GUGGENHEIM ABU DHABI

WORKFLOW SUBMITTAL FORM

Document No: GAD-STGM-MAS-SWF-000006 Rev:00 Date: 29/11/2023

Title: Material Submittal for Display Items (Screens & Tablets) (Wayfinding & Signage
Works)
CONSULTANT COMMENTS
Stamp:

A B C D E Signature:
Status
Date:

EMPLOYER REP. COMMENTS


Stamp:

A B C D E Signature:
Status
Date:
EMPLOYER COMMENTS
Stamp:

A B C D E Signature:
Status
Date:

Review Status:

A: Approved B: Approved with Comments C: Revise and Resubmit D: Reviewed E: Rejected

FORM-WSF-000 Rev.00
GUGGENHEIM ABU DHABI

MATERIAL SUBMITTTAL (MAS)

Employer : Department of Culture and Tourism


Project Manager : Turner Construction - International LLC
Consultant : Parsons Brinckerhoff Ltd – Abu Dhabi
Contractor : Sixco-Trojan Joint Venture
Project Name : Guggenheim Abu Dhabi Main Works
MAS No. : GAD-STGM-MAS-SWF-000006 Rev: 00 Date: 29/11/2023
Material Approval Request : Display Items (Screens & Tablets) for Signage Works
Manufacturer / Supplier : Galaxy Metal Industries LLC
Area of Use : Various Areas (As per attached IFC drawings)
Sample: : N/A

Material Description : GRC & Accessories for Signage Works (Wayfinding & Signage Works)

Attachments : PQ /Catalogue, Commercial License, ISO etc.


Date : 29/11/2023
Location: : GAD
Relevant Drawing and Specification
* Structural Specification : SECTION 10 14 00 – SIGNAGE
* Drawing General Notes : G5-133 to G5-140
Material Confirm to Specification: YES ◼ NO 

For Contractor: Sixco-Trojan Joint Venture Title Signature Date


Prepared by Mani Kookkal
I have prepared this document having identified Project Manager
Project requirements.
Reviewed by Ali Zakour /
Maria Alwan QA/QC Manager /
I have reviewed this document for its accuracy
Sustainability Manager
and technical content, and to meet Project
requirements.
Checked by Ilayda Selcuk/ Ahmed Hajras Package Manager /
I have checked this document for its layout and
format, and to meet Project requirements.
Lead Architect
Approved by Yves de Rue
I have approved this document for Project Director
implementation.

Employer (DCT) Project Manager (Turner) Lead Consultant (WSP) Others

 Approved  Approved  Approved  Approved


 Approved with Comments  Approved with Comments  Approved with Comments  Approved with Comments
 Resubmit  Resubmit  Resubmit  Resubmit

Reviewed by: Reviewed by: Reviewed by: Reviewed by:

Signature: Signature: Signature: Signature:

Date: Date: Date: Date:

Comments: Comments: Comments: Comments:


Checklist for Material Approval Request
Project : Guggenheim Adu Dhabi Guggenheim Abu Dhabi
NAME OF COMPANY : Worldwide Digital FZE / Galaxy Metal Industries LLC
Material Description : Material Submittal for Display items (Screens & Tablets) (Wayfinding & Signage Works)

Ref No : Yes No N/A Remark

1 Manufacturer /Supplier Profile (Brief Presentation)



2 Trade License and ISO Certificates ( Check validity) √
3 Compliance statement

4 Project Architect Schedule and Specification

5 Technical Data Sheets

6 Material safety data sheets

7 Test Reports or Test Certificates

8 Mill Certificate (if applicable)

9 Galvanization Report (If applicable)

10 Installation Manual or Application Method √
11 O&M Manual (if applicable)

12 Certificate of origin

13 Draft Warranty (As per Project Specifications)

14 Reference drawings


Project Sustainable Materials Questionnaire - you need to fill, sign and stamp the form with all supporting
15
documents (CDPH test reports, DCL certificate, VOC test report, etc. as per attached format (if applicable)

16 VOC (for chemicals)



17 Recycled content

18 List of jobs supplied in the past & Previous approvals

19 Photos of previous projects (where applicable)

20 Accreditation Certificates (where available)

21 Physical Samples - attached on presentation Board with Tagging (Required Two (2) – Numbers).

22 Add VE list : (If applicable) Please highlight your material in VE list.

*NOTE: ALL DOCUMENTS ONLY IN ENGLISH Name ,Signature , Date & Stamp

Form No : TRA-SBJ-QCD-QA-GEN-00046-REV0
13.01.2018
MATERIAL SUBMITTAL

Display Items (Screens & Tablets)


Wayfinding & Signage Works

GALAXY
Construction Projects

MATERIAL
SUBMITTAL
Project Name:
Guggenheim Abu Dhabi

Project Name: 24101

Package: Wayfinding
& Signage Works

Between

Sixco – Trojan Joint Venture

and

GALAXY METAL INDUSTRIES LLC


GRC Sub-Contractor :
ELITE LANDMARK TECHNICAL
WORKS LLC
INDEX
1. Manufacturer/Supplier Profile
2. Trade License and ISO Certificates
3. Compliance Statement
4. Project Architect Schedule and Specification
5. Technical Data Sheet
6. Material Safety Data Sheets
7. Test Reports
8. Mill Certificate
9. Galvanization Report
10. Installation Manual or Application Method
11. O & M Manual
12. Certificate of Origin
13. Draft Warranty
14. Reference Drawings
15. Sustainability Material Submittal Questionnaire
16. Supporting documents for Estidama Compliance
17. VOC Content
18. Recycled Content
19. List of Jobs supplied in the past & previous approvals
20. Photos of previous projects
21. Accreditation Certificates
22. Physical Samples
23. VE List
1. Manufacturer/Supplier
Profile

Display Items (Screens & Tablets)


Wayfinding & Signage Works
Solution for Growing Business

WORLDWIDE DIGITAL FZE


T : +971 6 5565185 | F: +971 6 5574296, www.worldwidedg.com | info@worldwidedg.com
About Us

WorldWide Digital is a young company with the most experienced team into Digital Signage Soluation with
primary focus to provide extraordinary service to the Digital Signage industry. We are constantly expanding in the growing
Digital Signage market with solutions which include Indoor/Outdoor LED, Video wall, Indoor/Outdoor Standing Display, all in one interactive Kiosk
Consumables and Spare Parts. Having loyal suppliers, valued customers and a dedicated team sets the rhythm for committed
growth and success. Our target is to fulfill the expectations of every client by offering innovative and quality products and
outstanding customer service, thus making the dream of Digital Signge company come true.WorldWide Digital’s dedication to
extraordinary service is what sets us apart from our competition. Our team of diversely skilled professionals continually push
themselves to learn and Evolve so that we may help you to conquer each new challenge on the road to success. We strive to not
only meet our commitments and client expectations but to exceed them on every level and deliver exceptional value.

Our vision is to be the first choice in offering Sales and Service for the prospect and customers and a leader in customer value.
Service excellence is our mission, the critical element for maintaining life-long, valuable relationships. The aim is to perform
consistently and deliver value-added services to our customers with the highest level of quality. In the process meet or exceed
customer expectations. We aim to work hard 24/7 to make WorldWide Digital the most respected service provider in the industry.

Head Office : Sharjah Branch : Sharjah Branch :


Worlwide Digtal FZE Worlwide Digtal EQ. Tr. LLC Worlwide Digtal EQ. Tr. LLC
P8-01-44 Saif Zone C23, Ind 33 S21, Ind M44
Sharjah - UAE Sharjah - UAE Abu Dhabi - UAE

Complete LED Solutions


OUTDOOR LED SCREEN

Complete LED Solutions


OUTDOOR LED SCREEN

Complete LED Solutions


INDOOR LED SCREEN

Complete LED Solutions


INDOOR LED SCREEN

Complete LED Solutions


HOTEL AND OFFICE LED/LCD SCREEN

Complete LED Solutions


HOTEL AND OFFICE LED/LCD SCREEN

Complete LED Solutions


SHOPPING MALLLED
INDOOR LED/LCD
SCREENSCREEN

Complete LED Solutions


SHOPPING
INDOOR
MALLLED
LED/LCD
SCREENSCREEN

Complete LED Solutions


CUSTOM DESIGNLED
INDOOR LED/LCD
SCREENSCREEN

Complete LED Solutions


CUSTOM DESIGNLED
INDOOR LED/LCD
SCREENSCREEN

Complete LED Solutions


STANDINGINDOOR
/ WAY FINDING KIOSK DISPLAY
LED SCREEN

Complete LED Solutions


STANDINGINDOOR
/ WAY FINDING KIOSK DISPLAY
LED SCREEN

Complete LED Solutions


Solution for Growing Business
2. Trade License and ISO
Certificates

Display Items (Screens & Tablets)


Wayfinding & Signage Works
‫شهادة ترخيص‬
License Certificate

LICENSE NO. 13469 ١٣٤٦٩ ‫رقم الرخصة‬


NAME WORLDWIDE DIGITAL (FZE)
)‫ح‬.‫م‬.‫ورلد وايد ديجيتال (م‬ ‫الســــــــــــم‬
LEGAL STATUS Free Zone Est. with Limited Liability ‫مؤسسة منطقة حرة ذات مسؤولية محدودة‬ ‫الشكل القانوني‬
TYPE OF LICENSE Commercial ‫تجارية‬ ‫نوع الرخصة‬
ACTIVITY(S) Trading in Digital Printers, Inks ‫تجارة الطابعات الرقمية والحبر‬ ‫النشــــــــــاط‬
& its Related Spare ‫ومستلزماتها‬

OWNER(S) Sachin Kumar ‫ساشين كومار‬ ‫المــــالــــــــــــك‬

MANAGER Sachin Kumar ‫ساشين كومار‬ ‫المدير المسؤول‬

SAIF-ZONE SAIF Executive Office P8-01-44 ٤٤-٨-٠١‫مكتب تنفيذي بيي‬ ‫العــــنوان فــي‬
ADDRESS P.O.Box 124230 ١٢٤٢٣٠ .‫ب‬.‫ص‬ ‫المنطقة الحرة‬
Sharjah - U.A.E ‫م‬.‫ع‬.‫ أ‬- ‫الشارقة‬
INCORPORATION DATE 18 March 2014 ٢٠١٤ ‫ مارس‬١٨ ‫تاريخ عقد التاسيس‬
ISSUE DATE 18 March 2023 ٢٠٢٣ ‫ مارس‬١٨ ‫تاريخ الصدار‬
EXPIRY DATE 17 March 2024 ٢٠٢٤ ‫ مارس‬١٧ ‫تاريخ النتهــــــــاء‬

REMARKS THIS LICENSE IS ISSUED AND BASED ‫هذه الرخصة صادرة استنادا الى المرسوم الميري‬ ‫ملحظـــــــــات‬
UPON EMIRI DECREE NO. 2 OF 1995
‫ الصادر في الشارقة بتاريخ‬١٩٩٥ ‫ لسنة‬٢ ‫رقم‬
ISSUED IN SHARJAH ON MAY 8, 1995
١٩٩٥ ‫ مايو‬٨
THIS LICENSE IS GRANTED TO THE
LICENSEE ONLY AND SHALL NOT BE ‫له فقط ول يجوز‬ ‫هذه الرخصة ممنوحة للمرخص‬
LEASED OR TRANSFERRED WITHOUT
PRIOR APPROVAL OF THE SAIF ZONE
‫تأجيرها أو تحويلها إل بموافقة هيئة المنطقة‬
‫الحرة لمطار الشارقة الدولي‬
SALES IN U.A.E. SHALL BE CARRIED OUT
IN ACCORDANCE WITH THE VALID
‫تتم أعمال البيع داخل الدولة وفقا للنظم والقوانين‬
LAWS AND REGULATIONS THEREOF
‫السارية فيها‬

To check the validity of the license: :‫للتحقق من صلحية الرخصة‬

1- Send an SMS to 2514 with License number. .‫ مع رقم الرخصة‬2514 ‫) إلى الرقم‬SMS( ‫ رسالة نصية قصيرة‬-1
2- Scan the QR code. )QR Code( ‫ مسح رمز الستجابة السريع‬-2
3- Visit the website: :‫ زيارة الموقع اللكتروني‬-3
https://portal.saif-zone.com/LicenseDetail.aspx https://portal.saif-zone.com/LicenseDetail.aspx

www.saif-zone.com ‫هذه الوثيقة رسمية ول تحتاج لختم أو توقيع وللتأكد من صحة البيانات يرجى زيارة الموقع‬
This document is official and it does not need to be stamped or signed. To view license detail visit www.saif-zone.com
3. Compliance Statement

Display Items (Screens & Tablets)


Wayfinding & Signage Works
Type 1:
LG Single Touch Monitor 19MB15T (19’’) – LG Brand

Type 2:
65’’ Digital Display – LG UHD (UH5F Series) – LG Brand

Type 3:
P1.5 Indoor LED Screen – Shenzhen Lamp Technology Co. Ltd. (Unilumin Group) - China
COMPLIANCE STATEMENT
(AS PER SPECIFICATIONS)

PROJECT NAME: GUGGENHEIM ABU DHABI


SUBCONTRACTOR NAME: GALAXY METAL INDUSTRIES LLC
SUMMARY OF WORK / DESCRIPTION: WAYFINDING AND SIGNAGE WORKS

SECTION 10 14 00 – SIGNAGE
DESRITION AS PER PROJECT SPCIFICATION AS PER M/S.GALAXY METAL INDUSTRY COMPLIANCE
PART 1 - GENERAL
A. Drawings, Project Database and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this
1.1 RELATED DOCUMENTS Section. Review all listed above to determine details, assemblies and location of dimensional control for all elements of the Work of this section. Noted. Comply.

A. The intent of this specification is to include all items necessary for the proper execution and completion of the Work by the Signage Contractor. Performance by the
Signage Contractor shall be required to the extent consistent with the Contract Documents.
B. The intent of the Contract Documents is to provide everything necessary for a complete contract. All drawings and specifications are mutually dependent. In the event of
Noted. Comply.
a discrepancy, or an error, neither document rules over the other. Signage Contractor is to make the Consultant aware of any inconsistencies found in the design drawings;
including but not limited to incorrect quantities, inconsistencies in the sign between drawings, incorrect dimensions, installation or site conflicts.

C. Provide in accordance with requirements of the Contract Documents. The Signage work is specified bythe performance specifications. The drawings show the design
intent and except for setting out parameters and finished profiles, are indicative only. The Contractor shall full responsibility for the Work of this specification including but
not limited to the following:
1. Be responsible for the engineering, procurement and installation of the Signage work based upon the Drawings and the requirements of this Specification.
2. Be responsible for the final confirmation of materials, sizes, thickness, types, locations of fixings and related accessories, all in accordance with specified standards
Noted and will be complied. Comply.
1.2 SUMMARY detailed herein and submission of samples for review and acceptance by the signage Consultant and Architect prior to fabrication and/or manufacture.
3. Compliance with the requirements of the UAE and the local municipality where the project is located as related to applicable Building Codes, the International Building
Code (IBC) and other applicable local regulations Submit all information necessary to the relevant statutory authorities to obtain approval in timely manner so as to comply
with the construction program.

D. Related Requirements:
1. Division 1 – General Requirements.
2. Work restriction requirements: 01 14 00.
3. Substitution procedures and requirements: 01 25 00
Noted. Comply.
4. Request for Information procedures: 01 26 13.
5. Project management and coordination: 01 31 00.
6. Testing, inspection and quality assurance and mockups: 01 45 23 and 01 45 50.
7. Waste management and disposal requirements: Section 01 74 19.
A. Reference Standards
1. British Standards:
2. United States Standards for Accessible Design (SAD), 2010
3. Council of American Building Officials (CABO)
4. A117.1-98 Accessible and Usable Buildings and Facilities
1.3 REFERENCES Noted. Comply.
5. American National Standards Institute (ANSI):
6. N2.1-89 Warning Symbols
11. Federal Specifications (Fed. Spec.):
15. ADIBC Section 1110, Accessibility and Code Signage.
16. Estidama Pearl Building Rating System; www.estidama.org.

Page 1 of 6
COMPLIANCE STATEMENT
(AS PER SPECIFICATIONS)

PROJECT NAME: GUGGENHEIM ABU DHABI


SUBCONTRACTOR NAME: GALAXY METAL INDUSTRIES LLC
SUMMARY OF WORK / DESCRIPTION: WAYFINDING AND SIGNAGE WORKS

SECTION 10 14 00 – SIGNAGE
DESRITION AS PER PROJECT SPCIFICATION AS PER M/S.GALAXY METAL INDUSTRY COMPLIANCE
A. Coordination: All construction administration coordination to be in accordance with Division 1.
Noted. Comply.
1.4 ADMINISTRATIVE
B. Preinstallation Meetings: Arrange a pre installation meeting in accordance with Section 01 31 00 “Project Management and Coordination”
REQUIREMENTS 1. Prior to the start of the Work, meet at the Project site to review methods and sequence of metal fabrication installation, special details and conditions, standard of Noted. Comply.
workmanship, testing and quality control requirements, job organization and other pertinent topics related to the Work.
A. Product Data
1. Submit manufacturer’s literature, specifications and installation instructions describing the general properties of each material and accessory to be used in the Work.
Noted. Comply.
Include, manufacturer’s technical data documenting the primary function, quality and performance of each system and containing specification for each material, or other
information as required.
B. Shop Drawings
2. Submit original shop drawings to illustrate details of Work on minimum sheet size A0 (840mm x 1190mm).
3. Shop drawings, which are to be provided by the Sign Contractor, will be used as the final construction documents and must include all construction, engineering and
installation details for the complete implementation of the designs described herein.
4. The Sign Contractor shall provide dimensioned shop drawings for all signs, clearly showing elevations, sections, dimensions, materials, typographic layouts, fabrication Noted and will be complied. Comply.
methods, external finishes, anchorage, and other details of construction as well as details related to engineering, adjacent construction associated with signage and other
construction responsibilities. The Sign Contractor shall be responsible for all construction, installation and internal supports for a safe and permanent installation of all
signs. Furnish location detail drawings for signs supported or anchored to other construction.
5. Shop drawings shall include complete details of fasteners (diameter, length, type, and material).
C. Samples and Mockups
1. Label samples to indicate product, characteristics, and location in the Work. Samples will be reviewed for color and appearance only. Furnish sufficient samples to
establish the full range of colors and textures for materials exposed in the finished work. Compliance with other requirements is the responsibility of the Contractor.
1.5 SUBMITTALS
4. Provide complete full-size prototypes of each unique sign type as noted in the signage drawings. See individual sheets for additional information and Table B at the end
of this Section.
5. Duly reviewed and approved sign samples shall be the minimum workmanship and quality standard for reference until completion of the Work.
6. Duly reviewed sign type samples shall be retained by the Sign Contractor until released by the Consultant, at which time they may be incorporated into the permanent
Work.
7. Install completed prototype signs on site for each unique sign type. Prototypes to be retained and stored on site for reference. Signs should be coordinated with on-site
construction status as to demonstrate the final condition. Prototypes to be retained and stored on site for reference. Noted and will be complied. Comply.
8. Adjustments made on samples by the Consultant are not intended to change the Contract Price. If adjustments affect the value of the Work, state such in writing for
approval by the Construction Manager prior to proceeding with the Work.
9. The Owner, Consultant or Construction Manager reserve the right to reject any sample or product found not to meet minimum quality and craftsmanship as outlined in
this document and / or deemed inappropriate for the project’s overall design standards. Rejected samples or products will require immediate resubmission with 5 working
days;
unless notified in writing and approved by the Owner, Consultant and / or Construction Manager, and will be furnished at no additional cost. The sign Contractor must have
complete approval on all samples and products prior to production.
10. Product and material manufacturer’s printed specifications, anchorage details, installation and maintenance instructions are to be provided as part of the shop drawing
submittal.
F. Estidama Submittal Requirements
1. Estidama Supporting Documentation as per section 01 81 14, Estidama Requirements. Information to be supplied for this form shall include:
a. Cost breakdowns for the materials included in the Contractor or sub-contractor’s work. Cost breakdowns shall include total cost plus itemized material costs for the
signage system and associated products. Noted and partially complied. Proposed and Complied.
b. The manufacturing location and raw material sources of the signage system and associated products.
c. The amount of post-consumer and/or post-industrial recycled content in the signage system.
d. The VOC content of all interior and field-applied adhesives, sealants, paints, and coatings.
A. Final as built drawings are to be submitted upon completion of work and upon final approval. Drawings are to be submitted in electronic and hard copy form to the
client. Drawings are to show details and notes including final as built conditions, designs, and included any site instructions and / or addendums required for the fabrication
1.6 CLOSEOUT SUBMITTALS and installation of the products.
Noted and will be complied. Comply.

