Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 9

Which of the following reports are related to reviews in veloci-q?

CLEAR SELECTION

a. Review

b. Defect Prevention Report

c. Release Review Summary

d. All of the above

The role of the Author in a review is


CLEAR SELECTION

a. Provides an overview of the artifact to be reviewed during the kick-off meeting

b. Classify defects

c. Provide clarification

d. To moderate the review meeting

A visual examination of a work product to detect and identify anomalies or defects including errors
and deviations from standards is
CLEAR SELECTION

a. Walkthrough

b. Testing

c. Inspection

d. None of the above

In a table review, who paraphrases the code/document?


CLEAR SELECTION

a. Reader
b. Author

c. Review Leader

d. Recorder

Which of the following could be a criteria to stop review?


CLEAR SELECTION

a. Reviewers decide that there is no need for another review

b. Defects are rectified and verified by review team leader

c. Too many errors are found in the review

d. All of the above

Sometimes a need may arise for an external review of a work product. Which of the
following needs will prompt you to go for ERT?
CLEAR SELECTION

a. Domain Content

b. Technical Content

c. Cosmetic Content

d. All of the above

In a table review, who records the defects and classifies errors?


CLEAR SELECTION

a. Review Leader

b. Reader
c. Author

d. Recorder

The role of the Author in a review is


CLEAR SELECTION

a. Provides an overview of the artifact to be reviewed during the kick-off meeting

b. Classify defects

c. Provide clarification

d. To moderate the review meeting

Review is a formal evaluation technique in which requirements, design and code is


examined in detail by groups of persons other than the author to detect faults, violations
of development standards and other problems. The definition of reviews is by:
CLEAR SELECTION

a. IEEE

b. Roger Pressman

c. SEI

d. None of the above

23. Which of the following is the most important criteria to start review of work item:
CLEAR SELECTION

a. Sign off by customer

b. Approved by Project Manager

c. Check whether estimations of review is available


d. Check for completeness of work item to be reviewed

Mike Fagan of IBM published a paper in 1976, describing a method called --- for
formalizing the review process
CLEAR SELECTION

a. Peer Review

b. Table Review

c. Online Review

d. Pair Review

Which of the following procedures are related to reviews in veloci-q?


CLEAR SELECTION

a. Proposal/Contract review

b. Release Review

c. Review

d. All of the above

--- refers to 'Is the product that is developed is right or not'?


CLEAR SELECTION

a. Review

b. Validation

c. Testing

d. Verification
Which of the following is not a document defect type:
CLEAR SELECTION

a. Cosmetic

b. Violation of standards

c. Lack of clarity

d. Performance

--- refers to 'Are we building the product RIGHT'?


CLEAR SELECTION

a. Review

b. Validation

c. Testing

d. Verification

An informal meeting for evaluation or information purposes is:


CLEAR SELECTION

a. Walkthrough

b. Testing

c. Inspection

d. None of the above


The basic building block in any phase of SDLC which forms the core of Wipro's
Reviews and Testing Process is called the
CLEAR SELECTION

a. Verification and validation techniques

b. ETVX model

c. Peer review

d. All of the above

Importance of Reviews suggests:


CLEAR SELECTION

a. Emphasis on quality throughout development

b. Early detection of defects

c. Both (a.) and (b.)

d. None of the above

The role of the Review Team Leader is


CLEAR SELECTION

a. Provides an overview of the artifact to be reviewed during the kick-off meeting

b. Classify defects

c. Provide clarification

d. To moderate the review meeting

Which of the following checklists is related to reviews in veloci-q?


CLEAR SELECTION
a. Test Plan/ Testcase Development Review

b. Transition Review

c. Code Review

d. All of the above

In a table review, Author cannot play the following roles


CLEAR SELECTION

a. Reader, Recorder or Review Team Member

b. Reader, Recorder or Review Team Leader

c. Review Team Member, Recorder or Review Team Leader

d. Recorder or Review Team Member

In a review process, who moderates the review sessions?


CLEAR SELECTION

a. Author

b. Reviewer

c. Review Leader

d. Recorder

Which of the following are objectives of a review?


CLEAR SELECTION

a. Verifying that specifications are met

b. Collecting data for improvement


c. Identifying deviations from the standards and specifications

d. All of the above

Which of the following review types is used for building code or documents by
discussing with the members of the development team and improving the work item:
CLEAR SELECTION

a. Table Review

b. Peer Review

c. Inspection

d. Walk Through

The outputs of review meeting are:


CLEAR SELECTION

a. Defect Log

b. Review Task List

c. Review Meeting Minutes

d. All of the above

The inputs to planning stage in a review process are:


CLEAR SELECTION

a. Problem definition

b. List of roles

c. Review process map


d. None of the above

Challenges for reviews and testing are:


CLEAR SELECTION

a. Lack of domain expertise

b. Monotony of the job and coping with requirements changes

c. Both (a.) and (b.)

d. None of the above

You might also like