TEST SHEET ID: ATTENDEES:

To verify the continuity and the


TEST TITLE: Power Cable Test Record PURPOSE OF THE TEST: insulation resistant of the power and
earthing cables.

TEST DATE: TEST TIME:

TEST PHASE: Cable test after HPC charger housing and the mast installation, and before the first commissioning. To test
power cable continuity and insulation resistance, making sure the system is safe before energization.

LOCATION OF TEST: GMI Facility SITE CONDITION:

TEST INSTRUMENTS:

Digital Multi Function Tester:

Insulation Resistance Tester:

Phase Rotation Tester:

CABLE TESTING RECORD

Cable ID Insulation Continuity Comments/Remark


Resistance Resistance
(MΩ) (Ω)
Utility Incomer L1 + L2
Utility Incomer L2 + L3
Utility Incomer L3 + L1
Utility Incomer L1 + N
Utility Incomer L2 + N
Utility Incomer L3 + N
Utility Incomer L1 + PE
Utility Incomer L2 + PE
Utility Incomer L3 + PE
Utility Incomer N + PE

WD20 + WD21 WD20 is DC+, WD21 is DC-, WE30 is PE.


WD20 + WE30
WD21 + WE30

WD34-1 + WD34-2 WD34 is for 230VAC Pantograph, 3 core cable.


WD34-1 + WD34-PE
WD34-2 + WD34-PE

WD35-1 + WD35-2 WD35 is for 230VAC Mast electrical outlet, 3


core cable.
WD35-1 + WD35-PE
WD35-2 + WD35-PE

713162985.docx1
Test Performed by Registered Electrical
Worker number
Signature Date

Test Witnessed by Test Witnessed by


Company Company
Signature Signature
Date Date
COMMENTS:

TEST RESULT: [ ] PASSED [ ] PASSED WITH COMMENTS [ ] FAILED

REMEDIAL WORK:

Test Approved by Company


Signature Date

713162985.docx1

You might also like