Page 2 of 6
COMPLIANCE STATEMENT
(AS PER SPECIFICATIONS)

PROJECT NAME: GUGGENHEIM ABU DHABI


SUBCONTRACTOR NAME: GALAXY METAL INDUSTRIES LLC
SUMMARY OF WORK / DESCRIPTION: WAYFINDING AND SIGNAGE WORKS

SECTION 10 14 00 – SIGNAGE
DESRITION AS PER PROJECT SPCIFICATION AS PER M/S.GALAXY METAL INDUSTRY COMPLIANCE
A. Basis of Design: When particular manufacturers’ materials, products or processes are specified for an item of Work, only approved alternatives may be used. An
alternative material, product or process will be considered if the Contractor submits a written substitution request together with such information as may be necessary to
assist the Engineer in determining whether the proposed substitution is acceptable; the burden of proof rests solely upon the Contractor.
B. Fabricator/Installer: A firm specializing in signage fabrication work similar to that indicated for this project for a minimum of 5 years and with sufficient production and
installation capacity to produce required products, systems and assemblies specified without causing delay to the Work.
C. Regulatory Requirements: Comply with applicable requirements of the laws, codes, ordinances and regulations of authorities having jurisdiction. Obtain necessary
approvals from authorities having jurisdiction.
D. The Consultant must be notified of any variations of conditions as shown on these drawings. It shall be the Sign Contractor’s responsibility to obtain and utilize the most
current and up-todate plans and specifications for all construction and installation work.
1.8 QUALITY ASSURANCE Noted and will be complied. Comply.
E. Work done and material furnished shall be of superior quality in every respect. The Owner, Consultant, and / or Construction Manager shall reserve the right to reject
any work or materials that are not deemed acceptable by their assessment.
F. The Owner, Consultant, and / or Construction Manager shall reserve the right to reject any shop drawings, samples, or other submittals, as well as any finished product or
installation that does not meet or exactly equal the standard of quality established. Any such decision will be considered final and not subject to recourse.
G. The Sign Contractor must guarantee that only new materials are being used for this work.
H. Products must be made accessible for quality control inspection at any time.
I. Any claims for work carried out on instructions by others will not be accepted or honored.
J. Provide site administration and inspection of this part of the Work.

A. Delivery and Acceptance Requirements:


1. Signs to be packaged to prevent damage or deterioration during shipment, handling, storage and installation. Maintain protective covering in place and in good repair
until removal is necessary.
2. Deliver signs only when the site and mounting services are ready for installation work to proceed.
1.9 DELIVERY STORAGE AND 3. Store products in dry condition inside enclosed facilities.
Noted and will be complied. Comply.
HANDING 4. Ensure products are secured to prevent willful damage and / or theft. Sign Contractor to coordinate with the Construction Manager as to the possibility of on site storage
and or work area, if required.
6. Packaging Waste Management:
a. Refer to the Overall Construction Environmental Management Plan (OCEMP) for environmental requirements concerning packaging materials.
b. Contractor is encouraged to obtain materials in biodegradable or recyclable/reusable packaging using the minimum amount of packaging possible.
A. Sign Contractor to verify all site conditions in accordance with Section 01 31 00.
B. Sign Contractor is responsible for ensuring that all site conditions have been thoroughly reviewed and coordinated prior to fabrication.
C. Sign contractor is responsible for coordinating with the General Contractor and other trades to ensure a successful fabrication and installation of all sign products.
1.10 SITE CONDITIONS D. Sign contractor to coordinate with other building trades all signage elements that are carved into building surfaces, or require in-lay within wall surfaces prior to wall Noted. Comply.
finishing.

A. Sign fabricator is to provide a complete and detailed schedule of all activities related to the fabrication and installation of sign products. This should include but is not
limited to:
1. Submission of samples
1.11 SCHEDULE 2. Submission of prototypes Noted and will be complied. Comply.
3. Installation of on-site mockups and prototypes
4. Submission of shop drawings
6. Installation including key milestones such as final installation of product types, complete installation.
A. Manufacturer Warranty: Warrant work of this Section for period of 2 years against defects and/or deficiencies in accordance with Section 01 77 00. Promptly correct any
defects or deficiencies, which become apparent within warranty period, to satisfaction of the signage consultant or Architect and at no expense to Owner. Defects include Noted.
1.12 WARANTY Comply.
but are not limited to buckling, opening of seams, bond failure and extensive colour fading. Draft warranty will be provided with material submittal.

Page 3 of 6
COMPLIANCE STATEMENT
(AS PER SPECIFICATIONS)

PROJECT NAME: GUGGENHEIM ABU DHABI


SUBCONTRACTOR NAME: GALAXY METAL INDUSTRIES LLC
SUMMARY OF WORK / DESCRIPTION: WAYFINDING AND SIGNAGE WORKS

SECTION 10 14 00 – SIGNAGE
DESRITION AS PER PROJECT SPCIFICATION AS PER M/S.GALAXY METAL INDUSTRY COMPLIANCE
PART 2 – PRODUCTS
A. The Designs contained within the Contract are the property of Pentagram and may not be used for any other purpose than reference without express written permission
of the Owners and / or Pentagram.
B. Provide graphics items as completed units produced by a single manufacturer, including necessary mounting accessories, fittings and fastenings.
C. Do not scale drawings for dimensions. Sign Contractor to verify and be responsible for all dimensions and conditions shown by these drawings. Construction Manager to
be notified of any discrepancy in drawing, in field directions or conditions, and / or of any changes required for all such construction details.
D. The Sign Contractor, by commencing work of this section, assumes overall responsibility, as part of his warranty of work, to assure that assemblies, components and
parts shown or required within the work of the section, comply with the Contract Documents. The Sign Contractor shall further warrant that all components, specified or
2.1 GENERAL required to satisfactorily complete the
Noted and will be complied. Comply
installation, are compatible with each other and with conditions of installations.
E. The Sign Contractor shall obtain and pay for all necessary permits and variances.
F. The Sign Contractor is responsible for meeting all local, building codes as well established national standards and requirements.
G. Sign components presented in the Graphics document are for design intent purposes only. Duly reviewed and /or engineered shop drawings shall be provided by the
Sign Contractor to be used as the final construction documents, and shall include complete construction, engineering and installation details required for implementing the
designs described herein.
H. LED Illumination
1. 6mm White LED panel to provide continuous even illumination to all visible area of sign face without hot or cold spots.
2. Final hook-up by Signage Contractor. Electrical components/power supply to be housed within sign assembly where space is available, otherwise internal cavity below
grade is required.
I. Commercial Displays 1. Not in GMI (WWD) scope.
1. Display: Professional Grade high definition Display Panel. 2. Noted and will be complied.
2. Displays to be provided in 2286mm (90”), 1651mm (65”), 1092.2mm (43”) and 533.4mm (21”). 3. Noted and will be complied.
3. Provide and install high definition display panels. There shall be a gang of commercial grade display panels that create the panels or single displays as described in the 4. NUC Media Player Incuded.
drawing package for per location. Exact mounting locations and configuration are shown on the drawings. 4a. Software and integration with BAS not in GMI (WWD) scope.
4. Provide and install message display controller and software provided by the manufacturer for the commercial display panels. Proposed and Comply
5. HDMI
a. Message display controller and software to interface with the BAS to display graphic representations of energy consumption, water consumption, weather data, and 6. Noted and will be complied.
building sustainability diagrams as required by Estidama credit IDP-6 7. Noted and will be complied.
5. Provide and install video processor to interface various video signal feeds to allow video content to be displayed correctly on to the commercial display panels. 8. Noted and will be complied.
Contractor shall verify exact quantity of processors required prior to installation.
6. Thin, adjustable brackets to be provided to securely attach the monitor to the wall, and match the viewing angles to those specified within the contract documents. All
bracket attachments to be colored matte black and allow for monitors to be easily serviced.
7. Mounting brackets to be secured to wall using bracket manufacturers specifications and allow for integration of power and data cable runs to create a clean installation
of all control systems.
8. There are to be no visible manufacturers names, indicator lights or control buttons.

2.2 MATERIALS

Page 4 of 6
COMPLIANCE STATEMENT
(AS PER SPECIFICATIONS)

PROJECT NAME: GUGGENHEIM ABU DHABI


SUBCONTRACTOR NAME: GALAXY METAL INDUSTRIES LLC
SUMMARY OF WORK / DESCRIPTION: WAYFINDING AND SIGNAGE WORKS

SECTION 10 14 00 – SIGNAGE
DESRITION AS PER PROJECT SPCIFICATION AS PER M/S.GALAXY METAL INDUSTRY COMPLIANCE
9. The 2286mm (90”), 1651mm (65”), and 1092.2mm (43”) commercial displays shall have the following minimum specifications:
a. Native resolution: 1920 x 1080 9. For LED(90") screen it will be complied. 43" changed to 65"
b. Brightness (minimum) 700 nits or greater a. LED screen 746 x 1280 pixels / LCD will be complied.
2.2 MATERIALS c. Contrast Ratio (typical): 5000:1 b.LCD Screen only 500 Nits / LED will be complied.
Proposed and Comply
d. Viewing Angle (typical): 176° Vert., 176° Hor. (88U/88D/88L/88R) @ CR>10 C. LCD screen 1000:1 / LED will be complied.
e. Response Time (Gray to Gray): 4 ms Noted will be complied.
f. Refresh Rate: 60Hz
g. Aspect Ratio: 16:9
J. Commercial Grade Tablet Display (533.4mm or 21”)
1. Multi-purpose fixed commercial grade tablet display for interactive signage to deliver commercialgrade computing with a PC-based platform. Installation to provide
control and content management to the commercial-grade tablet display via ethernet connection.
2. The minimum specifications are as follows:
a. Native resolution: Full HD 1920 x 1080 @ 60Hz
b. Brightness (typical): LCD Panel: 250 nits; PCAP: 225 nits
c. Contrast Ratio: 3000:1
d. Viewing Angle (typical): Horizontal +/- 89° or 178° total / Vertical +/- 89° or 178° total j. not 21" its 19" interactive.
e. Response Time-total (typical): 30 msec 1. control and content managment not in GMI (WWD) scope. Proposed and Comply
f. Aspect Ratio: 16:9 Complied as per quoted product.
g. Processor: i5: Intel i5 2.3GHz (up to 3.3 GHz) 6500TE Quad-Core Processor; 6MB Smart Cache
h. Storage: 128GB hard drive or greater
i. Bluetooth 4.0
j. Ethernet Port: 1 x LAN RJ45 (Gigabit)
k. Wireless: Wi-Fi 802.11 a/b/g/n/ac
l. The contractor shall certify that their proposed solution is fit for the intended purpose.

A. General: Provide same basic metal or alloy as the metal to be fastened, and finish to match in colour and texture. Type, grade, class and style best suited for the
respective purpose. Use countersunk flat-head type machine screws for exposed fasteners. Use stainless steel fasteners for exterior construction, dissimilar materials and
for fastening components fabricated of galvanized steel.
2.5 FASTENERS 1. Steel Bolts, Screws and Nuts: BS 3692. Noted and will be complied. Comply
2. Stainless Steel Bolts, Screws, Studs and Nuts: BS 6105
3. Include supplementary parts necessary to complete metal fabrications work though not definitely shown or specified.

PART 3 - EXECUTION

A. Manufacturer's Instructions: Prepare substrates and install the work of this Section, including, components and accessories in accordance with the manufacturer's
3.1 GENERAL instructions, except where more stringent requirements are shown or specified, and where project conditions require extra precautions or provisions to ensure satisfactory Noted. Comply
performance of the Work.
A. Site Verification of Conditions: Verify actual site dimensions and location of adjacent materials prior to commencing work. Notify Consultant in writing of any conditions
that would be detrimental to the installation. Commencement of work implies acceptance of previously completed work.
B. General signage locations are shown on signage plan drawings. Architectural elevations, floorplans and reflected ceiling plans are to be consulted for specific site,
3.2 EXAMINATION location, and elevation details. Noted and will be complied. Comply
C. Sign Contractor shall notify the Construction Manager in writing of unacceptable substrates, detrimental conditions or dimensional discrepancies.
D. Beginning work indicates acceptance of substrate and subsequent modifications will become the Sign Contractor’s complete responsibility.
E. When not enough information has been provided for installation, the Sign Contractor is responsible for determining the correct sign positioning with the Consultant or
Owner prior to installation.
A. Examine the substrates, adjoining construction and the conditions under which the Work is to be installed. Do not proceed with the Work until unsatisfactory conditions
3.3 PREPARATION have been corrected. Noted. Comply

C. Coordinate power, electrical, and data components as needed.


3.4 COORIDINATION Noted. Comply

Page 5 of 6
COMPLIANCE STATEMENT
(AS PER SPECIFICATIONS)

PROJECT NAME: GUGGENHEIM ABU DHABI


SUBCONTRACTOR NAME: GALAXY METAL INDUSTRIES LLC
SUMMARY OF WORK / DESCRIPTION: WAYFINDING AND SIGNAGE WORKS

SECTION 10 14 00 – SIGNAGE
DESRITION AS PER PROJECT SPCIFICATION AS PER M/S.GALAXY METAL INDUSTRY COMPLIANCE
A. Protect products against damage during field handling and installation. Protect adjacent existing and newly placed construction, landscaping and finishes as necessary to
prevent damage during installation. Paint and touch up any exposed fasteners and connecting hardware to match color and finish of surrounding surface.
B. Mount signs in proper alignment, level and plumb according to the sign location plan and the dimensions given on elevation and sign location drawings. Where otherwise
not dimensioned, signs shall be installed where best suited to provide a consistent appearance throughout the project. When exact position, angle, height or location is in
doubt, contact Consultant or
Construction Manager for clarification.
Noted. Comply
C. Sign Contractor shall own and be responsible for all signs that are damaged, lost or stolen while materials are on the job site and up until the completion and final
acceptance of the job.
D. Remove or correct signs or installation work the Construction Manager determines as unsafe or as an unsafe condition.
F. Locate signs as shown in G1 and G2 series of drawings (Sign Location Plans).
3.5 INSTALLATION
G. Sign Contractor will be responsible for verifying that behind each sign location there are no utility lines that will be affected by installation of signs. Any damage to
utilities during installation of signs will be the sole responsibility of the Sign Contractor to correct and repair.
I. Sign Contractor to be responsible for signage internal wiring and electrical and data cable hookup. All source power and data will be supplied to the general vicinity of
electrified signs; by others.
J. The Sign Contractor is to protect goods supplied by him from damage during installation with appropriate insurance against fire, theft, or other damage. He shall also
protect from injury the property of the Owner, which may be adjacent, or with which he may come in contact, and he shall make good any such damage occurring through Comply
Noted.
his fault.
L. All exterior structure to support signage is the responsibility of the Sign Contractor. All necessary blocking, plates or supports within the walls are to be the responsibility
of the subcontractor unless otherwise specified.

A. Contractor’s Testing and Inspection: Perform the following tests and inspections.
3.6 FIELD QUALITY CONTROL 1. Bolted Connection Inspection: Noted Comply
a. Visual inspection of all bolted connections after assembly for correct installation and assurance of fit and tightness.
A. Site Tests and Inspections:
Noted.
3.7 SITE QUALITY CONTROL 2. Non-Conforming Work: Replace damaged work which cannot be satisfactorily repaired, restored or cleaned, to satisfaction of Architect at no cost to Owner. Comply
ITP will be submitted following project requirements.

