Kadar Alir Gerik - (A) (Rev)
Kadar Alir Gerik - (A) (Rev)
Project CADANGAN MEMBINA SEBUAH STESEN MINYAK DI ATAS LOT NO. 12382 MUKIM Design
ABS Civil
GERIK DAERAH HULU PERAK, GERIK, PERAK DARUL RIDZUAN. Date Jun-10
Consultant
Page 1
Ref Calculation Remarks
Catchment Information
Catchment : A
Catchment Area : 0.1106 ha @ 0.27 ekar @ 1106 m2
State : PERAK
Location : GERIK
Status : Pre-Development
ARI a b c d
2 4.2114 0.9483 -0.3154 0.0179
5 4.7986 0.5803 -0.2202 0.0107
10 5.3916 0.2993 -0.1640 0.0071
20 5.7854 0.1175 -0.1244 0.0044
50 6.5736 -0.2903 -0.0482 0.00002
100 6.0681 0.1478 -0.1435 0.0065
1/10 1/5
eq.14.6 For natural catchment, tc = FcL/A S min
Conversion factor Fc = 92.5
Length of flow path L = 0.067 km
Length of top cacthment to main drainage Ls = 0.041 km
Catchment area A = 0.1106 ha
Slope of stream flow path S = 25 m/km
2 3
eq.13.2 ln( R I t ) = a + b ln (t) + c (ln(t) ) + d (ln(t) )
eq.13.3 P 4.06 = P 30 - FD ( P 60 - P 30 )
Note:
CATEGORY D - Medium Soil- Forest
Worksheet Stormwater Drainage Design For Small Catchment Check
Project CADANGAN MEMBINA SEBUAH STESEN MINYAK DI ATAS LOT NO. 12382 MUKIM Design
ABS Civil
GERIK DAERAH HULU PERAK, GERIK, PERAK DARUL RIDZUAN. Date Jun-10
Consultant
Page 2
Ref Calculation Remarks
Catchment Information
Sub-catchment : A
Catchment Area : 0.1106 ha @ 0.27 Ekar @ 1106 m2
State : PERAK
Location : GERIK
Status : Post-Dvelopment
ARI a b c d
2 4.2114 0.9483 -0.3154 0.0179
5 4.7986 0.5803 -0.2202 0.0107
10 5.3916 0.2993 -0.1640 0.0071
20 5.7854 0.1175 -0.1244 0.0044
50 6.5736 -0.2903 -0.0482 0.00002
100 6.0681 0.1478 -0.1435 0.0065
1/3 1/2
eq.14.1 Overland flow time to = 107nL / S min
Manning's roughness co. n = 0.015
Length of flow path L = 29 m
Slope of overland surface S = 2.5 %
Overland flow time to = 3.1 min
2 3
eq.13.2 ln( R I t ) = a + b ln (t) + c (ln(t) ) + d (ln(t) )
eq.13.3 P 4 = P 30 - FD ( P 60 - P 30 )
CATEGORY 5 -
Bare loam, suburban resedential with garden)
Worksheet Stormwater Drainage Design For Small Catchment Check
ABS Civil Project CADANGAN MEMBINA SEBUAH STESEN MINYAK DI ATAS LOT NO. 12382 MUKIM Design
Consultant GERIK DAERAH HULU PERAK, GERIK, PERAK DARUL RIDZUAN. Date Jun-10
Page 3
Ref Calculation Remarks
ARI Qa Qp a b PSD
(years) (l/s) (l/s) (l/s)
2 77.8 81.5 728.9 54152 84.0
Determination Of Site Storage Requirement (SSR) - (For Below-Ground Storage)
eq. 19.2
eq. 19.2a SSR = 0.06td (Qd-c-d)
eq. 19.2b c = 0.675 PSD (1-0.392PSD/Qd)
d = 0.117 PSD2/Qd
For ARI
50 years
td Qd PSD c d SSR
(min) (l/s) (l/s) (m3)
5 108.5 84.0 39.5 7.601 18.428
10 76.4 84.0 32.3 10.793 20.021
15 60.2 84.0 25.7 13.708 18.712
20 49.7 84.0 19.2 16.582 16.784
25 41.3 84.0 11.5 19.963 14.741
3
From calculation, the storage capacity required is 20.021 m .
Worksheet Stormwater Drainage Design For Small Catchment Check
ABS Civil Project CADANGAN MEMBINA SEBUAH STESEN MINYAK DI ATAS LOT NO. 12382 MUKIM Design
Consultant GERIK DAERAH HULU PERAK, GERIK, PERAK DARUL RIDZUAN. Date Jun-10
Page 4
Ref Calculation Remarks
ARI Design for below ground storage = 50 years ARI for SSR
a) The required volume for the total storage is 20.021 m3 , 50 years ARI for SSR
occur at 10 min
Therefore, size of below of ground storage tank = 1.2 m (Width) x 1.2 m (High) x
14.0 m(Length)
Worksheet Stormwater Drainage Design For Small Catchment Check
ABS Civil Project CADANGAN MEMBINA SEBUAH STESEN MINYAK DI ATAS LOT NO. 12382 Design
Consultant MUKIM GERIK DAERAH HULU PERAK, GERIK, PERAK DARUL RIDZUAN. Date Jun-10
Page 5
Ref Calculation Remarks
Ao = Q / (Cd (2gHo)1/2)
And
Q = PSD ( 2 years ARI) = 83.96 L/S
Cd = 0.62
therefore,
(1/2)
Ao = ( 0.08396 ) / ( 0.62 ( 2 ( 9.81 ) ( 0.6 )) )
= 0.0395 m2
Therefore,
--------------------------- ok
Worksheet Stormwater Drainage Design For Small Catchment Check
ABS Civil Project CADANGAN MEMBINA SEBUAH STESEN MINYAK DI ATAS LOT NO. 12382 Design
Consultant MUKIM GERIK DAERAH HULU PERAK, GERIK, PERAK DARUL RIDZUAN. Date Jun-10
Page 6
Ref Calculation Remarks
The secondary outlet is a broad-cested weir slotted into the retaining wall along the front boundary.
The weir should be sized for the estimated major system ARI flow from the site for
the time t cs ( 10 minutes). The major Drainage system in the catchment has been
designed for 50 year ARI.
50
P 10 = 20.02 m3
50 50
I 10 = P 10 = 20.02 = 120.124 mm/hr
d ( 10 / 60 )
using the rational method, the major system flow is calculated as follows:
Assuming the head over the weir is limited to 100 mm and CBCW = 1.70 ,
B = Qd = 24.2 = 0.450 m
1.5 1.5
CBCW H 1.70 x 0.1
Allowing 100 mm freeboard, the dimensions of the secondary outlet weir are:
450 mm
100 mm
Worksheet Stormwater Drainage Design For Small Catchment Check
ABS Civil Project CADANGAN MEMBINA SEBUAH STESEN MINYAK DI ATAS LOT NO. 12382 Design
Consultant MUKIM GERIK DAERAH HULU PERAK, GERIK, PERAK DARUL RIDZUAN. Date Jun-10
Page 7
Ref Calculation Remarks
Conclusion
From the calculation as shown above, we need to provide 14 Units of Box Culvert for below ground
storage. The Below Ground storage as shown below :-