 1403.64 kN
𝑟 ( ) = 2.4𝑑𝑡𝐹 = 968.03 kN
𝑙 = 𝐿 − 𝑑 /2 = 43.50 mm
𝑙 =𝑠−𝑑 = 87.00 mm
C= 6.00 Tables (7-1..14)

Demand axial load Pa = 1314.52 kN


Ratio demand/capacity D/C = 0.42 OK

Tear out under axial load


∅𝑅 = ∅[U 𝐹 𝐴 + min( 0.6𝐹 𝐴 ; 0.6𝐹 𝐴 )] = 2496.96 kN AISC J4-5

With: Φ= 0.75
Ubs = 1.00 Sec. J4-3
𝐴= (𝑏 − 𝑔)𝑡 = 2520.00 mm²
𝐴 = 𝐴 − (𝑑 + 1.6)𝑡 = 1482.38 mm² Sec. J4-3
𝐴 = 𝑛 (𝐿 + (𝑛 − 1) s) t = 14580 mm² Sec. J4-3

𝐴 = 𝐴 − 𝑛 (𝑛 − 0.5)(d + 1.6) t = 9910.69 mm² Sec. J4-3

Demand axial load Pa = 1314.52


Ratio demand/capacity D/C = 0.53 OK

Global critical strength ratio 0.95


PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G5 TO COLUMN
I. MATERIAL
Bolt
Grade 8.8
Ultimate strength of bolt Fu = 80 kN/cm²
Nominal tensile strength Fnt = 60 kN/cm² (Table J3.2)
Nominal shear strength Fnv = 36 kN/cm² (Table J3.2)

Plate
Material A572 Gr 50
Tensile strength Fu = 44.8 kN/cm²
Yeild strength Fy = 34.5 kN/cm²

Beam
Material A572 Gr 50
Ultimate tensile strength Fu = 44.8 kN/cm²
Yeild strength Fy = 34.5 kN/cm²
Elastic module E= 20000 kN/cm²

II. INTERNAL FORCE FOR CALCULATING

Combo Axial (kN) V2 (kN) M33 (kNm)


Moment max -2.702 -133.598 -221.08176
Axial force max 35.856 23.785 -59.9846
Shear max -2.702 -143.94038 -131.254

III. DIMENSION
Beam section
Height h= 314 mm
Flange width bf = 164 mm
Web thickness tw = 6 mm
Flange thickness tf = 20 mm
Beam setback sb = 10 mm

Web Plate
Thickness twp = 12 mm
Height Lp = 220 mm
Double plate

Flange Plate
Thickness tfp = 20 mm
Width b= 164 mm
Consider interior plate

Bolts for Web


Type M20
Bolt rows n= 2
Bolt columns nc = 2
Gage - transverse spacing g= 120 mm
Pitch - longitudinal spacing s= 100 mm
Vertical edge distance Lev = 60 mm
Horizontal edge distance Leh = 60 mm
PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G5 TO COLUMN
Longitudinal distance to edge ef = 65 mm
Eccentric distance e= 130 mm

Bolts for Flange


Type M24
Bolt rows n= 2
Bolt columns nc = 3
Gage - transverse spacing g= 100 mm
Pitch - longitudinal spacing s= 120 mm
Vertical edge distance Lev = 60 mm
Horizontal edge distance Leh = 32 mm
Longitudinal distance to edge ef = 32 mm

IV. SHEAR WEB PLATE DESIGN


1. Plate (beam side)
Bolt shear
∅𝑅 = ∅𝐶𝐹 𝐴 𝑛 = 430.75 kN AISC J3-1

With: Φ= 0.75
nv = 2
C= 2.54 Tables (7-1..14)
Demand shear Va = 143.94 kN
Ratio demand/capacity D/C = 0.33 OK

Bolt bearing under shear load

∅𝑅 = ∅ Cmin( 𝑟 , r , 𝑟 ( )) = 983.18 kN AISC J3-6

With: Φ= 0.75
𝑟= 1.2𝑙 𝑡𝐹 = 316.22 kN
𝑟 = 1.2𝑙 𝑡𝐹 = 503.37 kN
𝑟 ( ) = 2.4𝑑𝑡𝐹 = 258.14 kN
𝑙 = 𝐿 − 𝑑 /2 = 49.00 mm
𝑙 =𝑠−𝑑 = 78.00 mm
C= 2.54 Tables (7-1..14)

Demand shear Va = 143.94 kN


Ratio demand/capacity D/C = 0.15 OK

Shear yielding
∅𝑅 = ∅0.6𝐹 𝐴 = 1092.14 kN AISC J4-3

With: Φ= 1
𝐴 =𝐿 𝑡 = 2640 mm² Sec. D3-1
Demand shear Va = 143.94 kN
Ratio demand/capacity D/C = 0.13 OK
PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G5 TO COLUMN
Shear rupture
∅𝑅 = ∅0.6𝐹 𝐴 = 836.37 kN AISC J4-4