A. The Contractor will commence Closeout Procedures in accordance with the requirements in Section 017700 Close Out Procedures. Employers Representative will
schedule and conduct a project closeout conference at a time convenient to Employer and Employers Representative, but no later than 90 days prior to the scheduled Time
3.8 PROJECT COMPLETION of Completion date of the Works.
Noted and will be complied. Comply

Page 6 of 6
COMPLIANCE STATEMENT - TECHNICAL (AS PER IFC DRAWINGS)
SUBCONTRACTOR : GALAXY METAL INDUSTRIES LLC
Sr. No. Sign Type/Name SIGNAGE - Identification Specification Proposed Material Grade/Finish Status Remarks
C SIGNAGE - Digital

Sign Code D1.1 Exhibition Directory - Glass / LCD (FOH); 3000 x 1500 x 2-
6mm Laminated Glass Assembly (Annealed); with 3M Scotchcal ElectroCut
1 19/19 Add -01 - A Graphic Film 'Dusted Crystal' applied to second surface of glass; attached 90" LED Display 90" LED Display N/A Comply
to 90" LED display mounted; Supported by 316 S/S Base Block and typical
S/S threaded cleanly welded to bracket piece, as per drwg no. G5-133

Sign Code D1.2 Map Directory - Glass / LCD (FOH); 3000 x 1500 x 2-6mm
Laminated Glass Assembly (Annealed); with 3M Scotchcal ElectroCut
2 19/19 Add -01 - B Graphic Film 'Dusted Crystal' applied to second surface of glass; attached 90" LED Display 90" LED Display N/A Comply
to 90" LED display mounted; Supported by 316 S/S Base Block and typical
S/S threaded cleanly welded to bracket piece, as per drwg no. G5-134

Sign Code D3 Event Display at Counter; 3-60 in LED Displays to be


3 19/19 Add -01 - C attached to the beam via a standard bracket as needed, as per drwg no. G5- LED Displays 65" LED Displays 65" N/A Comply
135
Sign Code D4 Event Display at Bag Check ; 2- 60 in LED Displays to be
4 19/19 Add -01 - D attached to the beam via a standard bracket as needed, as per drwg no. G5- LED Displays 65" LED Displays 65" N/A Comply
136
Sign Code D4 Event Display at Information Desk ; 2- 60 in LED Display to
5 19/19 Add -01 - E be attached to the beam via a standard bracket as needed, as per drwg no. LED Displays 65" LED Displays 65" N/A Comply
G5-137

Sign Code D6 Studio Lab Display - 3mm Low iron glass panel secure to 19"
6 19/20 Add-01 - A multi sync monitor; attached with wall bracket; 440 x 368mm overall size, 19' Thick display 19' Thick display N/A Comply
as per drwg no. G5-140
4. Project Architect Schedule
and Specification

Display Items (Screens & Tablets)


Wayfinding & Signage Works
SECTION 10 14 00

Signage

GUGGENHEIM Abu Dhabi


ABU DHABI, UNITED ARAB EMIRATES

TURNER CONSTRUCTION
– INTERNATIONAL LLC ISSUED
PROJECT MANAGER
P.O. BOX 890, No. Description Date
Abu Dhabi, United Arab Emirates - ADDENDUM NO. 1 06/12/2020
GEHRY PARTNERS, LLP
1 ISSUE FOR CONSTRUCTION 12/11/2020
ARCHITECT ISSUE FOR CONSTRUCTION -
12541 Beatrice Street 2 UPDATE
5/31/2021
Los Angeles, CA 90066, USA
ISSUE FOR CONSTRUCTION
C01 UPDATE – IFC 2
03/21/2022
ARUP GULF LTD
ENGINEER
39th Floor, Media One Tower, Dubai Media City
Dubai, P.O. Box 212416, United Arab Emirates

WSP - PARSONS BRINCKERHOFF LTD


CONSULTANT OF RECORD
PO Box 47445, Sky Tower, Level 36
Office Unit 3602, Reem Island
Abu Dhabi, United Arab Emirates
THIS PAGE LEFT BLANK INTENTIONALLY

Guggenheim Abu Dhabi


Pentagram Design 101400 - 2/18
GP Project #2008-009 SIGNAGE
Issue for Construction Update – IFC 2 March 21, 2022
SECTION 10 14 00 – SIGNAGE

PART 1 - GENERAL

1.1 RELATED DOCUMENTS


A. Drawings, Project Database and general provisions of the Contract, including General and
Supplementary Conditions and Division 01 Specification Sections, apply to this Section. Review all
listed above to determine details, assemblies and location of dimensional control for all elements of
the Work of this section.

1.2 SUMMARY
A. The intent of this specification is to include all items necessary for the proper execution and completion
of the Work by the Signage Contractor. Performance by the Signage Contractor shall be required to
the extent consistent with the Contract Documents and reasonably inferable from them as being
necessary to produce the indicated results.
B. The intent of the Contract Documents is to provide everything necessary for a complete
contract. All drawings and specifications are mutually dependent. In the event of a discrepancy,
or an error, neither document rules over the other. Signage Contractor is to make the
Consultant aware of any inconsistencies found in the design drawings; including but not limited to
incorrect quantities, inconsistencies in the sign between drawings, incorrect dimensions,
installation or site conflicts.
C. Provide in accordance with requirements of the Contract Documents. The Signage work is specified by
the performance specifications. The drawings show the design intent and except for setting out
parameters and finished profiles, are indicative only. The Contractor shall full responsibility for the
Work of this specification including but not limited to the following:
1. Be responsible for the engineering, procurement and installation of the Signage work based upon
the Drawings and the requirements of this Specification.
2. Be responsible for the final confirmation of materials, sizes, thickness, types, locations of fixings
and related accessories, all in accordance with specified standards detailed herein and
submission of samples for review and acceptance by the signage Consultant and Architect prior
to fabrication and/or manufacture.
3. Compliance with the requirements of the UAE and the local municipality where the project is
located as related to applicable Building Codes, the International Building Code (IBC) and other
applicable local regulations Submit all information necessary to the relevant statutory authorities
to obtain approval in timely manner so as to comply with the construction program.
D. Related Requirements:
1. Division 1 – General Requirements.
2. Work restriction requirements: 01 14 00.
3. Substitution procedures and requirements: 01 25 00
4. Request for Information procedures: 01 26 13.
5. Project management and coordination: 01 31 00.
6. Testing, inspection and quality assurance and mockups: 01 45 23 and 01 45 50.
7. Waste management and disposal requirements: Section 01 74 19.
8. Provision of Estidama requirements: Section 01 81 14.
9. Use of Timber construction requirements: Section 06 18 00.
10. Precast concrete requirements: Section 03 45 00.
11. Exterior Plaster Assemblies: Section 09 24 00
12. Glass-Fiber-Reinforced Concrete: Section 03 49 00

Guggenheim Abu Dhabi


Pentagram Design 101400 - 3/18
GP Project #2008-009 SIGNAGE
Issue for Construction Update – IFC 2 March 21, 2022
13. Glazing: Sections 08 44 01, 08 44 02 and 08 44 04.

1.3 REFERENCES
A. Reference Standards
1. British Standards:
2. United States Standards for Accessible Design (SAD), 2010
3. Council of American Building Officials (CABO)
4. A117.1-2003 Accessible and Usable Buildings and Facilities
5. American National Standards Institute (ANSI):
6. N2.1-89 Warning Symbols
7. American Society for Testing and Materials (ASTM):
8. B209-96 Aluminum and Aluminum-Alloy Sheet and Plate
9. B221-96 Aluminum and Aluminum-Alloy Extruded Bars, Rods Wire, Shapes and Tubes.
10. A480M-06b Rolled Stainless and Heat-Resisting STEEL Plate, Sheet, and Strip
11. Federal Specifications (Fed. Spec.):
12. MIL-P-8184E Plastic Sheet, Acrylic, Modified.
13. MIL-P-46144C Plastic Sheet, Polycarbonate
14. AWS "Structural Welding Code"
15. ADIBC Section 1110, Accessibility and Code Signage.
16. Estidama Pearl Building Rating System; www.estidama.org.

1.4 ADMINISTRATIVE REQUIREMENTS


A. Coordination: All construction administration coordination to be in accordance with Division 1.
B. Preinstallation Meetings: Arrange a pre installation meeting in accordance with Section 01 31 00
“Project Management and Coordination”
1. Prior to the start of the Work, meet at the Project site to review methods and sequence of
metal fabrication installation, special details and conditions, standard of workmanship,
testing and quality control requirements, job organization and other pertinent topics related
to the Work.

1.5 SUBMITTALS
A. Product Data
1. Submit manufacturer’s literature, specifications and installation instructions describing the
general properties of each material and accessory to be used in the Work. Include,
manufacturer’s technical data documenting the primary function, quality and performance of
each system and containing specification for each material, or other information as
required.
B. Shop Drawings
1. Show in detail the construction, thickness of materials, jointing, methods of installation,
fastening and supports, location and sizes of welds, anchoring, hangers, additional
reinforcing of structural steel, and all other pertinent information. Show all loads and
eccentricities. Submit details drawn to scale at not less than 1:5. Shop drawings shall
contain the design, type of steel and load assumption and shall bear the seal of a
licensed Professional Engineer (Submit Professional Engineer's credentials and license).
2. Submit original shop drawings to illustrate details of Work on minimum sheet size A0
(840mm x 1190mm).

Guggenheim Abu Dhabi


Pentagram Design 101400 - 4/18
GP Project #2008-009 SIGNAGE
Issue for Construction Update – IFC 2 March 21, 2022
3. Shop drawings, which are to be provided by the Sign Contractor, will be used as the final
construction documents and must include all construction, engineering and installation
details for the complete implementation of the designs described herein.
4. The Sign Contractor shall provide dimensioned shop drawings for all signs, clearly showing
elevations, sections, dimensions, materials, typographic layouts, fabrication methods,
external finishes, anchorage, and other details of construction as well as details related to
engineering, adjacent construction associated with signage and other construction
responsibilities. The Sign Contractor shall be responsible for all construction, installation
and internal supports for a safe and permanent installation of all signs. Furnish location
detail drawings for signs supported or anchored to other construction.
5. Shop drawings shall include complete details of fasteners (diameter, length, type, and
material).
6. Sign contractor is responsible for ensuring they have the most current Design Intent
drawings as well as any other applicable documents: such as architectural, structural and
electrical drawings of the building.
7. The Sign Contractor is responsible for ensuring that appropriate fastening methods are used
as required by the specific substrate that product is to be installed on.
8. Shop drawings for any sign weighing more than 25kg, or integrated within architectural
surfaces or materials are to be reviewed and signed by a certified professional structural
engineer recognized in the UAE.
C. Samples and Mockups
1. Label samples to indicate product, characteristics, and location in the Work. Samples
will be reviewed for color and appearance only. Furnish sufficient samples to establish the
full range of colors and textures for materials exposed in the finished work. Compliance
with other requirements is the responsibility of the Contractor.
2. Submit (5 sets). The Construction Manager will retain (1 set), the Consultant will retain (2
sets), the Client will retain (1 set) of samples, the other will be returned to the Sign
Contractor.
3. Temporary models to be reviewed at Architect’s office. Temporary models shall be
constructed of white foamcore and/or white posterboard; with digital paper prints applied to
represent placeholder graphics as applicable. See individual sheets for additional information
and Table A at the end of this Section.
4. Provide complete full-size prototypes of each unique sign type as noted in the signage
drawings. See individual sheets for additional information and Table B at the end of this
Section.
5. Duly reviewed and approved sign samples shall be the minimum workmanship and
quality standard for reference until completion of the Work.
6. Duly reviewed sign type samples shall be retained by the Sign Contractor until
released by the Consultant, at which time they may be incorporated into the
permanent Work.
7. Install completed prototype signs on site for each unique sign type. Prototypes to be
retained and stored on site for reference. Signs should be coordinated with on-site
construction status as to demonstrate the final condition. Prototypes to be retained
and stored on site for reference.
8. Adjustments made on samples by the Consultant are not intended to change
the Contract Price. If adjustments affect the value of the Work, state such in
writing for approval by the Construction Manager prior to proceeding with the Work
9. The Owner, Consultant or Construction Manager reserve the right to reject any sample
or product found not to meet minimum quality and craftsmanship as outlined in this
document and / or deemed inappropriate for the project’s overall design standards.
Rejected samples or products will require immediate resubmission with 5 working days;
unless notified in writing and approved by the Owner, Consultant and / or Construction

Guggenheim Abu Dhabi


Pentagram Design 101400 - 5/18
GP Project #2008-009 SIGNAGE
Issue for Construction Update – IFC 2 March 21, 2022
Manager, and will be furnished at no additional cost. The sign Contractor must have
complete approval on all samples and products prior to production.
10. Product and material manufacturer’s printed specifications, anchorage details, installation
and maintenance instructions are to be provided as part of the shop drawing submittal.
D. Structural Calculations
1. Where installed metal, glass and timber fabrications are required to comply with certain
design loadings, include structural computations, material properties, and other information
needed for structural analysis. Engage the services of a qualified Professional Engineer
licensed in Abu Dhabi who is experienced in providing engineering services of the kind
indicated. (Submit Professional Engineer's credentials and license).
E. Artwork
1. Electronic templates for artwork to be provided by the Consultant for each sign type.
Templates will be provided to the Sign Contractor as Illustrator (.ai) or Adobe PDF (.pdf)
files.
2. Artwork of variations for message content to be laid out by the Sign Contractor and
provided to the Consultant for approval prior to production.
3. All artwork to be submitted in either full size hardcopy or electronic form as Adobe PDF
(.pdf).
4. The Owner reserves the right to add and otherwise modify sign text and lettering layout
during the submittal reviews at no additional cost to the Owner.

F. Estidama Submittal Requirements


1. Estidama Supporting Documentation as per section 01 81 14, Estidama Requirements.
Information to be supplied for this form shall include:
a. Cost breakdowns for the materials included in the Contractor or sub-contractor’s work.
Cost breakdowns shall include total cost plus itemized material costs for the
signage system and associated products.
b. The manufacturing location and raw material sources of the signage system and
associated products.
c. The amount of post-consumer and/or post-industrial recycled content in the signage
system.
d. The VOC content of all interior and field-applied adhesives, sealants, paints, and
coatings.

1.6 CLOSEOUT SUBMITTALS


A. Final as built drawings are to be submitted upon completion of work and upon final approval.
Drawings are to be submitted in electronic and hardcopy form to the client. Drawings are to
show details and notes including final as built conditions, designs, and included any site
instructions and / or addendums required for the fabrication and installation of the products.:

1.7 MAINTENANCE MATERIAL SUBMITTALS


A. Spare Parts:
B. Extra Stock Materials: Provide 15% overage of all materials, fasteners and completed
assemblies.
C. Tools: Provide Owner with [2] lifting devices of type suitable for changeability of large-scale glass
signage elements.

1.8 QUALITY ASSURANCE

Guggenheim Abu Dhabi


Pentagram Design 101400 - 6/18
GP Project #2008-009 SIGNAGE
Issue for Construction Update – IFC 2 March 21, 2022
A. Basis of Design: When particular manufacturers’ materials, products or processes are
specified for an item of Work, only approved alternatives may be used. An alternative material,
product or process will be considered if the Contractor submits a written substitution request
together with such information as may be necessary to assist the Engineer in determining
whether the proposed substitution is acceptable; the burden of proof rests solely upon the
Contractor.
B. Fabricator/Installer: A firm specializing in signage fabrication work similar to that indicated for this
project for a minimum of 5 years and with sufficient production and installation capacity to produce
required products, systems and assemblies specified without causing delay to the Work.
C. Regulatory Requirements: Comply with applicable requirements of the laws, codes, ordinances
and regulations of authorities having jurisdiction. Obtain necessary approvals from authorities
having jurisdiction.
D. The Consultant must be notified of any variations of conditions as shown on these drawings. It
shall be the Sign Contractor’s responsibility to obtain and utilize the most current and up-to-
date plans and specifications for all construction and installation work.
E. Work done and material furnished shall be of superior quality in every respect. The Owner,
Consultant, and / or Construction Manager shall reserve the right to reject any work or materials
that are not deemed acceptable by their assessment.
F. The Owner, Consultant, and / or Construction Manager shall reserve the right to reject any shop
drawings, samples, or other submittals, as well as any finished product or installation that does
not meet or exactly equal the standard of quality established. Any such decision will be
considered final and not subject to recourse.
G. The Sign Contractor must guarantee that only new materials are being used for this work.
H. Products must be made accessible for quality control inspection at any time.
I. Any claims for work carried out on instructions by others will not be accepted or honored.
J. Provide site administration and inspection of this part of the Work.

1.9 DELIVERY STORAGE AND HANDING


A. Delivery and Acceptance Requirements:
1. Signs to be packaged to prevent damage or deterioration during shipment, handling, storage
and installation. Maintain protective covering in place and in good repair until removal is
necessary.
2. Deliver signs only when the site and mounting services are ready for installation work to
proceed.
3. Store products in dry condition inside enclosed facilities.
4. Ensure products are secured to prevent willful damage and / or theft. Sign Contractor to
coordinate with the Construction Manager as to the possibility of on site storage and or
work area, if required.
5. Refer to product MSDS for precautionary measures during storage and handling.
6. Packaging Waste Management:
a. Refer to the Overall Construction Environmental Management Plan (OCEMP) for
environmental requirements concerning packaging materials.
b. Contractor is encouraged to obtain materials in biodegradable or recyclable/reusable
packaging using the minimum amount of packaging possible.

1.10 SITE CONDITIONS


A. Sign Contractor to verify all site conditions in accordance with Section 01 31 00.

Guggenheim Abu Dhabi


Pentagram Design 101400 - 7/18
GP Project #2008-009 SIGNAGE
Issue for Construction Update – IFC 2 March 21, 2022
B. Sign Contractor is responsible for ensuring that all site conditions have been thoroughly
reviewed and coordinated prior to fabrication.
C. Sign contractor is responsible for coordinating with the General Contractor and other trades to
ensure a successful fabrication and installation of all sign products.
D. Sign contractor to coordinate with other building trades all signage elements that are carved into
building surfaces, or require in-lay within wall surfaces prior to wall finishing.

1.11 SCHEDULE
A. Sign fabricator is to provide a complete and detailed schedule of all activities related to the
fabrication and installation of sign products. This should include but is not limited to:
1. Submission of samples
2. Submission of prototypes
3. Installation of on-site mockups and prototypes
4. Submission of shop drawings
5. Fabrication of signs including key milestones such as acquisition of materials, fabrication
of sign products, painting and finishing
6. Installation including key milestones such as final installation of product types, complete
installation

1.12 WARANTY
A. Manufacturer Warranty: Warrant work of this Section for period of 2 years against defects and/or
deficiencies in accordance with Section 01 77 00. Promptly correct any defects or
deficiencies, which become apparent within warranty period, to satisfaction of the signage
consultant or Architect and at no expense to Owner. Defects include but are not limited to;
buckling, opening of seams, bond failure and extensive colour fading.

PART 2 – PRODUCTS

2.1 GENERAL
A. The Designs contained within the Contract are the property of Pentagram and may not be
used for any other purpose than reference without express written permission of the Owners and
/ or Pentagram.
B. Provide graphics items as completed units produced by a single manufacturer, including
necessary mounting accessories, fittings and fastenings.
C. Do not scale drawings for dimensions. Sign Contractor to verify and be responsible for all
dimensions and conditions shown by these drawings. Construction Manager to be notified of
any discrepancy in drawing, in field directions or conditions, and / or of any changes required
for all such construction details.
D. The Sign Contractor, by commencing work of this section, assumes overall responsibility, as part
of his warranty of work, to assure that assemblies, components and parts shown or required
within the work of the section, comply with the Contract Documents. The Sign Contractor shall
further warrant that all components, specified or required to satisfactorily complete the
installation, are compatible with each other and with conditions of installations.
E. The Sign Contractor shall obtain and pay for all necessary permits and variances.
F. The Sign Contractor is responsible for meeting all local, building codes as well established
national standards and requirements.

