POND ASH
POND ASH 835+307 835+542 136 MCW RHS cum 0.235 14.70 0.50 2 150 300
POND ASH 832+030 832+470 136 MCW LHS cum 0.44 14.70 1.00 6 150 900
Total 0.675 8 1,200
Embankment
Embankment 819+250 BubBay cum 0.12 7.00 0.25 0 257 54
Embankment 821+500 BubBay cum 0.12 7.00 0.25 0 257 54
Embankment 835+870 835+986 38 ACW LHS cum 0.116 6.00 1.00 1 257 257
Embankment 836+002 836+185 38 ACW LHS cum 0.183 6.00 0.20 - 257 -
Embankment 836+050 836+110 38 ACW RHS cum 0.06 6.00 0.40 - 257 -
Embankment 837+700 837+790 136 ACW LHS cum 0.09 9.00 0.50 - 257 -
PQC
+829 200 8.00 0.310 496 6777 3,361,392
Total 0
HYSD in R/W
MT 60.0 5 72000 345,600
Total 5 6,886,416
Misc. Work
Stone Pitching, Work under PUP/VUP, Junction etc. 1 6000000 6,000,000
Structure Work
Friction Slab Rmt. 235 20100 4,723,500
Aproach Slab
PCC 835,300 VUP 136 MCW LHS Cum 15 3.3 0.10 10 4,768 47,203
PCC 835,300 VUP 136 MCW RHS Cum 15 3.3 0.10 10 4,768 47,203
RCC 835,300 VUP 136 MCW LHS Cum 1 15 3.5 0.30 32 9,203 289,895
RCC 835,300 VUP 136 MCW RHS Cum 1 15 3.5 0.30 32 9,203 289,895
674,195
Structure Work
Girder 836,002 MNB 136 RHS Cum 6 133 0.5 1.50 600 9,290 5,576,453
Slab 836,002 MNB 136 RHS Cum 1 23 9.1 0.25 51 9,290 474,225
PCC 829,216 PUP 136 MCW RHS Cum 12 11.6 0.10 14 4,768 65,264
Raft 829,216 PUP 136 MCW RHS Cum 1 12 11.4 0.75 101 5,840 589,198
Wall 829,216 PUP 136 MCW RHS Cum 2 12 0.7 2.00 17 7,806 128,955
HYSD MT 63 72000 4,506,675
Total 11,340,770
Total wt.
NB(mm) Thickness Wt(kg/m) 5.0
(Kg)
5.0
65.0 3.2 5.8 144.0 144.0 Present at Site
65.0 3.6 6.4 161.0 161.0
65.0 4.5 8.0 198.8 198.8
65.0 4.8 8.4 211.0 211.0
Weight of Pipe per Canopy.- 613.8 Kg
Corrugated GI Sheet 28.22 Sqm