The document provides cost estimates for replanting and maintaining plants and shrubs along a road project in Varanasi Aurangabad. It gives unit costs for uprooting, transporting, replanting and maintaining individual plants. It also provides estimated costs for planting and maintaining different sizes of flowering plants and shrubs along 1 km stretches of road, including costs for labor, materials, machinery and contractor fees. The estimated total cost for planting and 1 year of maintenance along 1 km is around Rs. 295,000 for large plants, Rs. 300,000 for medium plants and Rs. 306,000 for small plants.
The document provides cost estimates for replanting and maintaining plants and shrubs along a road project in Varanasi Aurangabad. It gives unit costs for uprooting, transporting, replanting and maintaining individual plants. It also provides estimated costs for planting and maintaining different sizes of flowering plants and shrubs along 1 km stretches of road, including costs for labor, materials, machinery and contractor fees. The estimated total cost for planting and 1 year of maintenance along 1 km is around Rs. 295,000 for large plants, Rs. 300,000 for medium plants and Rs. 306,000 for small plants.
The document provides cost estimates for replanting and maintaining plants and shrubs along a road project in Varanasi Aurangabad. It gives unit costs for uprooting, transporting, replanting and maintaining individual plants. It also provides estimated costs for planting and maintaining different sizes of flowering plants and shrubs along 1 km stretches of road, including costs for labor, materials, machinery and contractor fees. The estimated total cost for planting and 1 year of maintenance along 1 km is around Rs. 295,000 for large plants, Rs. 300,000 for medium plants and Rs. 306,000 for small plants.
The document provides cost estimates for replanting and maintaining plants and shrubs along a road project in Varanasi Aurangabad. It gives unit costs for uprooting, transporting, replanting and maintaining individual plants. It also provides estimated costs for planting and maintaining different sizes of flowering plants and shrubs along 1 km stretches of road, including costs for labor, materials, machinery and contractor fees. The estimated total cost for planting and 1 year of maintenance along 1 km is around Rs. 295,000 for large plants, Rs. 300,000 for medium plants and Rs. 306,000 for small plants.
Uprooting Per No. 70 Transpotation, packing of plants in polybags, loading and unloading Per No. 80 Replantation Per No. 50 1 week maintenance Per No. 130 Cost of Uprooting and replanting 1 plant Per No. 330 Cost of Uprooting and replanting 5000 plant 1,650,000.00
In case of New Plantation Unit Rate
Plantation of 1 plant Per No. 48 Maintenace of 1 Week Per No. 130 Total Per No. 178 Cost for 5000 nos 890,832 Quantity as per project Description Unit Large Medium Small Planting flowering plants and shrubs in central verge 200 plants and 800 shrubs in two rows in one km length of road where width of verge is 3m and above unit=Running metre Taking output =1000 metres a. labour Mate day 0.48 0.48 0.48 Mazdoor day 12 12 12 b. Machinery Water Tanker 6 KL capacity hour 6 6 6 c. Material Plants each 200 200 200 Shrubs each 800 800 800 Manure sludge / Farm Yard manure Cum 63.64 63.64 63.64 Pesticide Kg 0.5 0.5 0.5 Cost of Water KL 36 36 36 d. Overhead Charges @ on (a+b+c) 8% 10% 12% e. Contractor Profit @ on (a+b+c+d) 10% 10% 10% Rate per km f =(a+b+c+d+e) Rate per plant (f/nos)
Quantity as per project
Description Unit Large Medium Small Maintenance of flowering plants and shrubs in central verge for 1 year unit=Running metre Taking output =one Km a. labour Mate day 14.6 14.6 14.6 Mazdoor day 365 365 365 b. Machinery Water Tanker 6 KL capacity hour 90 90 90 c. Material Manure sludge / Farm Yard manure Cum 10 10 10 Cost of Water KL 180 180 180 Replacement of casualiaties @10% Plants each 20 20 20 Shrubs each 80 80 80 Pesticide Kg 1.5 1.5 1.5 d. Overhead Charges @ on (a+b+c) 8% 10% 12% e. Contractor Profit @ on (a+b+c+d) 10% 10% 10% Rate per km f =(a+b+c+d+e) Rate per plant (f/nos) Amount Rate Large Medium Small