Guggenheim Abu Dhabi


Pentagram Design 101400 - 8/18
GP Project #2008-009 SIGNAGE
Issue for Construction Update – IFC 2 March 21, 2022
G. Sign components presented in the Graphics document are for design intent purposes only. Duly
reviewed and /or engineered shop drawings shall be provided by the Sign Contractor to be
used as the final construction documents, and shall include complete construction,
engineering and installation details required for implementing the designs described herein.
H. Sign Contractor shall furnish all labor, materials, equipment, tools, supplies and services
necessary and reasonably incidental to complete fabrication, installation and delivery of
sign(s) as specified. Sign Contractor shall provide all materials, equipment, services, labor
tools, and supplies to fulfill completion of this contract. Sign Contractor shall be responsible or
a complete and thorough job. Materials not specifically described but required for a complete
and proper installation shall be identified and provided for by the Sign Contractor. Sign
Contractor shall be responsible for the quality of all materials and workmanship of any firms
or individuals who act as his subcontractors. Sign Contractor shall be responsible for providing
subcontractors with complete and up-to-date drawings, specifications, sign schedules and
other information issued for this project. The Sign Contractor shall be responsible for
coordinating final review and approval of all copy wording with Consultant prior to submittal of
shop drawings.
I. Provide complete and comprehensive fabrication / installation liaison with all other trades. Where
the Sign Contractor is providing graphics only, it shall be the Sign Contractor’s responsibility
to schedule his work to coincide with other trades’ fabrication, finishing and installation
schedules.

2.2 MATERIALS
A. Metal Surfaces, General: For metals which will be exposed to view in the finished work,
only use materials which are smooth and free of pitting, seam marks, roller marks, rolled
trade names, roughness and other surface blemishes.
1. Steel:
a. Steel Plates, Shapes, and Bars: BS 1449 Part 1.
b. Structural Shapes: BS 5950 Part 1.
c. Structural Carbon Steel Tube: BS 1387.
d. Structural Steel Sections: BS 4 Part 1.
e. Hot-Rolled Steel Sections: BS 4848 Part 2.
f. Welding Rods and Bare Electrodes: Select in accordance for the metal alloy to be
welded. Welding procedures shall be such that distortion is reduced to a minimum
and local distortion rendered negligible in the final fabrication. Corrections, if
necessary, shall be undertaken by a method, w h i c h has been agreed to by
the consultant. No welds other than those shown on the Shop Drawings, even for
temporary attachments or repairs, shall be acceptable unless agreed by the
consultant. If welded temporary connections are agreed upon, then the welding and
removal of the connection shall be in accordance with clause 15 of BS EN 1011-1.
2. Aluminum: Provide alloy and temper recommended by aluminum producer or finisher for
type of use and finish specified or shown, and with not less than the strength and durability
properties of the alloy and temper designated below for each aluminum form required.
a. Aluminum Extrusions: All extruded aluminum alloy framing members shall be
fabricated from the appropriate grade of aluminum alloy complying with BS EN
12020-1 and BS EN 755-2, unless otherwise specified.
b. Aluminum Sheet: Unless specified otherwise, aluminum sheeting shall be a minimum
of 3mm thick and satisfy the requirements of BS 1470, BS EN 485: Parts 1-4, BS
EN 515 and BS EN 573: Parts 1-4.
c. All painted surfaces properly primed. Finish coating of paint to have complete
coverage.

Guggenheim Abu Dhabi


Pentagram Design 101400 - 9/18
GP Project #2008-009 SIGNAGE
Issue for Construction Update – IFC 2 March 21, 2022
d. Custom extrusion designs, provided, enhanced, and/or developed within the scope of this
Contract are and will remain the property of the Owner.
e. Finish to match Architectural Samples
3. Stainless Steel:
a. Duplex stainless steel sheet: ASTM A167, Type 316 to ASTM A 167-96, Type 316 alloy in
sandblasted finish unless shown otherwise.
B. Acrylic
1. Cast or continuously manufactured polymethyl methacrylate (pmmA) acrylic that offers excellent
optical clarity.
2. Photopolymer
a. Exterior-grade photopolymer resin of photosensitive synthetic rubber compound
monomers. Exterior rated after initial exposure to UV light and has a 0% swell rate in
moisture-saturated environments.
C. Exterior Plaster Surfaces, General: Signage Contractor to coordinate with Plaster Wall System
Contractor to determine wall details and requirements to implement engraved messages. Plaster Wall
Contractor responsible for supply and installation of panel system. Signage Contractor responsible for
provision of all inset signage components, as detailed in Contract Documents, per schedule dictated
by Plaster Wall Contractor. All signage components to be installed in a manner that protects
surrounding areas, ensures plaster wall system warranties are not compromised, and leaves
surrounding surfaces void of imperfections.
D. Applied Vinyl:
1. 2 mil, pressure-sensitive films designed for permanent graphics that may be pre-spaced and
electronically cut, screen printed, digitally printed or used in narrow width thermal transfer printing
systems with a pressure sensitive adhesive. Films have the same color on both sides, have a
transparent synthetic liner that resists moisture absorption and static buildup, lays flat for easier
assembly of multicolor graphics, and allows superior cutting and weeding.
2. Digital printed graphics on film: protect image with laminated film overlay of same material as
decal base; clear matte finish, as required. Digital prints are to be free from colour fading and
delamination and are to reflect warranty periods as outlined.
E. Paint:
1. AKZO Nobel GripGard® acrylic polyurethane, Matthews Paint acrylic polyurethane, or approved
equivalent complete with priming per guidelines set by paint supplier. Paint to be applied in a
controlled environment and applied via spray unless otherwise required.
2. A low VOC (volatile organic compounds) compliant coating which exceeds EPA standards for
solvents and is an ultraviolet inhibited aliphatic, acrylic polyurethane system engineered for
extreme color and gloss retention. Lead and heavy metal free.
F. Glass
1. Glass panels to be two layers of annealed low-iron Float Glass: ASTM C 1036, Type I, Quality-
Q3, Class I, complying with other requirements specified and with a visible light transmission not
less than 91% relative to a 6mm nominal thickness, laminated together using approved glass
laminating techniques. Laminated layers to be 2, 12mm layers, 2, 6mm layers, or 2, 3mm layers
of heat strengthened glass as specified within the drawings.
2. Yellowish index for the interlayer to be 1.5 or less in compliance with ASTM D1925 Test Method
for Yellowness Index of Plastics, and the glass unit to comply with the performance requirement
meeting ASTM B 177-11 Standard Practice for Operating Salt Spray (Fog) Apparatus.
3. All laminated glass must use Ionoplast Interlayer.
G. Precast Concrete
1. Signage Contractor to coordinate with Precast Concrete Contractor to determine wall details and
requirements to implement inset messages. Precast Concrete Contractor responsible for supply,
implementation, and installation of precast wall. Sign Contractor to provide forms required to cast

Guggenheim Abu Dhabi


Pentagram Design 101400 - 10/18
GP Project #2008-009 SIGNAGE
Issue for Construction Update – IFC 2 March 21, 2022
messages in concrete to Precast Concrete Contractor, as detailed in Contract Documents, per
schedule dictated by Precast Concrete Contractor. All signage components to be installed in a
manner that protects surrounding areas, ensures precast wall warranties are not compromised,
and leaves surrounding surfaces void of imperfections. ..
H. LED Illumination
1. 6mm White LED panel to provide continuous even illumination to all visible area of sign face
without hot or cold spots.
2. Final hook-up by Signage Contractor. Electrical components/power supply to be housed within
sign assembly where space is available, otherwise internal cavity below grade is required.
I. Commercial Displays
1. Display: Professional Grade high definition Display Panel.
2. Displays to be provided in 2286mm (90”), 1651mm (65”), 1092.2mm (43”) and 533.4mm (21”).
3. Provide and install high definition display panels. There shall be a gang of commercial grade
display panels that create the panels or single displays as described in the drawing package for
per location. Exact mounting locations and configuration are shown on the drawings.
4. Provide and install message display controller and software provided by the manufacturer for the
commercial display panels.
a. Message display controller and software to interface with the BAS to display graphic
representations of energy consumption, water consumption, weather data, and building
sustainability diagrams as required by Estidama credit IDP-6
5. Provide and install video processor to interface various video signal feeds to allow video content
to be displayed correctly on to the commercial display panels. Contractor shall verify exact
quantity of processors required prior to installation.
6. Thin, adjustable brackets to be provided to securely attach the monitor to the wall, and match the
viewing angles to those specified within the contract documents. All bracket attachments to be
colored matte black and allow for monitors to be easily serviced.
7. Mounting brackets to be secured to wall using bracket manufacturers specifications and allow for
integration of power and data cable runs to create a clean installation of all control systems.
8. There are to be no visible manufacturers names, indicator lights or control buttons.
9. The 2286mm (90”), 1651mm (65”), and 1092.2mm (43”) commercial displays shall have the
following minimum specifications:
a. Native resolution: 1920 x 1080
b. Brightness (minimum) 700 nits or greater
c. Contrast Ratio (typical): 5000:1
d. Viewing Angle (typical): 176° Vert., 176° Hor. (88U/88D/88L/88R) @ CR>10
e. Response Time (Gray to Gray): 4 ms
f. Refresh Rate: 60Hz
g. Aspect Ratio: 16:9
J. Commercial Grade Tablet Display (533.4mm or 21”)
1. Multi-purpose fixed commercial grade tablet display for interactive signage to deliver commercial-
grade computing with a PC-based platform. Installation to provide control and content
management to the commercial-grade tablet display via ethernet connection.
2. The minimum specifications are as follows:
a. Native resolution: Full HD 1920 x 1080 @ 60Hz
b. Brightness (typical): LCD Panel: 250 nits; PCAP: 225 nits
c. Contrast Ratio: 3000:1
d. Viewing Angle (typical): Horizontal +/- 89° or 178° total / Vertical +/- 89° or 178° total
e. Response Time-total (typical): 30 msec

Guggenheim Abu Dhabi


Pentagram Design 101400 - 11/18
GP Project #2008-009 SIGNAGE
Issue for Construction Update – IFC 2 March 21, 2022
f. Aspect Ratio: 16:9
g. Processor: i5: Intel i5 2.3GHz (up to 3.3 GHz) 6500TE Quad-Core Processor; 6MB Smart
Cache
h. Storage: 128GB hard drive or greater
i. Bluetooth 4.0
j. Ethernet Port: 1 x LAN RJ45 (Gigabit)
k. Wireless: Wi-Fi 802.11 a/b/g/n/ac
l. The contractor shall certify that their proposed solution is fit for the intended purpose.
K. Commercial Exterior-Grade Curved Display
1. Provide and install high definition display panels. There shall be a gang of exterior commercial
grade display panels that create the panels or single displays as described in the drawing
package per location. Exact mounting locations and configuration are shown on the drawings.
The minimum specifications are as follows:
a. Pixel Pitch: 4.7 mm
b. Brightness (minimum) 5200 nits or greater
c. Colors: Up to 10-bit input / 16-bit processing / 68 trillion
d. Viewing Angle (typical): 170° Vert., 160° Hor.
e. Refresh Frequency: 960-4800 Hz
f. Flexibility (Min Dia): 1829 mm, 72 in

2.3 FABRICATION
A. Include supplementary parts necessary to complete metal fabrications work though not definitely shown
or specified.
B. Verify measurements and dimensions at the job site and cooperate in the coordination and scheduling
of the work of this Section with the work of related trades (with particular attention given to the
installation of items embedded in concrete and masonry). Allow for trimming and fitting of metal
fabrications wherever the taking of field measurements before fabrication might delay job progress.
On shop drawings, note which dimensions have been verified by field measurement.
C. Fabrication Tolerances: Fabrication tolerances shall generally comply with BS 5950 Part 2, and special
tolerances shall be determined as required in order to produce proper fit and coordination with other
trades. The special tolerances pertaining to length, squareness, preassembled units, milling, camber
and any other items, shall be submitted for consultant’s review.
D. Engineer, fabricate and install exterior components to provide for expansion and contraction over an
ambient temperature range of 45°C ambient temperature range of -10ºC to +40ºC, which may result in
a surface temperature exceeding 90°C without buckling, undue stress on members or anchors, and
other detrimental effects. Fabricate joints that will be exposed to weather in a manner to exclude
water, or provide weep holes where water may accumulate.
E. Typography:
1. All typographic layouts shall utilize typeface specified in each sign type drawing.
2. Letterforms and symbols shall be photographically or digitally rendered in precise, crisp, clean
forms. All letterforms shall be free of ticks, discontinuous curves, line waves, cut or ragged
edges, edge build-up, bleeding, surface pinholes, and other imperfections. Letterforms shall
conform to the prescribed proportions of the typographic font(s) specified by the Consultant.
3. All text, arrows, and symbols to be provided in size, colors, typefaces and letter spacing shown.
Text shall be a true, clean, accurate reproduction of typeface(s) shown. Text shown in drawings is
for prototypical layout purposes only; final text for signs will be finalized prior to commencement of
fabrication of individual sign types.

Guggenheim Abu Dhabi


Pentagram Design 101400 - 12/18
GP Project #2008-009 SIGNAGE
Issue for Construction Update – IFC 2 March 21, 2022
4. Contractor is responsible for acquiring translations for all signs in Arabic and Braille as required.
Final approved English messages are to be provided by the client / consultant for use.
5. For lettering allowance, refer to specification drawings for typical messaging.
F. Braille Signage
1. All signage requiring Braille and Tactile lettering to be fabricated to be compliant to the Standards
for Accessible Design (SAD) 2010 and the International Building Code.
2. Braille to be Grade 2 Braille. Signage Contractor responsible for Grade 2 Braille translation.
3. Tactile characters must be raised or embossed to a height of not less than 1mm and not more
than 1.5mm.
4. All caps must be used for all tactile characters, and tactile characters must have a height of not
less than 15mm and not more than 55mm.
5. Tactile characters, symbols, and the like, must have rounded edges.
6. The entire sign, including any frame, must have all edges eased.
7. The background, negative space or fill of signs must be of matte or low sheen finish.
8. The characters, symbols, logos and other features on signs must be matte or low sheen finish.
9. The minimum letter spacing of tactile characters on signs must be 2mm.
10. The minimum word spacing of tactile characters on signs must be 10mm.
11. The thickness of letter strokes must be not less than 2mm and not more than 7mm.
G. Construction:
1. Design components to allow for expansion and contraction for a minimum material temperature
range as to be expected at the project site, without causing buckling, excessive opening of joints
or over stressing of adhesives, welds and fasteners.
2. Form work to required shapes and sizes, with true curve lines and angles. Provide necessary
rebates, lugs and brackets for assembly of units. Use concealed fasteners whenever and
wherever possible.
3. Shop fabricate all products so far as practicable. Joints fastened flush to conceal reinforcement,
or welded where thickness or section permits.
4. Contact surfaces of connected members to be true. Assemble so joints will be tight and
practically unnoticeable, without use of filling compound.
5. Signs shall have fine, even texture and be flat and sound. Lines and miters sharp, arises
unbroken, profiles accurate and ornament true to pattern. Plane surfaces to be smooth, flat and
without oil-canning, free of rack and twist.
6. Level or straighten wrought work. Members shall have sharp lines and angles and smooth
surfaces. Extruded members to be free from extrusion marks. Square turns and corners sharp,
curves true.
7. Drill holes for bolts and screws. Conceal fastenings where possible. Exposed ends and edges mill
smooth, with corners slightly eased (rounded). Form joints exposed to weather to exclude water.
8. Finish hollow signs with matching material on all faces, tops, bottoms and ends. Edge joints
tightly mitered to give appearance of solid material.
9. Movable parts, including hardware, are be cleaned and adjusted to operate as designed without
binding or deformation of members. Doors and covers centered in opening or frame. All contact
surfaces fit tight and even without forcing or warping components.
10. Pre-assemble items in shop to greatest extent possible to minimize field splicing and assembly.
Disassemble units only as necessary for shipping and handling limitations. Clearly mark units for
re-assembly and coordinated installation.

2.4 FINISHES
1. All painted surfaces properly primed. Finish coating of paint to have complete coverage
with no light or thin applications allowing substrate or primer to show. Finish surfaces

Guggenheim Abu Dhabi


Pentagram Design 101400 - 13/18
GP Project #2008-009 SIGNAGE
Issue for Construction Update – IFC 2 March 21, 2022
smooth, free of scratches, gouges, drips, bubbles, thickness variations, foreign matter and
other imperfections.
2. All finishes of materials to match those of the architectural conditions outlined within the
architectural specifications.
3. Precast elements to be finished to match the architectural precast as referenced in Section 03 45
00.
4. Any elements integrated within architectural surfaces are to be coordinated with the Construction
Manager to ensure finishing is consistent with surrounding areas.
5. A suitable bond-break to be provided between all dissimilar materials to prevent galvanic
reaction.
6. Exterior plaster assemblies to be finished to match architectural plaster as referenced in
Section 09 24 00.

2.5 FASTENERS
A. General: Provide same basic metal or alloy as the metal to be fastened, and finish to match in
colour and texture. Type, grade, class and style best suited for the respective purpose. Use
countersunk flat-head type machine screws for exposed fasteners. Use stainless steel fasteners
for exterior construction, dissimilar materials and for fastening components fabricated of
galvanized steel.
1. Steel Bolts, Screws and Nuts: BS 3692.
2. Stainless Steel Bolts, Screws, Studs and Nuts: BS 6105
3. Include supplementary parts necessary to complete metal fabrications work though not
definitely shown or specified.

PART 3 - EXECUTION

3.1 GENERAL
A. Manufacturer's Instructions: Prepare substrates and install the work of this Section, including,
components and accessories in accordance with the manufacturer's instructions, except where
more stringent requirements are shown or specified, and where project conditions require
extra precautions or provisions to ensure satisfactory performance of the Work.

3.2 EXAMINATION
A. Site Verification of Conditions: Verify actual site dimensions and location of adjacent materials prior
to commencing work. Notify Consultant in writing of any conditions that would be detrimental to
the installation. Commencement of work implies acceptance of previously completed work.
B. General signage locations are shown on signage plan drawings. Architectural elevations, floor
plans and reflected ceiling plans are to be consulted for specific site, location, and elevation
details.
C. Sign Contractor shall notify the Construction Manager in writing of unacceptable substrates,
detrimental conditions or dimensional discrepancies.
D. Beginning work indicates acceptance of substrate and subsequent modifications will become the
Sign Contractor’s complete responsibility.
E. When not enough information has been provided for installation, the Sign Contractor is
responsible for determining the correct sign positioning with the Consultant or Owner prior to
installation.

3.3 PREPARATION

Guggenheim Abu Dhabi


Pentagram Design 101400 - 14/18
GP Project #2008-009 SIGNAGE
Issue for Construction Update – IFC 2 March 21, 2022
A. Examine the substrates, adjoining construction and the conditions under which the Work is to be
installed. Do not proceed with the Work until unsatisfactory conditions have been corrected.

