Professional Documents
Culture Documents
CGNT-209 Manual
CGNT-209 Manual
CGNT-209 Manual
the consequences.
1
Operation Manual
2
Productivity 40,000 capsules/hour
and humidity
1 #: 43000 capsules
2 #: 43000 capsules
3
The utility model discloses a double-head spreading
the operating table, long blocks are welded on the tops of the
4
5
1.Double-head spreading capsule device comprises an
fixed on the top of the operating table (2), and long blocks (7)
block (8) is welded at the top of the long block (7) near one
that top end of the long hole (11) for convey capsules is
surface wall of the round hole (29), And one end of the
6
hole (29), One end of the compression spring (28) is fixed
bottom of the reed frame (25), And one end of the clamping
reed (26) extends to the inside of the long hole (11) for
welded with fixing blocks (14) near the edges of both sides,
and the four fixing blocks (14) are arranged in total and
(10), and the two fixing plates (13) are welded with each
other.
7
push rod (15) is installed at the bottom center of the
blocks (7), and the tops of the two long blocks (7) are each
push rod (21) is welded with a second long plate (23), the
8
the balloon pressing groove (6).
bottom of the operating table (2), and the top of the motor (1)
fixed disc (18) is welded on the top of the rotating shaft, and
(18).
is placed on the top of the fixed disc (18), and the top of the
with an engaging hole (20), and the inner surface wall of the
9
Double head spreading capsule device
Technical field
device.
Background technique
10
greatly reduce the efficiency of the capsule during use,
capsule.
fixed with two bases, the top of the two bases are welded
with a support block near the edge of one side, the top of
11
material frame is fixed on the part, and a plurality of
12
is divided into two groups. A horizontal plate is welded
there are two fixing plates, and the two fixing plates are
plates.
13
electric push rod.
compression groove.
14
The utility model provides a double head sowing
transport the capsule from the inside of the long hole of the
clamping spring, so that the capsule enters into the inner part
rod is used to start the second electric push rod to push the
push rod is used to start the first electric push rod to press the
capsule groove to make the capsule enter into the inner part
above steps, the capsule can be seeded into the inner part of
15
head method can effectively improve the efficiency of
Material frame; 13. Fixed plate; 14. Fixed block; 15. First
electric push rod; 16. First long plate; 17, Ballast plate; 18.
Fixed Disc; 19, clamping rod; 20, clamping hole; 21, second
16
electric push rod; 22, notch; 23, second long plate; 24, push
capsule plate; 25, reed holder; 26, card Capsule reed; 27,
concrete manifestation
17
technical solution: a double-head spreading capsule device
top of the operating table 2. The base 5 can better fit the long
block 7 The position is fixed. The tops of the two bases 5 are
welded with a long block 7, and the top of the long block 7 is
inside the long conveying block 10. And the top end of the
18
hole 11 of each conveying capsule. The cavity 27 can better
install and fix the internal device. The inner surface wall of
extends to the outside of the round hole 29, one end of the
done here. For more details, the front surface of the long
edges on both sides. There are four fixed blocks 14 and they
19
are divided into two groups. A horizontal plate is welded
9.There are two conveying long blocks 10, and the relative
welded with fixed plates 13, and there are two fixed plates 13
in total, and the two fixed plates 13 are welded with each
other, and the two fixed plates 13 are welded with each other,
push rod 15, The first electric push rod 15 adopts the model
of cla-200 mm. The bottom end of the first electric push rod
15 is welded with a first long plate 16, and the bottom of the
20
pressing the capsules in the capsule pressing groove 6 into
the inside of the capsule groove 4. There are two long blocks
on the top of the two long blocks 7, and the capsules coming
out of the capsule long hole 11 are sent into the interior of
provided with a notch 22. The inner surface wall of one side
21
operation table 2 is equipped with an electric machine 1, the
shaft The top of the rotating shaft is welded with a fixed disc
18, the top of the fixed disc 18 is welded with a clamping rod
22
inside the long hole 11 of the conveying capsule descends,
the reed frame 25 will be rotated and the capsule reed 26 will
the capsule enters the inside of the bag pressing groove 6 and
23
present utility model is not limited to this. Anyone familiar
utility model.
24
Figure 1
25
Figure 2
Figure 3
26
Figure 4
27
The Factory Certificate of Products
CGNT-209
1 Assembly test
2 Running test
3 Performance test
Appearance
4
Inspection
The examiner:
28