With: Φ= 0.75
𝐴 = [L − n( d + 1.6)]𝑡 = 2073.60 mm Sec. J4-2
Demand shear Va = 143.94 kN
Ratio demand/capacity D/C = 0.17 OK

Block shear rupture

∅𝑅 = ∅[U 𝐹 𝐴 + min( 0.6𝐹 𝐴 ; 0.6𝐹 𝐴 )] = 1178.95 kN AISC J4-5

With: Ubs = 0.50 Sec. J4-3


𝐴 = [(𝑛 − 1)𝑠 + 𝐿 − (𝑛 − 0.5)(𝑑 + 1.6)] t = 1495.20 mm² Sec. J4-3
𝐴 = [𝐿 + (𝑛 − 1) s − (𝑛 − 0.5)(𝑑 + 1.6)]𝑡 = 1735.20 mm² Sec. J4-3
𝐴 = [(𝑛 − 1)𝑠 + 𝐿 ]𝑡 = 1920 mm² Sec. J4-3
Φ= 0.75
Demand shear Va = 143.94 kN
Ratio demand/capacity D/C = 0.12 OK

Flexure rupture
∅𝑀 = ∅𝐹 𝑍 = 84.64 kNm p. 9-6

With: 𝑡
𝑍 = [L − 𝑠 𝑛(𝑛 − 1)(d + 1.6)/𝐿 ] = 3
125901 mm
4
Φ= 0.75
Demand moment 𝑀 =𝑉𝑒= 18.71225 kNm
Ratio demand/capacity D/C = 0.22 OK

Flexure yielding
𝑀 = ∅𝐹 𝑍 = 90.10 kNm p. 15-7

𝑡 𝐿 3
With: 𝑍 = = 145200 mm
4
Φ= 0.9
Demand moment 𝑀 =𝑉𝑒= 18.71225 kNm
Ratio demand/capacity D/C = 0.21 OK

2. Beam
Bolt bearing under shear load

∅𝑅 = ∅ Cmin( 𝑟 , r , 𝑟 ( )) = 245.79 kN AISC J3-6

With: Φ= 0.75
𝑟 = 1.2𝑙 𝑡𝐹 = 309.77 kN
𝑟 = 1.2𝑙 𝑡𝐹 = 251.69 kN
𝑟 ( ) = 2.4𝑑𝑡𝐹 = 129.07 kN
𝑙 = 𝐿 − 𝑑 /2 = 96.00 mm
𝑙 = 𝑠−𝑑 = 78.00 mm
C= 2.54 Tables (7-1..14)
PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G5 TO COLUMN
Demand shear Va = 143.94 kN
Ratio demand/capacity D/C = 0.59 OK

Shear yielding
∅𝑅 = ∅0.6𝐹 𝐴 = 389.69 kN AISC J4-3

With: Φ= 1
𝐴 = ℎ𝑡 = 1884 mm² Sec. D3-1
Demand shear Va = 143.94 kN
Ratio demand/capacity D/C = 0.37 OK

V. FLANGE PLATED
1. Plate
Compression
∅𝑅 = ∅𝐹 𝐴 = 1811.95 kN AISC E3-1

With: Φ= 0.9
𝑏 = 𝑏 − 𝑡 − 30 = 128.00 mm
𝐴 = 𝑏𝑡 + 𝑏 𝑡 = 5840.00 mm²
yg = 32.47 mm
Iyg = 2.50E+06 mm3
r= 20.67 mm
KL/r = 4.09
Fe = 11811.41 kN/cm²
Fcr = 34.47 kN/cm² Sec.E3

Demand compression load Pa = 663.27 kN


Ratio demand/capacity D/C = 0.37 OK

Tension yielding
∅𝑅 = ∅𝐹 𝐴 = 1811.95 kN AISC E3-1

With: Φ= 0.9
𝐴 = 𝑏𝑡 +𝑏 𝑡 = 5840.00 mm²
Demand tension load Pa = 660.57 kN
Ratio demand/capacity D/C = 0.36 OK

Bolt shear
∅𝑅 = ∅𝐶𝐹 𝐴 𝑛 = 1465.74 kN AISC J3-1

With: Φ= 0.75
nv = 2
C= 6.00 Tables (7-1..14)
Demand shear Va = 705.43 kN
Ratio demand/capacity D/C = 0.48 OK

Bolt bearing under axial load

∅𝑅 = ∅ Cmin( 𝑟 , r , 𝑟 ( )) = 4501.32 kN AISC J3-6


PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G5 TO COLUMN
With: Φ= 0.75
𝑟= 1.2𝑙 𝑡𝐹 = 500.15 kN
𝑟 = 1.2𝑙 𝑡𝐹 = 1000.29 kN
𝑟 ( ) = 2.4𝑑𝑡𝐹 = 516.28 kN
𝑙 = 𝐿 − 𝑑 /2 = 46.50 mm
𝑙 =𝑠−𝑑 = 93.00 mm
C= 6.00 Tables (7-1..14)