3.4 COORIDINATION
A. Coordinate installation of anchorages for metal fabrications. Furnish setting drawings,
templates, and directions for installing anchorages, including sleeves, concrete inserts,
anchor bolts, and items with integral anchors, that are to be embedded in concrete or
masonry. Deliver such items to Site in time for installation.
B. Coordinate lettering carved into concrete or GFRC panels that are specified in this Section but
required for work of another Section. Deliver such items to Site in time for installation.
C. Coordinate power, electrical, and data components as needed.

3.5 INSTALLATION
A. Protect products against damage during field handling and installation. Protect adjacent
existing and newly placed construction, landscaping and finishes as necessary to prevent
damage during installation. Paint and touch up any exposed fasteners and connecting
hardware to match color and finish of surrounding surface.
B. Mount signs in proper alignment, level and plumb according to the sign location plan and the
dimensions given on elevation and sign location drawings. Where otherwise not dimensioned,
signs shall be installed where best suited to provide a consistent appearance throughout the
project. When exact position, angle, height or location is in doubt, contact Consultant or
Construction Manager for clarification.
C. Sign Contractor shall own and be responsible for all signs that are damaged, lost or stolen while
materials are on the job site and up until the completion and final acceptance of the job.
D. Remove or correct signs or installation work the Construction Manager determines as unsafe
or as an unsafe condition.
E. At completion of sign installation, clean exposed sign surfaces. Clean and repair any
adjoining surfaces and landscaping that became soiled or damaged as a result of installation of
signs.
F. Locate signs as shown in G1 and G2 series of drawings (Sign Location Plans).
G. Sign Contractor will be responsible for verifying that behind each sign location there are no utility
lines that will be affected by installation of signs. Any damage to utilities during installation of
signs will be the sole responsibility of the Sign Contractor to correct and repair.
H. Furnish inserts and anchoring devices that must be set in concrete or other material for
installation of signs. Provide setting drawings, templates, instructions and directions for
installation of anchorage devices that may involve other trades.
I. Sign Contractor to be responsible for signage internal wiring and electrical and data cable hook-
up. All source power and data will be supplied to the general vicinity of electrified signs; by
others.
J. The Sign Contractor is to protect goods supplied by him from damage during installation with
appropriate insurance against fire, theft, or other damage. He shall also protect from injury the
property of the Owner, which may be adjacent, or with which he may come in contact, and he
shall make good any such damage occurring through his fault.
K. The Sign Contractor shall not use any hazardous substances in the manufacture of the signs,
nor bring on site any hazardous substances, regulated under any environmental laws, without
the express written consent of the Owner.

Guggenheim Abu Dhabi


Pentagram Design 101400 - 15/18
GP Project #2008-009 SIGNAGE
Issue for Construction Update – IFC 2 March 21, 2022
L. All exterior structure to support signage is the responsibility of the Sign Contractor. All
necessary blocking, plates or supports within the walls are to be the responsibility of the
subcontractor unless otherwise specified.
M. When installing signs in the vicinity of building expansion joints, consideration to be given to the
movement created by the joints.

3.6 FIELD QUALITY CONTROL


A. Contractor’s Testing and Inspection: Perform the following tests and inspections.
1. Bolted Connection Inspection:
a. Visual inspection of all bolted connections after assembly for correct installation and
assurance of fit and tightness.
2. Welding Inspection:
a. Visual inspection of all welds to BS 5289.
b. Measurement of weld profiles for 10% of all fillet welds, at random.

3.7 SITE QUALITY CONTROL


A. Site Tests and Inspections:
1. Structural Inspection: Ensure a registered structural engineer specified herein inspects
work of this Section during erection/installation.
2. Non-Conforming Work: Replace damaged work which cannot be satisfactorily repaired,
restored or cleaned, to satisfaction of Architect at no cost to Owner.

3.8 PROJECT COMPLETION


A. The Contractor will commence Closeout Procedures in accordance with the requirements in
Section 017700 Close Out Procedures. Employers Representative will schedule and conduct a
project closeout conference at a time convenient to Employer and Employers Representative,
but no later than 90 days prior to the scheduled Time of Completion date of the Works.

TABLE A
Temporary Models: All temporary models to be reviewed at Architect’s office. Temporary models shall
be constructed of white foamcore and/or white posterboard; with digital paper prints applied to represent
placeholder graphics as applicable. See individual sheets for additional information.
Sheet Sign Type Description Model Requirement
G5-104 A1.4 Site ID - Weaving Scrims Partial Model
G5-112 A5.1 Tickets ID Partial Model
G5-122 A8.2 West Lobby - Kiosk Ticketing Full Model
G5-127 B2 Pedestrian Directional (Wall Mounted) Full Model
G5-130 C1 Cone and Artwork Display Totem Full Model
G5-131 C3.1 Elevator Directory - FOH Full Model
G5-133 D1.1 Exhibition Directory - Glass Panel/LCD Display - FOH Full Model
G5-138 D5.1 Exhibition Directory - Glass Panel/LCD Display - VIP Full Model
G5-141 E1.1 Room ID - FOH Full Model
G5-146 G1.1 Egress Map - FOH Full Model
G5-148 H1.1 Secondary Amenities ID – FOH (Wall Mounted) Full Model/2 Layouts
G5-150 H2 Secondary Amenities ID – (Large Pictogram Full Model/2 Layouts

Guggenheim Abu Dhabi


Pentagram Design 101400 - 16/18
GP Project #2008-009 SIGNAGE
Issue for Construction Update – IFC 2 March 21, 2022
G5-151 H3 Secondary Amenities ID – (Projecting) Full Model/2 Layouts
G5-152 H4.1 Prayer Room – VIP FOH Full Model
G5-156 R1.1 No Smoking Sign Full Model
G5-157 R1.2 Designated Smoking Area – Wall Mounted Full Model
G5-158 S1.1 Stair ID – Corridor Side – FOH Full Model
G5-160 S1.2 Stair ID – Corridor Side – BOH Full Model

TABLE B
Prototypes: Provide complete full-size prototypes of each unique sign type as noted in the signage draw-
ings. See individual sheets for additional information.
Sheet Sign Type Description Prototype
Requirement
G5-101A A1.1 Site ID Partial Prototype
G5-102 A1.2 Site ID @ Security Building Partial Prototype
G5-103 A1.3 Site ID @ Main Entrance Full Prototype
G5-104 A1.4 Site ID - Weaving Scrims Partial Prototype
G5-106 A2.1 Theater ID Full Prototype
G5-107 A3.1 Museum Shop ID (Primary) Partial Prototype
G5-108 A3.2 Museum Shop ID (Secondary) Partial Prototype
G5-109 A4.1 Group Ticket Sales (Primary) Partial Prototype
G5-110 A4.2 Group Ticket Sales (Secondary) Partial Prototype
G5-112 A5.1 Tickets ID - Main Partial Prototype
G5-120 A7.1 Gallery ID (Number) Full Prototype
G5-133 D1.1 Exhibition Directory – Glass Panel/LCD Display - FOH Full Prototype
G5-125 A12.1 Level ID @ Stairs (On Glass) Full Prototype
G5-126 A21 Loading Dock ID Full Prototype
G5-127 B2 Pedestrian Directional (Wall Mounted) Full Prototype
G5-128 B3 Pedestrian Directional - BOH (Wall Mounted) Full Prototype
G5-129 B4 Pedestrian Directional (On Glass) Full Prototype
G5-130 C1 Cone and Artwork Display Totem Full Prototype
G5-131 C3.1 Elevator Directory - FOH Full Prototype
G5-132 C3.2 Elevator Directory - BOH Full Prototype
G5-135 D3 Event Display @ Tickets/Members Counters Full Prototype
G5-136 D4 Event Display @ Bag Check Full Prototype
G5-138 D5.1 Exhibition Directory – Glass Panel/LCD Display - VIP Full Prototype
G5-140 D6 Studio Lab Display Full Prototype
G5-141 E1.1 Room ID - FOH Full Prototype
G5-142 E1.2 Room ID - BOH Full Prototype
G5-143 E1.3 Room ID - Security Zone Full Prototype
G5-144 E2 Work Station ID Full Prototype
G5-145 E3 Security Zone ID Full Prototype
G5-146 G1.1 Egress Map - FOH Full Prototype
G5-147 G1.2 Egress Map - BOH Full Prototype
G5-148 H1.1 Secondary Amenities ID - FOH (Wall Mounted) Full Prototype
G5-149 H2.1 Secondary Amenities ID - BOH (Wall Mounted) Full Prototype
G5-150 H2 Secondary Amenities ID - (Large Pictogram) Full Prototype
G5-151 H3 Secondary Amenities ID – (Projecting) Full Prototype
G5-152 H4.1 Prayer Room ID - VIP FOH Full Prototype
G5-153 H4.2 Prayer Room - BOH Full Prototype
G5-154 J4 Permanent Collection ID Full Prototype
G5-155 J5 Exhibition Display @ Galleries Full Prototype
G5-156 R1.1 No Smoking Sign Full Prototype
G5-157 R1.2 Designated Smoking Area - Wall Mounted Full Prototype

Guggenheim Abu Dhabi


Pentagram Design 101400 - 17/18
GP Project #2008-009 SIGNAGE
Issue for Construction Update – IFC 2 March 21, 2022
G5-157 R1.3 Designated Smoking Area - On Glass Full Prototype
G5-158 S1.1 Stair ID - Corridor Side - FOH Full Prototype
G5-158 S1.2 Stair ID - Corridor Side - BOH Full Prototype
G5-160 S2.1 Stair ID - Stair Side Full Prototype

END OF SECTION 10 14 00

Guggenheim Abu Dhabi


Pentagram Design 101400 - 18/18
GP Project #2008-009 SIGNAGE
Issue for Construction Update – IFC 2 March 21, 2022
5. Technical Data Sheet

Display Items (Screens & Tablets)


Wayfinding & Signage Works
Type 1:
LG Single Touch Monitor 19MB15T (19’’) – LG Brand

Type 2:
65’’ Digital Display – LG UHD (UH5F Series) – LG Brand

Type 3:
P1.5 Indoor LED Screen – Shenzhen Lamp Technology Co. Ltd. (Unilumin Group) - China
L G S i n g l e To u c h M o n i t o r
Energy Efficiency Certification
UL conducted an independent evaluation on behalf of:

LG ELECTRONICS INC
LCD TV Division
222 LG-ro Jinwi-myeon Pyeongtaek-si 451-713 Gyeonggi-do Republic of Korea
2022-04-18
for the following products: This product meets all of the necessary
qualifications pursuant to:
Display
N/A
Brand: LG ENERGY STAR®: Program requirements for
Displays Version 8.0
Model Name: 19MB15T

Model Number: 19MB15T-#

(# may be 0-9, A-Z or blank according to color 4790365177


of stand or enclosure.)

00-VS-F0419, Version 6.0, This is to cer�fy that representa�ve samples of the Cer�fied Product(s) listed above have been inves�gated by UL to the Standard(s) indicated on this cer�ficate, in accordance with the UL Global Services Agreement and the EEC Terms & Condi�ons (“Agreement”). The
Cer�ficate Holder is en�tled to use the UL Energy Verified Mark for the Cer�fied Product(s) listed on the cer�ficate and manufactured at the production site(s) covered by the UL Test Report, in accordance with the terms of the Agreement. This Cer�ficate shall remain valid unless a Standard iden�fied on
this Cer�ficate is amended or withdrawn prior to that date or there is a non-compliance with the Agreement.
Type 1:
LG Single Touch Monitor 19MB15T (19’’) – LG Brand

Type 2:
65’’ Digital Display – LG UHD (UH5F Series) – LG Brand

Type 3:
P1.5 Indoor LED Screen – Shenzhen Lamp Technology Co. Ltd. (Unilumin Group) - China
Energy Efficiency Certification
UL conducted an independent evaluation on behalf of:

LG ELECTRONICS INC
LCD TV Division
222 LG-ro Jinwi-myeon Pyeongtaek-si 451-713 Gyeonggi-do Republic of Korea
2022-04-13
for the following products: This product meets all of the necessary

Display
qualifications pursuant to:
N/A
Brand: LG ENERGY STAR®: Program requirements for
Displays Version 8.0
Model Name: 65UH5J

Model Number: 65UH5J-#

(# may be 0-9, A-Z or blank according to color 4790365177


of stand or enclosure.)

00-VS-F0419, Version 6.0, This is to certify that representative samples of the Certified Product(s) listed above have been investigated by UL to the Standard(s) indicated on this certificate, in accordance with the UL Global Services Agreement and the EEC Terms & Conditions (“Agreement”). The
Certificate Holder is entitled to use the UL Energy Verified Mark for the Certified Product(s) listed on the certificate and manufactured at the production site(s) covered by the UL Test Report, in accordance with the terms of the Agreement. This Certificate shall remain valid unless a Standard identified on
this Certificate is amended or withdrawn prior to that date or there is a non-compliance with the Agreement.
Type 1:
LG Single Touch Monitor 19MB15T (19’’) – LG Brand

Type 2:
65’’ Digital Display – LG UHD (UH5F Series) – LG Brand

Type 3:
P1.5 Indoor LED Screen – Shenzhen Lamp Technology Co. Ltd. (Unilumin Group) - China
Technical Parameters

WPI-M-P1.5 Indoor LED Screen Picture for Reference Only

Module Specs

Pixel Pitch (mm) 1.5mm

Pixel Configuration 1R1G1B (SMD1212)

Pixcel density (pixels/sqm) 422500Dots/

Cabinet Dimensions (LxWxH)/mm Custom


Physical
Module Dimension (LxWxH)/mm 320 x 160
Parameter
Module Resolution 208 x 104

Panel Material Aluminum/MS

Cabinet Weight (kg/panel) 7.5kg

Module Weight 0.47kg

Color Grayscale (Bit) 14-16 bits

Display Color 4398 Billion

Electronic
Refresh Rate Hz >3840Hz
Parameter
Driving Type 1/26 Scan

CAT5 cable: 100 m;


Signal Transmission Distance m Single mode fiber: 10 km

Brightness nit >600-800 (Adjustable)


Optical
Optimal Horizontal Viewing Angle ° 160
Parameter
Optimal Vertical Viewing Angle ° 70

AC Input Voltage V AC: 200V~240V

AC Input Frequency Hz 50
Electrical
Parameter
AC Input Power Maximum Value W/m²

AC Input Power Typical Value W/m²

Storage Temperature 40 60

Working Temperature ( ) 0-40

IP rating (Front/Rear) IP40/IP20


Circumstance
Parameter
Storage Humidity (RH) 10%~90% non condensing

Working Humidity (RH) 10%~60% non-condensing

Lifetime Typical Value hrs 100000

WORLDWIDE DIGITAL FZE


Head Office: Z1-10, SAIF Zone, Sharjah-UAE, P. O. Box-124230
T : +971 6 5565185 | F: +971 6 5574296, www.worldwidedg.com | info@worldwidedg.com
Taurus Series
Multimedia Player

TB50 Specifications
Taurus Series Multimedia Player TB50 Specifications

Change History
Document Version Release Date Description

V1.0.4 2022-06-10 Added a description of RF synchronization.


Added notes and cautions.
Updated the certification information.
Updated the indicator descriptions.
Updated the accessory descriptions.

V1.0.2 2021-12-17 Updated the descriptions of the USB (Type B) port and Gigabit
Ethernet port.
Added the gross weight of the product.
Added a note for the power consumption.

V1.0.1 2021-09-30 Added certification information.


Updated the description of the playback performance.
Updated net weight.

V1.0.0 2021-07-30 First release

Introduction
The TB50 is a new generation of multimedia player created by NovaStar for full-color LED displays. This multimedia
player integrates playback and sending capabilities, allowing users to publish content and control LED displays with a
computer, mobile phone, or tablet. Working with our superior cloud-based publishing and monitoring platforms, the
TB50 enables users to manage LED displays from an Internet-connected device anywhere, anytime.
Support for multi-screen synchronous playback and synchronous and asynchronous modes makes this multimedia
player a perfect fit for a wide range of applications.
Thanks to its reliability, ease of use, and intelligent control, the TB50 becomes a winning choice for commercial LED
displays and smart city applications such as fixed displays, lamp-post displays, chain store displays, advertisement
players, mirror displays, retail store displays, door head displays, shelf displays, and much more.

Certifications
NBTC, IMDA, PSB, FAC DoC, ENACOM, ICASA, SRRC, EAC DoC, EAC RoHS, RCM, UL Smark, CCC, FCC, UL, IC,
KC, CE, UKCA, CB, MIC, PSE, NOM
If the product does not have the relevant certifications required by the countries or regions where it is to be
sold, please contact NovaStar to confirm or address the problem. Otherwise, the customer shall be responsible
for the legal risks caused or NovaStar has the right to claim compensation.

Features
Output external source supports 32 kHz, 44.1 kHz, or

for audio output, audio with a sample rate of 48


Loading capacity up to 1,300,000 pixels
kHz is required.
Maximum width: 4096 pixels
Maximum height: 4096 pixels 1x HDMI 1.4 connector
Maximum output: 1080p@60Hz, support for
2x Gigabit Ethernet ports
HDMI loop
These two ports serve as primary by default.
Users can also set one as primary and the other Input
as backup.
1x HDMI 1.4 connector
1x Stereo audio connector
In synchronous mode, video sources input from
The audio sample rate of the internal source is this connector can be scaled to fit the entire
fixed at 48 kHz. The audio sample rate of the screen automatically.

www.novastar.tech 1
Taurus Series Multimedia Player TB50 Specifications

2x sensor connectors Allows users to publish content and control


Connect to brightness sensors or temperature screens from anywhere, anytime.
and humidity sensors. Allows users to monitor screens from
anywhere, anytime.
Control
Switching between Wi-Fi AP and Wi-Fi STA
1x USB 3.0 (Type A) port In Wi-Fi AP mode, the user terminal
Allows for USB playback and firmware upgrade connects to the built-in Wi-Fi hotspot of the
over USB. Last 8
digits of SN
1x USB (Type B) port
Connects to the control computer for content
In Wi-Fi STA mode, the user terminal and
publishing and screen control.
the TB50 are connected to the Wi-Fi
1x Gigabit Ethernet port hotspot of a router.
Connects to the control computer, a LAN or Synchronous and asynchronous modes
public network for content publishing and screen
control. In asynchronous mode, the internal video
source works.
Performance In synchronous mode, the video source
input from the HDMI connector works.
Powerful processing capacity
Synchronous playback across multiple screens
Quad-core ARM A55 processor @1.8 GHz
NTP time synchronization
Support for H.264/H.265 4K@60Hz video
decoding GPS time synchronization (The specified
4G module must be installed.)
1 GB of onboard RAM
RF time synchronization (The specified RF
16 GB of internal storage
module must be installed.)
Flawless playback
Support for 4G modules
2x 4K, 6x 1080p, 10x 720p, or 20x 360p video
The TB50 ships without a 4G module. Users
playback
have to purchase 4G modules separately if
Functionality needed.
Network connection priority: Wired network > Wi-
All-round control plans Fi network > 4G network
Enables users to publish content and When multiple types of networks are available,
control screens from a computer, mobile the TB50 will choose a signal automatically
phone, or tablet. according to the priority.

