Professional Documents
Culture Documents
Frames Finalized Section A-A+ Elevation
Frames Finalized Section A-A+ Elevation
-
FACULTY OF ENGINEERING
---
DEPARTMENT OF ARCHITECTURE
ARC 251 - Building (3)
1 2 3 4 5 6 7 8 9 10 11 FALL 2023
10.29 L6 L6 10.29
N
0.50
0.50
1.00
1.00
9.79 R.F.F.L R.F.F.L 9.79
1.45
1.45
8.34 Bottom of Beam Bottom of Beam 8.34
GENERAL NOTES:
4.14
4.14
10.29
10.29
8.84
9.29
3.75
3.75
0.45 G.F.F.L
G.F.F.L 0.45
0.45
0.45
0.45
0.00 ±0.00 ±0.00 0.00
-
---
Skirting 20cm
Southern Elevation G C
Screed 5cm
3
Sand 6cm
A
DPC 2cm Lightweight Foam Cellular
H - Concrete 7cm B
Lightweight Foam Cellular
---
Concrete 7cm Heat Insulation 5cm
10.29 L6 L6 10.29
0.50
0.50
9.79
9.79 R.F.F.L R.F.F.L 9.79
1.45
1.45
9.25
1.45
Tension Post 25x25cm
Tension Post 25x25cm
5.05
Ceramic Tiles 2cm
4.14
4.14
Cement Mortar
3.60
Sand 6cm
2cm
RC Slab 25cm
PROJECT NAME
10.29
10.29
3.75
3.75
1.91
Youssef Ehab Hosny 2100987
3.40
3.40
Epoxy 5mm
Ceramic Tiles 2cm
Slab on Grade 15cm
Screed 3cm Cement Mortar
DPC 2cm 2cm
Sand 6cm
Screed 2cm Screed 5cm
0.45 G.F.F.L DPC 2cm
OC 10cm
OC 15cm G.F.F.L 0.45
Compacted Soil
0.45
0.45
0.45
SHEET NAME
-
---
South Elevation, Section A-A
Section A - A
1 1 : 50
SCALE As DATE 28/11/2023
indicated
SHEET NUMBER A201