Demand axial load Pa = 705.43 kN


Ratio demand/capacity D/C = 0.16 OK

Tear out under axial load


∅𝑅 = ∅𝑅 + ∅𝑅 = 3241.42 kN

With: Φ= 0.75
∅𝑅 = ∅[U 𝐹 𝐴 + min( 0.6𝐹 𝐴 ; 0.6𝐹 𝐴 )] = 1344.18 kN AISC J4-5

With: Ubs = 1.00 Sec. J4-3


𝐴
= min( 𝑔, 𝑏 − 𝑔)𝑡 = 1280.00 mm²
𝐴 = 𝐴 − (𝑑 + 1.6)𝑡 = 708.25 mm² Sec. J4-3
𝐴 = 2(𝐿 + (𝑛 − 1) s) t = 7200 mm² Sec. J4-3

𝐴 =𝐴 − 2(𝑛 − 0.5)(d + 1.6) t = 5484.75 mm² Sec. J4-3

∅𝑅 = ∅[U 𝐹 𝐴 + min( 0.6𝐹 𝐴 ; 0.6𝐹 𝐴 )] = 1897.24 kN AISC J4-5

With: Ubs = 1.00 Sec. J4-3


𝐴 = min( 2𝐿 , 𝑏 − 2𝐿 ) t = 1280.00 mm²
𝐴 = 𝐴 − (𝑑 + 1.6)𝑡 = 708.25 mm² Sec. J4-3
𝐴 = 𝑛 (𝐿 + (𝑛 − 1) s) t = 10800 mm² Sec. J4-3

𝐴 = 𝐴 − 𝑛 (𝑛 − 0.5)(d + 1.6) t = 8227.13 mm² Sec. J4-3

Demand axial load Pa = 660.57 kN


Ratio demand/capacity D/C = 0.20 OK

Tension rupture
∅𝑅 = ∅𝑅 + ∅𝑅 = 809.88 kN
With: Φ= 0.75
∅𝑅 = ∅𝐹 𝐴 = 525.94 kN AISC J4-2

With: 𝐴 = [𝑏 − n ( d + 1.6)]𝑡 = 1564.75 mm² Sec. D3-2

𝐴 = min( 0.85𝐴 , 𝐴 ) = 1564.75 mm² Sec. J4-1

∅𝑅 = ∅𝐹 𝐴 = 283.94 kN AISC J4-2

With: 𝐴 = [𝑏 − n ( d + 1.6)]𝑡 = 844.75 mm² Sec. D3-2

𝐴 = min( 0.85𝐴 , 𝐴 ) = 844.75 mm² Sec. J4-1


Demand axial load Pa = 660.57 kN
Ratio demand/capacity D/C = 0.82 OK
PROJECT CODE : 719002
Calculation Sheet for DOCUMENT NO. : CAL-1-004-C-0001
Dryer Offgas Cleaning System
DATE : 30/08/2023
- Main Structure
REV :2
BEAM SPLICE CONNECTION - G5 TO COLUMN
2. Beam
Flange bending
ΦMn = 254.79 kNm AISC Eq. F13-1

With: Φ= 0.9
𝐴 =𝑏 𝑡 = 3280.00 mm² Sec. D3-1
𝐴 = [𝑏 − n ( d + 1.6)]𝑡 = 2136.50 mm² Sec. D3-2
Yt = 1.00 Sec, F13.1

𝐹𝑍 = 371.26 kNm
𝐹𝑆 = 434.63 kNm
Demand moment Ma = 221.08 kNm
Ratio demand/capacity D/C = 0.87 OK

Bolt bearing under axial load

∅𝑅 = ∅ Cmin( 𝑟 , r , 𝑟 ( )) = 2250.66 kN AISC J3-6

With: Φ= 0.75
𝑟 = 1.2𝑙 𝑡𝐹 = 500.15 kN
𝑟 = 1.2𝑙 𝑡𝐹 = 1000.29 kN
𝑟 ( ) = 2.4𝑑𝑡𝐹 = 516.28 kN
𝑙 = 𝐿 − 𝑑 /2 = 46.50 mm
𝑙 =𝑠−𝑑 = 93.00 mm
C= 6.00 Tables (7-1..14)

Demand axial load Pa = 750.63 kN


Ratio demand/capacity D/C = 0.33 OK

Tear out under axial load


∅𝑅 = ∅[U 𝐹 𝐴 + min( 0.6𝐹 𝐴 ; 0.6𝐹 𝐴 )] = 1558.43 kN AISC J4-5

With: Φ= 0.75
Ubs = 1.00 Sec. J4-3
𝐴= (𝑏 − 𝑔)𝑡 = 1280.00 mm²
𝐴 = 𝐴 − (𝑑 + 1.6)𝑡 = 708.25 mm² Sec. J4-3
𝐴 = 𝑛 (𝐿 + (𝑛 − 1) s) t = 9120 mm² Sec. J4-3

𝐴 = 𝐴 − 𝑛 (𝑛 − 0.5)(d + 1.6) t = 6547.13 mm² Sec. J4-3

Demand axial load Pa = 750.63


Ratio demand/capacity D/C = 0.48 OK

Global critical strength ratio 0.87