Appearance
Front Panel

Name Description

SWITCH Switches between synchronous and asynchronous modes


Staying on: Synchronous mode
Off: Asynchronous mode

SIM CARD SIM card slot


Capable of preventing users from inserting a SIM card in the wrong orientation

RESET Factory reset button

www.novastar.tech 2
Taurus Series Multimedia Player TB50 Specifications

Name Description
Press and hold this button for 5 seconds to reset the product to its factory settings.

USB USB (Type B) port


Connects to the control computer for content publishing and screen control.

LED OUT Gigabit Ethernet outputs

Rear Panel

Name Description

SENSOR Sensor connectors


Connect to brightness sensors or temperature and humidity sensors.

HDMI HDMI 1.4 connectors


OUT: Output connector, support for HDMI loop
IN: Input connector, HDMI video input in synchronous mode
In synchronous mode, users can enable full-screen scaling to adjust the image to fit
the screen automatically.
Requirements for full-screen scaling in synchronous mode:

Images can only be scaled down and cannot be scaled up.

WiFi Wi-Fi antenna connector


Support for switching between Wi-Fi AP and Wi-Fi Sta

ETHERNET Gigabit Ethernet port


Connects to the control computer, a LAN or public network for content publishing
and screen control.

COM 2 GPS or RF antenna connector

USB 3.0 USB 3.0 (Type A) port


Allows for USB playback and firmware upgrade over USB.
The Ext4 and FAT32 file systems are supported. The exFAT and FAT16 file
systems are not supported.

COM 1 4G antenna connector

AUDIO OUT Audio output connector

100-240V~, 50/60Hz, 0.6A Power input connector

ON/OFF Power switch

www.novastar.tech 3
Taurus Series Multimedia Player TB50 Specifications

Indicators
Name Color Status Description

PWR Red Staying on The power supply is working properly.

SYS Green Flashing once every 2s The operating system is functioning normally.

Staying on/off The operating system is malfunctioning.

CLOUD Green Staying on The TB50 is connected to the Internet and the connection
is available.

Flashing once every 2s The TB50 is connected to VNNOX and the connection is
available.

Flashing once every second The TB50 is upgrading the operating system.

Flashing once every 0.5s The TB50 is copying the upgrade package.

RUN Green Flashing once every second The FPGA has no video source.

Flashing once every 0.5s The FPGA is functioning normally.

Staying on/off The FPGA loading is abnormal.

Dimensions

Tolerance: ±0.3 Unit: mm

www.novastar.tech 4
Taurus Series Multimedia Player TB50 Specifications

Specifications
Electrical Parameters Input power 100-240V~, 50/60Hz, 0.6A

Maximum power consumption 18 W

Storage Capacity RAM 1 GB

Internal storage 16 GB

Operating Environment Temperature 20ºC to +60ºC

Humidity 0% RH to 80% RH, non-condensing

Storage Environment Temperature 40°C to +80°C

Humidity 0% RH to 80% RH, non-condensing

Physical Specifications Dimensions 274.3 mm × 139.0 mm × 40.0 mm

Net weight 1234.0 g

Gross weight 1653.6 g


Note: It is the total weight of the product, accessories
and packing materials packed according to the
packing specifications.

Packing Information Dimensions 385.0 mm × 280.0 mm × 75.0 mm

Accessories 1x Wi-Fi omnidirectional antenna


1x AC power cord
1x Quick Start Guide
1x Packing list

IP Rating IP20
Please prevent the product from water intrusion and do not wet or wash the product.

System Software Android 11.0 operating system software


Android terminal application software
FPGA program
Note: Third-party applications are not supported.

The amount of power consumption may vary depending on various factors such as product settings, usage, and
environment.

Media Decoding Specifications


Image

Category Codec Supported Image Size Container Remarks

JPEG JFIF file 96×32 pixels to 817×8176 pixels JPG, No support for non-interlaced scan
format 1.02 JPEG
Support for SRGB JPEG
Support for Adobe RGB JPEG

BMP BMP No Restriction BMP N/A

GIF GIF No Restriction GIF N/A

www.novastar.tech 5
Taurus Series Multimedia Player TB50 Specifications

Category Codec Supported Image Size Container Remarks

PNG PNG No Restriction PNG N/A

WEBP WEBP No Restriction WEBP N/A

Video

Category Codec Resolution Maximum Maximum Bit File Remarks


Frame Rate Rate Format
(Ideal Case)

MPEG-1/2 MPEG- 48×48 pixels to 30fps 80Mbps DAT, MPG, Support for field
1/2 1920×1088 pixels VOB, TS coding

MPEG-4 MPEG4 48×48 pixels to 30fps 38.4Mbps AVI, MKV, No support for
1920×1088 pixels MP4, MOV, MS MPEG4
3GP v1/v2/v3, GMC

H.264/AVC H.264 48×48 pixels to 2304p@60fps 80Mbps AVI, MKV, Support for field
4096×2304 pixels MP4, MOV, coding and
3GP, TS, MBAFF
FLV

MVC H.264 48×48 pixels to 2304P@60fps 100Mbps MKV, TS Support for


MVC 4096×2304 pixels Stereo High
Profile only

H.265/HEVC H.265/ 64×64 pixels to 2304P@60fps 100Mbps MKV, MP4, Support for
HEVC 4096×2304 pixels MOV, TS Main Profile,
Tile & Slice

GOOGLE VP8 48×48 pixels to 30fps 38.4Mbps WEBM, N/A


VP8 1920×1088 pixels MKV

GOOGLE VP9 64×64 pixels to 60fps 80Mbps WEBM, N/A


VP9 4096×2304 pixels MKV

H.263 H.263 SQCIF (128×96) 30fps 38.4Mbps 3GP, MOV, No support for
MP4 H.263+
QCIF (176×144)
CIF (352×288)
4CIF (704×576)

VC-1 VC-1 48×48 pixels to 30fps 45Mbps WMV, ASF, N/A


1920×1088 pixels TS, MKV,
AVI

MOTION MJPEG 48×48 pixels to 60fps 60Mbps AVI N/A


JPEG 1920×1088 pixels

Notes and cautions


FCC Caution

authority to operate the equipment.

This device complies with part 15 of the FCC rules. Operation is subject to the following two conditions: (1) this
device may not cause harmful interference, and (2) this device must accept any interference received, including
interference that may cause undesired operation.

www.novastar.tech 6
Taurus Series Multimedia Player TB50 Specifications

NOTE: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to
part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in
a residential installation. This equipment generates uses and can radiate radio frequency energy and, if not installed
and used in accordance with the instructions, may cause harmful interference to radio communications. However,
there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful
interference to radio or television reception, which can be determined by turning the equipment off and on, the user is
encouraged to try to correct the interference by one or more of the following measures:
Reorient or relocate the receiving antenna.
Increase the separation between the equipment and receiver.
Connect the equipment into an outlet on a circuit different from that to which the receiver is connected.
Consult the dealer or an experienced radio/TV technician for help.

Radiation Exposure Statement


This equipment complies with FCC radiation exposure limits set forth for an uncontrolled environment. This
equipment should be installed and operated with minimum distance 20cm between the radiator and your body.
This transmitter must not be co-located or operating in conjunction with any other antenna or transmitter.
IC Caution
This device contains license-exempt transmitter(s)/receiver(s) that comply with Innovation, Science and Economic
e-exempt RSS(s). Operation is subject to the following two conditions: (1) This device
may not cause interference. (2) This device must accept any interference, including interference that may cause
undesired operation of the device.

fonctionnement.
This equipment complies with Industry Canada radiation exposure limits set forth for an uncontrolled environment.
Cet équipement est conforme à l'exposition aux rayonnements Industry Canada limites établies pour un
environnement non contrôlé.

Radiation Exposure Statement


This equipment complies with Canada radiation exposure limits set forth for an uncontrolled environment. This
equipment should be installed and operated with minimum distance 20cm between the radiator & your body.
Cetéquipementestconforme Canada limitesd'exposition aux radiations dans un environnement non contrôlé.
Cetéquipementdoitêtreinstallé et utilisé à distance minimum de 20cm entre le radiateur et votre corps.
Others
This is Class A product. In a domestic environment, this product may cause radio interference in which case the user
may be required to take adequate measures.

www.novastar.tech 7
6. Material Safety Data Sheets

Display Items (Screens & Tablets)


Wayfinding & Signage Works
7. Test Reports

Display Items (Screens & Tablets)


Wayfinding & Signage Works
Type 1

Energy Efficiency Certification


UL conducted an independent evaluation on behalf of:

LG ELECTRONICS INC
LCD TV Division
222 LG-ro Jinwi-myeon Pyeongtaek-si 451-713 Gyeonggi-do Republic of Korea
2022-04-18
for the following products: This product meets all of the necessary
qualifications pursuant to:
Display
N/A
Brand: LG ENERGY STAR®: Program requirements for
Displays Version 8.0
Model Name: 19MB15T

Model Number: 19MB15T-#

(# may be 0-9, A-Z or blank according to color 4790365177


of stand or enclosure.)

00-VS-F0419, Version 6.0, This is to cer�fy that representa�ve samples of the Cer�fied Product(s) listed above have been inves�gated by UL to the Standard(s) indicated on this cer�ficate, in accordance with the UL Global Services Agreement and the EEC Terms & Condi�ons (“Agreement”). The
Cer�ficate Holder is en�tled to use the UL Energy Verified Mark for the Cer�fied Product(s) listed on the cer�ficate and manufactured at the production site(s) covered by the UL Test Report, in accordance with the terms of the Agreement. This Cer�ficate shall remain valid unless a Standard iden�fied on
this Cer�ficate is amended or withdrawn prior to that date or there is a non-compliance with the Agreement.
Type 2

Energy Efficiency Certification


UL conducted an independent evaluation on behalf of:

LG ELECTRONICS INC
LCD TV Division
222 LG-ro Jinwi-myeon Pyeongtaek-si 451-713 Gyeonggi-do Republic of Korea
2022-04-13
for the following products: This product meets all of the necessary
qualifications pursuant to:
Display
N/A
Brand: LG ENERGY STAR®: Program requirements for
Displays Version 8.0
Model Name: 65UH5J

Model Number: 65UH5J-#

(# may be 0-9, A-Z or blank according to color 4790365177


of stand or enclosure.)

00-VS-F0419, Version 6.0, This is to certify that representative samples of the Certified Product(s) listed above have been investigated by UL to the Standard(s) indicated on this certificate, in accordance with the UL Global Services Agreement and the EEC Terms & Conditions (“Agreement”). The
Certificate Holder is entitled to use the UL Energy Verified Mark for the Certified Product(s) listed on the certificate and manufactured at the production site(s) covered by the UL Test Report, in accordance with the terms of the Agreement. This Certificate shall remain valid unless a Standard identified on
this Certificate is amended or withdrawn prior to that date or there is a non-compliance with the Agreement.
TYPE 3
TYPE 3
TYPE 3
TYPE 3
TYPE 3
TYPE 3
TYPE 3
8. Mill Certificate

Display Items (Screens & Tablets)


Wayfinding & Signage Works
9. Galvanization Report

Display Items (Screens & Tablets)


Wayfinding & Signage Works
10. Installation Manual or
Application Method

Display Items (Screens & Tablets)


Wayfinding & Signage Works
Method statement For

PRODUCTION & INSTALLATION OF

Indoor LED & LCD Screen

CLIENT: Galaxy Metal Industries

DIC, Dubai
By

Worldwide Digital (FZE)


Preface

This detailed Method Statement was produced to ensure the Best Practice Guidance
the avoidance of hazards and the risks where reasonably practicable as per Local and
Federal Laws.

Scope of Works

This document covers the production and installation of Indoor LED & LCD Screen at
the mentioned location as per the drawings.

Programmed
Commencement:
Production: Within 3 days from the day of the approval
Site Completion: 10 days from the date of confirmation and all approvals.

Company details: Worldwide Digital (FZE)


P B NO. 124230
SAIF Free Zone,
Sharjah, UAE Site
Address:

DIC, Dubai

METHOD STATEMENT FOR Indoor LED Screen

INSTALLATION INTRODUCTION

This method statement describes the procedures that will be employed to carry out the
necessary and associated works.

Signage details

Indoor LED Screen Size: 112cm x 192cm P1.5 Pixel Pitch


Indoor LCD screen Size: 65” and 19” Touch screen

SEQUENCE

SITE WORKS

➢ All signage materials will be transported to the site by the contractor’s


vehicle.

➢ Where possible arrange a meeting on site with the client’s


representative and Site Engineer/project Manager prior to
commencement on site to confirm site access, material storage and
any special site requirements.

➢ Prior to commencement of works, the site is to be walked and all


potential obstructions are to be recognized and measures taken to
reduce the risks involved.

➢ All risk zones will be identified, and adequate signage will be erected
to notify the public/and other personnel if applicable.

➢ On arriving at site all workers shall report to the site office to confirm
arrival and sign in (if applicable). All staff shall then attend a site-
specific briefing before commencing any works with the relevant
foreman. Operatives are to ascertain any information regarding
potential hazards.

➢ Materials to be supplied by a recognized or approved supplier,


ensuring all materials conform to the client’s specification and
relevant standards.

➢ Materials/Tools to be delivered to site by Worldwide Digital own


vehicle.

➢ Ensure that all sign materials are stored neatly and safely in an
agreed area.
➢ The sign area to be cordoned off using safety cones and ribbons.

➢ The Main Sign Structure and all associated sub structure and graphic
panels will be assembled at site.
➢ Trenching of power cables from the power point (provided by client)
and making connections to the LED Screen

➢ Final checks to be carried out. ➢ Project to be handed over to the


client.
➢ After the completion of the work, staff shall report back to the site
office and sign out as required.

Health Safety & Welfare Facilities:

# Any accident is to be reported immediately to the office and authorities. All works will
be stopped until clearance is received to continue.

# A suitable first aid box will be made available

# All equipment operatives will be UAE license registered

# Wear hand gloves, helmet, Safety glass, High Visibility Jacket, and safety shoe etc.

# Operating Area should be barricaded and prevented from any unauthorized entry to
that area.

# Adequate sign will be placed, and signal shall be given by a competent personal.

All personnel will be issued with the necessary PPE and will be expected to always
wear it on site. A special PPE will be issued as necessary in the hazardous locations
following site induction and or issue of a permit to work.

During site induction all personnel will be made aware of the client’s site rules, accident
reporting and site emergency procedures. These will be always adhered to. Worldwide
digital operatives will be familiar with the policies and procedures in place on projects
of this size, with knowledge gained from previous experience.
Emergency Contacts:
Mridul Coordinator 0588376903
Rabbani Project in charge 0551349756

Police 999

Ambulance 998

Fire 997
11. O & M Manual

Display Items (Screens & Tablets)


Wayfinding & Signage Works
Will be submitted later separately.
12. Certificate of Origin

Display Items (Screens & Tablets)


Wayfinding & Signage Works
Type 1
Type 2
TYPE 3 - Sample
13. Draft Warranty

Display Items (Screens & Tablets)


Wayfinding & Signage Works
General Warranty for Signage Package

CERTIFICATE OF WARRANTY (DRAFT)

Project: Guggenheim Abu Dhabi


Location: Saadiyat Island, Abu Dhabi, U.A.E.
Client: Department of Culture and Tourism
Project Manager: Turner Construction – International LLC
Consultants: Gehry Partners, LLP (Architects) Arup Gulf Ltd (Engineer)
Consultant of Record: WSP Parsons Brinkerhoff Ltd. Abu Dhabi
Main Contractor: Six Construct-Trojan Joint Venture
Signage Contractor: Galaxy Metal Industries LLC.

Duration of Warranty: (WARRANTY CERTIFICATE – DRAFT)


(VALID FROM DATE OF ISSUING THE TAKING-OVER CERTIFICATE OF THE WORKS
BY THE EMPLOYER TO THE MAIN CONTRACTOR)
05 YEARS – DEFECTS ON METALLIC MATERIAL OR WORKMANSHIP

M/s. Galaxy Metal Industries LLC guarantees that the above-mentioned Fabrication, Supply & Installation of
Wayfinding/Signage Works will meet the standards (as Proposed).
Any defects or failure proved attribute to the quality of materials and workmanship within a standard agreed
warranty period shall result in replacing the failed product, completely or free of charge commensurate with the
service life expired at the time of replacement.
This warranty shall not cover resulting where there is event of “force majeure” on causes beyond our control and
without the fault or negligence and which by exercise of the reasonable diligence M/s. Galaxy metal Industries LLC
was affected and unable to prevent the event or circumstances.

M/s. Galaxy Metal Industries LLC – (Fabrication, Supply & Installation of Wayfinding/Signage Works) obligation and
liabilities arising in connection with its products can only be limited to the replacement of the products and not to any
other costs or losses of whatever nature incurred by the Contractor or Client (including the cost of replacement
product).

Written notice of defective work will be given to M/s. Galaxy Metal Industries LLC. Should M/s. Galaxy Metal
Industries LLC fail to correct defective work within a reasonable time after receiving written notice, the Owner may,
at his option, correct defects and charge M/s. Galaxy Metal Industries LLC cost for such correction. M/s. Galaxy Metal
Industries LLC agrees to pay such charges upon demand.

For and on behalf of:


M/s. Galaxy Metal Industries LLC.
TYPE 3

Unilumin Group Co (Lamp) Warranty Certification Letter

Valid Till 30th October 2024

To Whom It May Concern:

It is my privilege to inform you that '' Worldwide Digital (FZE)'', UAE

We cooperate and support Worldwide Digital (FZE) in the Middle East

countries.

To distribute Unilumin Group Co (Lamp) products [ GN, LS, and LST]

with 5 years warranty

'' Worldwide Digital (FZE) '' also can provide any technical supports to

the clients together with Unilumin Group Co (Lamp) local engineers.

kofi
Signature & Stamp Unilumin Group Co (Lamp) Worldwide Digital (FZE)
14. Reference Drawings

Display Items (Screens & Tablets)


Wayfinding & Signage Works
KEY PLAN

80 O.A.

3 (Typ.) 77

1 Typical S/S threaded stud cleanly


welded to Bracket piece as shown.
Pre-drilled slotted holes to be
provided as shown.
625 1500 O.A. 625
Typical ±50 Durometer Compression
FROM EDGE FROM EDGE Pad as required.
375 750 375

30
OF SIGN TO EDGE OF SIGN TO EDGE CL Sufficient tolerance to be calculated within

18
OF WALL / CORNER, TYP OF WALL / CORNER, TYP gasket in order to allow glass to be easily
189.5 1121 (O.A. Screen Active Area) 189.5
removed and reinstalled without binding.
GENERAL NOTES

CL A CL
Typical 50mm Wide 316 S/S two
60 10° piece Bracket Assembly fabricated
(From Finished Wall to Edge of Bracket) from 3mm thick flat bars cleanly
welded and angles as shown.

Finished Wall
Bracket Assembly to be secure by

475
3000 x 1500 x 2-6mm Laminated anchors to the existing wall as
Glass Assembly (Annealed) required.
ALL visible surfaces to be milled
3M¨ Scotchcal ElectroCut to match Stainless Steel Finish.
Graphic Film ‘Dusted Crystal’
(Product No. 7725SE-314)
3000 x 1500 x 2-6mm Laminated
to be applied on second surface of the
Glass Assembly (Annealed)
‫ﻧﺎﺋﺐ اﻟﻤﻌﺮض‬
PLACEHOLDER
glass.
EXHIBIT
‫اﻟﺘﻌﻠﻴﻢ ﻓﻀﺎﺋﻴﺔ‬ SECTION A
SATELLITE EDUCATION
Screen Active Area must remain without
the Graphic Film.

1 ‫ﻧﺎﺋﺐ اﻟﻤﻌﺮض‬ 301


PLACEHOLDER
EXHIBIT 1
302 ‫ﺷﺮﻓﺔ‬
3000 (From Finished Floor to Top Edge of Glass)

3000 (From Finished Floor to Top Edge of Glass)


TERRACE
‫ ﻣﺎﻳﻮ‬15 - ‫ ﻳﻨﺎﻳﺮ‬14
JANUARY 14-MAY 15 303 ‫اﻟﺘﻌﻠﻴﻢ ﻓﻀﺎﺋﻴﺔ‬
SATELLITE EDUCATION

rea)
2 ‫ﻧﺎﺋﺐ اﻟﻤﻌﺮض‬ 304
PLACEHOLDER

ctive A
EXHIBIT 2

)
. Glass
305
2925

306

A
‫ ﻣﺎﻳﻮ‬15 - ‫ ﻳﻨﺎﻳﺮ‬14

A
n
75 O.A.

.
307

O
JANUARY 14-MAY 15

e e

(
r

0
O.A. Sc

300
10° ISSUE FOR CONSTRUCTION UPDATE - IFC 2 03-21-22
‫ﻧﺎﺋﺐ اﻟﻤﻌﺮض‬
PLACEHOLDER
‫ﻧﺎﺋﺐ اﻟﻤﻌﺮض‬
PLACEHOLDER
3000 x 1500 x 2-6mm Laminated C01

1-

1993 (
EXHIBIT EXHIBIT
Glass Assembly (Annealed) ISSUE FOR CONSTRUCTION 12-11-20
‫ﺷﺮﻓﺔ‬ 34
TERRACE - ISSUE FOR TENDER - ADDENDUM 01 06-12-20
Concealed Typical ±50 Durometer Compression Pad
Power & Data as required. NO. ISSUE DESCRIPTION DATE
oulets by others. Sufficient tolerance to be calculated within PROJECT OWNER
gasket in order to allow glass to be easily
‫ﻧﺎﺋﺐ اﻟﻤﻌﺮض‬
PLACEHOLDER removed and reinstalled without binding.
EXHIBIT
‫ ﻣﻌﻠﻮﻣﺎت‬/ ‫ﺗﺬاﻛﺮ‬
TICKETS/INFORMATION

DEPARTMENT OF CULTURE

75 O.A.
Typical 316 S/S Base Block complete AND TOURISM
‫اﻟﺒﺮاﻣﺞ اﻟﻌﺎﻣﺔ‬ with machined slot as show.
PUBLIC PROGRAMS ALL visible surfaces to be milled to
‫ﻣﺰﻳﺪ ﻣﻦ اﻟﺘﻔﺎﺻﻴﻞ‬ Typical 90” match Stainless Steel Finish.

±1100 A.F.F. (TBC)


‫ﻓﻲ ﻣﻜﺘﺐ اﻟﻤﻌﻠﻮﻣﺎت‬ PROJECT MANAGER
More detail at the information desk LED Display
mounted to
existing wall.
TURNER CONSTRUCTION
(TBD) - INTERNATIONAL LLC
P.O. BOX 890, ABU DHABI, UAE
Typical S/S internal Studs TEL: +971 2 6500 888
to be inserted into pre-drilled
holes as shown.

±40
CONSULTANTS

Typical 1mm thick, continuous GEHRY PARTNERS, LLP.


rubber gasket as required. ARCHITECT
12541 BEATRICE STREET LOS ANGELES, CALIFORNIA 90066 USA
75

TEL: 310-482-3000

Finished Floor
CL CL CL CL
ARUP
ENGINEER
B
900 WILSHIRE BLVD., 19TH FLOOR LOS ANGELES, CALIFORNIA 90017 USA
±625 O.A.
TEL: 310-578-4400
190 370 380 370 190

FRONT VIEW 1500 O.A. SIDE VIEW


CONSULTANT-OF-RECORD

SECTION B
ARUP GULF LTD
12TH FLOOR,
13mm ø ABU DHABI UNIVERSITY TOWER,
AL MUROOR STREET,
PO BOX 78907,
ABU DHABI, UNITED ARAB EMIRATES

PROJECT NAME

GUGGENHEIM ABU DHABI


SIGN TYPE D1.1 EXHIBITION DIRECTORY - GLASS PANEL/LED DISPLAY - FOH FRONT AND SIDE VIEW SCALE 1:10 SIGN TYPE D1.1 EXHIBITION DIRECTORY - GLASS PANEL/LED DISPLAY - FOH SECTIONS DETAIL SCALE 1:1

ZONE

CULTURAL DISTRICT, SAADIYAT ISLAND


150 (Typ.)
SECTOR NO. PLOT NO.

1500 O.A. 1500 O.A.


SDN1 P7

PROJECT DESCRIPTION

MODERN AND CONTEMPORARY ART


MUSEUM

‫ﻧﺎﺋﺐ اﻟﻤﻌﺮض‬
PLACEHOLDER
EXHIBIT
‫اﻟﺘﻌﻠﻴﻢ ﻓﻀﺎﺋﻴﺔ‬
SATELLITE EDUCATION

1 ‫ﻧﺎﺋﺐ اﻟﻤﻌﺮض‬ 301


DRAWING TITLE
PLACEHOLDER
EXHIBIT 1

SIGN D1.1
302 ‫ﺷﺮﻓﺔ‬
TERRACE
‫ ﻣﺎﻳﻮ‬15 - ‫ ﻳﻨﺎﻳﺮ‬14
JANUARY 14-MAY 15 303 ‫اﻟﺘﻌﻠﻴﻢ ﻓﻀﺎﺋﻴﺔ‬
SATELLITE EDUCATION

2 ‫ﻧﺎﺋﺐ اﻟﻤﻌﺮض‬ 304

EXHIBITION DIRECTORY
PLACEHOLDER TERRACE

EXHIBIT 2
305

306

GLASS / LCD FOH


‫ ﻣﺎﻳﻮ‬15 - ‫ ﻳﻨﺎﻳﺮ‬14
JANUARY 14-MAY 15 307

‫ﻧﺎﺋﺐ اﻟﻤﻌﺮض‬ ‫ﻧﺎﺋﺐ اﻟﻤﻌﺮض‬


PLACEHOLDER PLACEHOLDER
EXHIBIT EXHIBIT
‫ﺷﺮﻓﺔ‬
LEGEND

TERRACE YOU ARE HERE

ELEVATOR

WASHROOMS
DRAWING NUMBER REVISION NO.
TEMPORARY MODEL
BEVERAGE BAR

‫ﻧﺎﺋﺐ اﻟﻤﻌﺮض‬
PLACEHOLDER
EXHIBIT
‫ ﻣﻌﻠﻮﻣﺎت‬/ ‫ﺗﺬاﻛﺮ‬
TICKETS/INFORMATION
Temporary model required, shall be constructed of white foamcore with
applied digital paper prints, representing the full size/dimensions of the G5-133 C01
1
sign, with a base or double-sided tape provided to ensure stability.
DATE SCALE
‫اﻟﺒﺮاﻣﺞ اﻟﻌﺎﻣﺔ‬
PUBLIC PROGRAMS
‫ﻣﺰﻳﺪ ﻣﻦ اﻟﺘﻔﺎﺻﻴﻞ‬
‫ﻓﻲ ﻣﻜﺘﺐ اﻟﻤﻌﻠﻮﻣﺎت‬
More detail at the information desk PROTOTYPE 1:100
Fabricator to provide full size prototype.
PROJECT ID PLAN ID

-All signs to be free from residues 24101


-All metal edges are to be clear of burns and smooth
-Fabricator to verify all site conditions prior to production and to coordi-
nate with Architect and /or General Contractor as required. OFFICIAL USE ONLY:

SIGN TYPE D1.1 SIGN TYPE D1.2

For exact sign graphic elements and text messaging (by location), refer OFFICIAL USE ONLY:
to the specific ‘Sign Drawings’ and ‘Sign Message Schedule’
Unless otherwise noted:
-All lighting effects to be consistent with no hot-spots and/or no shadows
to be cast
-All power cables to be concealed, where applicable.

SIGN TYPE D1.1 EXHIBITION DIRECTORY - GLASS PANEL/LED DISPLAY - FOH TYPICAL ELEVATION SCALE 1:20
KEY PLAN

80 O.A.

3 (Typ.) 77
1
Typical S/S threaded stud cleanly
welded to Bracket piece as shown.
Pre-drilled slotted holes to be
provided as shown.
625 1500 O.A. 625
Typical ±50 Durometer Compression
FROM EDGE FROM EDGE Pad as required.
375 750 375

30
OF SIGN TO EDGE OF SIGN TO EDGE CL Sufficient tolerance to be calculated within

18
OF WALL / CORNER, TYP OF WALL / CORNER, TYP gasket in order to allow glass to be easily
189.5 1121 (O.A. Screen Active Area) 189.5
removed and reinstalled without binding.
GENERAL NOTES

CL A CL
Typical 50mm Wide 316 S/S two
60 10° piece Bracket Assembly fabricated
(From Finished Wall to Edge of Bracket) from 3mm thick flat bars cleanly
welded and angles as shown.

Finished Wall
Bracket Assembly to be secure by

475
3000 x 1500 x 2-6mm Laminated anchors to the existing wall as
Glass Assembly (Annealed) required.
ALL visible surfaces to be milled
3M¨ Scotchcal ElectroCut to match Stainless Steel Finish.
Graphic Film ‘Dusted Crystal’
(Product No. 7725SE-314)
3000 x 1500 x 2-6mm Laminated
to be applied on second surface of the
Glass Assembly (Annealed)
glass.
SECTION A
Screen Active Area must remain without
the Graphic Film.
3000 (From Finished Floor to Top Edge of Glass)

3000 (From Finished Floor to Top Edge of Glass)


rea)
TERRACE

ctive A

)
. Glass
2925

A
n
75 O.A.

O .
e e

(
r

0
O.A. Sc

300
10° ISSUE FOR CONSTRUCTION UPDATE - IFC 2 03-21-22
3000 x 1500 x 2-6mm Laminated C01

1-

1993 (
Glass Assembly (Annealed) ISSUE FOR CONSTRUCTION 12-11-20
LEGEND
34
- ISSUE FOR TENDER - ADDENDUM 01 06-12-20
YOU ARE HERE

ELEVATOR
Concealed Typical ±50 Durometer Compression Pad
WASHROOMS Power & Data as required. NO. ISSUE DESCRIPTION DATE
BEVERAGE BAR
oulets by others. Sufficient tolerance to be calculated within PROJECT OWNER
gasket in order to allow glass to be easily
removed and reinstalled without binding.

DEPARTMENT OF CULTURE

75 O.A.
Typical 316 S/S Base Block complete AND TOURISM
with machined slot as show.
ALL visible surfaces to be milled to
Typical 90” match Stainless Steel Finish.

±1100 A.F.F. (TBC)


PROJECT MANAGER
LED Display
mounted to
existing wall.
TURNER CONSTRUCTION
(TBD) - INTERNATIONAL LLC
P.O. BOX 890, ABU DHABI, UAE
Typical S/S internal Studs TEL: +971 2 6500 888
to be inserted into pre-drilled
holes as shown.

±40
CONSULTANTS

Typical 1mm thick, continuous GEHRY PARTNERS, LLP.


rubber gasket as required. ARCHITECT
12541 BEATRICE STREET LOS ANGELES, CALIFORNIA 90066 USA
75

TEL: 310-482-3000

Finished Floor
CL CL CL CL
ARUP
ENGINEER
B
900 WILSHIRE BLVD., 19TH FLOOR LOS ANGELES, CALIFORNIA 90017 USA
±625 O.A.
TEL: 310-578-4400
190 370 380 370 190

FRONT VIEW 1500 O.A. SIDE VIEW


CONSULTANT-OF-RECORD

SECTION B
ARUP GULF LTD
12TH FLOOR,
13mm ø ABU DHABI UNIVERSITY TOWER,
AL MUROOR STREET,
PO BOX 78907,
ABU DHABI, UNITED ARAB EMIRATES

PROJECT NAME

GUGGENHEIM ABU DHABI


SIGN TYPE D1.2 MAP DIRECTORY - GLASS PANEL - FOH FRONT AND SIDE VIEW SCALE 1:10 SIGN TYPE D1.2 MAP DIRECTORY - GLASS PANEL - FOH SECTIONS DETAIL SCALE 1:1

ZONE

CULTURAL DISTRICT, SAADIYAT ISLAND


150 (Typ.)
SECTOR NO. PLOT NO.

1500 O.A. 1500 O.A.


SDN1 P7

PROJECT DESCRIPTION

MODERN AND CONTEMPORARY ART


MUSEUM

SATELLITE EDUCATION

PLACEHOLDER EXHIBIT NAME


301
DRAWING TITLE
302

SIGN D1.2
PLACEHOLDER EXHIBIT NAME
TERRACE

PLACEHOLDER EXHIBIT NAME


303
SATELLITE EDUCATION

304

MAP DIRECTORY
PLACEHOLDER EXHIBIT NAME
TERRACE

PLACEHOLDER EXHIBIT NAME


305

306

GLASS / LCD - FOH


PLACEHOLDER EXHIBIT NAME

PLACEHOLDER EXHIBIT NAME


307

LEGEND

YOU ARE HERE

TERRACE ELEVATOR

WASHROOMS
DRAWING NUMBER REVISION NO.
BEVERAGE BAR

TICKETS/INFORMATION
G5-134 C01
1
DATE SCALE

PUBLIC PROGRAMS

More detail at the information desk


1:100

PROJECT ID PLAN ID

-All signs to be free from residues 24101


-All metal edges are to be clear of burns and smooth
-Fabricator to verify all site conditions prior to production and to coordi-
nate with Architect and /or General Contractor as required. OFFICIAL USE ONLY:

SIGN TYPE D1.1 SIGN TYPE D1.2

For exact sign graphic elements and text messaging (by location), refer OFFICIAL USE ONLY:
to the specific ‘Sign Drawings’ and ‘Sign Message Schedule’
Unless otherwise noted:
-All lighting effects to be consistent with no hot-spots and/or no shadows
to be cast
-All power cables to be concealed, where applicable.

SIGN TYPE D1.2 MAP DIRECTORY - GLASS PANEL - FOH TYPICAL ELEVATION SCALE 1:20
KEY PLAN

GENERAL NOTES

Sign A5.1
Tickets ID

60 in LED Displays
To be attached to back wall with
Bracket, as required.

C01 ISSUE FOR CONSTRUCTION UPDATE - IFC 2 03-21-22


- ISSUE FOR CONSTRUCTION 12-11-20
- ISSUE FOR TENDER - ADDENDUM 01 06-12-20
NO. ISSUE DESCRIPTION DATE

PROJECT OWNER

DEPARTMENT OF CULTURE
AND TOURISM

PROJECT MANAGER

TURNER CONSTRUCTION
- INTERNATIONAL LLC
P.O. BOX 890, ABU DHABI, UAE
TEL: +971 2 6500 888

SIGN TYPE D3 EVENT DISPLAY @ TICKETS COUNTER TYPICAL INSTALLATION ELEVATION SCALE 1:20
CONSULTANTS

GEHRY PARTNERS, LLP.


ARCHITECT
12541 BEATRICE STREET LOS ANGELES, CALIFORNIA 90066 USA
TEL: 310-482-3000

ARUP
ENGINEER
900 WILSHIRE BLVD., 19TH FLOOR LOS ANGELES, CALIFORNIA 90017 USA
TEL: 310-578-4400

Sign A5.1
Tickets ID

CONSULTANT-OF-RECORD

ARUP GULF LTD


12TH FLOOR,
ABU DHABI UNIVERSITY TOWER,
4200 O.A. 245
AL MUROOR STREET,
PO BOX 78907,
ABU DHABI, UNITED ARAB EMIRATES
A
PROJECT NAME

GUGGENHEIM ABU DHABI


Concealed
Power & Data
oulets by others.
ZONE
Bracket bolted to back wall, 60 in LED Display
828 O.A.

as required. model TBD CULTURAL DISTRICT, SAADIYAT ISLAND

SECTOR NO. PLOT NO.

SDN1 P7
60 in LED Displays 60 in LED Displays 60 in LED Displays
To be attached to back wall with Bracket, To be attached to back wall with Bracket, To be attached to back wall with Bracket,
PROJECT DESCRIPTION
as required. as required. as required.
MODERN AND CONTEMPORARY ART
12 MUSEUM
TYPICAL

FRONT VIEW SECTION A

DRAWING TITLE

SIGN D3
EVENT DISPLAY AT COUNTERS

DRAWING NUMBER REVISION NO.

G5-135 C01
DATE SCALE

PROTOTYPE 1:100
Fabricator to provide LED display prototype.

PROJECT ID PLAN ID

-All signs to be free from residues 24101


-All metal edges are to be clear of burns and smooth
-Fabricator to verify all site conditions prior to production and to coordinate
with Architect and /or General Contractor as required. OFFICIAL USE ONLY:

For exact sign graphic elements and text messaging (by location), refer to OFFICIAL USE ONLY:
the specific ‘Sign Drawings’ and ‘Sign Message Schedule’
Unless otherwise noted:
-All lighting effects to be consistent with no hot-spots and/or no shadows to
be cast
-All power cables to be concealed, where applicable.

SIGN TYPE D3 EVENT DISPLAY @ TICKETS COUNTER MESSAGE VARIATIONS SCALE 1:20 SIGN TYPE D3 EVENT DISPLAY @ TICKETS COUNTER DETAILS SCALE 1:10
KEY PLAN

GENERAL NOTES

Sign A5.4
Check Room ID

60 in LED Displays
To be attached to back wall with
Bracket, as required.

EQ 2796 O.A. EQ

C01 ISSUE FOR CONSTRUCTION UPDATE - IFC 2 03-21-22


- ISSUE FOR CONSTRUCTION 12-11-20
- ISSUE FOR TENDER - ADDENDUM 01 06-12-20
NO. ISSUE DESCRIPTION DATE

PROJECT OWNER

DEPARTMENT OF CULTURE
AND TOURISM

PROJECT MANAGER

TURNER CONSTRUCTION
- INTERNATIONAL LLC
P.O. BOX 890, ABU DHABI, UAE
TEL: +971 2 6500 888

SIGN TYPE D4 EVENT DISPLAY @ BAG CHECK ROOM ELEVATION SCALE 1:20
CONSULTANTS

GEHRY PARTNERS, LLP.


ARCHITECT
12541 BEATRICE STREET LOS ANGELES, CALIFORNIA 90066 USA
TEL: 310-482-3000

ARUP
ENGINEER
900 WILSHIRE BLVD., 19TH FLOOR LOS ANGELES, CALIFORNIA 90017 USA
TEL: 310-578-4400
Sign A5.4
Check Room ID

CONSULTANT-OF-RECORD

ARUP GULF LTD


12TH FLOOR,

EQ 2796 O.A. EQ ABU DHABI UNIVERSITY TOWER,


AL MUROOR STREET,
PO BOX 78907,
ABU DHABI, UNITED ARAB EMIRATES
A
PROJECT NAME
Concealed
Power & Data GUGGENHEIM ABU DHABI
oulets by others.

ZONE
Bracket bolted to back wall, 60 in LED Display
828 O.A.

as required. model TBD CULTURAL DISTRICT, SAADIYAT ISLAND

SECTOR NO. PLOT NO.

SDN1 P7
60 in LED Displays 60 in LED Displays
To be attached to back wall with Bracket, To be attached to back wall with Bracket,
PROJECT DESCRIPTION
as required. as required.
MODERN AND CONTEMPORARY ART
12 MUSEUM
TYPICAL

FRONT VIEW SECTION A

DRAWING TITLE

SIGN D4
EVENT DISPLAY @
BAG CHECK

DRAWING NUMBER REVISION NO.

G5-136 C01
DATE SCALE

PROTOTYPE 1:100
Fabricator to provide LED display prototype.

PROJECT ID PLAN ID

-All signs to be free from residues 24101


-All metal edges are to be clear of burns and smooth
-Fabricator to verify all site conditions prior to production and to coordinate
with Architect and /or General Contractor as required. OFFICIAL USE ONLY:

For exact sign graphic elements and text messaging (by location), refer to OFFICIAL USE ONLY:
the specific ‘Sign Drawings’ and ‘Sign Message Schedule’
Unless otherwise noted:
-All lighting effects to be consistent with no hot-spots and/or no shadows to
be cast
-All power cables to be concealed, where applicable.

SIGN TYPE D4 EVENT DISPLAY @ BAG CHECK ROOM DETAILS SCALE VARIES SIGN TYPE A5.4 CHECK ROOM ID DETAILS SCALE 1:10
KEY PLAN

GENERAL NOTES

Sign A5.3
Information Desk ID

60 in LED Displays 60 in LED Displays


To be attached to back wall with To be attached to back wall with
Bracket, as required. Bracket, as required.

C01 ISSUE FOR CONSTRUCTION UPDATE - IFC 2 03-21-22


- ISSUE FOR CONSTRUCTION 12-11-20
- ISSUE FOR TENDER - ADDENDUM 01 06-12-20
NO. ISSUE DESCRIPTION DATE

Sign A5.2 PROJECT OWNER

Members ID

DEPARTMENT OF CULTURE
AND TOURISM

PROJECT MANAGER

TURNER CONSTRUCTION
- INTERNATIONAL LLC
P.O. BOX 890, ABU DHABI, UAE
TEL: +971 2 6500 888

SIGN TYPE D4 EVENT DISPLAY @ INFORMATION DESK ELEVATION SCALE 1:20


CONSULTANTS

GEHRY PARTNERS, LLP.


ARCHITECT
12541 BEATRICE STREET LOS ANGELES, CALIFORNIA 90066 USA
TEL: 310-482-3000

ARUP
ENGINEER
900 WILSHIRE BLVD., 19TH FLOOR LOS ANGELES, CALIFORNIA 90017 USA
TEL: 310-578-4400
Sign A5.3
Information Desk ID

CONSULTANT-OF-RECORD

ARUP GULF LTD


12TH FLOOR,
ABU DHABI UNIVERSITY TOWER,
EQ 2796 O.A. EQ
AL MUROOR STREET,
PO BOX 78907,
ABU DHABI, UNITED ARAB EMIRATES
A
PROJECT NAME
Concealed
Power & Data GUGGENHEIM ABU DHABI
oulets by others.

ZONE
Bracket bolted to back wall, 60 in LED Display
828 O.A.

as required. model TBD CULTURAL DISTRICT, SAADIYAT ISLAND

SECTOR NO. PLOT NO.

SDN1 P7
60 in LED Displays 60 in LED Displays
To be attached to back wall with Brack- To be attached to back wall with
PROJECT DESCRIPTION
et, as required. Bracket, as required.
MODERN AND CONTEMPORARY ART
12 MUSEUM
TYPICAL

FRONT VIEW SECTION A

DRAWING TITLE

SIGN D4
EVENT DISPLAY @
INFORMATION DESK

DRAWING NUMBER REVISION NO.

G5-137 C01
DATE SCALE

PROTOTYPE 1:100
Fabricator to provide LED display prototype.

PROJECT ID PLAN ID

-All signs to be free from residues 24101


-All metal edges are to be clear of burns and smooth
-Fabricator to verify all site conditions prior to production and to coordinate
with Architect and /or General Contractor as required. OFFICIAL USE ONLY:

For exact sign graphic elements and text messaging (by location), refer to OFFICIAL USE ONLY:
the specific ‘Sign Drawings’ and ‘Sign Message Schedule’
Unless otherwise noted:
-All lighting effects to be consistent with no hot-spots and/or no shadows to
be cast
-All power cables to be concealed, where applicable.

SIGN TYPE D4 EVENT DISPLAY @ INFORMATION DESK DETAILS SCALE VARIES SIGN TYPE A5.4 CHECK ROOM ID DETAILS SCALE 1:10
KEY PLAN

GENERAL NOTES

440 O.A. 200

‫اﻟﻔﻦ ﺑﻌﺪ اﻟﻤﺪرﺳﺔ‬

368 O.A.
ART AFTER SCHOOL

4:00–6:15 PM
‫ورﺷﺔ‬
workshop

C01 ISSUE FOR CONSTRUCTION UPDATE - IFC 2 03-21-22


- ISSUE FOR CONSTRUCTION 12-11-20
- ISSUE FOR TENDER - ADDENDUM 01 06-12-20

1325 F.F.
NO. ISSUE DESCRIPTION DATE

PROJECT OWNER

DEPARTMENT OF CULTURE
AND TOURISM

PROJECT MANAGER

TURNER CONSTRUCTION
- INTERNATIONAL LLC
P.O. BOX 890, ABU DHABI, UAE
TEL: +971 2 6500 888

SIGN TYPE D6 STUDIO LAB MONITOR ELEVATION SCALE 1:20


CONSULTANTS

GEHRY PARTNERS, LLP.


ARCHITECT
12541 BEATRICE STREET LOS ANGELES, CALIFORNIA 90066 USA
TEL: 310-482-3000

ARUP
ENGINEER
900 WILSHIRE BLVD., 19TH FLOOR LOS ANGELES, CALIFORNIA 90017 USA
TEL: 310-578-4400

CONSULTANT-OF-RECORD

ARUP GULF LTD


12TH FLOOR,
ABU DHABI UNIVERSITY TOWER,
AL MUROOR STREET,
PO BOX 78907,
ABU DHABI, UNITED ARAB EMIRATES

PROJECT NAME

440 O.A. GUGGENHEIM ABU DHABI

28 384 28
ZONE
(Screen Active Area)
CULTURAL DISTRICT, SAADIYAT ISLAND
28

SECTOR NO. PLOT NO.

SDN1 P7
3mm Low Iron Glass panel with
opaque back painted border to be PROJECT DESCRIPTION

‫اﻟﻔﻦ ﺑﻌﺪ اﻟﻤﺪرﺳﺔ‬


secured to monitor frame using
VHB Film. MODERN AND CONTEMPORARY ART
MUSEUM

VESA surface mounted monitor wall

ART AFTER SCHOOL


bracket.
312 (Screen Active Area)

DRAWING TITLE
368 O.A.

SIGN D6
4:00–6:15 PM STUDIO LAB DISPLAY

‫ورﺷﺔ‬ 19” multi sync monitor with integrated


PC card controller.
DRAWING NUMBER

G5-140
REVISION NO.

C01
workshop All power and data connections to be
located behind monitor with no exposed
connections. PROTOTYPE
DATE SCALE

1:100
Fabricator to provide full size prototype.

PROJECT ID PLAN ID

-All signs to be free from residues 24101


-All metal edges are to be clear of burns and smooth
28

-Fabricator to verify all site conditions prior to production and to coordinate


with Architect and /or General Contractor as required. OFFICIAL USE ONLY:

For exact sign graphic elements and text messaging (by location), refer to OFFICIAL USE ONLY:
FRONT VIEW SIDE VIEW the specific ‘Sign Drawings’ and ‘Sign Message Schedule’
Unless otherwise noted:
-All lighting effects to be consistent with no hot-spots and/or no shadows to
be cast
-All power cables to be concealed, where applicable.

SIGN TYPE D6 STUDIO LAB MONITOR DETAILS SCALE 1:2


15. Sustainability Material
Submittal Questionnaire

Display Items (Screens & Tablets)


Wayfinding & Signage Works
GUGGENHEIM ABU DHABI MUSEUM PROJECT – MAIN WORKS
SUSTAINABILITY MATERIAL SUBMITTAL QUESTIONNAIRE

Please complete this questionnaire for each product (signed & stamped), along with supporting documents listed in Section
D of this Questionnaire.
This questionnaire has been developed to ensure that proposed materials comply with the requirements of:
1. Project Sustainability Specifications
2. Estidama Pearl Building Rating Systems (PBRS) v1.0
NOTE THAT INCOMPLETE OR INCORRECTLY FILLED QUESTIONNAIRE AND NOT ATTACHING THE RELEVANT SUPPORTING DOCUMENTS, AS REQUESTED, WILL
RESULT IN REJECTION OF THE MATERIAL SUBMITTAL.
A. GENERAL INFORMATION
Material Description: Digital Screens / Display
Manufacturer name and location(s): LG – Korea and LAMP China

Supplier name and location(s): Worldwide Digital FZE,Sharjah , UAE


B. ESTIDAMA CREDIT APPLICABILITY THIS SECTION IS TO BE FILLED BY STJV’S PQP ONLY.
Applicability of the targeted Estidama Applicable ☐ See detailed credit applicability below.
Credits/requirements for the material
proposed. Not Applicable ☐ Remarks:

Detailed Credit Applicability


Credit Ref. Credit Title Applicable Remarks
NS Natural Systems
NS-3 Ecological Enhancement ☐
LBo & LBi Livable Buildings: Outdoors & Indoors
LBo-R3 Outdoor Thermal Comfort Strategy ☐
LBo-8 Preferred Car Parking Spaces ☐
LBi-R1 Healthy Ventilation Delivery ☐
LBi-R2 Smoking Control ☐
LBi-R3 Legionella Prevention ☐
LBi-1 Ventilation Quality ☐
LBi-2.1 Materials Emissions: Adhesives & Sealants ☐
LBi-2.2 Materials Emissions: Paints & Coatings ☐
LBi-2.3 Materials Emissions: Carpet & Hard Flooring ☐
LBi-2.4 Materials Emissions: Ceiling Systems ☐
LBi-2.5 Materials Emissions: Formaldehyde Reduction ☐
LBi-5.2 Thermal Comfort & Controls: Occupant Control ☐
LBi-6 High Frequency Lighting ☐
PW Precious Water
PW-R1 Minimum Interior Water Use Reduction ☐
PW-R2 Exterior Water Monitoring ☐
PW-1 Improved Interior Water Use Reduction ☐
PW-2.1 Exterior Water Use Reduction: Landscaping ☐
PW-3 Water Monitoring & Leak Detection ☐
RE Resourceful Energy
RE-R1 Minimum Energy Performance ☐
RE-R2 Energy Monitoring & Reporting ☐
RE-R3 Ozone Impacts of Refrigerants & Fire Suppression Systems ☐
RE-1 Improved Energy Performance ☐
RE-3 Energy Efficient Appliances ☐
RE-4 Vertical Transportation ☐
RE-7 Global Warming Impacts of Refrigerants & Fire Suppression Systems ☐
SM Stewarding Materials
SM-R1 Hazardous Materials Elimination ☐
SM-R3 Basic Operational Waste Management ☐
SM-1 Non-Polluting Materials ☐
SM-9 Regional Materials ☐
SM-10 Recycled Materials ☐
SM-12 Reused or Certified Timber ☐

Doc. No: GAD-STJV-FOR-HSE-000001 Rev. 03 Date: 05/10/2022 Page 1 of 19


GUGGENHEIM ABU DHABI MUSEUM PROJECT – MAIN WORKS
SUSTAINABILITY MATERIAL SUBMITTAL QUESTIONNAIRE

C. DOCUMENTATION CHECKLIST TO BE FILLED BY THE MATERIAL SUBMITTER/VENDOR/SUPPLIER/MANUFACTURER

Document
Credit Required Documents Attached
Applicable Materials Remarks
Ref. (To be attached along with this questionnaire)
Yes No NA

All Materials SM-R1 Manufacturer’s letter confirming No asbestos content. X

For composite materials, weighted average distance


calculation
All materials except
Country of Origin certificate
Concrete, Steel
SM-9
(Reinforcement,
Trade License copy X
Structural)
Manufacturer’s letter confirming material origin and the
X
manufacturing location.
Note for Structural Steel/Reinforcement Steel:
1. To be MANDATORILY manufactured within 500KM of the Project Location.
2. Structural steel to MANDATORILY have Min. 25% Post – consumer recycled content or to have CARES sustainable
certification.
3. Reinforcement steel to MANDATORILY have Min.90% Post – consumer recycled content or to have CARES
sustainable certification.

Country of Origin certificate


Structural
Steel/Reinforcement SM-9 Trade License copy
Steel Manufacturer’s letter confirming material origin and the
manufacturing location.
Provide CARES Sustainability Certification (Appendix 05-
structural steel or Appendix 01-reinforcement bars).
SM-10 An attested certificate from appropriately qualified 3rd party or
manufacture declaration attested by 3rd party, stating the % of
post-consumer recycled content.
Note for Concrete & Precast Concrete Items:
1. To be MANDATORILY manufactured within 500KM of the Project Location.
2. Cast In-Situ Concrete Mixes proposed should Mandatorily achieve Min. 2 credit points, when cumulatively listed in
the Estidama Concrete GHG Calculator.

Country of Origin certificate


Concrete & Precast Trade License copy
Concrete Items SM-9
Manufacturer’s letter confirming material origin and the
manufacturing location.

Mix design component sheet.


SM-10
Cumulative GHG calculator with all proposed mixes

Third Party Test Certificate for Thermal Conductivity of (W/mk)

Elemental U-value calculation with sectional details


Envelope – External
walls block, insulation, RE-R1 Area weighted Average U-Value Calculation
Roofing, Glazing & & RE-1
Thermal Conductivity – Elemental (W/mk) W/mk
Cladding.
Area weighted Average U-Value Wall /Roof/Glazing/skylight W/m2K

Solar Heat Gain Coefficient SHGC -Glazing/skylight

Doc. No: GAD-STJV-FOR-HSE-000001 Rev. 03 Date: 05/10/2022 Page 2 of 19


16. Supporting documents
for Estidama Compliance

Display Items (Screens & Tablets)


Wayfinding & Signage Works
17. VOC Content

Display Items (Screens & Tablets)


Wayfinding & Signage Works
18. Recycled Content

Display Items (Screens & Tablets)


Wayfinding & Signage Works
19. List of Jobs supplied in
the past & previous
approvals
Display Items (Screens & Tablets)
Wayfinding & Signage Works
LIST OF MAJOR PROJECTS

Sl No. SCOPE OF WORKS PROJECT

1 Outdoor P4 LED screens Dubai Shopping Festival

2 Indoor P2.5 and LCD 55 Screens Ethiopia Telecom

3 Indoor P2.5 LED Screen Jashanmal stores

4 Indoor P1.8 LED Screen Jumbo stores

5 Indoor P2.5 LED Screen PEPSICO


20. Photos of previous
projects

Display Items (Screens & Tablets)


Wayfinding & Signage Works
Solution for Growing Business

WORLDWIDE DIGITAL FZE


T : +971 6 5565185 | F: +971 6 5574296, www.worldwidedg.com | info@worldwidedg.com
INDOOR P2.5 LED SCREEN

CLIENT

Indoor P2.5
42 Square Meter
Mall of Emirates
INDOOR P2 & P2.5 LED SCREEN

CLIENT

Indoor P2 & P2.5


100 + Screens
150 Square Meter
Installed in Multi Locations
INDOOR P2.5 LED SCREEN

CLIENT

Indoor P2.5
125 Square Meter
Installed in Multi Locations
INDOOR P2.5 LED SCREEN

CLIENT

Indoor P2.5
07 Square Meter
Installed in Dubai Mall
INDOOR P1.8 LED SCREEN

CLIENT

Indoor P2.5
12 Square Meter
Installed in Burj Al Arab
INDOOR LED SCREEN

Indoor P1.8 Indoor P2.5


6.2 Square Meter GARAGE 6.7 Square Meter
D3 - Dubai CAFE Oud Mehta

Indoor Video Wall


Indoor P2.5 55” - 2x2
5.0 Square Meter Dubai Science Park
Mirdif City Center
INDOOR LED SCREEN

Indoor P2.5 Indoor P2.5


2.5 Square Meter 3.0 Square Meter
Dubai Festival City Different Locations

55” , 65” , 75”, 85”


55” , 65 “, 75” & 85 Dubai Festival City
IBN Battuta
INDOOR LED SCREEN

Indoor P3.0 Indoor P2.5


8.5 Square Meter 13 Square Meter
Yas Mall Abudhabi Yas Mall Abudhabi

Indoor P2.5
Indoor P2.5 Flexible 9.0 Square Meter
5.1 Square Meter DWTC
Manara Mall RAK
Solution for Growing Business
21. Accreditation Certificates

Display Items (Screens & Tablets)


Wayfinding & Signage Works
22. Physical Samples

Display Items (Screens & Tablets)


Wayfinding & Signage Works
23. VE List

Display Items (Screens & Tablets)


Wayfinding & Signage Works

You might also like